(E) PARKING LOT OPEN TO PUBLIC (E) PARKING LOT OPEN TO PUBLIC (E) BUILDING TO REMAIN PUBLIC (E) BUILDING TO REMAIN (E) BUILDING TO REMAIN

Similar documents
CHAPTER 2 PROJECT DESCRIPTION

The Van Ness Campus. Weekly Construction Bulletin #259

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

3.13. Development Guidelines

VEHICULAR AND PEDESTRIAN CIRCULATION

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

LAND USE ASSESSMENT REPORT (LUAR) PROPOSED AFFORDABLE HOUSING COMPLEX MAIN ROAD PDE FILE NUMBER: REZ

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

NorthPoint, Inc. Community-Based Development Concept

Fall 2017 Construction Update

City of Redlands Architectural Guidelines for Non-Residential Development

P: Site Plan Approval

russell+mills studios

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Cleveland Park Streetscape and Drainage Improvement Project 1

FLUSH MOUNT 6' SIDEWALK PAINTED WITH COURT DELINEATIONS REMOVABLE BOLLARD, TYP. PRIVATE ALLEY CURB AND GUTTER (STREET NAME TO BE DETERMINED)

ARLINGTON COUNTY, VIRGINIA

Shell Beach Road Streetscape Frequently asked Questions

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Figure Example of out door dining in the public right-of-way.

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING May 21, :00 PM

STANDARDS THAT APPLY TO ALL OR SOME DEVELOPMENT PROJECTS WITH RESIDENTIAL USES

Briar Crest Elementary

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

Rezoning Petition Zoning Committee Recommendation August 1, 2017

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Review Zone Application for D&R Canal Commission Decision

SITE PLAN REVIEW APPLICATION

Effective September 1, 2015

Property Owners Association. Annual Meeting Notice July 26, :00pm - 7:00pm Park City Marriott 1895 Sidewinder Drive Park City, Utah

Darwin International Airport Current Projects 21/02/2018 Page 1 of 5

PLANNED UNIT DEVELOPMENT APPLICATION

City of Hermosa Beach Administrative Policy #

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

CITY OF DAVIS DESIGN REVIEW INFORMATION CHECKLIST

Report or technical documentations of the target areas in Siauliai

# Cog Circle Menards Project Review for Planning and Zoning Commission

CONTEXT + PROGRAM. CONTEXT - Site Photos RIALTO THEATRE STATION DEPOT HOTEL CONGRESS GREYHOUND SITE 4TH AVENUE BROADWAY BOULEVARD

VILLAGE OF CHANNAHON COMMERCIAL DESIGN GUIDELINES. Village of Channahon S. Navajo Drive Channahon, IL (815)

APPENDIX I: GREENWAY DESIGN STANDARDS

BRADENTON RIVERWALK EXPANSION MASTER PLAN

PROPOSED REDEVELOPMENT OF THE GLEN ABBEY GOLF CLUB. STREETSCAPE DESIGN STUDY (excerpt from the Urban Design Brief) TOWN OF OAKVILLE.

CENTERS AND CORRIDORS

3.10 ROW Overlay District

COMPLETE GREEN STREET CHECKLIST

DESIGN AND LANDSCAPE GUIDELINES FOR DEVELOPMENT

November 21, Planning Commission Charter Township of Lyon Grand River Ave. New Hudson, MI 48165

WELCOME. Welcome to the Public Open House

Chapter 22. Alternatives to the Proposed Project

CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, :00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS

County of El Dorado Standard Plans

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Spoonfed, A Full Service Restaurant

Building Permit Type & Sub-Type Definitions

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

February 17, Sara Ullman Planner I. Sincerley,

JOB CREATION PROJECTS

STANDARD DETAILS QUICK REFERENCE

VILLAGE OF PITTSFORD PLANNING AND ZONING BOARD OF APPEALS Regular Meeting January 27, 2014 at 7:00 PM. George Wallace Jill Crooker Joe Maxey

ARB ACTION MEMO. Mr. Wardell called the meeting to order at 1:03 p.m. and established a quorum.

This Review Is Divided Into Two Phases:

ORDINANCE NO

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

DESIGN REVIEW COMMITTEE AGENDA ITEM

8 October 14, 2015 Public Hearing

CAMPUS PLANNING COMMITTEE STAFF REPORT SAMARITAN SPORTS MEDICINE INSTITUTE AT OSU 10/21/2013

Capital Projects Update March 2017

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

DESIGN REVIEW COMMITTEE AGENDA ITEM

Garden edges provide vertical plantings to buffer the neighbors from the building facilities around the entire campus.

South East Sports Complex Phase I

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB


Community Development Department Commercial Permit Application

4 January 11, 2012 Public Hearing APPLICANT:

SOUTH UNIVERSITY Street Design Alternatives in Progress

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

Speedway Mall Project Frequently Asked Questions

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

CITY OF SIMI VALLEY MEMORANDUM

DESIGN REVIEW COMMITTEE AGENDA ITEM

MIXED-USE ZONING DISTRICT DESIGN GUIDELINES

Note: Staff reports can be accessed at Special Permit Application No.

MASTER PLAN IMPLEMENTATION COSTS. Appendix A

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY

DIVISION 32 EXTERIOR IMPROVEMENTS

Transcription:

G R OUN D (E) TRANSFORMER TO BE REMOVED ENTRY AT TO BE ACCESSIBLE DURING CONSTRUCTION No. Revision Description YYYY-MM-DD Major Permit - Stage 2-07-206 2 Major Permit - Stage 2 02-7-207 Response. EXISTING UTILTIES REMOVED.. UTILITY RELOCATION, STOP LIGHT INSTALLATION AT CIRBY WAY. (E) WEST LOT. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED.. NEW GRADING, UNDER UTLITIES, CURBS AND ASPHALT. 2. NEW PARKING AREA TO BE STRIPED TO PROVIDE DURING CONSTRUCTION. LOOP ROAD OPEN TO THE (E) SIGNAGE TO RIVERSIDE ENTRY TO OPEN DURING CONSTRUCTION (E) LOOP ROAD OPEN TO THE SOUTH LOT. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED. 2. (E) SOIL CUT WILL BE USED TO FILL WEST LOT ABOVE.. NEW GRADING, UNDER UTLITIES, CURBS AND ASPHALT. 2. NEW PARKING DECK FOUNDATION. MATURE TREES TO BE PROTECTED/PRESERVED THIS AREA. ROSEVILLE MEDICAL CENTER 00 RIVERSIDE AVENUE ROSEVILLE, CALIFORNIA SITE PLAN - PHASE SITE PLAN - PHASE Kaiser No. 859-964 2/6/207 :08:23 PM Graphic inch = 40 feet 0 40' 80' 20' 60' HOK No. 504030.00 A00

(E) RELOCATED WITH (N) BUS SHELTER & CONCRETE PAD ENTRY OPEN TO THE DURING CONSTRUCTION Major Permit - Stage 2 206--07. ASPHALT & SOIL REMOVAL TO LOWER GRADE. 2. EXISTING CURBS AND ASPHALT DEMOLISHED AS NEEDED FOR RIGHT TURN LANE STREET IMPROVEMENTS. 3. (E) RELOCATED. (E). GRADE LOWERED. 2. RIGHT TURN LANE CONSTRUCTED INCLUDING ASPHALT, CURBS, SIDEWALK, AND LANE STRIPING 3. RELOCATED WITH NEW SHELTER & CONCRETE PAD TEMPORARY TEMPORARY DEPARTMENT ACCESS ONLY. NO PATIENT ACCESS BEYOND THIS POINT. LOOP ROAD OPEN TO THE TEMPORARY (E) SIGNAGE TO ACCESS FROM MEDICAL OFFICE BUILDING. (E) ASPHALT, PARKING & LANDSCAPE TO BE DEMOLISHED.. MOB UNDER UTILITIES, SLAB ON GRADE PREP BEGINS EGRESS EXISTING STRIPING REMOVED (E) SOUTH LOOP ROAD DECOMISSIONED - CLOSED TO THE. DEPARTMENT ACCESS ONLY SOUTH LOOP ROAD RELOCATED & REPAVED. DEPARTMENT ACCESS ONLY PARKING DECK. CONSTRUCTION COMPLETED THIS PHASE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 2 SITE PLAN - PHASE 2 Kaiser No. 859-964 0/3/206 :42:28 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No. 504030.00 A002

ENTRY OPEN TO Major Permit - Stage 2 206--07 TEMPORARY TEMPORARY ROAD OPEN TO DURING CONSTRUCTION NO PATIENT ACCESS BEYOND THIS POINT. EGRESS MEDICAL OFFICE BUILDING. MOB STRUCTURAL STEEL AND ENCLOSURE ACCESS FROM SOUTH LOOP ROAD - DEPARTMENT ACCESS ONLY PARKING DECK FOR CONSTRUCTION STAFF USE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 3 SITE PLAN - PHASE 3 0/3/206 :42:33 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No. 859-964 HOK No. 504030.00 A003

ENTRY OPEN TO Major Permit - Stage 2 206--07 TEMPORARY ACCESSIBLE ACCESS TEMPORARY PAVILION BUILDING:. (E) ASPHALT, CURBS & LANDSCAPING DEMOLISHED.. CORE & SHELL, INTERIOR FIT OUT 2. ADJACENT ROADS INCLUDING ASPHALT, CURBS, STORM DRAINS AND LANDSCAPING 3. ENTRY CANOPY ACCESS FROM MEDICAL OFFICE BUILDING:. MOB CORE & SHELL, INTERIOR FIT OUT 2. SERVICE YARD ASPHALT, CURBS, GATES, TRASH & RECYCLING ENCLOSURES 3. COURTYARDS INCLUDING LANDSCAPING, FURNISHINGS, STORM WATER TREATMENT, UNDER UTLITIES EGRESS SOUTH LOOP ROAD - DEPARTMENT ACCESS ONLY PARKING DECK FOR CONSTRUCTION STAFF USE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 4 SITE PLAN - PHASE 4 0/3/206 :42:38 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No. 859-964 HOK No. 504030.00 A004

No. Revision Description YYYY-MM-DD ENTRY OPEN TO EAST LOT. (E) ASPHALT, CURBS, SIDEWALKS, AND LANDSCAPING REMOVED. 2. COMMUNICATIONS BUILDING BE DEMOLISHED TEMPORARY. (N) ASPHALT, CURBS, SIDEWALKS, UTILITIES, BIOSWALE AND LANDSCAPE TEMPORARY WALK WAY FOR BUILDING ACCESSIBLE ACCESS LOOP ROAD OPEN TO TEMPORARY PAVILION BUILDING OPEN TO EGRESS MEDICAL OFFICE BUILDING OPEN TO LOOP ROAD OPEN TO EXISTING ENTRY DECOMMISSIONED NEW ACCESS FROM LOOP ROAD OPEN TO PARKING DECK OPEN TO 00 RIVERSIDE AVENUE SITE PLAN - PHASE 5 SITE PLAN - PHASE 5 0/3/206 :42:44 AM Graphic inch = 40 feet 0 40' 80' 20' 60' NOT FOR CONSTRUCTION MAJOR PROJECT PERMIT - STAGE 2 Kaiser No. 859-964 HOK No. 504030.00 A005

ENTRY - REMOVE (E) CURB AND STRIPING No. Revision Description YYYY-MM-DD TEMPORARY NORTH PARKING LOT. (E) ASPHALT, PARKING, SIDEWALKS & LANDSCAPE 2. (E) BUILDINGS & CANOPIES. NEW GRADING, UNDER UTLITIES, CURBS, SIDEWALKS, ASPHALT, LANDSCAPING, STORM DRAINS, BIOSWALES AND STRIPING 2. NEW LOOP ROAD CONNECTION 3. NEW COURTYARD INCLUDING LANDSCAPING & SITE WORK 4. PATIENT PARKING LOT FOR CONSTRUCTION STAFF ONLY TEMPORARY CURB AT PARKING STALLS TEMPORARY (E) (E) (E) TEMPORARY WALK WAY FOR BUILDING ACCESSIBLE ACCESS PATIENT TEMPORARY EXIT THROUGH ROAD OPEN TO PAVILION BUILDING OPEN TO. SELECTIVE DEMOLITION OF (E) ASPHALT, SIDEWALKS & LANDSCAPE.. PATIENT & SURROUNDING SIDEWALKS, ASPHALT, CURBS, UNDER UTLITIES, STORM DRAINS, BIOSWALES, LANDSCAPING. (E) (E) EAST COURTYARD. SELECTIVE DEMOLITION OF (E) ASPHALT, SIDEWALKS & LANDSCAPE. (E) TEMPORARY CURB AT PARKING STALLS TEMPORARY PATIENT MEDICAL OFFICE BUILDING OPEN TO. EAST COURTYARD & SURROUNDING SIDEWALKS, ASPHALT, CURBS, UNDER UTLITIES, STORM DRAINS, BIOSWALES, LANDSCAPING. EXISTING RIVERSIDE DRIVE ENTRY DECOMMISSIONED RIVERSIDE NEW ENTRY OPEN TO PARKING DECK OPEN TO 00 RIVERSIDE AVENUE SITE PLAN - PHASE 6 SITE PLAN - PHASE 6 Kaiser No. 859-964 0/3/206 :42:50 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No. 504030.00 A006

RIGHT TURN ONLY EXIT ENTRY OPEN TO Major Permit - Stage 2 206--07 WEST LOT. SELECTIVE DEMOLITION OF (E) ASPHALT, & LANDSCAPING.. FINAL WEST PARKING LOT & GREEN ZONE NEW GRADING, UNDER UTLITIES, STORM DRAINS, BIOSWALES, CURBS, SIDEWALKS, ASPHALT, LANDSCAPING. PARKING LOT OPEN TO THE ROAD OPEN TO THE PARKING LOT OPEN TO THE GREEN ZONE LANDSCAPING UNDER CONSTRUCTION FINAL WEST LOT PARKING STRIPING COMPLETED PAVILION BUILDING OPEN TO THE EAST PARKING LOT COMPLETION. ING (E) LOOP ROAD ASPHALT, CURBS, LANDSCAPING DEMOLISHED.. COMPLETE EAST PARKING LOT INCLUDING ASPHALT, CURBS, STORM DRAINS, STRIPING, AND LANDSCAPING. MOB OPEN TO THE EXISTING ENTRY DEMOLISHED RIVERSIDE NEW ENTRY OPEN TO ROAD OPEN TO THE PARKING DECK OPEN TO THE 00 RIVERSIDE AVENUE SITE PLAN - PHASE 7 SITE PLAN - PHASE 7 Kaiser No. 859-964 0/3/206 :42:55 AM NOT FOR CONSTRUCTION Graphic inch = 40 feet 0 40' 80' 20' 60' MAJOR PROJECT PERMIT - STAGE 2 HOK No. 504030.00 A007