HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

Similar documents
HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

PLATTEVILLE MIDDLE SCHOOL

Encumbered Balance (E-D) Branham HVAC Implementation Complete 100% 03/04/19 07/19/19 $765, $635, $635, $130, $0.

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

Forest Hills Facilities Plan

National Property Inspections

Tillamook High School Bond Projects

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

2014 Bond District-wide Facility Repairs

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

2014 Bond District-wide Facility Repairs

Facilities Management State-Funded and Billable Services

Master Facility Planning Update School Board Meeting May 26, 2016

Ashland School District Facility & Capacity Assessment Report 2005

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Charles W Earle Elementary School

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Genevieve Melody Elementary School

CMHC HOME MAINTENANCE CHECKLIST

2014 Bond Project Guide

Briar Crest Elementary

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013

January 11, New benches installed. Paving of parking lot adjacent to piers and the canoe put-in. Near complete with clean up remaining.

Design Presentation. Chief Operations Officer Willie Burroughs

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

Home Maintenance Schedule

Procurement Department ADDENDUM # 1

MAINE. Downloaded g. Maintain an effective pest control program so that the facility is free of pests and rodents;

Oxford Hills School District Capital Renewal Plan Updated March 2017

While most maintenance is seasonal, there are some things you should do on a frequent basis year-round:

Home Safety Checklist For Older Adults

29 Bella Fontaine Park

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Richard Henry Lee Elementary School

The Ultimate Home Maintenance Schedule

Calmeca Academy of Fine Arts and Dual Language

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

RECAPP Facility Evaluation Report

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Steve Ramsey Home Inspections

Trustee update Oct 16, 2018

Alessandro Volta Elementary School

REPAIR ESTIMATE GUIDE

CCES IEQ Walkthrough Summary Spring Room Observations (Responses)

TENANT AND LANDLORD REPAIR RESPONSIBILITIES

Single Family, Hamden, CT

Sidney Sawyer Elementary School

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Doyle Home Inspections

5 Year Capital Improvement Plan Update

Beaufort County Community College. Maintenance and House Keeping Plan

John Palmer Elementary School

Oscar DePriest Elementary School

Edward Jenner Elementary Academy of the Arts

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

Joseph Brennemann Elementary School

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

Food needs to be in sealed containers 03. FOOD: Unsealed, left in

Albany Senior Center Remodel

Appendix E: Photo Documentation

Washington Irving Elementary School

Master Project List Report

SUMMARY 1234 Main St.Edmonton AB T5T3E9 Buyer Name 07/05/2018 9:00AM

Room Number or CUSTODIAL FACILITIES WORK ORDERS ADMINISTRATION IEQ WORK ORDERS ASSIGNED DATE COMPLETION DATE 30-DAY REVISIT CLOSED

How to report a repair

DeWitt Clinton Elementary School

RESERVE DATA ANALYSIS est.1983

ce Is the Key Seasonal Home Maintenance Inspecting help keep live. help you. person to round: snow or debris. test button, which should then cause the

ALLISON ELEMENTARY SCHOOL 4315 Don Julio Blvd., North Highlands, CA 95660

SPLOST I, II, III,IV

Florence High School / Middle School Page 1 of 3 Florence, WI

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

INSPECTION La Mansion CARRETERA A BARRA DE NAVIDAD 2292 KM 6.9. PUERTO VALLARTA. JAL INSPECTED BY

AGING IN PLACE CHECKLIST Use this checklist to identify fall hazards and accessibility for the homeowner and family members.

Trustee update - Nov 9, Fire alarms: Quarterly Koorsen fire alarm system test was performed.

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

Francis M McKay Elementary School

4. Name the room designed specifically for washing, drying, folding, and ironing clothes.

George B Swift Elementary Specialty School

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski -

DOCUMENT TABLE OF CONTENTS

Front Door and Entrance Hall

TRINITY LUTHERAN SCHOOL RENOVATIONS

Mechanical Inspection Plumbing

Transcription:

$4,013,500.00 $4,013,500.00 $ 1,155,000.00 $ 1,000,000.00 $ 205,000.00 $ 275,000.00 $ 300,000.00 $ 360,000.00 $ 438,500.00 $ 280,000.00 School Status Item HS Boilers boiler controls replaced 2017 2002 2022-2032 HS Brick/Exterior Walls 2002 HS Burglar Alarm 2002 Ongoing maintenance and repair issues. Building key HS Y Door Hardware & locks $150,000.00 system not consistent - re-key needed $ 150,000.00 HS Electrical System 2002 HS Elevators & Lifts 2002 HS Y Exterior Lighting $20,000.00 security lighting for lower fields $ 20,000.00 HS HS Fire Alarm 2002 HS R Flooring $50,000.00 Library carpets heavily stained, some VCT issues 2002 $ 50,000.00 flooring has been resurfaced yearly. Wood boards are rippled from moisture and have heaved several times. Metals strips surrounding flooring loose as original installation never done properly. Floor needs full sanding, repainting and refinish with new metal edging ($18,200 for HS R Gym Floor $30,000.00 just floor refinish- not metal edge fix) 2002 $ 30,000.00 HS R Gym Divider Curtains Original motors and hardware. Fabric was replaced at some point by local sail maker. Curtains are torn and in poor $25,000.00 condition. Need immediate replacement $ 25,000.00 HS Y Gym Lights Ballast buzz, some have been replaced and still buzz. LED $56,000.00 replacement estimated cost 2002 $ 56,000.00 HS Y Gym Wall pads pads are damaged from balls - ripped in places - needs $7,500.00 replacement $ 7,500.00 HS Y Hot Water Tanks $100,000.00 one heat bundle replaced - system near end of life span 2002 2012-2017 $ 100,000.00 HS R HVAC System $30,000.00 System need balancing 2002 $ 30,000.00 HS Intercom System 2002 HS 2002 HS HS Phone System 2002 HS Plumbing 2002 HS Roof some persistent leaks - maintenance issue 2002 Courts in very poor condition, asphalt heaved, net poles heaved. Courts need complete rebuild - cannot be repaired HS R Tennis Courts $300,000.00 by resurfacing 2002 $ 300,000.00 HS Windows some fogged windows from gasket leaking, some hardware issues. Windows lack insect screens 2002 HS Scoreboards replace 2 scoreboards and shot clocks (2) 2002 HS Y Security $10,000.00 no swipe card system or panic buttons 2012 $ 10,000.00

School Status Item Boilers 2004 Brick/Exterior Walls some areas of brick have issues with moisture penetration 2004 Burglar Alarm main panel replaced in 2016 2004/2016 Door Hardware & locks Electrical System 2004 Elevators & Lifts Improve access to PAC Shop - lift difficult to use - need light switch for shop near lift exit. Examine how stage door locks for handicap access 2004 Exterior Lighting Fire Alarm 2004 Y Flooring floor tile issues near expansion joints and where flooring is installed over original wood flooring from old HS, carpet in $75,000.00 library needs to be replaced 2004 $ 75,000.00 Hot Water Tanks Scheduled for replacement summer 2017 2017 2042 HVAC System Control system could potentially be upgraded and folded into new Compass system 2004 Intercom System 2004 paint PAC and address moisture bleeding through brick work PAC Seating Seating showing signs of wear 2004 Phone System 2004 Plumbing 2004 Roof 2004 No swipe card system or panic buttons - no security Y Security $100,000.00 cameras, no single lock down key $ 100,000.00 Windows 2004 Boilers 2010 Brick/Exterior Walls 2010 Burglar Alarm 2010 Door Hardware & locks 2010 Electrical System 2010 Elevators & Lifts 2010 Exterior Lighting Fire Alarm 2010 Flooring 2010 Hot Water Tanks 2010

School Status Item HVAC System Warm weather 3rd floor & gym temp issues 2010 Intercom System 2010 Phone System 2010 2010 Plumbing 2010 Roof 2010 Y Security $50,000.00 no panic buttons - limited number of security cameras $ 50,000.00 Windows no operable windows in gym 2010 R Boilers 1963 boiler has problematic motor that we can't get $175,000.00 replacement for - units all past lifespan 1949/1963 Brick/Exterior Walls 1949/1963 Burglar Alarm no burglar alarm Y Door Hardware & locks $40,000.00 Front door and many exterior doors in poor shape Y Electrical System $200,000.00 system past lifespan 1949/1963 Y Elevators & Lifts $500,000.00 Not handicap accessible Exterior Lighting limted exterior lighting Y $30,000.00 wood trim needs painting and repairs - gutters need work Fire Alarm Flooring Hot Water Tanks 1949/1963 R HVAC System $150,000.00 Control system not working, many rooms overheat 1949/1963 R Intercom System $30,000.00 well past lifespan - no access from anywhere but main office 1949/1963 Phone System System recently replaced with refurb system 2017 Y $250,000.00 Some equipment needs repair/replacement Y Plumbing $250,000.00 Old plumbing fixtures hard to get parts for 1949/1963 R Roof $750,000.00 regular leaks in main building 1949/1963 Y Security $50,000.00 No panic buttons or security cameras Y Windows rusted metal frames - staircase window leaks when it rains - $600,000.00 no insect screens 1949/1963 R Boilers $175,000.00 Boiler well past life span - multiple sections blocked off 1953 R Brick/Exterior Walls Bricks need repointing in numerous locations. Wood trim $250,000.00 rotted and falling off 1906 Burglar Alarm no burglar alarm Door Hardware & locks Interior doors original to building

School Status Item R Electrical System $200,000.00 insufficient electrical capacity Y Elevators & Lifts $500,000.00 not handicap accessible Exterior Lighting little exterior lighting wood trim needs painting and repair - some trim missing Fire Alarm R Flooring $200,000.00 worn carpet and flooring materials throughout the building Hot Water Tanks R HVAC System $150,000.00 heat control very poor - sytem well past lifespan Y Intercom System $20,000.00 very old intercom system - only accessible from main offie R $100,000.00 multiple areas of water damage - ceilings need repair Phone System Y Plumbing $200,000.00 original plumbing - hard to get parts 1906 R Roof $750,000.00 Slate roofing materials loose and falling - many roof leaks 1906 Y Security $50,000.00 No panic buttons or security cameras 1970's replacement windows have failed springs and fogged R Windows $600,000.00 over lexan - no insect screens 1970's Upper Bell Y Bathrooms $30,000.00 Metal partitions rusted and need replacement. 1970 $ 30,000.00 Boiler approaching end of life span - has 9 of 26 sections Upper Bell R Boilers $175,000.00 blocked off and leaks regularly 1970 $ 175,000.00 Upper Bell Brick/Exterior Walls come foundation concrete spalling 1970 Upper Bell Burglar Alarm no burglar alarm Upper Bell Door Hardware & locks front entry doors have frequent hardware issues capacity issues in certain areas of the building due to Upper Bell Y Electrical System $250,000.00 window ac units 1970 $ 250,000.00 Upper Bell Elevators & Lifts no elevators or lifts Upper Bell Exterior Lighting limited exterior lighting Upper Bell wood trim needs repainting Upper Bell Fire Alarm new alarm in 2015 2015 Upper Bell Flooring old carpets replaced with new VCT in 2014-2015 pony water heater system has regular issues - well past Upper Bell Y Hot Water Tanks $50,000.00 lifespan 1970 $ 50,000.00 Upper Bell R HVAC System Temp control system needs complete replacement. Classroom AC units very old and run off non dedicated AC outlets, AC roof top units for office, Library and teacher's $200,000.00 room well past lifespan. 1970 $ 200,000.00 1970 intercom system failing. Only accessible from main Upper Bell R Intercom System $30,000.00 office 1970 $ 30,000.00

School Status Item Upper Bell 1970 Upper Bell Interior maintenance painting needs to continue. Gym needs repainting. Upper Bell Y Office Area $30,000.00 needs remodel. No privacy or security. $ 30,000.00 Upper Bell Phone System swings from 70s. Older structures removed- some newer Upper Bell Y $250,000.00 structurtes $ 250,000.00 Upper Bell Plumbing Sink/counter in teachers room needs replacement 1970 Upper Bell R Roof Rubber membrane roof from 1994 failing. Multiple leaks throughout building. Insulation has sunk leaving membrane $1,000,000.00 stretched over fasteners. Needs complete replacement 1994 $ 1,000,000.00 Upper Bell Y Security $75,000.00 No video cameras, swipe card system or panic buttons $ 75,000.00 Original 1970 windows well past lifespan - single pane metal Upper Bell Windows frames - no insect screens 1970 Lower Bell Y Boilers $100,000.00 No issues present but unit past lifespan 1958 $ 100,000.00 Lower Bell Brick/Exterior Walls 1958 Lower Bell Burglar Alarm no burglar alarm Lower Bell Door Hardware & locks Lower Bell Electrical System some upgrades to electrical systems over the years Lower Bell Elevators & Lifts no elevators or lifts Lower Bell Exterior Lighting limited exterior lighting Lower Bell wood trim needs repainting Lower Bell Fire Alarm Lower Bell Y Flooring $75,000.00 VCT issues in several classrooms $ 75,000.00 Lower Bell Hot Water Tanks 1958 Lower Bell Y HVAC System Temp control system needs replacement. Classroom window AC units are very old - many run off non dedicated $100,000.00 outlets. 1958 $ 100,000.00 Lower Bell Intercom System Lower Bell Lower Bell Interior painting needs to continue no phone system for the building - phones lines wired direct Lower Bell Y Phone System $25,000.00 to some phones $ 25,000.00 Lower Bell Y Plumbing $200,000.00 old plumbing systems past lifespan 1958 $ 200,000.00 Lower Bell Lower Bell Roof Lower Bell Y Security $30,000.00 Original 1958 single pane metal frame - no insect screens $ 30,000.00 Lower Bell Windows Original 1958 single pane metal frame 1958

School Status Item Glover Boilers 2014 Glover Brick/Exterior Walls 2014 Glover Burglar Alarm 2014 Glover Door Hardware & locks 2014 Glover Electrical System 2014 Glover Elevators & Lifts 2014 Glover Exterior Lighting 2014 Glover 2014 Glover Fire Alarm 2014 Glover Flooring 2014 Glover Hot Water Tanks 2014 Glover HVAC System ac or window ventilation in café and gym - perhaps iron grate doors? 2014 Glover Intercom System 2014 Glover 2014 Glover 2014 Glover Phone System 2014 Glover Plumbing 2014 Glover 2014 Glover Roof 2014 Glover Security 2014 Glover Windows 2014 Eveleth Y Boilers $100,000.00 no issues present but unit past lifespan 1958 $ 100,000.00 Eveleth Brick/Exterior Walls 1958 Eveleth Burglar Alarm no burglar alarm Eveleth Y Door Hardware & locks $25,000.00 some door hardware missing $ 25,000.00 Eveleth Y Electrical System $40,000.00 original system 1958 $ 40,000.00 Eveleth Elevators & Lifts no elvators or lifts Eveleth Exterior Lighting limied exterior lighting Eveleth wood trim needs painting Eveleth Fire Alarm limited fire alarm system Eveleth Y Flooring $75,000.00 classroom carpets worn & stained $ 75,000.00 Eveleth Hot Water Tanks 1958 Eveleth Y HVAC System $100,000.00 heating system ran from thermostats in one room 1958 $ 100,000.00 Eveleth Y Intercom System $15,000.00 no intercom system $ 15,000.00 Eveleth Eveleth

School Status Item Eveleth Phone System no phone system Eveleth Eveleth Plumbing 1958 Eveleth Roof some roof leaks - interior water damage Eveleth Y Security $35,000.00 no swipe cards, panic buttons or security cameras $ 35,000.00 Eveleth Windows rusted metal frames - no insect screens 1958 Burglar Alarm Door Hardware & locks Electrical System Exterior Lighting Fire Alarm Flooring lobby carpet replaced 2017 Hot Water Tanks HVAC System some heating control issues to be addressed by town Intercom System Phone System Phone system in need of upgrading Plumbing Roof some leaks Security no security from rear entrances Windows