SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER

Similar documents
SECTION GYPSUM PLASTER

1. Vinyl wall covering. 2. Woven glass-fiber wall covering. 3. Textile wall covering. 4. Wallpaper. 5. Heavy-duty, synthetic, textile wall covering.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES

Section Plaster Accessories

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 12/12/2018

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture.

c. Oko-Tex (European environmental health standard)

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

EXAMPLE SPECIFICATION ONLY

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

INTERNAL FRAMING PROFILES

DIVISION 10 SPECIALTIES

SECTION 900 TURF ESTABLISHMENT

1. Portable fire extinguishers. 2. Fire-protection cabinets for portable fire extinguishers.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

SPECIAL SPECIFICATION 3687 Impermeable Liner

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

WALLCOVERINGS WALLCOVERINGS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

SECTION FIRE EXTINGUISHER CABINETS

ARCHITECTURAL SPECIFICATIONS

REFRIGERANT PIPING SYSTEM

Innovative Services Give Dayton Contractor A Big Edge

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

Tectum Direct-Attach Ceiling and Wall Panels Assembly and Installation Instructions for 1-Inch Thick Direct-Attach Wall and Ceiling Panels

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SECTION OVERHEAD COILING FIRE DOORS

TECTUM Direct-Attach Ceiling and Wall Panels Assembly and Installation Instructions for 1" Thick Direct-Attach Wall and Ceiling Panels

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following sanitary drainage piping specialties:

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

A. Provide products and workmanship in accordance to: (Where applicable)

FIRE SUPPRESSION SPRINKLER SYSTEM

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

SECTION ELECTRICAL IDENTIFICATION

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Construction Standards Page

Mercy Hospital of Buffalo Catholic Health System 2 nd Floor Patient Holding Center 3 rd Floor Locker Rooms Shaflucas Architects, PC Project No.

E. Luminaire: Complete lighting fixture, including ballast housing if provided.

Product Guide Specification

SECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating.

SECTION FIRE-RATED GLASS AND FRAME

SECTION DOMESTIC WATER HEATERS

INSTALLATION INSTRUCTIONS FOR. ProTek RIGID VINYL WALLCOVERING

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

A U TO S M O K E. Model AUTO SMOKE FIRE SHUT Flat Slats Fire Shut Rolling Doors

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

SECTION (15820) - AIR DUCT ACCESSORIES

CertainTeed. Finishing Products. Eastern Canada

SECTION SODDING

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

TABLE OF CONTENTS DIVISION 21- FIRE SUPPRESSION PAGES SECTION WATER BASED FIRE PROTECTION SYSTEMS... 5

Pedimat Installation Instructions

Product Guide Specification

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

SECTION (09950) - WALL COVERINGS

1 SLABBING, RENDERING, FLOATING AND SKIMMING

Knauf Direct Bonding and Metal Furring

SECTION IDENTIFYING DEVICES

Installation Manual May 9/14 No revision

CableReady

Richmond Hill Primary Renovation SECTION STAGE CURTAINS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

SECTION FAN COIL UNITS

SECTION Overhead Coiling Doors

GSL Artira Inclined Lift Specifications L DS Section

815 NE 172 nd Avenue Vancouver, WA Installation Manual

ARCHITECT'S GUIDE ALL NOISE CONTROL WINDOW HARDWARE

Non Woven Wallcoverings with or without Crystals Installation and Maintenance Guidelines

DIVISION 21 - FIRE SUPPRESSION

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

SECTION SPLIT-SYSTEM AIR-CONDITIONERS

SECTION AIR COILS

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

WARNING. Before installing your siding, inspect the delivered wood. All installed material shall be considered accepted.

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

UMC El Paso Far East Clinic and Neighborhood Healthcare Center West Issue for Construction Page Project No and April 13, 2015

PART 1 GENERAL 1.01 SUMMARY

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

Standard Specification for Hardened Steel Washers [Metric] 1

National Reach. Local Service.

A. Provisions of the General and Supplementary Conditions and Division 01 apply to this section. 1. Steel Shelving, counters, and storage cabinets

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

I-VICFLEX.AB4. Victaulic VicFlex Style AB4 Sprinkler Fitting for Hat Furring Channel Ceiling Systems WARNING INSTALLATION INSTRUCTIONS

I N D U S T R I A L Y A R D S

SECTION AIR DUCT ACCESSORIES

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

SECTION SODDING

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

SECTION RADIANT HEATING UNITS

Transcription:

2004 Specifications CSJ: 0921-02-314 SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER 1.1 DESCRIPTION A. Section Includes 1. This Item shall govern for the installation of lath, stucco and plaster particularly at metal wall flashing locations and interior work plaster reconstruction as indicated on the plan drawings. B. Supply and install all laths and plaster work or plaster work only as shown on drawings and as specified herein. C. Coordination: Work herein requires coordination with trades whose work connects with, is affected, or concealed by lathing and plastering. Before proceeding, make certain all required inspections have been made. D. Inspection: Inspect surfaces to receive lath and plaster before starting work and do not start until surfaces are acceptable. Starting work under this section implies acceptance of surfaces. E. Delivery and Storage: Deliver all manufactured materials in original packages bearing manufacturerʼs name and brand. Use only one brand of each material throughout job. Store materials in dry areas. F. General Requirements: Comply with all applicable requirements of the Texas Bureau of Lathing and Plastering, Inc. Manuel for Lathing and Plastering, and Texas Lathing and Plastering Contractorʼs Association Standards, except where more stringent requirements are called for herein or in local building codes. Do all cutting and patching required to accommodate work of other trades. G. Submittals: Product Data for each product specified and Samples for each type of finish indicated. H. Fire-Test-Response Characteristics: Where indicated, provide materials and construction identical to those tested per ASTM E 119. 1.2 MATERIALS A. Expanded Type, diamond shaped, copper bearing steel, weighing 3.4#/Sq. Yd., galvanized. 1-7 2242

B. Installation: Apply to true surfaces, straight without warps or buckles, long dimension of lath at right angles to supports. Secure lath to supports at 6 inch intervals. Secure the side laps to supports and tie between supports. Lap 1/2 at sides and 1 at ends; and laps must be staggered and supported. No sheet ends allowed less than one support distant from any angle or corner, bend sheets for internal corners or use corner laths. Install strip lath over joints between dissimilar base materials where surfaces lie in the same plane and where base materials cannot be effectively bonded together. C. Accessories: 1. Install all accessories to plumb, true and level lines, and backing plates as located by the trade furnishing these items. D. Manufacturers: Subject to compliance with requirements, provide products by one of the following or equal: 1. Expanded-Metal Lath: a. California Expanded Metal Products Co. b. Dietrich Industries, Inc. c. National Gypsum Co. d. United States Gypsum Co. e. Western Metal Lath Co. 2. Metal Accessories: a. California Expanded Metal Products Co. b. Metalex (Keene Products). c. National Gypsum Co. d. United States Gypsum Co. e. Western Metal Lath Co. 3. Stucco: a. California Stucco Products Corp. b. Florida Stucco Corp. c. Highland Stucco. d. IPA Systems, Inc. e. United States Gypsum Co. E. Ceiling Support Components: ASTM C 1063. 1. Wire for Hangers and Ties: ASTM A 641 Class 1 zinc coating, soft temper. 2. Rod Hangers: Mild steel, zinc coated. 2-7 2242

3. Flat Hangers: Mild steel, zinc coated or protected with rust-inhibitive paint. 4. Channels: Cold-rolled steel, minimum 0.0598-inch- thick base (uncoated) metal and 7/16-inch- wide flanges, and as follows: a. Carrying Channels: 1-1/2 inches deep, 475 lb/1000 feet. b. Furring Channels: 3/4 inch deep, 300 lb/1000 feet. c. Finish: ASTM A 653, G60 hot-dip galvanized. F. Vertical Metal Furring: Comply with the following: 1. Protective Coating: ASTM A 653, G40 hot-dip galvanized coating. 2. Protective Coating: Manufacturer's standard corrosion-resistant coating. 3. Channel Furring and Braces: Cold-rolled steel, minimum 0.0598-inch- thick base (uncoated) metal and 3/4-inch- deep-by-7/16-inch- wide flanges, 300 lb/1000 feet. 4. Hat Channels: Hat-shaped screwable furring channels, 7/8 inch deep, formed from Zinc-coated (galvanized) steel sheet, minimum 0.0179 inch thick, Grade 33. 5. Z-Furring Members: Screw-type Z-shaped furring members formed from minimum 0.0179-inch- thick, zinc-coated (galvanized) steel sheet. 6. Furring Brackets: Serrated-arm type, minimum 0.0329-inch- thick base (uncoated) metal, adjustable from 1/4- to 2-1/4-inch wall clearance for channel furring. 7. All metal laths, corner beads, anchors and accessories to be Galvanized Steel Components: Fabricated from zinc-coated (galvanized) steel sheet complying with ASTM A 653, G40 minimum coating designation. 8. Zinc-Alloy Components: ASTM B 69, 99 percent pure zinc. 9. Metal Cornerbeads: Fabricated from zinc-coated (galvanized) steel. 10. Corner Laths: As specified for expanded metal lath, 3 legs bent to a 105% corner, weighing 40#/1000 L.F.. Install at interior angles and where one or both abutting surfaces are metal lath. Corner laths are not required where metal is continued around corner at junction of walls and where ceiling lath turns down wall. 11. Casing Beads: #66 Type, expanded metal flange, galvanized, depth as required by plaster thickness, weighing approximately 289#/100 L.F. for 3/4 and 7/8 Types. Install at all edges of plaster, continuously, including where plaster butts all other materials, by securing to lath at 6 o.c. 12. Strip Reinforcement: Smooth-edge strips of expanded-metal lath fabricated from uncoated or zinc-coated (galvanized) steel sheet. Provide cornerite or stripite form as required. 3-7 2242

13. Casing Beads: Square-edged style, fabricated from aluminum coated with clear plastic, with short or expanded flanges to suit kinds of plaster bases indicated. 14. Control Joints: Aluminum coated with clear plastic and adjustable for joint widths from 1/8 to 5/8 inch. 15. Control and Expansion Joints: 7/8 ground, expanded metal flanges, galvanized minimum 28 gauge, (Type #15). 16. Steel Drill Screws: ASTM C 1002 & ASTM C 954 G. Water for Mixing and Finishing Plaster: Potable and free of substances capable of affecting plaster set or of damaging plaster, lath, or accessories. H. Lime: ASTM C 206, Type S; ASTM C 207, Type S. I. Bonding Agent: ASTM C 932. J. Expanded-Metal Lath: ASTM C 847, diamond mesh, flat or self-furring configuration as indicated, and with minimum 3.4-lb/sq. yd. weight. K. Waterproofing: Application procedures for Self-adhesive Water-proofing membrane will be to apply coating by brush, roller, spray, or other applicators according to manufacturer's written instructions. Exterior wall application only. L. Scratch Coat: 1 part Portland Cement, 4 parts sand and hydrated lime equal to 25% of volume of cement. Apply with sufficient material and pressure to shove material through metal lath and form a good key; 3/8 minimum thickness, score in horizontal direction with metal scorer with clipped teeth to provide good mechanical key for second coat. M. Brown Coat: 1 part Portland Cement, 5 parts sand and hydrated lime equal to 25ʼ% of the volume of cement. N. Finish coat to match adjacent wall surface interior and exterior applications. O. Curing: Keep each base coat moist for at least 48 hours; commence moistening as soon as plaster has hardened sufficiently so to prevent injury; apply water in a fine fog spray; avoid soaking; curing shall proceed over holidays, Saturdays and Sundays if necessary. If atmospheric conditions are hot and dry, curing time shall be extended as necessary. Allow plaster base coats to cure for a minimum of 7 days before applying finish coat. P. Mechanically mix cementitious and aggregate materials for plasters to comply with applicable referenced application standard and with recommendations of plaster manufacturer. 1. Stucco Finish Coat: Factory-packaged stucco, including portland cement, aggregate, coloring agent, and other proprietary ingredients. Add water only; comply with stucco manufacturer's written instructions. 4-7 2242

2. Thickness: 7/8 thick; measured from back of lath or equivalent to original finish thickness. 1.3 EXECUTION A. Lathing: Apply lath with long dimension at right angles to supports; lap sides and ends as recommended by manufacturer. B. Lathing and Furring: Install lath and furring indicated to comply with ML/SFA 920, "Guide Specifications for Metal Lathing and Furring," and with ASTM C 1063. C. Install supplementary framing, blocking, and bracing at terminations in work and for support of fixtures, equipment services, heavy trim, grab bars, handrails, furnishings, and similar work to comply with details indicated or, if not otherwise indicated, to comply with applicable written instructions of lath and furring manufacturer. D. Ceiling Suspension Systems: Install ceiling suspension system components of sizes and spacings indicated, but not in smaller sizes or greater spacings than those indicated in ASTM C 1063. Coordinate installation of ceiling suspension system with installation of overhead structural systems to ensure inserts and other structural anchorage provisions have been installed to receive ceiling hangers in a manner that will develop their full strength and at spacings required to support ceiling. 1. Hanger Installation: Attach hangers to structure above ceiling to comply with ML/SFA 920, "Guide Specifications for Metal Lathing and Furring," and with referenced standards. E. Installation of Vertical Metal Furring: Install ceiling suspension system components of sizes and spacings indicated, but not in smaller sizes or greater spacings than those required to comply with ML/SFA 920, "Guide Specifications for Metal Lathing and Furring," and with referenced standards. For furring on interior side of exterior walls, provide furring brackets, unless otherwise indicated. F. Preparing Solid Surfaces for Plastering: Clean plaster bases and substrates for direct application of plaster, removing loose material and substances that may impair the Work. 1. Etch concrete and concrete unit masonry surfaces indicated for direct plaster application to obtain adequate suction and mechanical bond of plaster (where dash coat, bonding agent, or additive is not used). 2. Apply bonding agent on concrete and concrete unit masonry surfaces indicated for direct plaster application; comply with manufacturer's written instructions for application. 3. Apply dash coat on concrete surfaces indicated for direct plaster application. Moist-cure dash coat for at least 24 hours after application and before plastering. 4. Install temporary grounds and screeds to ensure accurate rodding of plaster to true surfaces; coordinate with scratch-coat work. 5-7 2242

5. Surface Conditioning: Immediately before plastering, dampen surfaces indicated for direct plaster application, except where a bonding agent has been applied. Moisten to obtain optimum suction for plastering. G. Installation of Plastering Accessories: Comply with referenced lathing and furring installation standards for provision and location of plaster accessories of type indicated. Install accessories of type indicated at following locations: 1. External Corners: Install corner reinforcement at external corners. 2. Terminations of Plaster: Install casing beads, unless otherwise indicated. 3. Control Joints: Install at locations indicated or, if not indicated, at locations complying with the following criteria and approved by Architect / Engineer: a. Where an expansion or contraction joint occurs in surface of construction directly behind plaster membrane. b. Distance between Control Joints: Not to exceed 18 feet in either direction or a length-to-width ratio of 2-1/2 to 1. c. Wall Areas: Not more than 144 sq. ft. d. Horizontal Surfaces: Not more than 100 sq. ft. in area. e. Where plaster panel sizes or dimensions change, extend joints full width or height of plaster membrane. H. Plaster Application: Sequence plaster application with installation and protection of other work so that neither will be damaged by installation of other. Do not use materials that are frozen, caked, lumpy, dirty, or contaminated by foreign materials. Do not use excessive water in mixing and applying plaster materials. 1. Plaster Application Standard: Apply plaster materials, composition, mixes, and finishes indicated to comply with ASTM C 926. 2. Tolerances: Do not deviate more than plus or minus 1/8 inch in 10 feet from a true plane in finished plaster surfaces, as measured by a 10-foot straightedge placed at any location on surface. 3. Grout hollow-metal frames, bases, and similar work occurring in plastered areas, with base-coat plaster material, before lathing where necessary. Except where full grouting is indicated or required for fire-resistance rating, grout at least 6 at each jamb anchor. 4. Plaster flush with metal frames and other built-in metal items or accessories that act as a plaster ground, unless otherwise indicated. Where plaster is not terminated at metal frame by casing beads, cut base coat free from metal frame before plaster sets and groove finish coat at junctures with metal. 5. Corners: Make internal corners and angles square; finish external corners flush with cornerbeads on interior work, square and true with plaster faces on exterior work. 6-7 2242

6. Thickness: As indicated or as required by ASTM C 926. I. Finish Coats: To match adjacent wall surface finish. J. Moist-cure plaster base and finish coats to comply with ASTM C 926, including written instructions for time between coats and curing in "Annex A2 Design Considerations." K. Cutting and Patching: Repair cracks and indented surfaces. Point-up finish plaster surfaces around items that are built into or penetrate plaster surfaces. Repair or replace work to eliminate blisters, buckles, check cracking, dry outs, efflorescence, excessive pinholes, and similar defects. Repair or replace work as necessary to comply with required visual effects. L. Cleaning and Protecting: Remove plaster from other surfaces not to be plastered. When plastering is completed, remove unused materials, containers, equipment, and plaster debris. Protect plaster work from damage or deterioration until Substantial Completion. 1.4 MEASUREMENT A. This Item will be measured by the square foot installed complete and in place. A square foot is further defined as a 12 by 12 area or 144 square inch area. B. Note: It is unknown how much area under of the existing exterior stucco will require to be cut and patched due to the installation of the metal wall flashing so for bidding purposes it will be assumed that 100 sq. ft. of vertical wall surface will require replacement / repair. C. Note: There is one (1) area within the building s interior that will require plaster-work. Located above the south main entry door and in an Alamo shape that has deteriorated from a roof leak. 1.5 PAYMENT A. Lath, Stucco and Plaster and Incidentals: The work performed and materials furnished shall be in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Lath, Stucco and Plaster. This price shall be full compensation for furnishing all materials, anchoring, support members, equipment, labor and incidentals to complete the work as shown on the plans. 7-7 2242