Program Summary: A ,000 SF Program Statement: $46.41 $11,000,000 August 2013

Similar documents
A Building Area: (sf) 10,567 SF 20,321 SF total building. Cost per Square Foot: $ Construction Cost $4,424,163

A Building Area: (sf) 124,000 sf (offices & labs), 90,000 sf (covered parking) Cost per Square Foot: Varies. Construction Cost $60M

2016 AIA NEVADA DESIGN AWARDS

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

A Building Area: (sf) 43,000. Cost per Square Foot: $ Construction Cost $19,852,837

SMUD Utility Commissions Original Architect, Dreyfuss + Blackford, to Renovate and Expand Historic Sacramento Mid-Century Headquarters

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

36 TFG Design Centre. In keeping with the spirit of TFG s (The Foschini Group) vision of becoming a leading clothing PROJECT

A Building Area: (sf) 65,000. Cost per Square Foot: $246. Construction Cost $16,000,000. Date of Completion: Est. May 2014

North Elevation Existing trees along Pike Street were preserved and enhanced with extensive planting.

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

400 Park Road, Watertown, CT

New High School Concept

City of Green Administration Building. Brian Koze November 12, Lighting Schematic Design Presentation

THE ADVANTAGE OFFICE JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER. INSPIRE. BUILD. PARTNER.

A Program Summary: A fire station for a volunteer fire department that houses four apparatus bays, a conference room, and a living quarters.

01 april 2017 association for learning environments. Mac ball jill maumus. Ray Abrams School

Architectural Review Board Report

Client: University of Central Oklahoma Foundation Completion: April 2015 Scope: 18,000 SF

Imagine. Design. Deliver.

CENTERS AND CORRIDORS

Tech Report. September 9,

Thesis Proposal. Brian Regan The Virginia Historical Society Building West Wing Addition RICHMOND, VIRGINIA

Cypress High School Site Improvement Project

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

DVASE 2018 Excellence in Structural Engineering Awards Program

History of the Foundation Buildings and Landscapes

Lighting Proposal Memo

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

Alterations to a Designated Heritage Property and Authority to Amend a Heritage Easement Agreement Queen's Park

2 January 14, 2015 Public Hearing

Lindsey Beane. Executive Summary

CINCINNATI UNION TERMINAL

2012 Exhibition of School Planning and Architecture. Crockett Elementary School. Houston Renovation Lee J Brockway Award

Center for Health Research and Rural Advocacy

Briar Crest Elementary

New Hospital Tower Rush University Medical Center Chicago, IL, United States

RA1.01. Project Description:

2014 Bond Project Guide

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

Inspiration. Wall Street. Innovative Dynamic. Original. Established. Powerful Enlightened. Competitive. Modern. Intrigue

Duke University Medical School. Duke School of Nursing

lot flankage Y street 16m 6m landscape strip for large site 3m landscape strip for small medium site

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

[Lighting Proposal Memo ] Hotel and Conference Center Virginia, USA

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Bel-Air Lexus Automobile Service Station

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

UP Building Area: (sf) 205,000 SF. Cost per Square Foot: N/A. Construction Cost N/A. Date of Completion: N/A

AIRPORT BUSINESS PARK

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

City of Redlands Architectural Guidelines for Non-Residential Development

REVIEW OF ENVIRONMENTAL FACTORS HUDSON LIBRARY FIT OUT FOR MERIDEN SCHOOL, STRATHFIELD NSW

Lighting Existing Conditions and Design Criteria Report

PROJECT OVERVIEW Project type: Project name: Phase One, $21.5M, completed May 2013 Location: Completion date: responsibility of the architect

Village of Glenview Appearance Commission

CTA completes $1.1 million redevelopment/upgrade of 5,650 s/f refuse storage; Team includes: Galli Engineering, Cabo and Domingo Gonzales

Exterior monument 12.2

The Interlace. Winner Urban Habitat Award. Singapore

DINING ENTERTAINMENT SHOPPING

trade company in de rotterdam Nidera in de rotterdam

5A Appearance and Compatibility. 5B Mass and Scale. 5C Articulation. 5D Fenestration and Detailing. 5E Active Ground Floors

Brilliant alternative: Ceiling systems made of metallic mesh

Office 2.0. Beats By Dre McCann Erickson Jacobs Engineering ShopperTrak. The magazine of the Illuminating Engineering Society of North America

Urban Institute for Contemporary Arts

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

SMG Rocks. The MINI brand has, over the years, been associated with a fresh, young, vibrant and PROJECT

BUSINESS DISTRICT DESIGN GUIDELINES

Architects & Firms Rowland+Broughton

Program Summary: A church designed as a simple, contemporary worship space to attract younger members to an aging congregation.

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Ernie Podaca ABS 643 Interior Light Design Dr. Kroelinger Fall

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

Belisle Windows is a Manufacturer of Custom Hardwood Windows and Doors

06/24/16 22 JUNE 2016

Natural Structures + Refined Residential: A Tech Investment Firm in San Francisco s Presidio

EXISTING CONDITIONS SUMMARY

Decision Making Process with More than 400 Stakeholders: How to Manage Resistance to Change


Case Study. Manpower. Xsite workstations with low panels allow employees on teams to easily work with each other.

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

VALUEACT CAPITAL CORPORATE OFFICES

AIA Albuquerque 2016 Design Awards

Conference-Seminar Table & chair Case Study (tiered) Swivel chairs, Continuous Counter Top

WATERFRONT DISTRICT DESIGN STANDARDS

GOW HASTINGS ARCHITECTS ENVIRONMENTAL GRAPHICS GOWHASTINGS.COM

2012 Exhibition of School Planning and Architecture. Carroll Middle School. Construction Project of Distinction Award

APPLICATION FOR AGENDA ITEM # URBAN DESIGN COMMISSION Project # REVIEW AND APPROVAL Legistar # PROJECT ADDRESS: ALDERMANIC DISTRICT:

Spaces Hofplein, Rotterdam SevilPeach Architecture + Design

6 July 9, 2014 Public Hearing

Kaleida Health, Gates Vascular Institute and UB Clinical Translational Research Center A Buffalo research facility fosters interaction and innovation

Butler Junior High School

PHASE I BUDGET FOR THE GREATER DES MOINES BOTANICAL GARDEN IMPROVEMENTS

LA LUCIA. At night the screens appear translucent highlighting the abstract design of the Milkwood Tree graphic.

UNIVERSITY OF HOUSTON Campus Facilities Planning Committee Agenda Item Description Form

20 & 30 Frank Nighbor Place

Transcription:

The 55,000 sf expanded office space includes a new 14,000 sf mezzanine for future growth. The office zone houses the administrative functions including management, engineering, marketing, accounting, R&D, tech support, and training. The 168,000 sf manufacturing area is partially climate controlled and houses the production facilities, research and development lab and receiving and shipping functions for the company. Program Summary: Located on 12 acres, the 237,000 sf Headquarters will manufacture high quality industrial grade instrumentation for critical measurements of liquid and gas levels and flows. Program Statement: The 237,000 sf corporate International Headquarters, manufacturer of high quality industrial grade instrumentation for critical measurements of liquid and gas levels and flows, is located on 12 acres of land in Aurora, Illinois. An existing vacant building of sufficient size to accommodate continuous growth and expansion was identified, purchased, renovated and re-purposed for the project. The building renovation supports the administrative and manufacturing functions, as well as the technologically advanced research and development arm of the company. Master planned site improvements included the addition of 150 parking spaces, new basketball court, new putting green, cafeteria terrace and landscape improvements. The improved entry plaza enhanced the façade of the existing building, giving it a clear presence and display of the identity of the company. A180.01 Building Area: (sf) 237,000 SF Cost per Square Foot: $46.41 Construction Cost $11,000,000 Date of Completion: August 2013

A180.02 Site Plan: An existing abandoned warehouse facility was purchased by the client and repurposed into the new corporate headquarters and national production facility for this worldwide company. Existing site circulation worked well for the new use and was modernized with additional parking for production staff. The site is located in an established business park.

A180.03 Office Zone Floor Plan: Graphic depicting a developmental stage in planning of the office zone. Spaces are color keyed by department. Crossing corridors were defined and continued across blocks of space to facilitate communication among departments, while an open space concept was maintained throughout the office zone. Executive offices were grouped in a compact footprint adjacent to the reception space.

A180.04 Building Façade/Entry Flag Plaza: The existing entrance area was rehabilitated to provide a display of the company s corporate identity. The existing building height was carried into the plane of a simple monolithic precast concrete entry monument, placed at right angles to the dominant building line and traffic approach lane. A grouping of new flags display some of the countries where the company has a presence.

A180.05 Lobby/Waiting Area: The existing lobby space was refinished and provides electronic information monitors and features a wall displaying a small fraction of the company s collection of awards. Decorative stained glass panels were reclaimed from the original building location and featured in a new ceiling display which marks the reception seating area.

A180.06 Executive Suite Hallway: Core managers and directors offices are grouped on both sides of a compact new sky- lit alley.

A180.07 Executive Conference Room: Two spaces are combined for the executive office suite with conference function, and maintain views of the mature landscaping on the heavily shaded site.

A180.08 Conference Room/ Work Stations: Existing conference room is repurposed to provide corporate board room for the administrative area. Offices are zoned by grouping into adjacent open spaces with views maintained across the space to the exterior.

A180.09 Break Room: An existing lunchroom was enlarged and centrally placed between office and shop areas. Glazing on two sides provides views of the heavily greened site.

A180.10 Auditorium: An existing sales showroom was repurposed as an auditorium space, with simple suspended ceiling clouds for lighting and acoustic control. Lightweight risers were built for theater style seating. Corporate logo with backlit translucent panels is incorporated into the presentation and media wall.

A180.11 Fabrication Facility: The renovated warehouse area is repurposed as the Production Floor. New energy efficient lighting, large volume fans and light colored finishes provide a pleasant and efficient high volume space for the production units which are located logically for material flow.

Project Name: Magnetrol International Headquarters Project Location: Aurora, IL Owner/Client: Magnetrol International, Inc. Architect(s) of Record: (names and addresses) Chenevert Architects LLC 315 Third Street, Suite A Baton Rouge, LA 70801 Project Team: Norman J. Chenevert Principal in Charge David Santini Project Manager Landscape Architect: Norris Design Consultants: Structural, Mechanical & Electrical: KJWW Engineering Consultants Civil: V3 Companies Interior Design: Ferrand Design, LLC Materials Consultant: WAITING ON DAVID General Contractor: Krusinski Construction Co. Photographer(s): Chenevert Architects LLC (Slides 2 & 3) Marian Kraus Photography (Slides 4-11) A180.x