SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

Similar documents
PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

SECTION PACKAGED HEAT TRANSFER SYSTEM

SECTION FIRE PUMP AND CONTROLS

SECTION PLUMBING EQUIPMENT

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SECTION PLUMBING EQUIPMENT

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

Revitalize Building Mechanical Systems (4619)

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

Design and Construction Standards SECTION PLUMBING EQUIPMENT

SECTION DOMESTIC WATER PUMPS

SECTION HEATING BOILER FEEDWATER EQUIPMENT

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

SECTION STEAM CONDENSATE PUMPS

SECTION ROTARY-SCREW WATER CHILLERS

SECTION AUTOMATIC TRANSFER SWITCHES

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

SECTION STEAM CONDENSATE PUMPS

BuildingName The Description of the Project P DOCUMENTS

CTO BOOSTER SPECIFICATION

1.1 REFERENCES.1 American National Standards Institute/National Fire Protection Association (ANSI/NFPA).1 ANSI/NFPA 20, Centrifugal Fire Pumps.

HHA Lyerly Apartments 75 Lyerly Houston, Texas J. Allen Management Managing Agent

HHA Bellerive Apartments 7225 Bellerive Houston, Texas J. Allen Management Managing Agent

TECHNICAL. Series 18. Pump Packages

SECTION Fire Pumps

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

DualPak Series FILE NO: DATE: Feb. 15, 1999 SUPERSEDES: DATE: Sept. 28, DualPak 6900 Series Booster System

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

SECTION WATER-SOURCE UNITARY HEAT PUMPS

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

SECTION CHILLERS

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION STEAM CONDENSATE PUMPS

CONTENTS AUTOMATIC TRANSFER SWITCHES

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

University of Delaware

SECTION FIRE-SUPPRESSION STANDPIPES

SECTION AUTOMATIC TRANSFER SWITCHES

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

SECTION PLUMBING EQUIPMENT

SECTION FIRE PUMPS 1.00 PART 1 & GENERAL Description of Work. A. Provide pumps for fire suppression Section Includes

A. ASME Compliance: Fabricate and install hydronic piping in accordance with ASME B31.9 "Building Services Piping.

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

SECTION ELECTRIC WATER HEATERS

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

DIVISION FINNED WATER-TUBE WATER HEATERS

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

Suggested Specification: Benchmark 1.5 Low NOx Gas-Fired Hydronic Boiler(s)

15900 HVAC INSTRUMENTATION AND CONTROLS

P.C. Simonton & Associates, Inc. Consulting Engineers. Paul C. Simonton

Fire Pump Specification

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION AIR COOLED WATER CHILLERS

Soft Start Series MP700 Solid State, Reduced Voltage

Laboratory Enclosed Rotary Screw Air Compressor System with Air Treatment Center Package

SECTION HEATING BOILERS

Laboratory Enclosed Scroll Air Compressor System with Premium NFPA Controls

ADDENDUM NO. 3 March 19, 2018

SECTION GENERATOR PARALLELING CONTROLS

SECTION CENTRIFUGAL WATER CHILLERS Vibration Isolation Pumping Equipment (HVAC) Induced Draft Cooling Tower

A. Product Data: Include rated capacities, furnished specialties and accessories.

Across-the-Line SERIES MP300 Combined Manual and Automatic

MARLOW PUMPS RECIRCULATION

Domestic. Pump Series CB and CBE Condensate Units SINGLE OR DUPLEX 1,000 THRU 140,000 SQ. FT. EDR-250 THRU 34,748 LB./HR.

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

Variable Frequency Drive SERIES MP800 VFD

SECTION SAMPLE SPECIFICATION FOR BOILER CONTROLLER CONVERSION KIT

DIVISION FINNED WATER-TUBE BOILERS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

SECTION WET-PIPE SPRINKLER SYSTEMS

Direct Fired Heater Model AD Specification

User s Manual. TIGER S EYE E-Series Mark V Jockey. TIGERFLOW Systems, Inc Mint Way Dallas, Texas

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Operational Overview and Controls Guide

SECTION WATER HEATERS

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

REFRIGERANT PIPING SYSTEM

SECTION AIR HANDLING UNIT

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION DOMESTIC WATER HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

A. Section Instrumentation and Control Devices for HVAC. B. Section Building Automation Systems(BAS) for HVAC

Transcription:

SECTION 22 11 23.13 DOMESTIC WATER PRESSURE BOOSTING PART 1 - GENERAL 1.1 SUMMARY A. Where utility water pressure cannot adequately meet the pressure requirements of the domestic water systems and where it is impractical to have a dedicated pressure booster system serving isolated equipment, furnish and install a factory packaged and tested, duplex variable-speed domestic water pressure boosting system including pumps, motors, controls, valves, interconnecting piping, bypass piping, wiring and accessories for a complete, approved system. 1.2 QUALITY ASSURANCE A. The manufacturer of the domestic water pressure boosting system shall be responsible for compliance with all applicable codes and regulations, and be held accountable for the complete pump package and installation. B. Manufacturer s Qualifications: Company specializing in manufacturing the products specified in this Section with minimum three years documented experience. The packaged system manufacturer shall have 24 hour local service available provided by a trained factory authorized representative. C. All disconnects, transformers, and control devices shall be installed to provide minimum wire bending clearances per N.E.C. All wiring shall be stranded copper conductors with 90 C. insulation. Conductors shall be numbered and identified at all termination points. All wiring shall be installed in nylon wire ways and laced with nylon tie straps. All disconnects, transformers, controllers, control devices, selector switches, and indicator lights shall be provided with nameplates indicating their respective function and/or identification. A factory wiring schematic shall be permanently affixed to the inside of cabinet door. The entire assembly shall be wired and tested in accordance with the National Electrical Code (N.E.C.). All components shall be built to National Electrical Manufacturers Association (NEMA) standards and be Underwriters Laboratory (U.L.) approved. The entire control panel shall bear the U.L. Label for enclosed industrial control panels. The entire package pumping system shall comply with Federal Regulations 29 CFR 1910.399 and certified through ETL under Category 225 and ULQCZJ. D. Installer's Qualifications: The system shall be installed by a firm having proven experience regularly engaged in the installation of variable speed domestic booster pump systems. 1.3 SUBMITTALS A. Product Data: 1. Provide manufacturers literature including general assembly, pump curves showing performance characteristics with pump and system with operating point indicated, NPSH curve, controls, wiring diagrams, and service connections. See Section 01 33 23 Shop Drawings, Product Data, and Samples. B. Record Documents: 1. See Section 01 78 39 Project Record Documents. 2. Provide full written description of manufacturer s warranty. 3. Shop Drawings: Indicate layout, general assembly, components, dimensions, weights, clearances, and methods of assembly. 4. Manufacturer's Installation Instruction: Indicate support details, connection requirements, and include start-up instructions for pump system. U OF I FACILITIES STANDARDS 22 11 23.13-1 DOMESTIC WATER PRESSURE BOOSTING

5. Manufacturer's Certificate: Certify that pumps meet or exceed specified requirements at specified operating conditions. Submit summary and results of factory tests performed. 6. Field Reports: Submit verification statement, signed by system manufacturer representative, of start-up, adjustment service and acceptance of installation. Indicate summary of hydrostatic test and field acceptance tests performed. C. Operation and Maintenance Data: 1. See Section 01 78 23 Operation and Maintenance Data. 2. Operation Data: Include manufacturer s instructions, start-up data, trouble-shooting check lists, for pumps, drivers, and controllers. 3. Maintenance Data: Include manufacturer s literature, cleaning procedures, replacement parts lists, and repair data for pumps, drivers and controllers, preventive maintenance schedule, preventive maintenance recommendations and procedures. Identify place of purchase, location and contact numbers of service depot and technical support for each product installed. 1.4 DELIVERY, STORAGE AND HANDLING A. Accept pumps and components on Site in factory packing. Inspect for damage. Comply with manufacturers rigging and installation instructions. B. Protect pumps and components from physical damage including effects of weather, water, and construction debris. C. Provide temporary inlet and outlet caps, and maintain in place until installation. 1.5 MAINTENANCE SERVICE A. Furnish service and maintenance of packaged system for one year from date of Substantial Completion. PART 2 - PRODUCTS 2.1 GENERAL A. All materials shall meet or exceed all applicable referenced standards, federal, state and local requirements, and conform to codes and ordinances of authorities having jurisdiction. B. Pressure ratings of pumps, pipe, fittings, valves, gauges and all other water carrying appurtenances shall be suitable for the anticipated system pressures in which they are installed. C. The Contractor shall ascertain for himself the space and access available for the installation of a factory assembled packaged unit and as an option may assemble the various components in place at the Site in lieu of providing a factory assembled unit. However, all components of the system shall be compatible and be furnished by a single source manufacturer and all electrical services and interconnecting equipment wiring must be provided for within this Contractors bid. D. The booster system shall be factory assembled on a steel skid including pumps, motors, butterfly shut-off valves, wafer style silent check valves, Type "L" copper or Schedule 40 300 series stainless steel suction and discharge manifolds, all interconnecting piping, wiring, variable frequency drives with logic and power controls. E. Provide hydro-accumulator tank that will allow the pumps to shut down during low flow conditions. F. All pilot lights and visual indicators shall be illuminated from the rear by long life LED lamps. Neon and incandescent lamps are not acceptable. U OF I FACILITIES STANDARDS 22 11 23.13-2 DOMESTIC WATER PRESSURE BOOSTING

G. Provide isolation valves on the suction and discharge of each pump. The isolation valves shall be 600 WOG full-port ball valves (2" and smaller) and lug style butterfly valves (2½ and larger). H. Provide two 4 1/2" ASME grade A, panel mounted gauges for indicating system suction and system discharge pressure. I. All skid-mounted components shall be factory finished in high quality epoxy or enamel paint. The base shall be suitable for grouting. J. The packaged pumping system shall include all electrical wiring between components and shall be completed and tested at the factory prior to shipment. K. Unions or flanges shall be provided for easy removal of pumps. Pipe headers shall be sized for a velocity not exceeding 7-1/2 FPS and shall be terminated with a groove joint capable of accepting a groove coupling or groove flange furnished by Contractor. L. System shall be arranged such that single point connections are required for piping and electrical power supply. M. Individual pumps, motors and pressure regulating or check valves shall be serviceable with the booster system in operation. N. All similar components shall be of one manufacturer, (i.e., valves, gauges, etc.). O. Refer to schedules on Contract Drawings for required pump capacities and electrical characteristics. 2.2 ACCEPTABLE MANUFACTURERS A. The following manufacturers are acceptable provided their products meet or exceed these Specifications and the Contract drawing schedules: 1. Patterson Pump, Aqua FloPak 2. Bell and Gossett 3. Armstrong 4. Metropolitan 5. Aurora 2.3 PUMPS AND MOTORS A. System shall include two horizontal mounted close-coupled end suction centrifugal pumps with ANSI flanged connections. Pump features to include foot supported casing, back pull out design, top centerline discharge and hydraulically balanced impeller. Pump shall be cast iron bronze fitted or stainless steel construction with a replaceable shaft sleeve and mechanical seal with carbon-ceramic seal faces. B. Each pump shall be provided with an individual temperature probe and purge valve having adjustable high temperature set point and differential to sense heat buildup in the pump casing. On sensing high temperature the probe circuit shall open a solenoid valve that allows the heated water to flow out. C. See Section 26 60 00 Common Motor Requirements for motor information. 2.4 VARIABLE FREQUENCY DRIVES A. See Section 26 29 23 Variable Frequency Drive Controllers for VFD requirements. U OF I FACILITIES STANDARDS 22 11 23.13-3 DOMESTIC WATER PRESSURE BOOSTING

2.5 PRESSURE SENSOR/TRANSMITTER A. Provide one pressure sensor/transmitter that provides a 4 to 20 ma DC output, compatible with the system controls, temperature and pressure requirements. Pressure sensor/transmitter shall have zero, span and damping devices. The transmitter shall be installed on the system discharge header and factory wired to the control panel. 2.6 SEQUENCE OF OPERATION A. The lead pump shall run only as necessary to maintain system pressure and will be controlled automatically by means of a pressure sensor/transmitter and programmable logic controller (PLC) programmed to prevent short cycling. If the lead pump is unable to maintain system pressure the lag pump(s) will be called on after a time delay and will operate in parallel with the lead pump in accordance with the PLC program. When one pump can handle the system demand the controls will shut down the lag pump. When a low or no flow condition is reached, the controls will accelerate the lead pump to charge the system and hydro-accumulator tank then shut the lead pump down and alternate. 2.7 CONTROL PANEL A. Logic Section - Provide, mount and wire on the skid a programmable logic controller in a NEMA 1 enclosure to interface the signal from the pressure sensor to the VFD's and provide a stabilized response to speed up or slow down or add pumps to meet system requirements. The controller shall provide setpoint adjustment, timer adjustment, PID functions and both system and controller self-diagnostics via touch screen display. The touch screen display / human machine interface shall include a 5.7 (minimum) STN display, resistive analog touch, numerical system keyboard. All user interface set points shall be easily accessible via a password protected display screen. Normal system operation shall be tuned to eliminate hunting. Controller shall have one RS 485 Communication port, real time calendar/clock and EEPROM memory transfer cartridge. B. Power Section - Each system shall include a UL listed enclosed industrial control panel in a NEMA 1 enclosure, factory wired and mounted on the steel skid. The panel shall be furnished with individual pump disconnects with through the door handles, pump run lights, H-O-A selector switches and 115 volt fused control transformer and include the following features: 1. Control power (on-off) switch and light. 2. Low suction pressure shutdown circuit with auto reset, delay timer and light. 3. High system pressure shutdown circuit with auto reset and light. 4. Power failure monitoring. 5. Audible alarm with silence push button. 6. Auto alternate three equal pumps. 7. Auxiliary relay contacts for all alarm conditions. 8. PLC enable switch. 9. Individual pump temperature probe and purge valves. 10. Main Disconnect. 11. Audible and visual indication of low storage tank level (signal by others), with silence push button. 12. Elapsed time meters. 13. Flow sensor with digital display in GPM. 14. Seven day time clock for intermittent system operation. U OF I FACILITIES STANDARDS 22 11 23.13-4 DOMESTIC WATER PRESSURE BOOSTING

PART 3 - EXECUTION 3.1 INSTALLATION A. Installation shall meet or exceed all applicable federal, state and local requirements, referenced standards and conform to codes and ordinances. B. Install the system level and in accordance with manufacturer s published recommendations. C. Locate equipment with allowance for manufacturer's recommended clearances around unit. D. Set entire unit on 4" high reinforced concrete equipment pad. Provide vibration isolators and bolt skid to pad. Structurally connect equipment pad to building slab to prevent movement. E. Pipe discharge from all relief valves, drains and individual pump thermal purge protection solenoid valves, indirectly to floor drain having adequate capacity to accept discharge. F. Provide valved Type "L" copper branch feed to the bladder tank from system distribution main as shown on the Contract Drawings. 3.2 FACTORY TESTING A. The booster system shall be hydrostatically tested and shall undergo a complete electric and hydraulic test from 0 to 100% design flow at the factory. All control devices including transmitters and all safety features shall be factory calibrated and tested. 3.3 VERIFICATION AND TESTING A. Verify that the pumps and prime movers have been aligned according to manufacturers recommendations. Test the system performance by verifying the operation of the pumps and system vs. the pump curves, alarms, controls, etc. Contractor shall inform Owner 48 hours in advance of verification and testing so that Owner s Commissioning Authority (CxA) may observe pump alignment, performance verifications, and testing of system performance, alarms and controls. 3.4 INSTRUCTIONS AND START-UP A. Provide for the service of a competent factory-trained supervising agent from the pump package manufacturer to inspect the completed installation, start the system and acquaint the operators with the proper operation and maintenance of the equipment. END OF SECTION 2 11 23.13 This section of the U of I Facilities Standards establishes minimum requirements only. It should not be used as a complete specification. U OF I FACILITIES STANDARDS 22 11 23.13-5 DOMESTIC WATER PRESSURE BOOSTING