The Residences at Alewife Station

Similar documents
Innovation. Collaboration. Inspiration.

The subject site plan amendment proposes the following revisions to the approved site plan:

Chapter 3 Site Planning and Low Impact Development

GRACE CHURCH EXPANSION

Appendix E: Illustrative Green Infrastructure Examples

The Benefits and Challenges Associated with Green Infrastructure Practices

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Draft Rhode Island Stormwater Design and Installation Standards Manual

RIVERSIDE, Newton MA June 9, 2011

Innovation. Collaboration. Inspiration.

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Environmental Review Part 55 Floodplain Management Subpart C. 8-Step Decision Making Process

Reconnecting New Haven: Downtown Crossing

Introduction Post-Construction Stormwater Management Performance Requirements

2015 Campus Master Plan Update

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

MALLETTS BAY INITIATIVE

Springhill Suites by Marriot TR Limited DRI Hearing Hermann Foundation Room Falmouth Public Library

SHEFFIELD PARK Paulding County, GA DRI #588

Appendix I. Checklists

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Introduction Post Construction Stormwater Management Performance Requirements

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Existing Conditions. Planning and Design Principles

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Chesapeake Bay Critical Area Conservation Plan

PART 1: PROJECT SUMMARY. The application is Attachment A. The site plan is Attachment B.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

UNIVERSITY PRESBYTERIAN CHURCH - RENOVATION & ADDITION 209 EAST FRANKLIN ST., CHAPEL HILL, NC 27514

MONTGOMERY COUNTY PLANNING DEPARTMENT

Does Green Infrastructure Pay? WASHOE COUNTY COMMISSION CHAMBERS RENO, NEVADA

Structural Stormwater Best Management Practices

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Elderberry, Pioneer, Junction

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

Stormwater & South Carolina. A Case for Low Impact Development

WELCOME TO OPEN HOUSE TWO November 28, 2018

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

AUSTIN MEDICAL DISTRICT MASTER PLAN"

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

MONTGOMERY COUNTY PLANNING DEPARTMENT

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Neighborhood Districts

Smart Growth Development Checklist

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

OP Council Resolution June 16, Planning and Development Services

Queensborough Eastern Neighbourhood Node. Community Open House

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

Complete Neighbourhood Guidelines Review Tool

UNCW CAMPUS MASTER PLAN

DRAFT MAP AMENDMENT FLU 04-4

Pennsylvania Stormwater Best Management Practices Manual

BISCUIT RUN PARK MASTER PLAN

GREEN STREETS & INFRASTRUCTURE: A COUNTY APPROACH. Mimicking Nature to Manage Stormwater in Developed Areas

Tonight s Agenda. Disbrow Park & Facilities Master Plan

NORTHEAST DISTRICT. Description. Opportunities

SEMSWA s Role in the Land Development Process

Post - Construction Hydromodification Development Requirements

Description of Preferred Alternative

Third Ave CSO Integrated Green Infrastructure

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Mill Conversion Overlay District Zoning Bylaw Amendment

Working Group Meeting

STAFF REPORT NATIONAL MEDAL OF HONOR MUSEUM

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

SUBDIVISION PLANNED UNIT DEVELOPMENT & REZONING STAFF REPORT Date: May 5, 2016

New Auburn Village Center Study Auburn, Maine

IRVINGTON LOFTS 2017 AIA INDIANAPOLIS DESIGN AWARDS

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

SECTION 4(f) DE MINIMIS DOCUMENTATION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Review of Opportunity Area C Draft Comprehensive Plan and Draft BOS Follow-On Motions. Special Working Group Meeting March 4, 2015

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

What does LEED characterize?

Retrofitting Commercial Shopping Centers

Town of Westport. Design Guidelines Development Committee Public Informational Presentation

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

1. Project Description

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

Subject: Sea Level Rise Constraints and Opportunities for India Basin

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Transportation. Strategies for Action

The Art and Science of Stormwater Retrofitting

Exercises: Using LID Feasibility Worksheets

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

Parcel 5. Level 1 Application March 12, Design Submittal POST ROAD RESIDENTIAL

The Ritz-Carlton, Paradise Valley

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

Transcription:

The Residences at Alewife Station 195 & 211 Concord Turnpike Community Meeting Peabody School November 10, 2016

Site Context Special District 4

Special District 4 Restored Planned Development

Special District 4 Restored

The Residences at Alewife Station Site Plan & Architecture

Site Context Plan

Site Context Plan Birdseye looking North Birdseye looking South

Existing Site Conditions

Site Constraints RT. 2 / Concord Turnpike VOX Garage Garage Existing Drive Pedestrian Access

Breaking Down the Street Wall

Breaking Down the Street Wall

Creating Open Space Raingarden Entry Court Drive Courtyard Courtyard Raingarden

Creating Open Space Raingarden Entry Court Drive Courtyard Courtyard Courtyard Courtyard Courtyard Raingarden

TWO WAY TWO WAY Site Access Plan ONE WAY ONE WAY TWO WAY TWO WAY SERVICE

Major Pedestrian Routes BIKE BIKE BIKE BIKE

Site Plan 320 rental units 200-space garage 42 surface parking spaces

Building 1 Looking East

Building 1Bridge & Site Access

Building 1Bridge & Site Access

Building 2 Looking East

View Looking West

Building 2 Entry & Site Egress

Access Drive Looking West

Access Drive Looking North to RT.2

Building 2 Courtyard

Access Drive Looking East

Project Summary 320 rental units (studio, 1, 2 & 3 bedroom) 242 parking spaces (200 in garage, 42 other) 5 stories over parking (68 feet) 324,612 GSF building 1.95 FAR

The Residences at Alewife Station Site Improvements

Site Improvements In accordance with the Massachusetts Wetlands Protection Act (WPA) 310 CMR 10.00 and the Stormwater Management Handbook guidelines for Redevelopment Projects, the project analyzed the following existing and proposed conditions: Impervious & Pervious Groundcover Areas Stormwater Management & Water Quality Treatment 100 Buffer to Bordering Vegetated Wetlands Land Subject to Flooding (Resource Area)

Existing Site Conditions Lot Area = 3.8 acres Impervious Area = 92.9% Minimal Stormwater Treatment Small Portion of lot located within 100-foot wetland buffer Located within FEMA 100-year Floodplain

Impervious & Pervious Groundcover Areas Existing Site = 3.8 acres Impervious Area = 3.6 acres (93%) Proposed Impervious Area = 2.6 acres (70%) Project adds nearly one (1) acre of new pervious area

Stormwater Management & Water Quality Treatment The project will employ natural & structural Best Management Practices (BMPs) to manage & treat stormwater runoff: Wet Pond Rain Garden Catch Basins (Deep Sump w/ Hoods) Water Quality Treatment Units (i.e. Stormceptor or approved equal)

Bordering Vegetated Wetlands on Adjacent Site

100 Buffer to Bordering Vegetated Wetlands Existing Total Buffer Area = 13,248 sf Impervious Area = 9,630 sf (73%) M o t e l Proposed Impervious Area = 4,900 sf (37%) Proposed Building Parking Lot Wet Pond Project significantly reduces impervious surface in buffer area

Land Subject to Flooding Design based upon current FEMA floodplain mapping for 100-Year Storm Event AND the City of Cambridge Climate Change Vulnerability Assessment (CCVA) Projections for 2030 & 2070 100-year storms Recommendation to design to 2030 projection and show ability to recover from 2070 projection

Existing Conditions Existing 100-Year FEMA Floodplain Cambridge Gateway Inn Lanes and Games FEMA 100-year Flood Elevation = 6.8 3,748 CY of Existing Flood Storage

Existing Conditions Projected 2030 100-Year Floodplain CCVA s Estimated 2030 100-year Flood Elevation = 7.5 6,276 CY of Existing Available Flood Storage

100-Year FEMA and 2030 Floodplain Mitigation

Proposed Conditions 100-Year FEMA Floodplain FEMA 100-year Flood Elevation = 6.8 Underside/Bottom of Garage Slabs located at elevation 7.5 4,172 CY of Available Flood Storage Created Project provides an additional 424 CY of Available Flood Storage

Proposed Conditions Proposed 2030 100-Year Floodplain Estimated 100- year Flood Elevation = 7.46 Parking garage slabs set at 7.5 ; building lobbies set at elevation 8.5 7,174 CY of Available Flood Storage Created Project provides an additional 898 CY of Available Flood Storage

Proposed Conditions Proposed 2070 100-Year Floodplain Estimated 100-year Flood Elevation (Based upon Estimated Sea Level Rise AND Storm Surge = 11.16 NAVD Key Building Elevations: Underside/Bottom of Parking garage slabs - Elevation 7.5 NAVD Building lobbies & first floor amenity space - Elevation 8.5 NAVD Residential Units Approximate Elevation 21.0 NAVD Building Ground floor space (lobby & amenities area) and Parking Garage Entries will utilize flood gates at openings during forecasted 100- Year Storm Events and other major storm events.

Site Improvements Summary Impervious & Pervious Groundcover Areas Replaces almost an acre of impervious area with pervious area Stormwater Management & Water Quality Treatment - Significant improvements over existing conditions; including reduction in peak flows & water quality treatment 100 Buffer to Bordering Vegetated Wetlands Impervious area in the buffer zone will be reduced by almost 50% Stormwater runoff captured and treated prior to discharge to adjacent wetlands Land Subject to Flooding Increases onsite flood storage capacity Meets the recommendations of the City s Climate Change Vulnerability Assessment Accommodates the 2030 100-yr flood projection and able to recover from 2070 projection

The Residences at Alewife Station Traffic Assessment

Traffic Study Elements Study Area approved by Traffic Department Existing Conditions Vehicles Pedestrians Bicycles Vox on Two Background Traffic Growth Project Traffic Project Impacts Proposed Mitigation

Study Area

Existing Peak Hour Site Trip Generation Weekday Morning Entering Exiting Total 31 6 37 Weekday Evening Entering Exiting Total 36 25 61

Vox on Two Monitoring Survey 222 of 227 units are leased The mode type of all weekly trips made by current tenants included: 35% single occupancy vehicle 4% rideshare 45% public & private transit 8% walk 4% bike 4% other (includes work from home) 44 to 62% fewer peak hour vehicle trips than originally estimated

Public Transit

Private Transit

Pedestrian & Bike Paths

Weekday Peak Hour Project Trip Generation Total SOV Rideshare Transit Pedestrian Bicycle Other Morning 208 73 8 95 16 8 8 Evening 172 61 7 76 14 7 7

Net New Peak Hour Project Trips Weekday Morning Entering Exiting Total Proposed Existing Net New Trips 21 57 78 31 6 37 (10) 51 41 Weekday Evening Entering Exiting Total 35 30 65 36 25 61 (1) 5 4

Project Mitigation Focus is to reduce single occupancy vehicle use: Provide ample bicycle storage & maintenance areas Provide 20 bicycles for tenant s use at no charge Provide each tenant with a complimentary Charlie Card for one month upon leasing Appoint a Transportation Demand Manager Submit annual monitoring reports

The Residences at Alewife Station Community Engagement

courbanize Visit the project page using the web address courb.co/ras Learn about new project information, see the timeline and stay in the loop We ll post information about meetings and milestone events

courbanize Two ways to participate: add comments or questions - all comments go right to the project development team and we ll respond directly Follow to subscribe & get project updates from the development team by email Comment Follow

Discussion