Equipment Festge County Park

Similar documents
BETTER PRODUCTS for BETTER LIVING. Commercial Sales

ADA Descriptions Website Posting 12/12/17

SECTION 900 TURF ESTABLISHMENT

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Playground Standards, Specifications and Standard Details for Playground Construction

REVIEW GUIDELINES FOR THE DONATION OF PUBLIC ART

BUFFERS, TREE PROTECTION AND LANDSCAPING. Sec Purpose and Intent.

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

Wisconsin Contractors Institute Continuing Education

SECTION TURF AND GRASSES

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Department of Planning & Development Planning Unit

Agenda Report. TO: CITY COUNCIL April 6, 2009 FROM: RECOMMENDATION: BACKGROUND: CITY MANAGER

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Landscape Edging. objective/goal. Review Process

Urban Park Management Webinar Series

The leader in physical activity for young children!

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

LAWN RENOVATION & OVERSEEDING

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Bridleton HOA Design Guidelines

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

IPM in Schools Checklists Exclusion & Sanitation

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

Department of Planning & Development Planning Unit

As a public park, it is important to plan your community garden to ensure everyone can gain

Table of Contents. To learn more about the Schools In Motion program, visit

LANDSCAPE MAINTENANCE CONTRACT Detailed Scope of Work

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

CONSTRUCTION DOCUMENTS CHECKLIST

DESIGN GUIDELINES CONTENTS APPLICATION INFORMATION...2 COVENANT ENFORCEMENT PROCEDURE...2 GUIDELINES Patios and Walkways...

Department of Planning & Development Planning Unit

Structural Storm Water Best Management Practices (BMPs)

UPDATED PROGRAMMING ELEMENTS

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

Decision Notice. Proposed Action

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

REVISED AGENDA MATERIAL

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Trash. Holidays. Solid Waste and Recycling Guide. Germantown. Curb-Side Collection. Back-Door Collection S. Germantown Road Germantown, TN 38138

A new park will be delivered as part of the Elephant Park regeneration.

Landscape Questionnaire

(SCHOOL DISTRICT NAME) MAINTENANCE/MANAGEMENT SPECIFICATIONS FOR ATHLETIC FIELDS AND OUTDOOR FACILITIES (SUGGESTED TEMPLATE)

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

Master Gardener Recommended Horticulture Best Management Practices

Section General Tree Preservation Requirements for New Nonresidential and Residential Development

You can contact us on: T E.

Section 9 Landscaping and Street Trees

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Building Self-Inspection Program

Cherokee Park, Inc 5000 N Sherman Ave Madison, WI May 30, 2007

2015 Community Garden Sustainability Fund

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

CITY OF OVERLAND PARK POSITION DESCRIPTION

DIVISION 32 EXTERIOR IMPROVEMENTS

Appendix F Guidance on Selection of Temporary Slope Stabilization Techniques

How to Plan and Implement Outdoor Learning Environments

Unit 4 Landscape Installation

Volume 2, Chapter 12 - Revegetation

City of Moline Sidewalk Café Guidelines

A. Contractor shall provide product data for each type of product indicated.

Welcome! Today s topic: Landscaping and Curb Appeal

Edgings & Sleepers LANDSCAPING I EDGINGS & SLEEPERS

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Article 7.05 Manufactured Home Park Districts

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

FACILITIES CHILD CARE DEVELOPMENT CENTER EVALUATION GUIDE. b. Are staff members trained in first aid, CPR and Heimlich Maneuver?

Kensington Covenants Committee Guidelines

Master Plan Presentation August 12, 2015

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Topics. Grid Lattice Paving Systems. Gravelpave, Grasspave and Grassy Pavers. Applications, Materials and Construction

4/23/2012. Topics. Flexible Pervious Gravel Pavers. Flexible Pervious Gravel Pavers. Grid Lattice Paving Systems

Authority. any changes required as a result of the approved CHMP.

Sand, soil, bark & gravel

Preserve at Reed Mill Homeowners Association, Inc.

VISION PLAN PRESENTATION - SEPTEMBER 28, 2013

A DIVISION OF L & M SUPPLY EROSION CONTROL BLANKETS, WATTLES AND LOGS

Town of Essex Small Site Erosion Control Guide

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

What are Grassmats? Playground matting- can you explain more about playground fall height ratings for Grassmats?

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

REPORT TO COUNCIL City of Sacramento

LANDSCAPING (PLANTINGS AND RELATED STRUCTURES)

DIVISION 32 EXTERIOR IMPROVEMENTS

Outline. Growing Vegetables in a Raised Bed. Advantages of Raised Beds. Types of Raised Beds. Gardening Class Series -- Marshfield, MO 4/23/2018

City of Summer side. Turf Management Procedures

BREWSTER SR173 PROPOSED: OKANOGAN RIVER PADDLERS CAMPGROUND WATERBODY: OKANOGAN RIVER NEAR: BREWSTER COUNTY: OKANOGAN STATE: WASHINGTON

Proposed Staging Plan For:

Guidelines for Installing Rolled Erosion Control Products in Slope, Channel and Shoreline Applications Laurie Honnigford

22 February 13, 2013 Public Hearing APPLICANT: MCDONALD GARDEN MARKET, LLC PROPERTY OWNER: SEARS AND ROEBUCK

Transcription:

TRAVIS MYREN Director of Administration COUNTY OF DANE DEPARTMENT OF ADMINISTRATION PURCHASING DIVISION Room 425 City-County Building 210 Martin Luther King Jr. Blvd. Madison, WI 53703-3345 608/266-4131 FAX 608/266-4425 TDD 608/266-4941 CHARLES HICKLIN Controller DATE: June 17, 2014 TO: All Proposers, Request For Proposals #114076: Design and Installation of Playground Equipment Festge County Park FROM: Carolyn Ninedorf, Purchasing Agent SUBJECT: ADDENDUM #1 The following changes are made to the scope of the project and to Attachment G: Cost Proposal: 1.1 Introduction The purpose of this document is to provide interested parties with information to enable them to prepare and submit a proposal to provide removal of existing modular play equipment, design and installation of new modular play equipment and surfacing for a playground at Festge County Park, 4894 Scherbel Road, Cross Plains, WI 53528. The project purpose is to remove and dispose of existing playground and swings and replace with new equipment in natural colors of green tan and brown, similar to the playground found at Stewart County Park (See Attachment 4). The existing merry-go-round is to remain in its current location. 1.2 Scope of the Project 1.2.1 Project Description The project will include removal and disposal of existing modular equipment and top timber border, (playground, swings and timbers), provide orange barrier fencing around drip line of existing trees adjacent to the play area, provide design and installation of new modular playground equipment (including new swings), topdress play area with provide ADA accessible wood fiber or alternate NuPlay Nugget rubber chips (or approved equal by Dane County Parks) within the playground borders, provide an ADA accessible walkway with railings between play areas, provide new 6 x 6 treated timber edging border (or approved equal by Dane County Parks) to define the play areas, and provide lawn restoration of disturbed areas by spreading shredded topsoil, Madison Parks seed and mulching with

chopped straw. The County will perform the following tasks relating to the project: install 4 vehicle parking stalls and a 6 wide accessible path from parking area to playground. 5.2 Site Preparation and Removal of Existing Equipment Provide and Install a temporary orange barrier fence around the drip line perimeter of existing trees adjacent to play area prior to accessing work site with any equipment. Remove and dispose of existing modular playground equipment and swings and top existing timber border boarders. 5.3 Design of New Playground Equipment Provide a playground design with a dimensioned plan for the proposed modular playground equipment, a list of all play equipment elements, specifications for each piece of equipment, and quantities of new surface and edging material required. The playground shall include a variety of elements to accommodate as many user groups as possible. Users shall be able to access and circulate through the play areas with ease. Photographs or computer generated images of the proposed playground equipment are necessary. Design of playground shall include an ADA accessible walkway with railings, (See Attachment 3) to connect each separate play area. Formatted: Indent: Left: 0" Playground designs must include: * Transfer points that allow disabled persons access to major play elements. * Surfaces and/or pathways within the playground to make all equipment accessible. Surface material may shall be wood fiber or NuPlay Nugget rubber chips (or approved equal by Dane County Parks) that meets safety and ADA accessibility guidelines. * An ADA accessible walkway with railings to connect each play area. * Commercial grade, heavy-duty products. * Accommodation for as many users as possible with the given budget. 5.4 Installation of New Playground Equipment Provide and install new modular playground equipment where indicated. The maximum playground area available to design is within two separate areas and are is approximately 24 x 36, and 32 x 32 (See Attachment 3), however, actual perimeter boundaries are to reflect the minimum fall zone requirements for proposed elements, and minimize any extra play surface area that is not necessary. Equipment shall be durable, low-maintenance, safe, accessible, and shall provide a variety of events. Wooden structures, seesaws, log rolls, rope climbers, and stainless steel slides are not acceptable. The design must include an ADA accessible walkway with railings between play areas to connect them. Manufacturer must have adequate liability insurance.

5.5 Materials and Surface Finishing Provide and install surface and edging materials. Topdress existing wood fiber with new wood fiber Surface materials shall be wood fiber or NuPlay Nugget rubber chips (or approved equal by Dane County Parks) that meets safety and ADA accessibility guidelines. Gravel, sand or bark chip surfaces are not acceptable. Materials shall provide a high degree of quality, safety, longevity, and accessibility. Materials shall be low maintenance. Edging should consist of Install 6 x 6 treated timber border (or approved equal by Dane County Parks) fastened together and anchored with ½ rebar driven a minimum of 36 into the ground, at 8 intervals. Design of surface and edging shall be set at grade so mowers can mow over the edge of the playground without difficulty. When installation of playground, surfacing and edgings is complete, any disturbed lawn areas shall be restored by spreading shredded topsoil, seeding Madison Parks mix at 4 lbs. per 1000 sq. ft. and covering with chopped straw mulch. All proposed elements must be free of tripping hazards and a smooth, uniform finish grade of surface material shall be provided upon completion of playground installation. Remove temporary orange barrier fencing upon completion of project.

Attachment G Submit with RFP COST / FINANCIAL PROPOSAL **REVISED** NAME OF FIRM: Time required from receipt of order to completion of project: days after receipt of order. Completion shall be by September 1, 2014. Install temporary orange barrier fence around existing trees: COST: $ Removal and disposal of existing modular playground equipment : COST: $ ALTERNATE Remove and dispose of existing swings and replace with maximum number of swings that fit within existing area and includes at least one toddler swing. COST: Wood fiber mulch surfacing material: QTY: (C.Y.) COST: $ New modular playground equipment (installed): COST: $ Install Treated timber border: COST: $ Lawn restoration of disturbed areas: QTY: (S.Y.) COST: $ ITEMIZED LIST OF NEW EQUIPMENT:

Festge County Park Playground Removal and Replacement Plan #* Attachment 3 Existing Park Shelter Existing Drive Existing Merry-Go-Round to Remain? Proposed Play Area Proposed Parking & 5'-0" Path (By Owner) s s Existing Swing Area #* N Date Created: 5/27/14 Date Revised: 6/12/14 H:\Parks\Mapping\Parks\ Festge\Maps\Playground\ FestgePlaygroundMap 0 15 30 60 Feet