Illinois Planning and Environmental Studies for FRA Applications for High-Speed and Intercity Passenger Rail (HSIPR)

Similar documents
Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Pennsy Greenway Trail

1.0 Circulation Element

Welcome! Get On Board!

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017

Metropolitan Council Transportation Committee

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Ann Arbor Intermodal Station Environmental Review

DRAFT Subject to modifications

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

High Speed Rail in India-a perspective after a decade of Planning

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

Screen 1 Corridors and Profiles Evaluated

Chapter V-Transportation

DOWNTOWN MULTI-MODAL TRANSIT CENTER. City of Belvidere

Project Management Plan

South Dakota 100 Corridor Preservation

Chesterfield County Project Update

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

Port Credit Local Advisory Panel October 20 th Meeting

3.5 VISUAL AND AESTHETIC QUALITIES

Route 110 Alternatives Analysis

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Issues Requiring Future Study

Existing Transportation System 5-1

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

7.0 DRAFT SECTION 4(f) EVALUATION

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Elgin O Hare Western Access Project Local Advisory Committee. February 10, 2014

Regional Transportation District

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

Link Union Station (Link US) Project Open House September 26, 2018

URBAN MOBILITY PLANNING AND THE DEVELOPMENT OF PROPERTY VALUES Views From Around the World

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

SECTION 4(f) DE MINIMIS DOCUMENTATION

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

Figure 5. Previously Identified Viable Corridors

ALI-ABA Course of Study Land Use Institute: Planning, Regulation, Litigation, Eminent Domain, and Compensation

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

2030 Transit System Plan Refresh

TOWN COUNCIL / PLANNING COMMISSION

Jim Harkins DUNDEE WATER FRONT CIRCULATOR DUNDEE WATER FRONT CIRCULATOR. Specialists in Affordable & Sustainable Tramways. A short presentation by

Stakeholder Presentation

Parapet/Formliner/Fencing

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

CHAPTER 7: Transportation, Mobility and Circulation

BeltLine Corridor Environmental Study

Issues, Challenges & Opportunities

I-290 Eisenhower Expressway

Subject: Transit Planning in Toronto: roles, priorities and our decision making framework

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

SOUTHEAST CORRIDOR EXTENSION. PUBLIC SCOPING MEETING/OPEN HOUSE October 15, 2008

Land Use. Hardware Street Vendor Mixed-Use

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Relief Line Project Assessment

NORTH CENTRAL DISTRICT (Highlands & Centennial Park Neighborhoods)

The Role of Cities in Planning Transportation Megaprojects

EAR WORKSHOP FOR PALM BEACH COUNTY LOCAL GOVERNMENTS APRIL 2010 TREASURE COAST REGIONAL PLANNING COUNCIL

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Measuring and Modeling Differential Movement at Railroad Track Transitions

3 Vision and Goals. Vision and Goals. Blueprint for Bloomsburg. Vision. Town of Bloomsburg Comprehensive Plan,

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

9 North Downtown Master Plan & Saskatchewan Polytechnic

Planning and New Starts Development Committee. February 25, 2016

18.1 INTRODUCTION 18.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

City of Lake Mary, Florida. Evolution of a Historic Downtown with Transit Oriented Development Strategies

Project Overview. Get Involved. Public Information Meeting. Contact Information

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

East St. Louis High Speed Rail Multimodal Station

Southeast Extension to RidgeGate Parkway Scoping Booklet

County Transportation Plan Workshop

AMENDMENT NUMBER 2 TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN URS CORPORATION GREAT LAKES AND THE CITY OF ANN ARBOR

Stakeholders Meetings

Kick-off Meeting. FM No: ETDM No: 14050

Planning Districts INTRODUCTION

7.0 FINAL SECTION 4(f) AND 6(f) EVALUATION

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

West Midlands Local Transport Plan ( ) Making the Connections

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

Washington Union Station s 2nd Century DEVELOPMENT PLAN

HISTORIC BRIDGES IN PULASKI COUNTY. Bridges Listed on the National Register of Historic Places in Pulaski County

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

Transportation Committee

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

DRAFT ROOSEVELT ROAD. District Recommendations. Figure 5.23 The Roosevelt Road Corridor

Place and Opportunity: An Equity Assessment of the Twin Cities Region (

1.0 PROJECT PURPOSE AND NEED

Transcription:

Illinois Planning and Environmental Studies for FRA Applications for High-Speed and Intercity Prepared by Tim Selover, PE, AICP Parsons Brinckerhoff

On April 16, 2009, President Obama described his Vision for High Speed Rail in the United States and announced the inclusion of High-Speed and Intercity projects under the American Recovery and Reinvestment Act of 2009 (ARRA). There are several key corridors which are shown below. In response to the June 23, 2009 Federal Railroad Administration (FRA) guidance on implementing the vision for developing HSIPR projects, the Illinois Department of Transportation (IDOT) prepared applications for funding for the FRA s Track 1, 2, and 3 Programs. For Track 1 applications for final design and construction of ready to go projects, the FRA required completed project-level National Environmental Policy Act (NEPA) documentation, such as final environmental impact statements (EIS), environmental assessments (EA), or categorical exclusions (CE). For Track 2 applications, which include the development of a set of inter-related projects that result in the implementation of new high speed or intercity passenger rail corridors, the FRA required a corridor-wide EA to be performed to comply with NEPA requirements. This corridor-wide EA documents potential environmental impacts at the corridor or program level. In addition, the FRA established evaluation criteria for all of the HSIPR applications that included economic recovery benefits and other public benefits. Below is a summary of the applications tracks: Track 1: Ready to go projects Track 2: Inter-related projects for implementing new high-speed or intercity rail corridor Track 3: Design and environmental studies in preparation for Tracks 1 & 2 Track 4: For projects with at least 50% non-federal share Illinois Planning and Environmental Studies for Page 1

The IDOT applications for HSIPR projects included the following projects: Track 1 Validation that the Chicago St. Louis High Speed Rail Project Final EIS (Jan 2003) and the Record of Decision (Jan 2004) CE for Chicago St. Louis High Speed Rail Corridor CE for Galesburg Congestion Relief Project Track 2 EA for double-tracking of the Chicago St. Louis HSR Corridor EA for re-introducing intercity passenger rail for the Chicago Dubuque Corridor Track 2 Application Summaries The Track 2 applications were due on October 2, 2009 and included an EA as part of the application for both the Chicago-St. Louis and Chicago-Dubuque corridors. Below is a summary of both of these projects. Chicago-St. Louis Corridor Environmental Assessment An EIS was prepared for this corridor in 2003 and included a preferred alternative. This preferred alternative uses the existing Amtrak routing between Amtrak Station in St. Louis and Union Station in Chicago. This routing uses the Union Pacific Railroad between St. Louis and Dwight. Between Dwight and Chicago, three routing options were examined. They included: Canadian National Illinois Central / Union Pacific Alignment: This routing is the current Amtrak service via the Union Pacific and Canadian National. Norfolk Southern Alignment: This routing uses the Canadian National Illinois Central mainline and Norfolk Southern (formerly Conrail) via Kankakee and would serve the proposed South Suburban Airport. Rock Island District Alignment: This routing uses the Union Pacific between Dwight and Joliet and the Metra Rock Island District between Joliet and Chicago Union Station. Illinois Planning and Environmental Studies for Page 2

These routings are shown below: Source: Final Environmental Impact Statement Chicago St. Louis High-Speed Rail Project, FHWA-FRA, January 2003 The Chicago St. Louis corridor project proposed to provide a double track mainline between St. Louis and Chicago. Other project elements include, rehabilitate the existing mainline, in terms of roadbed; tie replacement, rail and ballast; and install or upgrade train signaling where necessary. Maximum speed will be 110 mph between St. Louis and Joliet, and current maximum speeds between Joliet and Chicago. It is anticipated that the vast majority of construction activities, including staging areas, will be within existing railroad rights-of-way. Chicago-Dubuque Corridor Environmental Assessment Previous studies for this corridor include a Feasibility Study on Proposed Amtrak Service Chicago Rockford Galena Dubuque (Revised June 22, 2007) that examined options for incremental improvements to support one round trip per day between Chicago and Dubuque, and an ongoing Transit Alternatives Analysis study being conducted by the Northern Illinois Commuter Transportation Initiative (NICTI) that is looking at passenger and commuter rail options between Elgin and Rockford, Illinois. Based on the previous studies, several routing options were examined to provide service from Chicago to Dubuque. These routings include: Route A: Chicago Elgin Rockford Galena Dubuque via Amtrak/Metra/UP/CN: This routing is begins at the Amtrak Chicago Terminal in downtown Chicago and uses the Metra Milwaukee District West (MD-W) Line to Big Timber; the Union Pacific (UP) Belvidere Subdivision to Rockford; and the Canadian National (CN) Freeport Subdivision to Dubuque serving stations in Chicago, Bensenville, Belvidere, Alpine Road, Rockford, Freeport, Galena, and Dubuque. Route B: Chicago Elgin Genoa Rockford Airport Rockford Galena Dubuque via Amtrak/Metra/ICE/IRY/CN: This routing beings at the Amtrak Chicago Terminal in downtown Chicago and uses the Metra MD-W Line to Big Timber; the Iowa, Chicago, Illinois Planning and Environmental Studies for Page 3

and Eastern (ICE) Railroad [now the Canadian Pacific (CP) Railway] to Davis Junction; the Illinois RailNet (IRY) to Rockford; and the CN Freeport Subdivision to Dubuque serving stations in Chicago, Bensenville, Genoa, Rockford Airport, Rockford, Freeport, Galena, and Dubuque. Route C: Chicago Elgin Genoa Rockford Galena Dubuque via Amtrak/CN: This routing beings at the Amtrak Chicago Terminal in downtown Chicago and uses the Canadian National Freeport Subdivision to Rockford and Dubuque, serving stations in Chicago, West Elgin, Genoa, Alpine Road, Rockford, Freeport, Galena, and Dubuque. Route D: Chicago Elgin Genoa Rockford Galena Dubuque via Amtrak/Metra/ICE/CN: This routing beings at the Amtrak Chicago Terminal in downtown Chicago and uses the Metra MD-W Line to Big Timber; the ICE Railroad to Genoa; and the CN Freeport Subdivision to Rockford and Dubuque serving stations in Chicago, Bensenville, Genoa, Alpine Road, Rockford, Freeport, Galena, and Dubuque. These routings are shown below. Source: Feasibility Report on Proposed Amtrak Service Chicago-Rockford-Galena-Dubuque, Amtrak, Rev. June 22, 2007 The Chicago Dubuque corridor project will rehabilitate existing rail infrastructure to 79 mph maximum operating speeds in order to restore previous intercity passenger rail service (Amtrak last served this route in 1981). It will rehabilitate roadbed; replace ties, rail and ballast; and install or upgrade train signaling where necessary. It is anticipated that the vast majority of construction activities, including staging areas, will be within existing railroad rights-of-way. Illinois Planning and Environmental Studies for Page 4