WELCOME TACOMA TRESTLE TRACK & SIGNAL PROJECT OPEN HOUSE REVIEW AND COMMENT ON TRESTLE AND PLATFORM PRELIMINARY STRUCTURAL DESIGN

Similar documents
Lynnwood Link Extension

SYSTEM EXPANSION. Sound Transit system expansion will:

West Seattle and Ballard Link Extensions. Early Scoping Information Report

Sound Transit 3. Appendix A: Detailed Description of Facilities and Estimated Costs

4.8 VISUAL QUALITY AND AESTHETIC RESOURCES

CENTRAL AND EAST CORRIDORS

South 200 th Link Extension Open House April 3, 2013

Regional Bike Network Update. Bicycle and Pedestrian Advisory Committee April 11, 2017

South King County High Capacity Transit Corridor Report. Figure 1-1. Study Area

Plan Review for High-Capacity Transit in the Project Corridor: S. 200th Street to Federal Way City Center

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

January 6, Katie Flores, Board Administrator. Kent Hale, Sr. Environmental Planner. Federal Way Link Extension Final EIS Comments

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

East Link Extension. June 28, South Bellevue Final Design Open House Public Involvement Summary

YOUR FUTURE RIDE. Lynnwood. 200th St SW. Lynnwood. Transit Center. 52nd Ave W. 220th St SW. Transit Center. 236th St SW. 244th St SW.

Erik Rundell, Project Manager

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Boise Fire Department $ 44, Tualatin Valley Fire & Rescue/Local 1660 $ 36, Local 2878 $ 34, Spokane County Fire District #9 $

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

Transportation. Strategies for Action

ATTACHMENT A. Definition of Activity Centers

BeltLine Corridor Environmental Study

BALLARD TO DOWNTOWN SEATTLE

Abstract. See the Fact Sheet for persons who may be contacted for additional information concerning this document

CALL TO ARTISTS REQUEST FOR QUALIFICATIONS STart PUBLIC ART PROGRAM

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

South King County High Capacity Transit Corridor Report. Figure Other Infrastructure

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Appendix E Section 4(f) Evaluation

Blue Line LRT Extension

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

22a. Existing Condition. 22b. Simulation of NE 20th Street Alternative (D3)

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Permit Activity Report

CHAPTER 12. RECREATION

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

The University District envisions, in its neighborhood

Southeast Extension to RidgeGate Parkway Scoping Booklet

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

Silver Line Gateway. Extension of Silver Line Bus Rapid Transit (BRT) to Chelsea and East Boston. Public Informational Meeting Chelsea, MA

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Seattle City Council Central Staff - Memorandum

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Port of Seattle Street Vacations Summary April, 2016

County Transportation Plan Workshop

Northwest District. Mark A. Crowley, IAAI-CFI. Everett, Washington

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

Washington Union Station s 2nd Century DEVELOPMENT PLAN

2030 Transit System Plan Refresh

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Designing for Sustainability: A Consultant s Perspective

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

4.5 Visual and Aesthetic Resources

COMMUNITY OPEN HOUSE. March 28, 2012

Quadrant Willows CORPORATE CENTER

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Knoxville Area Transit (KAT) Transit Development Plan Corridor Analysis

University of Washington Burke Gilman Trail Corridor Study

SR-2 Freeway Terminus Improvement Project

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Innovative Transportation Planning, Design & Technology in Fairfax County, VA

Port Credit Local Advisory Panel October 20 th Meeting

4.1 LAND USE AND HOUSING

City of Meriden Harbor Brook Flood Control Project Overview

Appendix H Historic Resources Discipline Report. Draft Environmental Impact Statement Alaskan Way, Promenade, and Overlook Walk

4.2 Land Use Introduction to Resources and Regulatory Requirements

117 E. Louisa St. #1 Seattle, WA January 29, 2016

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Welcome to the. Open House

Isabel Neighborhood Plan: Alternatives

DESIGN AND CONSTRUCTION OPEN HOUSE

Mississippi Skyway Preliminary Engineering Report

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

FDOT D4 Complete Streets

The Trinity River Corridor Project Update

OVERLAKE VILLAGE STATION

Century Park to Ellerslie Road Preliminary Engineering

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

Chapter 8. Visualizations

Quadrant Willows CORPORATE CENTER

WELCOME WHY A TEMPORARY PATHWAY? WE WANT TO HEAR FROM YOU

SOUTH 154 TH STREET STATION AREA ACTION PLAN CITY OF SEATAC, WASHINGTON

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

I was impressed with the final outcome

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Locally Preferred Alternative (LPA) Report (Volume I) Appendix A

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Early in the scoping process, several groups submitted a letter that reflected our collective values for Sound Transit 3. These values include:

Transportation Committee

Bus Rapid Transit Route Planning Project

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

Dumbarton Transportation Corridor Study. Stakeholder/Public Meetings August 16, 2017

Welcome! Agenda. South Downtown

Puget Sound Gateway Program Team. Phase 1, SR 509 Completion Project NEPA Re-evaluation

Fall 2017 Construction Update

Speakers. Learning Objectives & Schedule. ASLA 2013 Annual Meeting and EXPO

Transcription:

WELCOME TACOMA TRESTLE TRACK & SIGNAL ROJECT OEN HOUSE REVIEW AND COMMENT ON TRESTLE AND LATFORM RELIMINARY STRUCTURAL DESIGN LEARN ABOUT TIMING FOR AESTHETIC ELEMENTS NEXT STES

CURRENT AND FUTURE SOUND TRANSIT SERVICE Everett MA KEY Link Light Rail Central Link (SeaTac/Airport Westlake/Seattle) Tacoma Link (Tacoma Dome Theater District) Under Construction In Design In lanning/ lanned Mukilteo Ash Way South Everett Sounder Commuter Rail Everett Seattle Sounder Lakewood Tacoma Seattle Sounder ST Express Regional Bus Express Bus Service Future Bus Rapid Transit (BRT) Edmonds Lynnwood Mountlake Terrace Shoreline 145th Bothell Canyon ark Woodinville Supporting Investments ark & Ride Rail Station or Bus Facility Rail Station, Transit Center or Bus Stop Improvements First Hill Streetcar (Opens 2014) HOV/Transit Improvements HOV Direct Access Ramp, Freeway Station or Overpass Ferry Terminal Sea-Tac Airport Amtrak Future projects at a glance n Expanded new light rail service to Lynnwood, Overlake and Kent/ Des Moines n New First Hill streetcar connecting Capitol Hill and ioneer Square n Four new round-trip Sounder trains between Lakewood and Seattle n Sounder station improvements n ermanent Sounder station in Tukwila n Bus Rapid Transit service across SR 520 Seattle Westlake University Street ioneer Square International District/ Chinatown & King Street Stadium SODO Westwood Village Tukwila/ International Blvd Burien SeaTac /Airport Northgate Roosevelt U District University of Washington Capitol Hill First Hill Rainier Beacon Hill Mount Baker Tukwila Mercer Island Columbia City Othello Rainier Beach Kirkland Bellevue Transit Center East Main South Bellevue Totem Lake Overlake Transit Center Overlake Village 130th 120th Hospital Renton Redmond Bellevue Eastgate Issaquah SE Redmond Construction not currently funded South Sammamish Issaquah Highlands Angle Lake Kent/Des Moines Kent S 272nd/ Federal Way Construction not currently funded To Gig Harbor and urdy Tacoma Community College South Tacoma Tacoma Federal Way Theater District/ S 9th Commerce Street/ S 11th Convention Center/ S 15th Union Station/ S 19th S 25th Tacoma Dome uyallup Auburn Sumner Bonney Lake Lakewood Duont 2/14

ROJECT OVERVIEW Length:.65 miles roject budget: $62M (2014 dollars) Completion date: 2017 TACOMA TRESTLE TRACK & SIGNAL ROJECT Sound Transit is replacing the aging wooden single-track trestle with a new, concrete double-track bridge to increase rail capacity for additional Sounder and Amtrak trains and improve reliability of passenger service. New East G Street overpass bridge New extended passenger platform Freighthouse Square t e Replace retaining walls S ee t roject area Str E G e r t New bridge body The project also includes: Upgrade railroad signals Minor street construction and utility relocations E L Street Replace retaining walls E J The Tacoma Trestle project was approved by voters in 2008 as part of the Sound Transit 2 ballot measure and is independent of the implementation of the oint Defiance Bypass roject.

TIMELINE/ROCESS TACOMA TRESTLE TRACK & SIGNAL ROJECT WE ARE HERE Conceptual reliminary Final Construction Fully Engineering / Engineering/ Design Operational Environmental Environmental NOVEMBER SUMMER Summer 2013 2014 2014 2014 2015 2015 2017 Late 2017 30% design concept Environmental work State Environmental olicy Act (SEA) Archaeological Survey Wetlands Survey & Impact Analysis 60%, 90%, final design UBLIC INVOLVEMENT Aesthetic/architectural elements Construction impacts identify construction mitigation Develop business mitigation program Test pile program (Winter 2015)

BRIDGE BODY TACOMA TRESTLE TRACK & SIGNAL ROJECT BRIDGE BODY COMMUNITY INUT From spring 2014 survey referred: Two round column supports Two round bridge columns Support alternatives that were considered: Two, square Four, round Four, square latform extension column Note: This preliminary design does not include aesthetic treatments. Those treatments will be added during the final design phase.

EAST G STREET OVERASS TACOMA TRESTLE TRACK & SIGNAL ROJECT EAST G STREET OVERASS New steel girder overpass Replacement wall Steel girder overpass that includes pedestrian walkway 13ft. 10in. COMMUNITY INUT From February 2014 meeting Freighthouse Square Create an open design No column between East G Street and East 26th Street Improved sightlines due to new wall Take advantage of opportunities to incorporate aesthetics Existing column removed East 25th Street Aesthetic treatments will be added during final design phase Note: This preliminary design does not include aesthetic treatments. Those treatments will be added during the final design phase.

LATFORM EXTENSION LATFORM EXTENSION TACOMA TRESTLE TRACK & SIGNAL ROJECT Signal bungalow Baggage cart turnaround Safety rail latform Features Amtrak requirements latform Between 11-16 feet wide Space for baggage cart movement Safety rail Emergency exit Walled stairway, allowing protection of occupants for up to one hour Emergency exit Refuge for ADA Building to be demolished East 25th Street East G Street Freighthouse Square Note: This preliminary design does not include aesthetic treatments. Those treatments will be added during the final design phase.

AESTHETICS TACOMA TRESTLE TRACK & SIGNAL ROJECT Aesthetic treatments will be included during the final design of the new bridge. ublic feedback recommended: Lighting Incorporate lighting to enhance safety and serve as an artistic element Concrete forms Use form liners to treat concrete and create patterns on elements of the bridge Steel cut panels Integrate steel patterns into the bridge design and construction hyllis J. Tilley Memorial Bridge, Fort Worth, TX I-5 retaining wall, Tacoma, WA Shelby Street edestrian Bridge, Nashville, TN Interurban edestrian Bridge, Shoreline, WA Interurban edestrian Bridge, Shoreline, WA Beacon Hill Light Rail Station, Seattle, WA John Walser Bremerton Multi-modal Terminal, Bremerton, WA Art Grice Vicki Scuri Ray ower Artistic elements Transit Station wall, Charlotte, NC Loto Street Bridge, Eagle oint, OR

OTHER LATFORM EXTENSION Tacoma Link OMF COMMENTS Bridge body Building to be demolished latform extension East 25th Street East G Street Overpass East G Street Freighthouse Square BRIDGE BODY EAST G STREET OVERASS