SPLOST I, II, III,IV

Similar documents
CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Briar Crest Elementary

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

S P L O S T I I I P r o g r a m P l a n 9/7/2010

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Master Facility Planning Update School Board Meeting May 26, 2016

2014 Bond District-wide Facility Repairs

2014 Bond District-wide Facility Repairs

Master Project List Report

Oxford Hills School District Capital Renewal Plan Updated March 2017

School District of Milton 5- Year Capital Maintenance and Improvement Plan

2014 Bond Project Guide

Tillamook High School Bond Projects

Forest Hills Facilities Plan

New High School Concept

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Design Presentation. Chief Operations Officer Willie Burroughs

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Facilities Management Services

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Edward Jenner Elementary Academy of the Arts

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Richard Henry Lee Elementary School

NYC Department of Education

Ohlone College Measure G Project Scope Revisions

EXISTING CONDITIONS SUMMARY

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

29 Bella Fontaine Park

Josefa Ortiz De Dominguez Elementary School

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Genevieve Melody Elementary School

Oscar DePriest Elementary School

5 Year Capital Improvement Plan Update

NYC Department of Education

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

Florence High School / Middle School Page 1 of 3 Florence, WI

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

Washington Irving Elementary School

E-SPLOST V. Facts and Information. August 2018

Number of persons with a disability that live with a disability in your community?

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Calmeca Academy of Fine Arts and Dual Language

NYC Department of Education

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Cherry Hill Public Schools BUILDING A SOLID FUTURE

John Palmer Elementary School

Alessandro Volta Elementary School

Francis M McKay Elementary School

PROCTOR TERRACE ELEMENTARY SCHOOL

Beaufort County Community College. Maintenance and House Keeping Plan

FOOD SERVICE May 6, 2016

Joseph Brennemann Elementary School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

DeWitt Clinton Elementary School

Mechanical Inspection Plumbing

Agustin Lara Elementary Academy

Charles W Earle Elementary School

PLAN REVIEW SUBMITTAL GUIDE

MADISON ELEMENTARY SCHOOL

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Warren County Schools Plant and Operations

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

George B Swift Elementary Specialty School

30% Design Community Meeting

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

FOOD SERVICE May 6, 2016

FACILITIES CONDITION ASSESSMENT WAGNER RANCH ELEMENTARY SCHOOL. Orinda Union School District Facilities Master Plan

Sidney Sawyer Elementary School

Facilities Management State-Funded and Billable Services

ESUHSD Measure G Bond Program Update: November 1, Alterations to Student Services Building and Streetscape Building 1200 (Gym) Modernization

Vendor Application Form

Custom Report // Priorities 1+2

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

F. GENERAL REQUIREMENTS Electrical Design Criteria 2006 Edition 4/3/06 School District Palm Beach County Page-1 of 15

Ashland School District Facility & Capacity Assessment Report 2005

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Douglas Unified School District No. 27 Administrative Offices th Street, Douglas, Arizona (520) Fax: (520)

1354 CHECKLIST for Project Closeout

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MEDIA CENTER September 30, 2010

Rockwell/Johnson School Renovations Project. Existing Conditions September, 2016

Transcription:

ACWORTH ES (OLD) ACWORTH INTERMEDIATE Construction projects not done due to school replacement Land Acquisition, 61 IU Replacement Elementary School Access Controls, Temperature monitors for walk in coolers & freezers, Install ringers on all manager's telephones, ADA Exterior Ramp, Add HVAC to gym & school lettering to building, Replace carpet & Tile in selected areas Buzz in Intercom), Asphalt Paving, Landscape/Repair/Erosion, Walking Track 1 ADDISON ES ADULT EDUCATION CENTER Painting, Flooring, Roofing, Security System Upgrade, Doors and Window Upgrade, Gutters, New Covered Play Area, Add Curb Cuts and Walkways, Playscape Upgrades and Walkways, Restroom Renovations Roofing, Flooring, Painting, UHF Communications System, Safety/Security Communication Systems Upgrade Access Controls, Add 1 IU PE Gymnasium with restrooms,modify existing gym to accommodate Guidance & Administration, Food services upgrades, HVAC/PE gym, Canopy for bus lane, Locks on exterior doors CCTV surveillance cameras, Main switchgear & Panel upgrades Buzz in Intercom), Driveway Modification, Lighting Retrofit, Front Window Replacement, New Playground Equipment, Emergency Generator, Emergency Lighting, Site Lighting Door Controller @ Front Entrance, Intercom ALLATOONA HS Land, New 98 IU HS CCTV Surveillance System Replacement, Security Fencing, Classroom Door Added, ADA Sound System Equip. for Hearing Impaired, Band Tower Purchased & Installed Incl. Concrete Slab ADA Accessibility, Gym floor replacement, 4 2 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 1 of 61

ARGYLE ES Classroom Electrical Outlets, Upgrade Fire Alarms for Portables, Upgrade Restrooms old section, Drainage Improvements, Add Exterior Lighting, Playscape Upgrades and Walkways Access Controls, Carpeting, HVAC Installation, Painting/Roof coating in portables, Temperature Monitors in Walk in coolers and freezers, Grease traps, Door Bells & Drain, Install ringers on all Manager's Telephones, Fencing, Food Services upgrades, Main switchgear & Panel upgrades, HVAC Main gym, Painting, Replace Carpet. Add staff restroom Buzz in Intercom), New Playground Equipment, Cooler/Freezer Replacement, Electrical Upgrades in Kitchen, Walkway Enclosed Between Main Building & Gym for Safety Purposes, Concrete Paving, Canopies, Sprinkler (Fire Suppression), Marker Boards, Toilet Partitions, Clock, Lighting Retrofit 6 AUSTELL ES (OLD) AUSTELL ES (formerly Austell Primary) Construction projects not done due to school replacement New 36 IU Primary School Startup Access Controls, Land, 36 IU Primary School Buzz in Intercom), Ceiling Replacement, Landscaping/Erosion, Stage Flooring 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 2 of 61

AWTREY MS Paint Repair, Roofing, Security System Upgrade, CCTV Surveillance System, Food Service Space Upgrade, Repaving, Playground Upgrade, ADA Restroom Modifications Temperature Monitors for Walk in Coolers & Freezers, Grease Traps, Door Bells, Fencing, Food service small equipment, ADA curb cut & painting of Existing curb visibilty, Main switchgear & Panel upgrades, Replace HVAC in office, gym, media center & theater, Roofing for sections of building, CCTV Surveillance System, Re conditioning/metal roof replacement for covered play area, Whiteboards, Add window front office Access Controls, ADA Sink w/hot Water, ADA Door Access, Enclose Existing Walkways & Add Enclosed Walkways, Asphalt Paving, Sewer/Utilities, Toilet Partitions/Accessories, Basketball Goal Retractors, Music Casework, Water Heaters, Piping, Sprinkler (Fire Suppression), Lighting Retrofit, Theater Lighting, Flooring, Painting, ADA Ramp detectable warning at bus drop off, 1 BAKER ES BAKER ROAD BUS SHOP BARBER MS BARNES ED CENTER Painting, Flooring, Roof Repair, Landscaping Upgrade, Playscape Upgrades, ADA Access to Playground, Stage, Restroom Fixtures, Gravel Paths, Hot Water ADA Restroom & Handrail Modifications Access Controls, Temperature monitors for walk in coolers & freezers, Door Bells, Install ringers on all manger's telephones, ADA sidewalks, HVAC in main gym, Parking lot & Bus lane re paving,canopy for front & bus area, Fencing & Gated entrance New 71 IU, CCTV Surveillance Systems, Food service small equipment, Temperature monitors for walking/coolers & freezers, drains & door bells, Install ringers on all manager's telephones, Provide Access control at Entrance, Main switchgear & Panel upgrades, Buzz in Intercom), New Playground Equip., Asphalt Paving, HVAC, Marker Boards, Toilet Partitions, Window Blinds, Emergency Generator Access Controls, Painting, Fencing, Landscaping Gym floor replacement, 1 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 3 of 61

BELLS FERRY ES Flooring, Roofing, HVAC Upgrade, Security System Upgrade, Intercom System Upgrade, Emergency Callback Buttons, Fire Alarm Upgrade, Expand Food Service Space, Playscape Upgrade and Walkways, ADA Curb Cuts and Walkways, ADA Restroom Renovations Food service Door Bells, Upgrade temperature monitor, HVAC Main gym, Main switchgear panel upgrades, Painting, Bus Lane Re Paving, Re Conditioning / Metal Roof Replacement for covered play area, Access Controls, Add Restroom in the Pre Kindergarten Hall, Build Canopy over sidewalk, Upgrade Playground Access Control Enhancement (Front Door Buzz in Intercom), Addition/Modification includes CCTV Surveillance System, Cafeteria & Kitchen, Fire Suppression System, Ceiling Replacement, Addition for Admin & Pupil Personnel Services, Modify Existing Admin Area, 14 IU's added, Modified Restrooms, Replaced Fixtures, Lighting, Finishes, Additional Parking, Playground Equip., Marker Boards, Clock, Fire Alarm, Lighting Retrofit, Kitchen Power & Power Upgrades 4 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 4 of 61

BELMONT HILLS ES Classroom Addition 6 Classrooms, 1 Computer Lab, Water Piping, Fire Alarm Upgrade, Windows Upgrade, Renovate Food Service Space, Repave Driveways and Parking Lot, Roof Repair, Security System Upgrade, Emergency Callback Buttons, Electrical Wiring Upgrade, Add Security Fencing, Playscape Upgrade and Walkways, ADA Sink Install Ringers on all Manager's Telephones, ADA Restroom/Classroom Renovation, ADA Curb Cut & Ramp, ADA Carpet Workroom 110, Upgrade Temperature Monitors, ADA Handrails, Food Service Small Equipment, Replace exisitng Sidewalk at top of Bank, Add a new Sidewalk & Replace Wooden Ramp at lower Playfield, Replace HVAC System, Main switchgear/panel, HVAC PE Main Gym, Food Service Temperature Monitors, Replace Water Piping, Plumbing Fixtures & outside hose Bibs, Re Conditioning/Metal Roof Replacement for covered Play Area, Access Controls, Replace carpet, Landscape Buzz in Intercoms), Modify Lobby Wall (Provide View Window from Office), Sprinkler (Fire Suppression), Fencing, Painting, Marker Boards, Canopies, Café Stage Curtain, Water Coolers, Lighting Retrofit Gym floor replacement, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 5 of 61

BIG SHANTY ES Emergency Callback Buttons, Replace Flooring in Classrooms and New Addition, Roof Replacment, Fire Alarm Upgrade, Add Exterior Lighting in Front of Building, Add Fencing, Repaving, ADA Door Replacement Temperature Monitors for Walk in Coolers & Freezers, Door Bells & Grease Traps, Upgrade Electrical Capacity & Re Roof Walk in Cooler, Install Ringers on all Manager's Telephones, Main Switchgear & Panel Upgrades, Replace HVAC System, includes HVAC in Main gym, Painting, Replace Water Piping, Plumbing fixtures & outside hose bibs, Re Conditioning/Metal Roof Replacement for covered Play area, Access Controls, Build Outdoor storage unit, Whiteboards Buzz in Intercom), Converting Dishwashing Area to Storage, Provide New Furnishings & Equip., Repair Doors & Frames, & Refinish Area, Add'l Parking, Erosion Control, Sprinkler (Fire Suppression), Clock, Lighting Retrofit, Power Upgrade, Hazardous Materials (Abatement) ADA Flooring, ADA Stage Access, Gym floor replacement, 4 BIRNEY ES Classroom Addition 5 Classrooms, 1 Art Room, 1 Music Room, 1 Computer Lab, Workroom, Storage Rooms, Expansion of Parking and Driveways, Painting, Roofing, Renovate Food Service Space, Add Gates, Add Exterior Lighting, Security System Upgrade, Emergency Callback Buttons, ADA Playground Access, Playscape Upgrades, Visual Fire Alarms, Carpet Hearing Impaired Classroom Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on all Manager's Telephones, Food Service Small equipment, ADA Clinic Renovations, Main Switchgear & Panel upgrades, Upgrade Toilets, Urinals, Sinks, Water Coolers & Valves, Re Conditioning/Metal Roof Replacement for covered Play Area, Access Control, Carpet Replacement, Install Lighting at Canopy Buzz in Intercom), New Playground Equip., HVAC, Sewer/Utilities, Ceilings, Marker Boards, Prefab Canopies, Water Coolers, Sprinklers (Fire Suppression), Fire Alarm, Lighting Retrofit, Hand Dryers Convert Staff Restroom for ADA compliance, ADA Sidewalk modifications, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 6 of 61

BLACKWELL ES Food Service Door Bells, Small equipment Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, Add 60' of Fence & 2 gates, Extend Fence to include the spacing outside of 2 MOID Classrooms, HVAC main gym, Access Controls, Plant Sod on area Leading to Primary Playground, Add Handrails at sidewalks Buzz in Intercom), Security Fencing, HVAC Kitchen, Fire Sprinkler Head Replacement, Concrete Paving, Marker Boards Playground replacement, 4 BROWN ES (Teasley Primary - SPLOST III) Painting, Flooring, HVAC Upgrade Original Building, Alarm System Upgrade, Emergency Callback Buttons, Plumbing Upgrades Original Building, Upgrade Doors and Windows, Enlarge and Renovate Food Service Space, Drainage Upgrade, Landscaping, Repave and Add Parking, Add Fencing and Gate, Add Exterior Lighting, Playscape Upgrades and Walkways, Wheelchair Lift, ADA Restroom Renovations, Roofing Food Service Door Bells & Traps, ADA Restroom Renovation/Sidewalk/Curb Cut, Upgrade Temperature Monitors, ADA Add Sidewalk to Connect Special Needs Classroom Ramp with Parking Lot, Main Switchgear & Panel upgrades, HVAC main gym, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Renovate Administration Offices for Security, Grade & Level Playground Area, Blacktop Playground, Add Sidewalk to Parking Lot. Buzz in Intercom), Replace Carpet Tile in 23 Classrooms, Replace Gym Floor w/snap Court Flooring, Painting 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 7 of 61

BRUMBY ES Roofing, Security System Upgrade, Drainage Upgrade, Add Covered Walkways, Landscaping, Add Exterior Lighting in Back of New Building Temperature Monitors for Walk in Coolers & freezers, Door Bells & Lids, Install Ringers on All Manager's Telephones, Remove 2 Old walking coolers & Replace with new larger one, Install 6 Hand Dryers in Restrooms, Main Switchgear & Panel upgrades, Replace Carpet, Replace HVAC System & HVAC in Main Gym, Replace exterior Sanitary Sewer Piping, Cleanouts & Associated manholes, Access Controls, Enclose Open IU in the Old Building, Paint interior of Building Buzz in Intercom), ADA Classroom/Restroom Modifications, Addition of Traffic Gates & Bollards, Security Fencing, Playground Equipment & Surfacing Replacement school (61 IU's), 6 BRYANT ES Painting, Flooring, Electrical Wiring Upgrades, Drainage Upgrade, ADA Access to Playground, Provide Hot Water to SID/PID Classroom Access Controls, Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on all Manager's Telephones, Replace Walk in Cooler & Freezer, Main Switchgear & Panel upgrades, HVAC main gym, Bus Lane, Parking Lot Re Paving, Landscape, Correct Drainage Buzz in Intercom), ADA Playground Fencing, Carpet/Tile in SID/PID Classroom, Playground Fencing, Entry Drive Asphalt Paving, Fire Sprinkler Head Replacement, Lighting Retrofit, Kitchen Ceilings, Marker Boards, Prefab Canopies, Land Acquisitions Playground replacement, 3 BULLARD ES Land, New 61 IU Elementary School Food Service Door Bells, Upgrade Temperature Monitors, Fencing, HVAC Main Gym, Access Controls Buzz in Intercom), Playground Equipment, Add'l Parking, Blinds 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 8 of 61

CAMPBELL HS Softball Field Lighting, Modify Facilities for Trade & Industry Programs, Painting, Add Security System, CCTV Surveillance System, Landscaping Upgrade Food Service small equipment, Door Bells, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, ADA Ramp & Sidewalk for ROTC student, ADA Sidewalk improvements, Curb Cuts & a Ramp along the back of the school at the Art Hallway, ADA Classrooms/Restrooms Modifications, Add 18 IU Band, Choral, Graphic Arts, Culinary Arts, Drafting & Design Technology, Horticulture, Law Enforcement, 11 Typical Classrooms, Modify Existing undersized Band t Orchestra, Modify the undersized Choral to Drama, Renovate HVAC/PE gym, Su Switchgear/Panel, Auditorium, Paint Lockers, Whiteboards, Replace or Repair the existing Sports Lighting at the Football Field, Track Resurfacing/Track & Field Upgrades, CCTV Surveillance Systems CCTV Surveillance System Replacement, HVAC, Stadium Sound, New Security Fencing, Replacement Fencing, Auditorium Seating, Flooring, Ceiling, Painting, House Lighting, Sound System & Acoustical Baffles/Panels, Modify Gym to Raise Ceiling, Raise Duct Work & Sprinklers, Replace Lighting, Modify Kitchen, Irrigation, Marker Boards, Prefab Canopies, Toilet Partitions, Basketball Goal Retractors Interior & Exterior Painting, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 9 of 61

CAMPBELL MS Roofing, Security System Upgrade, CCTV Surveillance System, Gym Roof Replacement, Correct Mildew Problem in Technology Room, Replace Old Gym Flooring, Renovate Restrooms in Old Gym, Paving Repair in North Parking Lot, Add Safety Fencing in Front of School, Add Exterior LIghting, Landscaping Upgrades, Repair Track and Tennis Courts, Paint Old Gym Food Service Small Equipment, Restroom Renovations, Add 3,900 SQ. FT to the Admin & Pupil Personnel Service areas, Addition of 12 IU, 9 Typical classrooms, Drama, Business/Computer, Career Connections, Add 4,800 SQ. FT to the Media Center, Modify the Existing Admin Areas with the New Admin Addition, Modification & Renovation of Kitchen, Cafeteria & Replacement of the Food Service Equipment, Expansion of the Food Service Area, Media Center Modifications to Accomodate the new Addition, Renovations on HVAC/PE gym, Paving Bus & Parking Lot, Replace Bleachers, Lighting/Sound System, CCTV Surveillance Systems Access Controls, ADA Lift System, Fence Replacement, Ramp Door Improvement for Wheelchair Access, Addition/Modification to include new Band, Choral & Orchestra Classrooms, CCTV Surveillance System Replacement, Modify/Renovate Student Restrooms, Modify existing Band, Choral & Orchestra to be typical classrooms, Abatement of Hazardous Materials, Painting, Lockers, HVAC, Gym HVAC, Water coolers 2 CHALKER ES Add Classroom Door Locks, ADA Restroom Accessibility, Playscape Upgrades and Walkways Food Service Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, HVAC Main Gym, Access Controls, Whiteboards, Install hot water line Buzz in Intercoms), Security Fencing Around Retention Pond, Resurface Parking Areas & Bus Port, Flooring, Painting, Fire Sprinkler Head Replacement Playground replacement, 4 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 10 of 61

CHEATHAM HILL ES Flooring, Add Classroom Door Locks, Playscape Upgrades and Walkways, Restroom Renovations Temperature Monitors for Walk in Coolers & Freezers, Install Ringers on all manager's Telephones, ADA Ramp at Portable, Food Service Small equipment, HVAC Main Gym, Fencing, Access Controls Access Control Enhancement (Front Door Buzz in Intercom), Addition/Modification to include 8 IU's Typical Classrooms, CCTV Surveillance System, Additional Parking, Sewer Upgrade, Painting, Café Sound, Gym Sound, Construction And/or Purchasing of Classroom Space, Including Portable Classrooms & Enhancement to Existing Portables, Fire Sprinkler Head Replacement 7 CLARKDALE ES (OLD) Painting, Flooring, Security System Upgrade, Add Emergency Callback Buttons, Electrical Outlets Upgrade, Repaving, Playscape Upgrades and Walkways Food Service small equipment, Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Main Switchgear & Panel Upgrades, Replace HVAC System for Classrooms, Media Center & main gym, Upgrade Toilets, Urinals, Sinks, Water Coolers & Valves, Replace Restroom Stalls & Doors, Replace Exterior Sanitary Sewer Piping, Cleanouts & Associated manholes, Roofing for entire building, Re Conditioning/Metal Roof Replacement for Covered Play area, Access Controls, Replace Front Sign, Admin Area Renovation, including Installation of Window & Clinic Enlargement 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 11 of 61

CLARKDALE REPLACEMENT ES Land Acquisition Access Control Enhancement (Front Door Buzz in Intercom), Land Acquisitions, New Replacement School, ADA Garden Access 3 CLAY ES Add Emergency Callback Buttons, Flooring, Electrical and Plumbing Repairs, Upgrade Doors and Windows, Expand Dining Area, Drainage Upgrade, Repave and Add Parking, Landscaping Upgrades, Playscape Upgrades and Walkways Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Fence Main Drive, Main Switchgear & Panel Upgrades, Replace HVAC Systems for Classrooms, Media Center & Cafeteria & Main Gym, Painting, Upgrade Toilets, Urinals, Sinks, Water coolers & Valves, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Place Intercom, Speakers in Playground & Parking Lot Areas, Install Sidewalk from gym to front Walk, Replace Cafeteria Blinds, Whiteboards. Buzz in Intercom), Lighting Retrofit, Drainage/PE, Fencing, Playground Equip., Playground Surfacing, Gym Flooring, Toilet Partitions 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 12 of 61

COMPTON ES Drainage and Lanscaping Upgrades, Add Walkway to Dumpster, ADA Restroom Renovations, Food Service Renovations Temperature Monitors for Walk in Coolers & Freezers, Door Bells, & Grease Traps, Fence Front & Back & Right Side of Campus, Replace HVAC System For Main Building & Annex, HVAC/PE Gym, Switchgear/Panel Upgrades, Add Gravel in Rear of Building & Repainting Door Frames, Parking Lot, Bus Lane Re Paving, Upgrade Toilets, Sinks, Urinals, Water Coolers & Valves, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Carpet, Interior Painting, Replace Fencing, Add Locks to Classroom Doors in New Building, Build Canopy over Bus Lanes & Between Annex & Main Building, Add Restroom to Staff Lounge, Install Counter in Front Office, Landscaping At Front of Building Buzz in Intercom), ADA Restroom Modifications, Playground Equip., Roofing, Ceilings, Faucets, Piping, Sprinkler (Fire Suppression), Clocks, Electrical Upgrade 3 COOPER MS Land Acquisition, New 71 IU Middle School, ADA Curb Cuts and Restroom Renovations, CCTV Surveillance System Temperature Monitors for Walk in Coolers & freezers, Door Bells, Food Service Small Equipment, HVAC Main Gym, CCTV Surveillance Systems, Air Conditioning Kitchen Access Controls, ADA Ramp, Painting, Asphalt Paving, Window Replacement, Flooring, Toilet Partition/Accessories 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 13 of 61

DANIELL MS DAVIS ES Fine Arts Addition (Band, Choral, Orchestra) and Support Staff Space, Painting, Flooring, Roofing, HVAC Upgrades, Home Ed Safety Upgrades, Replace Lockers, Food Service Area Upgrades, Drainage Upgrades, Add Parking, Repaving, CCTV Surveillance System, Hall Lighting Upgrade Roofing, Painting, Flooring, Security System Upgrade, Drainage Upgrade Back Field, Fencing Upgrade Back Campus, Landscaping, Curb Cuts, Playscape Upgrades and Walkways, Restroom Renovations, ADA Sink Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Modify Existing Classroom For MOID Program, Install Ringers on All Manager's Telephones & Add System, Food Service Small Equipment, Addition For Admin & Pupil Personnel, Add 5 IU, Add 3 Teacher's Team Planning Rooms, Modify Existing Admin Areas To Work with the New Admin Addition, Flooring/Gym, HVAC/PE, Metal Refinish, Canopy at Theater, Whiteboards, Lockers, Safety Mats, Stripe Parking Lot, CCTV Serveillance Systems Food Service Drains & Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, Restrooms Renovations, HVAC Main Gym, Bus Lane & Parking Lot Re Paving, Access Controls, Fencing Upgrade (Back of Campus) Access Controls, Foyer Door Hardware Upgrade, Fencing & Gates, ADA Parking, Sidewalk & Ramp @ Athletic Bleachers, ADA Restroom Renovations, Cafeteria & Kitchen Addition and Modification to Existing Kitchen & Serving Lines, Add'l Parking, Irrigation, Bus Canopies, Music Casework, HVAC, Water Coolers, Flush Valves, Sprinkler (Fire Suppression), Lighting Retrofit, Theater Lighting Buzz in Intercom), Fencing @ Primary Playground, Painting, HVAC, Clock, Emergency Generator, Fire Alarm, Site Lighting, Electrical System Upgrade, Lighting Retrofit 4 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 14 of 61

DICKERSON MS 13 IU Addition, New Cafeteria and Kitchen, Renovations for Technology Lab, Team Planning Rooms, Lockers, Special Ed, Pull out Programs, Painting, Flooring, Home Ed Range Hood, Exerior Lighting, Paving, Emergency Callback Buttons, Parking Lot Repaving, Roofing, CCTV Surveillance System Addition For Admin & Pupil Personnel Services, Addtion of 4 IU Typical Classrooms, HVAC Main Gym, Lockers, Drainage, Doors, Restrooms Floors, Theatre Lighting, Food Service Door Bells, Install Ringers on All Manager's Telephones, Upgrades Temperature Monitors, Food Service Small Equipment, ADA Accessible Faucets in Students Restrooms, & Renovations, CCTV Surveillance Systems Access Controls, ADA Sidewalks, Ramps & Curb Cuts, Door Controller@ Front Entrance, Kitchen Floor Replacement, Ceiling & Lighting Replacement, Shelving for Laundry, Painting, Theater Renovation (Incl.Carpet Replacement, Seats, Sound System, Stage Lighting, Ceiling, Stage Curtain, & Repaint), Schoolwide Painting & Flooring, Water Heaters 6 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 15 of 61

DODGEN MS Roofing, Security System Upgrade, Fire Alarm Upgrade, Lighting Upgrade, Restroom Renovations, Add Lockers, Add Exterior Lighting, Drainage Upgrade, Landscaping, Repaving, CCTV Surveillance Cameras Addition For Admin & Pupil Personnel, Addition of 23 IU: 15 Classrooms, (3 Typical, 12 Science) 2 Sp.ED, 2 Business/Computer, Career Connections, Exploratory Technology, Band & Orchestra(Old Kitchen Modification) 22 New Construction, 1 from Modification, Add new Kitchen & Cafeteria, Modify 3 Common Areas For Teacher Planning Rooms, Modify the Choral Room to be Drama Classroom & the Existing Band Room to be Choral Classroom, 1 IU increase, Modify General Music to be Sp.Ed Classroom, Renovations includes: Switchgear Upgrade, HVAC Main Gym, Replace Gym Floor, Replace HVAC System, Enlarge Theatre Window, Entrance, Replace Carpet in Sp. Ed., Choral & Drama Rooms, Replace Carpet with VCT in Art Room, Food Service Small Equipment,CCTV Surveillance Systems Access Controls, Traffic Arrows & Signage @ Exterior, ADA Projects (Classroom Projector, Restroom Modification for 7th & 8th Grades, Outdoor Learning Center Access to Pond), Addition/Modification to Theater (Stage Curtain, Lighting & Sound System), Toilet Partitions, Basketball Goals, Auditorium Seating, Flooring, Painting 6 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 16 of 61

DOWELL ES DUE WEST ES DURHAM MS Painting, Flooring, Expand Food Service Serving Line Space, Add Fencing and Gate, Add Parking Lot Lighting, Landscaping Upgrade, Uprgrade and Repave Parking Area, Playscape Upgrades and Walkways, ADA Portable Stage Ramp, Visual Fire Alarms Add Emergency Callback Buttons, Painting, Replace Alarm System, Flooirng, Water Pipe Replacement, Upgrade Doors and Windows, Renovate Restrooms, Drainage Upgrade, Add Exterior Lighting and Ground Cover, Playscape Walkways New 71 IU Middle School, CCTV Surveillance System, Provide Handicapped Access to PE Field Access Controls, Temperature Monitors For Walk in Coolers & Freezers, Add 2 New Serving Lines, ADA Hearing Impaired, Food Service Small Equipment, HVAC Main Gym, Bus Lane & Parking Lot Re Paving, Access Controls, Build Canopy Over Bus Lanes, Upgrade Cafeteria Sound System, Hand Dryers in Student Restrooms Temperature monitors For Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Provide Traffic Gate, 2 Gates at Bus Drive, Addition for Admin & Pupil Personnel Services, Increase size of Cafeteria, 12 Classrooms, Modify Existing Admin to work with the Admin Addition, Renovate Switchgear/Panel, HVAC, HVAC/PE Gym, Sprinkler, Roofing, Metal Roof Refinishing, Level Playground, School Sign, Access Controls Food Service Door Bells, Install Ringers on All Manager's Telephones, ADA Curb Cut, Install Air Conditioning in Food Service Area, Upgrade Temperature Monitors, HVAC Main Gym, CCTV Surveillance Cameras, New Sound System in Cafeteria Buzz in Intercom), Drainage Added to Bus Parking Lot, Playground Equip. incl. Fencing, Roofing, Lighting Retrofit, Emergency Generator, Fire Alarm, Coat Racks, Marker Boards Buzz in Intercom), ADA Access Controls on 3 Doors, Painting, Playground Equipment, Kitchen Flooring, School Flooring, Toilet Partitions, Asphalt Paving, Lighting Retrofit, Piping, Clock, Fire Alarm Access Controls, Painting, Window Replacement, Skylights, Flooring, Piping, HVAC, Fire Sprinkler Head Replacement Cooler/Freezer Replacement, 7 7 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 17 of 61

EAST COBB MS Painting, Flooring, Security System Upgrade, CCTV Surveillance System, Add Parking Lot Lighting, Upgrade Walkways, Repaving, ADA Restroom and Classroom Modifications Upgrade Temperature Monitors, Door Bells, & New Grease Trap unit Outside, Ringers on All Manager's Telephones, Food Service Small Equipment, Relocate Lift System From Lovinggood, Addition for Admin & Pupil Personnel Services, Add 8 IU's (Typical Classroom), Modify Existing Admin Areas to work with the new Admin Addition, Renovate Serving Line, ADA Ramp & Lobby Renovations, Switchgear/Panel HVAC/PE gym, Whiteboards, Upgrade Clocks, Gym Floor, Refinish Canopy, CCTV Surveillance Systems CCTV Surveillance System Replacement, Access Controls, Painting, Toilet Partitions & Accessories (ONLY PARTIAL) Completed one set Boys & Girls in only one location, HVAC, Kitchen HVAC, Fire Sprinkler Head Replacement 6 EAST SIDE ES (OLD) 6 IU Classroom Addition, Rework Bus Drive, Roofing, Electrical Upgrades, HVAC Upgrades, Correct Moisture Problem, Playscape Upgrades and Walkways, ADA Wheelchair Lift Food Service Temperature Monitors, Door Bells, Install Ringers on all Manager's Telephones, Fence, Main Switchgear &Panel Upgrades, Replace Carpet, Replace HVAC System, Re Conditioning/Metal Roof Replacement For Covered Play Area, Access Controls, Paint & Pressure Wash the School, Replace existing Canopy, Replace School Sign 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 18 of 61

EAST SIDE REPLACEMENT ES EASTVALLEY ES FAIR OAKS ES 4 IU Classroom Addition, Painting, Flooring, Restroom Renovation, Exterior Lighting, Food Service Space Upgrades, Intercom, Alarm System, Front Door Replacement, Add View Windows at Front Office, Drainage Upgrade, ADA Access to Stage, Bathrooms, Curb Cuts, Playscape Upgrades and Walkways, ADA Restroom Renovations, Playfield Upgrades 12 IU Classroom Addition, HVAC Upgrade, Food Service Area Renovation, Fencing, Electrical Wiring Upgrade, Drainage Upgrade, Playscape Upgrade and Walkways Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Drain, Install Ringers on all Manager's Telephones, Main Swtichgear/Panel Upgrades, Replace HVAC System, HVAC main Gym, Bus Line & Parking Lot Paving, Roofing, Access Controls, Roofing, Painting, Landscape Access Controls, Food Service Door Bells, ADA Manager Phone System, ADA Audiology Electrical Upgrades, & Shelving Improvement, Addition of 16 IU's, Upgrade Temperature Monitors, Re Roofing, Expand Audiology, Switchgear/Panel, HVAC/PE Gym, Metal Roof refinishing, Painting, New Marquee, Hand Dryers, School Name, Water Fountain, Grass/Playground Parking & Paving Access Control Enhancement (Front Door Buzz in Intercom), Replacement School Includes 61 IU's, CCTV Surveillance System, Demolition and Abatement of Site Buzz in Intercom), ADA Access Controls, Fencing, Sprinkler (Fire Suppression), Flush Valves, Water Heaters, Clock, Lighting Retrofit, Bus Canopies, Canopies to Portables Buzz in Intercom), ADA Garden Access, Remodel Student Restrooms in Older Building (Fixtures, Partitions, Ceilings), Sewer/Utilities, Lighting Retrofit, Fencing, Flooring, Painting, Fire Sprinkler Head Replacement 5 2 FITZHUGH LEE TLC ADA New Timeout Room and Ramp to Cafeteria, Add Fencing, Painting, Flooring Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 19 of 61

FLOYD MS Fine Arts Addition (Band, Choral, Orchestra) and Support Staff Space, Exit Doors Upgrade, Repaving, Water Pipe Replacement, Security System Upgrade, CCTV Surveillance Systems, Plumbing Upgrade Upgrade Monitors, ADA Restroom and Changing Area, Addition to the Food Service Areas, 19 IU's, Addition to New Media Center, Modifications to old Music, Band & Choral, Switchgear Upgrade,HVAC RTUS, HVAC Main Gym, Upgrade Plumbing, Roofing, CCTV Surveillance Systems Access Controls, Add Concrete Path to Existing Asphalt, Flooring, Painting 2 FORD ES Roofing, Painting, Flooring, HVAC Upgrade, Security System Upgrade, Playground Upgrade, Fencing Food Service Door Bells, Upgrade Temperature Monitors, Install Ringers on All Manager's telephones, Food Service Small Equipment, HVAC Main Gym, Parking Lot & Bus Lane Paving, Access Controls Buzz in Intercom), Playground Equipment, Gym Flooring, HVAC, Emergency Generators, Fire Alarm, Lighting Retrofit 7 FREY ES Add Classroom Door Locks, Upgrade Food Service Space, Playscape Upgrades, Exterior Lighting Upgrade, ADA Curb Cuts and Walkways Food Service Door Bells, Install Ringers on all Manager's Telephones, Upgrade Temperature Monitors, HVAC Main Gym, Access Controls, Whiteboards, Landscaping & Additional Trees, Acoustical Panels in Gym Buzz in Intercom), ADA Fence Around Primary Playground, Flooring, Playground Equip., Painting, Classroom Casework, Water Coolers, Fire Sprinkler Head Replacement 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 20 of 61

GARRETT MS Fine Arts Addition Band, Choral, Orchestra and Support Staff Office Space, Flooring, Alarm System Upgrade, Water Piping Upgrade, Light and Sound System, Locker Room Renovation, Add Exterior Lighting, Redesign Parking, Repave, Restroom Renovation, Roofing, CCTV Surveillance System, ADA Restroom Renovation, Restripe ADA Parking, Add Lockers Food service Drains, Door Bells & Grease Traps, Install Ringer's on All Manager's Telephones, ADA Restroom Modification, Upgrade Temperature Monitors, Food Service Small Equipment, Provide Ramp, Main Switchgear & Panel Upgrades, HVAC Main Gym, CCTV Surveillance Systems, Enclose Media Center & Add Security Gates, Add Covered Walkway, Replace Theater Seating, Lighting & Sound System Access Controls, Existing Exploratory Space Modified to be Cafeteria & Construct New Kitchen, Fire Suppression, Ceiling Replacement, Added 3 New Exploratory Classrooms, Added 9 New Science IU's, Modify/Renovate Restrooms (Replacement of Flooring, Partitions, Plumbing Fixtures, Ceilings, Lighting, Paint, Added Hand Dryers), Modify Existing Kitchen New Serving & Dining, Modify 3 Existing Commons Areas for Teacher Team Planning Rooms, Abatement of Hazardous Materials, Asphalt Paving, Add'l Parking, Flooring, Painting, Music Casework, Water Heaters, Fire Alarm CCTV Surveillance System Replacement (incluyded in construction), 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 21 of 61

GARRISON MILL ES GREEN ACRES ES Painting, Flooring, Security System Upgrade, Restroom Renovation, Drainage Upgrade, Add Exterior Lighting, Stage Curtains and Blinds, Playscape Upgrades and Walkways Add Classroom Door Locks, ADA Ramps, Add Canopy, Fencing and Gate, Add Playground Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringer's on all Manager's Telephones, Replacing Existing Emergency Generator, Connect Lights, Cooler, Freezer & Phone System to Emergency Generator, Upgrade Air Conditioning in Gym & Kitchen, Bus Lane & Parking Lot Re Paving, Increase Parking Spaces, Re Conditioning Metal/Roof Replacement for Covered Play Area, Access Controls, Callback Buttons for Every Classroom Food Service Door Bells, Install Ringer's on all Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, HVAC Main Gym, Access Controls, Fix Drainage, Add Fencing Between Street & Portables, Increase Lighting in Parking Area & Back of Building, ADA Canopy from Entrance to Parking Area, Plant trees Buzz in Intercom), Playground Equip.,Gym Flooring, HVAC, Piping, Fire Alarm, Lighting Retrofit, Electrical System Upgrade, ADA Sidewalks & Handrails Constructed from Rear Entrance to each Playground & Track Surface Buzz in Intercom), Lighting Retrofit, Landscaping, Playground Equip., Flooring, Painting 5 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 22 of 61

GRIFFIN MS Painting, Roofing, HVAC Upgrade, Home Economics Safety Code Upgrade, Security System Upgrade, CCTV Surveillance System, Drainage Upgrade, Repaving, Upgrade Doors Food Service Addition of Admin & Pupil Personnel Services, Addition of New Cafeteria & Kitchen, Addition of 14 IU's, Switchgear Upgrade, Replace HVAC, HVAC Main Gym, Metal Roof Refinish, Renovate Theatre, Flooring/Network Access, Covered Play Area, Restroom modifications Access Controls, Modify/Renovate Restrooms (Replacement of Fixtures, Partitions, Ceiling, Lighting & Painting), Concrete Loading Docks, Auditorium Seating, Media Casework, Electrical System Upgrades, Elevator, Water Coolers, Piping, Site Lighting, Theater Lighting 2 HARMONY LELAND ES Painting, Replace Alarm System, Add Emergency Callback Buttons, Flooring, Water Pipe Replacement, Renovate Restrooms, Drainage Upgrade, Add Parking Lot Lighting, Playscape Upgrades and Walkways, Repaving Upgrade Temperature Monitors for Walk in Coolers & Freezers & Grease Traps, Install Ringer's on All Manager's Telephones, ADA Provide 2 Restrooms Doors, ADA MOID & Special Needs Pre K Classroom Modifications, Add 250' fence, Addition of 10 IU's, Switchgear HVAC Upgrade, HVAC Main Gym, Roof Replacement, Metal Roof Re Conditioning, Replace Sign, Landscaping, Drainage Improvements, Whiteboards, Access Controls Buzz in Intercom), Playground Equip., Window Replacement, Add'l Parking, Retention Pond Drainage, Café Stage Curtain, Stage Lighting, Clock, Freezer Lighting, Lighting Retrofit 3 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 23 of 61

HARRISON HS Band Room Addition, Roofing, Painting, Flooring, Renovations for CTAE Construction, Tennis Court and Track Resurfacing, Fire Alarm System Upgrade, Widows Upgrade, Drainage Upgrade, Repave Parking Lot, Add Exterior Lighting, Modify Facilities for T&I Programs Auto Tech, Computer Science, Culinary Arts, Law Enforcement, Telecommunications Lab, Add Girls' Softball Field, CCTV Surveillance Systems, Roof Repairs, Restroom Renovations, ADA Curb Cuts and Walkways, ADA Restroom Partition Renovation Temperature Monitors for Walk in Coolers & Freezers & Door Bells, Install Ringers on All Manager's Telephones, Food Service Small Equipment, Re Roofing, Replace Cooling Towers, CCTV Surveillance Systems, Pave Busport & Upper Parking Lot, Renovate Classrooms, Resurface Tennis Courts, Provide Additional Storage Area, Provide Additional Outdoor Area, Theater, Remove Arch, Add Acoustics, Curtains, Lighting, Add Motion Detectors ADA Classroom Modifications, ADA Automatic Door Openers, Broadcast Media Lab, Security Fencing@Football Field, Gates & Bollards, Remediating Tennis Courts, Fence Repair, Pressbox Replacement, Cafeteria Addition (included in 9th grade center) Modify/Renovate Theater (Seating, Flooring, Painting, Ceiling & House Lights), Modify Space for Choral, New 9th Grade Center, Playfield Renovation, Track Resurfacing, Water/Utilities, Flooring, Emergency Generator, Electrical System Upgrade, Football Sports Lighting, Stadium Sound, CCTV Surveillance System Replacement (included in construction), Renovate existing rooms into a Marketing Events Management Suite, 7 HAVEN AT FITZHUGH LEE ADA Counselor's Suite ADA Restroom Renovations, ADA Restroom & Entry Modifications, Fencing, ADA TASB Office Modifications, CCTV Surveillance Systems, Provide Drop Ceiling with New Lighting, Main Switchgear & Panel Upgrades, Parking Lot & Bus Lane Paving, Re Roof Sections of Building Add'l Fence & Gates (Student Safety) 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 24 of 61

HAVEN AT HAWTHORNE - HAVEN ADMINISTRATION (JUNE 2015) Replace Alarm System, Add Storage Vault for Special Ed Records, Drainage and Landscaping Upgrades, Upgrade Playground, Playscapes and Walkways, Timeout Room Modifications Temperature Monitors for Walk in Coolers & Freezers, Food Service Door Bells, CCTV Surveillance Systems, Main Switchgear & Panel Upgrades, Replace HVAC System, Painting, Re Conditioning/Metal Roof Replacement For Covered Play Area, Controls, Add'l Parking, 2 HAYES ES HENDRICKS ES (formerly AUSTELL INTERMEDIATE SCHOOL) Replace Carpet in Covered Play Area/Gym, Flooring, Upgrade Fire Alarm, Roof Repair, Drainage and Lanscaping Upgrades, Upgrade Playscapes and Walkways, ADA Curb Cuts and Walkways, Restroom Renovations 61 IU Replacement Elementary School, ADA Classroom Provide Hot Water Add 8 IU's, HVAC Main Gym, Access Controls, Enclose Walkway, Paint Interior & Exterior Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Repair & replace Exterior School & Building Signage, Provide HVAC in Gym, Access Controls, Add Surveillance Cameras, Build Additional Outdoor Storage Area Buzz in Intercom), Entry Drive Modification, Paving (Add'l Parking), Playground Equip., Window Film, Kitchen Exhaust, Flooring, Athletic Flooring in Gym Buzz in Intercom), Gym Flooring, Painting, Flooring, Drainage Perimeter fencing between school & adjoining properties, 1 3 HIGHTOWER TRAIL MS Flooring, Home Economics Safety Code Upgrades, Security System Upgrade, CCTV Surveillance System, HVAC Repair, Painting, Drainage Upgrades, Walkways Upgrades, Add Exterior Lighting, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Food Service Small Equipment, Addition for Band & Orchestra, HVAC/PE Gym, Theatre Lighting, Replace Walls, Landscaping, Whiteboards, CCTV Surveillance Systems Access Controls, Modify Front Office & Lobby Windows, Modify Front Entry Doors, Modify Existing Offices to Teacher Planning Rooms, Auditorium Seating, HVAC, Lighting Retrofit Paving (bus, car, drive, fire lanes), add separate drive, add speed humps, 5 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 25 of 61

HILLGROVE HS Land Acquisition New 98 IU's, ADA Renovate Restroom, ADA Restroom, Food Service Small Equipment, Install Sink, Baseball/Softball ADA Sidewalk, Practice Field Renovation. CCTV Surveillance Systems HOLLYDALE ES Replace Carpet, Replace Alarm System, Drainage Upgrade, Paving, ADA Accessibility to Playground, Upgrade Playscape and Walkways, ADA Plumbing/Restroom Renovations Upgrade Temperature Monitors, Install Ringers on All Manager's Telephones, Replace Walk in Cooler/Freezer, ADA Carpet Workroom. Food Service Small Equipment, Add 8 IU's, Main Swirchgear & Panel Upgrades, Replace HVAC System on Original Building and Main Gym. Painting, Upgrade Urinals, Toilets, Sinks, Water Coolers & Valves, Roofing for Front Canopy, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Install 3 Speed Bumps, Increase Electrical Outlets in Classrooms, Upgrade Intercom, Door Locks CCTV Surveillance System Replacement, Renovate ADA Transition Academy Kitchen, ADA Automatic Door Openers, Stadium Emergency Lights, Visitor Stand Fencing, Practice Field Fencing w/gates, Perimeter Fencing, Concrete Paving, Site Lighting Buzz in Intercom), Sprinkler (Fire Suppression), Lighting Retrofit, Security Lighting, Stage Lighting, Electrical System Upgrade, Playground Equip. Traffic queing improvements, drop off lane, 7 7 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 26 of 61

KEHELEY ES KELL HS KEMP ES Replace Carpet, Replace Roof, Upgrade Secrity System, Upgrade Electrical Outlets, Drainage and Landscape Upgrade, Repair Playground, Upgrade Playscape and Walkways Land Acquisition, New 91 IU High School, CCTV Surveillance System Land Acquisition, New 61 IU Elementary School Temperature For Walk in Coolers & Freezers, Door Bells, Drains, & Grease Traps, Install Ringers on All Manager's Telephones, Air Conditioning for Covered Play Area, Access Controls, Repair & Restripe Parking Lot, Install Hand Dryers in each Restroom Food Services Door Bells, Upgrade Temperature Monitors, Food Service Small Equipment Food Service Door Bells, Upgrade Temperature Monitors, Provide Air Conditioning in the Gym, Access Controls, Fence Perimeter Buzz in Intercom), Fence Playground, Fire Door Hardware Replaced on 16 Doors, Enlarge Office to Lobby Viewing Window, Renovate Vault to be Fireproof, Renovate Staff Restrooms & Other Admin. Areas, Modify/Renovate All Restrooms (Fixtures, Partitions, Accessories, Finishes & Lighting), Playground Surfacing, Window Replacement, HVAC, Fire Alarm, Sprinkler (Fire Suppression), Site Lighting, Freezer Lighting CCTV Surveillance System Replacement, ADA Automatic Door Openers, ADA Flooring, Overhead Grill, Bus Canopy, Relocate Lockers, Theater Lighting Upgrade Buzz in Intercom), Security Fencing @ Bus Gravel Lot, Gym Flooring, Painting, Flooring ADA improvements (sidewalk, curb cuts for wheelechair access), painting handicap spaces, Gym floor replacement, Playground replacement, 7 4 4 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 27 of 61

KENNESAW ES Painting, Flooring, Exterior Lighting, Upgrade Playscapes and Walkways Temperature Monitors For Walk in Colers & Freezers & Door Bells, Install Ringers on All Manager's Telephones, ADA Hot Water, Fence Between Play Field & Retention Pond, Modify Restroom in Self Contained Classroom, HVAC Main Gym, Access Controls, Enclose Walkway between Buildings, Install Hand Dryers in Students Restrooms, Venetian Blinds in Classroom & Library, Annex Classroom Function Locks on Interior Doors Buzz in Intercom), Asphalt Paving, Site Lighting, Roofing, Lighting Retrofit, Fire Alarm, Window Replacement, New Ceilings (excluding Annex Building). Gym floor replacement, 1 KENNESAW MOUNTAIN HS New 91 IU High School, CTAE Equipment for Business Ed Labs, Drafting, Family and Consumer Science, Graphic Arts, Horticulture, Integrated Information Systems, Introduction to Technology, Law Enforcement, Marketing, TV Media, Modifications for Visually Impaired, ADA Flooring, CCTV Surveillance System Food Service Door Bells, Install Ringers on All Manager's Telephones, Upgrade Temperature Monitors, Add Gates At Bus Entrance and Driveway Leading to Sports Field, Food Service Small Equipment, ADA access to track, CCTV Surveillance Systems, Repave Road to Practice Field, Provide Exterior Lighting in the Parking Areas, Landscaping, Resurface Track CCTV Surveillance System Replacement, ADA Transition Academy Renovation, ADA Automatic Door Openers, ADA Restroom Modification, Incline Chair Lift (SE Stair), Roof Insulation, Pedestrian Gates, Flooring, Painting, Theater Lighting 1 KENNESAW WAREHOUSE Building Modifications Including Electrical Upgrade and Data Center Move Temperature Monitors for Walk in Coolers & freezers, ADA Audiology LAB, Food Service, Access Controls Food Service Equip. Upgrades, Add/Mod to Include Construction of 3,550 SqFt Cooler, Modify FNS Test Kitchen, Admin, Warehouse, & Classroom Areas, Equip. for Audiology Services Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 28 of 61

KINCAID ES Painting, Flooring, Add Emergency Callback Buttons, Air Condition PE Building, Renovate Restrooms, Renovate Open Space Classrooms, Upgrade Playscapes and Walkways, Curb Cuts, Walkways, Railing Temperature Monitors for Walk in Coolers & Freezers, Install Ringers on All Manager's Telephones, ADA Utensil Washer, Hood, & Booster Heater, ADA Restroom Renovations, ADA Special Needs Playscape, Replace Emergency Generator, Parking Lot & Bus Lane re paving, Roofing For sections of Building, Re Conditioning Roof Replacement for Covered Play Area, Access Controls, Gate At Main Entrance, Improve Drainage at Playgrounds, Sink in Art Room, Provide New Marquee Buzz in Intercom), Add/Mod Includes Equip. Storage Building & Student Toilets for PE, Renovate & Modify Kitchen, Add Walk In Freezer, Playfield Renovation, Playground Equip., Sprinkler (Fire Suppression), HVAC, Lighting Retrofit Replace temporary Annex Building w/new permanent wing, Gym electrical, Expand parking lot, bathroom modifications, 4 KING SPRINGS ES Add Emergency Callback Buttons, Incline Wheelchair Lift, Painting, Flooring, Roofing, HVAC Upgrade, Security System Upgrade, Upgrade Kitchen and Freezer Space, Repaving, Playground, Playscape and Walkway Upgrades, Stage Wheelchair Lift, ADA Restroom Renovations Temperature For Walk in Coolers & Freezers, Door Bells, Food Service Small Equipment, Main Switchgear & Panel Upgrades, HVAC Upgrades in Main Gym, Re Conditioning/Metal Roof Replacement for Covered Play Area, Access Controls, Callback Buttons Access Control Enhancement (Front Door Buzz in Intercom), Add/Mod to include Addition for Admin & Pupil Personnel, CCTV Surveillance System, Modify/Renovate Restrooms (Replace Tile Floor, Ceilings, Tile Wall Finish, Partitions, Plumbing Fixtures, Lighting & Re Paint), Gym Flooring, Flooring, HVAC, Water Coolers, Sprinkler (Fire Suppression), Clock, Fire Alarm, Site Lighting Reposition fence & add sidewalk leading to school, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 29 of 61

LABELLE ES Painting, Flooring, Roofing, Add Emergency Callback Buttons, Upgrade Restrooms, Drainage Upgrades, Paving, Playground, Playscape and Walkway Upgrades, Security System Upgrade Temperature Monitors for Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, ADA Restroom Improvements, Provide a Door from the Special Needs Classroom directly into the H/C Stall, Addition for Admin & Pupil Services, Addition of 10 IU's, Switchgear/Panel, HVAC/PE Gym, Metal Roof Refinishing, Security Lighting, Enclose Walkways, Whiteboards, Replace Existing Kitchen Exhaust, Access Controls, Security Cameras Buzz in Intercom), ADA Wheelchair Lift, Lighting Retrofit, Add/Mod to Include Kitchen Renovation (Replace Flooring in Storage Room & Office, Replace Ceiling & Lights, Add Staff Lockers, Painting), Hazardous Material Abatement, Add'l Parking, Playground Equip., Site Signs, Cafe Stage Curtains Gym floor replacement, 2 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 30 of 61

LASSITER HS New Band Room, Replace Storm Water Line, Add Mezzanine Stair, Landing and Door, Add Fence and Gate, Paving, Painting, HVAC Upgrade, Resurface Tennis Courts, Drainage Upgrade, CCTV Surveillance System, Plumbing and Electrical Upgrades, Sound Wall, Upgrades for Visually Impaired, Restroom Renovations, ADA Curb Cuts, Toilet Stall Renovations and Automatic Door Holdopens Food Service Door Bells, & Drains, Install ringers on All Manager's Telephones, Upgrade Temperature Monitors, ADA Stadium improvements, Repair Cooler/Freezer, ADA Mat Table Repair, Food Service Small Equipment, repair the Emergency Generator, Main Switchgear/Panel Upgrades, Replace Carpet throughout & Add Carpet to the Choral Room, Replace Rubber Base in All Spaces including the Corridors, Replace Cooling Towers, Replace Gym Bleachers, Resurface Track, CCTV Surveillance System, Improve Drainage & Add Sidewalk, Repair & Replace Theater Seating CCTV Surveillance System Replacement, Security Fencing for Stadium, ADA HVAC, Fencing & Gates for Visitor Side of Stadium, Add/Mod to Include Theater for Performing Arts, Modify Existing Admin & Guidance/Pupil Personnel, Modify Existing Engineer & Tech Lab Facility to Meet GA DOE Facility Specs & Sq Footage, Kitchen & Cafeteria Renovation & Expansion (Cooler & Freezer Replacement, Flooring, Painting, Electrical Upgrade, Ceiling & Lighting), Modify Media Center & Replace Casework, Asphalt Paving, Tennis Courts Resurfacing, Water/Utilities, HVAC, Lighting Retrofit, Security Lighting, Football Sports Lighting, Softball Sports Lighting ADA Automatic Door replacement, 5 LEWIS ES Flooring, Drainage Upgrade, Add Exterior Lighting, Field Upgrades, Expand Physical Education Facility, Upgrade Playscapes and Walkways, ADA Curb Cuts, Walkways, and Restroom Renovations Temperature Monitors For Walk in Coolers & Freezers, Door Bells, Install Ringers on All Manager's Telephones, Add 1 IU PE Gymnasium with Restroom, Modify Existing PE Gym to Accommodate Guidance & Administration, HVAC/PE Gym, Paving Bus Lane & Parking Lot, Door Locks, Access Controls Buzz in Intercom), Traffic Gates @ Bus Entrance, ADA Playground Fencing, Perimeter Fencing Behind School, Fire Sprinkler Head Replacement, Lighting Retrofit, Playground Equip., Sanitary Sewer Upgrade, Food Service Equip., Kitchen HVAC, Water Heaters, Emergency Generators, 1 Clarkdale ES Replacement also includes funding from self insurance, Travelers Insurance, FEMA/GEMA. 31 of 61