GAIETY TECHNICAL SPECIFICATION

Similar documents
GAIETY TECHNICAL SPECIFICATION

TECHNICAL INFORMATION PACK. Main Auditorium. Carrick Street Ayr KA7 1NU TEL:

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATION Lighting Systems. Festival Theatre

Technical Information Pack

EAST DEAN & FRISTON VILLAGE HALL FIRE RISK ASSESSMENT

161 Rosebery Avenue, London, EC1 Fire Safety Management Plan & Evacuation Procedures

Technical Rider Preliminary, version 1.0 April 2018

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Fire Risk Assessment

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

MONRO PAVILION RISK ASSESSMENT FORM. Date(s) Monday 1 Wednesday 3 July. External Contact & Nos Sarah Taylor - Venue Information

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

Charlotte Building, 17 Gresse Street, London W1T 1QL

FIRE EMERGENCY ACTION PLAN (EAP)

UNIVERSITY COLLEGE LONDON EMERGENCY PLAN. Regulatory Reform (Fire Safety) Order 2005 PART ONE - SPECIFIC INSTRUCTIONS & OTHER RELEVANT INFORMATION:

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

The SEC Armadillo CDM Information

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

Colston Hall - Transformation of. Main Hall and Historic Foyer Public Consultation, February 2017

CONTRACTOR GUIDELINES

Fire Safety Policy and Procedures

VENUE INFORMATION FOR SCHOOLS

Scene Shop Procedures

Iroquois theatre, Chicago, The fire in this newly opened but badly planned theatre in Chicago in January 1904 caused 572 deaths

RIVERSIDE THEATRES Corner Church St & Market St Parramatta NSW PO Box 3636 Parramatta NSW

MANDATORY SIGNS. These signs indicate that a particular course of action must be undertaken. Wear mask. Hand protection. must be worn. Wear.

EMERGENCY EVACUATION PLAN

Whitechapel Gallery Venue Hire. whitechapelgallery.org

FIRE AND EMERGENCY EVACUATION PROCEDURES STARCROSS PRIMARY SCHOOL

EMERGENCY EVACUATION PLAN

UNIVERSITY COLLEGE LONDON PREMISES FIRE SAFETY HANDBOOK. Regulatory Reform (Fire Safety) Order 2005 DARWIN BUILDING

PREMISES FIRE SAFETY HANDBOOK

Arbour House. Fire Policy and Procedures

FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

Notes on Stage Map Page 18. DOn t glue it in YET

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

McLean High School 2017 All-Night Graduation Party. Volunteer Security and Emergency Procedures. Emergency Contact Information

FIRE SAFETY, PROCEDURES AND RISK ASSESSMENT POLICY PART 1: FIRE SAFETY

Osseo Senior High School

FIRE PREVENTION, PROCEDURES AND RISK ASSESSMENT POLICY

RFH Evacuation Procedure for artists

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

(Fire) Emergency Evacuation Plan

The Kamikaze Fireflies

ISD 279 Osseo Area Schools Park Center Senior High School. Auditorium Handbook

Property Name & Address [ Property Name ] - [ Property Address ]

Fire Safety Management Plan. Qube 90, Whitfield Street, W1T 4EZ. Fire Safety Management Plan & Evacuation Procedures

SAFETY INSPECTION REPORT

Emergency Guidelines Part II. North Campus

Fire Safety Procedures & Risk Assessment Policy

OLD HALL - RISK ASSESSMENT FORM. Date(s) Tuesday 2 Wednesday 3 July. External Contact & Nos. Sarah Taylor - Venue Information

LEICESTER GRAMMAR SCHOOL TRUST FIRE SAFETY POLICY

School Property REVIEWING YOUR BUILDINGS & GROUNDS

Guy s Campus Directorate of Estates & Facilities - Document No. HS16 V4 Dated January 2014

PREMISES FIRE SAFETY HANDBOOK

Fire Safety Policy. Signed Date September on behalf of the Management Committee. on behalf of The Woodlands

Fire Policy. Fire Safety Order (2005) Dangerous Substances and Explosive Atmospheres Regulations (2002)

Fire Safety, Procedures and Risk Assessment Policy

Exit to Studio 3. Stage. Upper. Entrance. Stage. Ramp. Wheelchair Bay. Exit to Lift, Toilets, Stairs & Studio 3

FIRE SAFETY POLICY. A. Policy Statement

THE DIGITAL HUB COMPANIES, HEALTH & SAFETY HANDBOOK

Lindsey Beane. Executive Summary

Access Statement. Dawyck Botanic Garden Access Statement November 1, Dawyck Botanic Garden Stobo Scottish Borders EH45 9JU +44 (0)

Annemount School Fire Safety Policy This Policy is for the whole school including the EYFS

Whitechapel Gallery Venue Hire Gallery 1

Health & Safety Policy

Great Dover Street London SE1 4XA Directorate of Estates & Facilities - Document No. HS30 V2.1 Dated November 2014

Fire alarm bells (and associated fire detection equipment) are tested on Wednesday mornings between

Fire Safety Policy & Fire Safety Management System Version October 2013 Emergency Evacuation Procedures

Date and Time of Incident. Feb. 13, 1964 Breakout at15:33 (approx.) Noticed at 15:27 Notified by emergency call. Extinguished by 21:07

Fire Evacuation Procedure WISE Campus

ChurchSafety InfoSheet: New Fire Regulations Regulatory Reform (Fire Safety) Order 2005

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

University of London

OMBC People, Communities & Society RISK ASSESSMENT

Fire Evacuation Procedure Stroud Campus

Fire detection and alarm

Fire Evacuation Policy

Access Statement. Logan Botanic Garden Access Statement January 1, Logan Botanic Garden Port Logan, Stranraer Dumfries & Galloway DG9 9ND

Fire Risk Assessment. A safety guide for users of the hall

GRADONARCHITECTURE. Jarrow Hub Redevelopment Design and Access Statement REV A September 2017

EXHIBITION SITE. fieramilanocity. Exhibition Site Safety Document (An. IV and V Min. Decree 22/7/2014)

PRODUCTION MANUAL 2017

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

Risk Assessment: Fire

Fire. This policy applies to all members of our school community, including those within the EYFS setting.

EMERGENCY RESPONSE/ FIRE PREVENTION

STOCKLINCH VILLAGE HALL FIRE RISK ASSESSMENT

Fire Evacuation Procedure Berkeley Green, John Huggett Engineering Hall

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

Fire Risk Assessment for Old School and Fuller Room

Fire Safety, Fire Procedures and Fire Risk Assessment Policy. Three Schools Policy

Museum Towers EVACUATION PROCEDURE IN CASE OF FIRE

Waverley School. Fire Procedure. The original policy June 2014 Amended June 2017

RENOWNED & LEADING CONTEMPORARY BED & BREAKFAST NINE STYLISH BEDROOMS IN ELEGANT LISTED GRADE II GEORGIAN TOWNHOUSE

Bishopstone Village Hall Health and Safety and Fire Evacuation Policy

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

Transcription:

GAIETY TECHNICAL SPECIFICATION MAIN AUDITORIUM

2 C0ntents Page History 3 Stage Info Grid Plot 4-5 6 Ground Plans 7-12 Backstage Layout 13 Loading Bay 14 Parking 14 Orchestra Pit Crew Lighting 15 15 16 Stage Management, Cue Lights, comms 17 Sound 18 Power Special Effects Useful contacts Health and Safety and Fire Strategy Notes 19 20 20 21-23 24-26

3 The Ayr Gaiety was built in 1902, reconstructed after a fire in 1904, its façade remodeled in 1935, and further reinstated after a fire in 1955. In 1995, an annex was constructed, including a new cafeé, box office, dressing rooms and studio space. After a faltering start, which saw several years as a cinema after WWI, Ben Popplewell bought the theatre, from Bradford who already had a track record of success running the Pavilion theatre on Ayr seafront. For fifty years the Popplewell family ran the theatre latterly as part of the Glasgow Pavilion business. During this time the Gaiety developed a reputation as a variety theatre with a summer variety show the Gaiety Whirl, which ran for 26 weeks at its height. Many Scottish and UK stars appeared regularly on its stage, and several started their careers there. The program offered more than a summer shows however, with several weeks of Shakespeare and regular transfers from Glasgow Citizens theatre, being part of a varied offer. After seventy years in private ownership the local Council acquired the Gaiety theatre freehold in 1974. In 2009 the closure was met with considerable opposition and dismay among many Ayr residents, particularly since it appeared that the required capital and revenue investment to reopen the theatre would not be available. In 2012 the charitable organisation Ayr Gaiety Partnership (AGP) Reopened the theatre. The new Ayr Gaiety is unlike most theatres in the UK because it is largely run through voluntary effort. Most of the people undertaking front of house, technical, fundraising, marketing and maintenance are doing so on a voluntary basis. Although the volunteering effort overall is led by the Executive Director and Board- each volunteer team is supported and led by one of the staff team members. The Gaiety's current full-time staff team consists of just nine employees University of the West of Scotland (UWS), Ayr College and the Gaiety Theatre officially launched Scotland s first Learning Theatre on Friday 19 September 2014. The launch event, which saw representatives from UWS, the Gaiety, as well as National Theatre of Scotland in attendance, marks the first stage in the development of the partnership Learning Theatre, which will provide a center for education, training and research in the area of performance and theatre.

4 Stage Information SCALED PDF AND DWG PLANS CAN BE SENT ON REQUEST Stage Specifications Meters/Feet Proscenium Opening- 7.15/23.51/2 Proscenium Height- 6.4/22.11 Depth from Pros wall to last hemp bar 7.94/26 Depth from Pros wall to front of stage 0.7/2.3 Depth from last bar to back wall 1.17/3.8 SL -> SR Dip Traps 11.1/36.41 Height from Stage to Under Fly Floor 6.39/20.96 Height form Stage to Fly Rail 7.69/25.22 Distance Between Fly foors 10.83/35.53 Grid Height 13.96/45.8 SL Wings 24.37 Square M SR Wings 19.06 Square M SR Dock 18.27 SquareM SR Dock Entrance 2.88/9.44 SR Dock Height 5.5/18.04 Dock Door Entrance 2.7/8.85 Dock Door Height 3.37/11.05 Front of Stage to Back of Auditorium 14.3/46.91 Stage Rake 1:30 - The Gaiety has a standard defending Safety Iron - The Gaiety can provide a black box with legs and borders. - 4 sets of hard masking

5 - Only lightweight fixings are permitted into the floor - The Stage is painted black and has a slight rake Flying -House tabs are operated onstage DSL -House Tabs are Red Valour -36 hemp bar positions -Hemp SWL 90kg evenly distributed -4 Electric Pile Winch Bars -Electric winch Bar SWL 500KG -Access to the grid can be reached from SR fly floor only in house technicians and riggers are permitted in the grid area Stage Inventory Borders 1x 26 x 3 10 / 7.9 x 1.8 1x 33 x 6 / 10.05 x 1.82 1x 32 x 6 / 9.75 x 1.82 Legs 3x 14 x 7 / 4.26 x 2.13 4x 19 x 88 / 5.79 x 1.76 2x 19 8 x 7 2 / 6.03 x 2.19 Clothes- Painted Clothes - Sunset swirls/blue swirls Silver Tabs Blacks Split Blacks

6 Grid Plot Description Position Rigging Information Op Front of Pit - 2436mm Front of Pros - 827mm Front of Stage - 719mm Pros Wall 0mm Iron 50mm (US) Electric Will operate be show at Intervals unless agreed before with Senior Manaagement DSR 1 56mm Hemp RED BORDER FOR TABS Flys Tabs 496mm Counterweight RED and GOLD TABS DSL Motor1 749mm Pile Winch Motor Normaly Rigged with House LX 2 1166mm Hemp Flys 3 1371mm Hemp Flys 4 1550mm Hemp Flys 5 1692mm Hemp Flys 6 1830mm Hemp Flys 7 1993mm Hemp Flys 8 2148mm Hemp Flys 9 2489mm Hemp Flys 10 2631mm Hemp Flys 11 3205mm Hemp Flys 12 3334mm Hemp Flys 13 3473mm Hemp Flys Motor2 3581mm Pile Winch Motor Normaly Rigged with House LX 14 - - - - 15 3781mm Hemp Flys 16 4024mm Hemp Flys 17 4189mm Hemp Flys Motor3 4328mm Pile Winch Motor Normaly Rigged with House LX 18 - - - - 19 4571mm Hemp Flys 20 4668mm Hemp Flys 21 4826mm Hemp Flys 22 5039mm Hemp Flys 23 5156mm Hemp Flys 24 5458mm Hemp Flys 25 5635mm Hemp Flys 26 5777mm Hemp Flys 27 5940mm Hemp Flys 28 6054mm Hemp Flys Motor4 6546mm Pile Winch Motor Normaly Rigged with House LX 29 6705mm Hemp Flys 30 6896mm Hemp Flys 31 7090mm Hemp Flys 32 7415mm Hemp Flys 33 7579mm Hemp Flys 34 7722mm Hemp Flys 35 7908mm Hemp Flys 36 8201mm Hemp Flys

7 Cross Section (ONLY FOR REFRENCE)

11 Up Bar Lift IVS 2 3 4 5 6 12 7 11 8 9 10 8 Ground Plan Stalls and Pit (ONLY FOR REFRENCE) FP 50 SURFACE 1.2m AFFL 3No 24/16 DIMMER RACKS SURFACE AT 800mm AFFL Coal Chute (Disused) DMX PATCH RACK SURFACE AT 1.0m AFFL Pump Assembly Tool Store Water Storage Tank Workshop 2 50mm BASKET 150x100 TRUNKING Storage Bay Storage Bay 75x75 TRUNKING 200mm BASKET CONTAINMENT RISING TO ABOVE 100mm BASKET Sump (Sub Water Pump) 150x150 TRUNKING RISER 75x75 TRUNKING RISE TO PLB 01 FP 06 PLB 06 CONTAINMENT RISING TO FP 18/19 Orchestra Pit FP 05 PLB 05 CONTAINMENT RISING TO ABOVE CONTAINMENT RISING TO FP 20/21 PIT SUB-FLOOR LEVEL PRINTED ON ISO A1 (841.00 x 594.00 MM) USING AutoCAD PDF (High Quality Print).pc3 ON 15.07.2016 BY Steve Dick Cold Store Male WC Kitchen Restaurant 60 covers Entrance Lobby Tickets Switch Room Roller Shutter PLB 01 Dressing Room (Arran Room) FP 01 SMD CONNECTION FP 46 Cellar FP 10 Male WC Fire Escape 1 hr fire door Female WC Lift Plant Room Gas Meter Housing 1 Up Scene Dock Dressing Room (Ailsa Craig Room) Accessible WC Store External Dwarf Wall and Railing External Footpath Stage Hoist Cage Elec. Foyer A. B. C. A. B. C. D. D. E. F. G. H. E. F. G. H. J. J. K. K. M. N. O. P. Q. M. N. L. M. N. M. N. O. P. Q. R. R. FP 02 PLB 02 FP 03 PLB 03 50x50 TRUNKING 50x50 TRUNKING 150mm BASKET CONTAINMENT RISER FROM BELOW TO ABOVE CONTAINMENT RISER FROM BELOW TO ABOVE 75x75 TRUNKING RISE TO IWB ON 3rd FLOOR 150x150 TRUNKING RISER Hatch FLOOR TRAP (REQUIRED SPACE IN TRAP = 650w x 320h) 150mm BASKET CONTAINMENT DROP FROM ABOVE GROUND FLOOR LEVEL FP 04 PLB 04 50x50 TRUNKING FP 11 FP 20/21 FP 18/19 FP 22 FLUSH N/A CEILING FP 23 FLUSH N/A CEILING FP 24 FLUSH N/A CEILING FP 25 FLUSH N/A CEILING 50mm BASKET IN CEILING VOID PLB 16 FLOOR TRAP TBC AFFL FP 38 FP 36 FLOOR TRAP TBC AFFL FP 37

1 2 ivs ivs 3 4 5 6 7 8 9 9 Ground Plan Stalls Upper (ONLY FOR REFRENCE) Female WC Dressing Room 3 Shower Duct Accessible Shower Dressing Room 4 Laundry Boiler 1 Boiler 2 Boiler Room Existing Studio Dressing Room 5 Dressing Room 7 Dressing Room 6 Store Extractor Duct 20 19 18 17 16 Up Up 15 10 14 11 13 12 Void over Scene Dock Stage Green Room PLB 10 CONTAINMENT RISER FROM BELOW TO ABOVE FP 12 Dressing Room 8 100mm BASKET Box B (Side Lighting) Dressing Room 9 Female WC Male WC Lift CONTAINMENT DROP FROM ABOVE 50mm BASKET/TRAY FP 49 SURFACE Office/Admin TBC Hub AFFL Circle Foyer Stage Circle Circle Foyer Stair CONTAINMENT RISER FROM BELOW TO ABOVE Box A (Side Lighting) Female Toilets Hoist Cage FP 13 PLB 11 150mm BASKET FP 39 50mm BASKET IN CEILING VOID FP 29 FLUSH N/A CEILING FP 28 FLUSH N/A CEILING FP 27 FLUSH N/A CEILING FP 26 FLUSH N/A CEILING

Desk Sound 10 Ground Plan Circle (ONLY FOR REFRENCE) Down Plant Room Void over Scene Dock 400mm AV BASKET FP 34 FP 48 FP 43 PLB 18 Up FP 14 FP 30 PLB 12 CONTAINMENT RISER FROM BELOW TO ABOVE Box D Stage Box B Box A Circle Total seats 150 Circle Display Case Circle Landing Store Desk Lighting Up CONTAINMENT RISER FROM BELOW TO ABOVE Up CONTAINMENT TO GROUND FLOOR CONTAINMENT RISING TO LX BOOTH 300mm BASKET Store Hoist Cage Box C FP 15 FP 31 PLB 13 400mm BASKET AV EQUIPMENT RACK 400mm BASKET FP 47 FP 42 PLB 17

St. 11 Ground Plan Gallery (ONLY FOR REFRENCE) 50mm BASKET FP 07 PLB 07 300mm BASKET RISER FP 32 FP 16 PLB 14 FP 40 Gallery Bridge Fly Gallery Fly Gallery Void over Stage CONTAINMENT RISING FROM BELOW CONTAINMENT RISING FROM BELOW Hoist Cage Cbd Cbd 50x50 TRUNKING 200mm BASKET Upper Circle (Balcony) CONTAINMENT TO INTERNALLY WIRE BAR ON BALCONY FRONT 72 Balcony Seats Down Down Down Void (Below seating unsurveyed) Store (Below seating unsurveyed) WC WC Upper Circle Foyer Office Office Cleaner's Store Up FP 09 PLB 09 100x100 TRUNKING 100mm BASKET FP 08 PLB 08 300mm BASKET RISER FP 33 FP 17 50x50 TRUNKING 200mm BASKET PLB 15 FP 41 CONTAINMENT TO INTERNALLY WIRE BAR ON BALCONY FRONT CONTAINMENT IN FLOOR TO FEED CEILING SPEAKERS BELOW

12 Ground Plan 4 th Floor (ONLY FOR REFRENCE) FP 44 PLB 20 Gallery Bridge Fly Gallery Fly Gallery Void over Stage Hoist Cage Cbd Cbd Box F Box E Auditorium Upper Circle (Balcony) Upper Circle (Balcony) Ceiling Void over Balcony (Unsurveyed) Battery Room Access High Level Ladder Office Ventilation Ducts St. Static Inverters 100mm BASKET Lighting Booth St. CONTAINMENT DROP TO BELOW FP 45 PLB 19

13 Backstage Layout Ground Floor Stage Kitchen/Cafe Dressing Room 1 - Small with Shower (1-2) Dressing Room 2 Disabled Access (1) Male Toilet FOH Access 1st Floor Dressing Room 3 - Small with Shower (2) Dressing Room 4 Large (5-6) Dressing Room 5 Large (5-6) Dressing Room 6 Large (5-6) Dressing Room 7 Medium (4-5) Dressing Room 8 Small (1-2) Dressing Room 9 Small (1-2) Dressing Room Medium (4) Green room Wardrobe - Small 1 x washing machine Studio/Bar Entrance

14 Loading Bay Load In and Load Out to the main stage can be found on Boswell Street via the large blue double dock doors. There is a single small step up and down to reach the main stage. The Gaiety has two ramps for easy access. Dock Doors Dimensions - 2.7m wide by 3.37m High Entry to the theatre must be sent a week in advance. Parking Parking for Cars and Vans is located next to the theatre. This is a privately run car park, which the theatre has no control over. 1 1 hour 2 2hours 3 3 hours 4 All Day

15 Orchestra Pit The Orchestra Pit Can be reached from under the stage via two small doors SL and SR 13 Amp power supply line the pit 6 single Lit Rat stands 1 Double Lit Rat Stand Crew The Gaiety will provide at least one Duty Technical Manager to assist with your show any other requirements above this must be agreed 4weeks before the Get In date. Please note contra charges may apply.

16 Lighting General Info The Gaiety will have a standard rig unless otherwise agreed prior to get in. Lighting plans must be sent in advance and agreed by the venue and company 72 ETC color source thru dimmers Control Strand 530i ETC GIO Titan and chauvet Pc dongles Effects Le Maitre Neutron hazer (CONTRA CHARGE) Jem Compact Pro (CONTRA CHARGE) Lanterns 14 x ETC S4 Lustr 2 36 degrees 6 x Mac Aura 10 x Chauvet Rogue 2 spot 8 x Martin Rush Par 2 zoom 8 x Lanta Quad Fireball 8 x ETC Fresnel s 10 x CCT Fresnel s 4 x S4 Profile 15-30 2 x S4 profile 25-50 16 x Patt 743 2 x Coda Single cell 4 x Coda Three Cell 3 x Coda Four Cell 18 x Par 64 cp62 (we have a couple of CP60s and 61s) Follow spots

17 Stage Management and Comms/Cue Lights Cue Lights One (1) Interspace 16 channel digital cue light master station Eight (8) Interspace outstations Comms One (1) Altair EF200 comms master station Eight (8) Altair EM201 single channel belt packs Eight (8) Altair AM1002 single muff headsets Paging Facilities to page backstage and Foh Clocks The clock unit has a digital clock (red display) and digital stopwatch (green display) Desk Lighting Two (2) dimmable LED stalk lights One (1) 19 LED rack light Video Monitors Two 7 TFT LCD Monitors provided to view camera content or external sources Video Relay HXB250IR Camera Rigged FOH stalls roof

18 Sound MAIN PA Pros Arch (4) EM Acoustics EMS-126 full range (2) EM Acoustics EMS-129 Subwoofers Two (2) EM Acoustics EMS-118 Front Fill Speakers Four (4) EM Acoustics EMS-61 Under Balcony Fill Speakers Eight (8) EM Acoustics EMS-51 Box Fill Speakers Six (6) EM Acoustics EMS-51 Amplification Three (3) EM Acoustics DQ10 amplifiers Audio Processing (DSP) One (1) BSS Sound web London Blu-100 12 x 8 digital signal processor One (1) BSS Sound web Blu-100 expansion Audio Routing Desks One (1) Allen & Heath IDR32 Mix Rack Allen and Heath ilive T112 Monitors Mics Four (4) Nexo PS10 package 2 x Sennheiser - g3 100 Handheld (Need to be booked out) 14 x sennheiser g3 headsets (CONTRA CHARGE) 5 x SM58s 4 x D9s 4 x SM57s

19 Power Stage 1 x 125 3ph USR 1 x 63 3ph USR 1 x 32 3ph USR 2 x 63 1ph USR 2 x 32 1ph USR 13 amp sockets located throughout Orchestra Pit 10 x Dual 13 amp socket (clean) PIT 1 x 32 1ph Fly Floor Control Position 6 x 13 amp Dual Socket 32-amp single (In house Audio) Stalls Control Position 2x 13 amps Dual Socket Slips Control 13 amp Dual socket Follow spot position 2 x 13 amp Single Dual socket 2 x 16 amp single

20 Special Effects Use of Haze, Smoke, Oil Crackers and Pyrotechnics must be cleared with Venue Management. Failure to do this may result in a fine from the Fire Brigade and no special The Use of Pyrotechnics must be cleared with the Gaiety Management. All Pyrotechnics must be stored correctly and come with the relevant paper work, risk assessment. Pyrotechnics must be set up, loaded and fired by a competent technician. Useful Contacts Vince Hope Artistic Director 01292288235 (ext3) Sally Rennie Operations Manager 01292288235 (ext2) Michael Stewart FOH Manager 01292288235 (ext4) Suzanne Mclellan Marketing Manager 01292288235 (ext5) Doug Paisley Technical Development 01292288235 (ext6) Fraser Emslie Deputy Technical Manager Sean Mckenzie Deputy Technical Manager Technical Enquires - Programming - General Info technical@ayrgaiety.co.uk vince.hope@ayrgaiety.co.uk info@ayrgaiety.co.uk Local Sound and Lighting companies - http://www.smalltownaudio.co.uk

21 Health and Safety All paperwork relating to your show must be sent at least 4 weeks in advance failure to do this could result in charges and or failure to complete all aspects of your show on the night. We require at minimum: - An up to date Technical Rider Ris Assessments and Method statements The correct PPE must be worn at all times. All visiting staff must adhere to in-house health and safety guidelines, the Duty Technician has the right to remove any member of visiting company staff from a working area who is not complying. Access to the building must be arranged prior to it being granted. Rehearsal/maintenance calls should be called prior to your arrival at the venue. The venue must be kept up to date with any changes in schedules (failure to do so may result in extra charges) The Duty Technician has the right to stop any performance by whatever means necessary in the event of an emergency situation arising. The visiting company manager is responsible for providing a signing in sheet for the visiting company. This must be given to a full time Staff member when you first arrive on site. The Company Manager must ensure that all visiting staff signs in/out when they enter and leave the building. (If sign in sheet is not available visiting company can ask for a temporary sign in sheet)

22 Health and Safety cont. The visiting company manager is responsible for providing a signing in sheet for the visiting company. This must be given to a full time Staff member when you first arrive on site. The Company Manager must ensure that all visiting staff signs in/out when they enter and leave the building. (If sign in sheet is not available visiting company can ask for a temporary sign in sheet) All work carried out by visiting companies must be carried out safely and professionally by competent persons The Gaiety's equipment must be respected and maintained if used. Any in house equipment must be asked for before using and returned at the end of the show. PPE All staff should visually check PPE for signs of damage before and after each use, any signs of wear and tear/damage must be reported to a full time member of staff. Safety boots must be worn: At all times while working in technical areas. (The only exception to this is when there is absolutely no risk to staff e.g. when working a performance where there are no trucks moving or the need to manually handle heavy objects) High Visibility Jackets Any staff required to work on the public highways (pavements/roads) must wear a high visibility jacket. These are available for all resident staff Harnesses Must be worn FOH where there is a risk of falling while working at height.

23 Fire Evacuation Policy PROCEDURES IN THE EVENT OF A FIRE 1. ON DISCOVERING A FIRE If you discover a fire raise the alarm immediately, operate the nearest fire call point. If you have been trained and feel that it is safe to do so, attempt to fight the fire using the equipment provided. Do not put yourself at any personal risk. If you find yourself using more than one extinguisher leave. If you are not capable of fighting a fire leave. If you cannot deal with the fire, evacuate immediately. Ensure that no one is left in your area and close any doors behind you. Do not stop to collect personal belongings. Do not use the theatre lift. Play your part in the roll call so you are safely accounted for. 2. FIRE ALARM The fire alarm is a klaxon in backstage, dressing rooms, administration offices, and studio theatre, café and box office areas. The Main Theatre has a red flashing light at the rear of the stalls and the circle. These alert staff/volunteers and prevent panic from the public, allowing them to be directed by staff to evacuate make yourself aware of where these lights are. Public areas, during performances, are alerted by the Duty Manager. 3. IF YOU HEAR THE FIRE ALARM Operate any essential shutdown devices, e.g. machinery. Immediately leave using the nearest available fire exit. Report to the assembly point which is in the car park at the rear of the building for a roll call. If you are with a visitor, ensure they accompany you. 4. DURING PERFORMANCES If an evacuation is to take place during a performance, the Duty Manager will make an announcement, and FOH staff/volunteers will assist theatregoers from the Main Theatre/Studio Theatre as detailed in FOH training. Other staff and Visiting Company members or visitors should leave the building using the nearest designated fire exit and make their way to the assembly point in the car park at rear of the building. The Visiting Company Manager should do a roll call of company members. The audience will be evacuated by FOH staff/volunteers to the car park at the rear of building

24 Notes

25 EMERGENCY EVACUATION PROTOCOL Safety Handbook IF ALARM SOUNDS OR ASKED TO LEAVE PLEASE LEAVE IN AN ORDERLY FASHION AND HEAD EVACUATION POINT WHICH IS LOCATED AT THE REAR OF THE THEATRE IN THE CAR PARK.

Ayr Gaiety Partnership Gaiety Theatre, Carrick Street Ayr, Ka7 1Nu www.ayrgaiety.co.uk