PowerWave 2 Busway System

Similar documents
Schneider Electric ibusway for Data Center: Schneider Electric Powerbus Plug-In Busway

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

PART GENERAL 1.01 SECTION INCLUDES

SECTION ISOLATED POWER SYSTEMS

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

elite Model ELN Centralized Emergency Lighting Inverter Systems 550 W to 1.5 KW Systems

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

A. Furnish and install luminaires, lamps, ballasts and in-line fuses as herein specified and shown on the Drawings.

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

SECTION (16140) - WIRING DEVICES

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION INTERIOR LIGHTING

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION DOMESTIC WATER HEATERS

OCH-SS series Direct Wired Units Indoor * and Outdoor Comfort Heaters

SECTION LIGHTING

Read these instructions carefully and completely. NOTE This appliance must be properly grounded.

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION GENERATOR PARALLELING CONTROLS

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

SECTION LIGHTING CONTROL DEVICES

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

A. This Section includes the following lighting control devices:

CALTECH Pasadena, CA

Molded Case Circuit Breakers, Bulletin 140G

SECTION HVAC Fans

SECTION ELECTRICAL GENERAL PROVISIONS

8. Multi-Family Residential Buildings

Element D Services Electrical

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

MACH N-407 Heat Pump Air-Cooled Chiller

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

SECTION ENCLOSED CONTROLLERS

CHAPTER 20 SERVICE EQUIPMENT

Guide Specification Model CTG Automatic Transfer Switch

SECTION LOW VOLTAGE LIGHTING CONTROLS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CADDY CORPORATION. Utility Distribution Systems

Ilnstallat!on. nstruct=ons. Before You Begin. Parts Included. Tools Needed. Built-In Wall Oven with Microwave ATTENTION INSTALLER

MN/DOT SPECIFICATION FOR A ROADWAY LIGHTING SERVICE CABINET

SECTION POWER SUPPLIES AND DISTRIBUTION

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

For use with models: PGM304-1, versions M-B PGM365-1, versions M-E, M-F & M-G

OKB, OKD, & OKH Series

Commercial Electric Water Heater Gallon Capacity, up to 58 KW in all Three Phase Voltages, Over 6 KW in all Single Phase Voltages

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

SECTION GAS-FIRED RADIANT HEATERS

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

ELECTRIC WALL OVEN INSTALLATION INSTRUCTIONS

CS1000. Single Pole Plugs & Connectors up to 400A, 1000VAC Featuring: Silver-Nickel, Butt-Style Contacts. Locking Pin. Finger Guard (IP2X)

Electrical Design Guidelines Table of Contents

Powerohm Resistors Digital HRG System

Installation Instructions

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

Installation, Operation & Maintenance: Field-Installed Electric Heater for RXT Series Units

APC Refrigeration Distribution Unit (RDU) Guide Specifications

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

FSA-Series Heavy-Duty Flat panel Emitter Architectural Electric Overhead Infrared Heaters

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

tungsten Smart-heat electric heater

INSTALLATION, INSTRUCTION AND SERVICE MANUAL

MaxLite LED Round Pendant Highbay Series

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

Product Specifications 4 Breaker Main Disconnect Panel with Undervoltage Trip

FSS-Series Heavy-Duty Flat panel Emitter Electric Overhead Infrared Heaters

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

FES - Series Portable Electric Heaters. YES - Series Suspended Electric Heaters CONTENTS

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.

LiteMinder. LM Series Inverter Pure Sine Wave Modular Inverter Technology. Fast Transfer System 1.0 to 18.75KVA LED Compatible

ChromaStar. Comfort. Infra-Red Radiant Heaters. Description. Portable. Applications. Fixed Overhead. 1.5 to 13.5 kw. 5,118 to 46,062 BTU/Hr

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

FIRE ALARM: BY OTHERS, IF REQUIRED.

Hi-lume 3D Overview. Fluorescent Dimming Ballasts Hi-lume 3D Architectural Dimming

MAC N-407 Air-Cooled Chiller

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Installation, Operation & Service Manual

PART 4 ELECTRICAL STANDARDS

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

Transcription:

PowerWave 2 Busway System Guide Specifications (Revision 004, 11/17/2017) 1 GENERAL 1.1 Summary This specification covers the electrical characteristics and general requirements for a continuous opening, low voltage, vertical or horizontal power busway distribution system. System shall be designed primarily as an overhead distributed power distribution center. System shall be designed to be located near critical distribution points to power specific loads, servers and work stations. Once installed, the completed system will provide a manageable, economical means for the distribution of power and communications. Distribution of power and communications will be made through the adaptation of plug-in Tap Off Units mounted securely to the busway rails. Tap Off points shall be easily modifiable for phase configuration and be safe for installation and decommissioning while the busway is in its live state. System shall be 100% recyclable and be shipped in recyclable containers and packing. 1.2 Standards The PDI PowerWave 2 Bus System shall be certified through ETL for the following standards: UL 857 CSA C22.2 No. 27-09 IEC 61439-2 C-TICK (Australia) In addition, the PowerWave 2 Bus System shall be designed, manufactured, tested, and installed in compliance with the following standards: IEC 60264 IEC 60364 IEC 61439-1 ISO 9001: 2015 Low Voltage Directive 73/23/EEC: Amendment 93/68/EEC NEC Art. 364 19 Busway NEMA AB-1 NEMA KS-1 NFPA-70 UL 60950-1 Power Distribution, Inc. Transform. Distribute. Monitor. 1

1.3 System Description 1.3.1 Environmental Requirements The PowerWave 2 Bus System shall have the following environmental requirements for operation and storage requirements: Temperature ranges: o Storage: -40 F to 158 F [-40 C to 70 C] o Operating: 250 400A Busway: 140 F [60 C] Maximum 800A Busway: 104 F [40 C] Maximum BCMS: 104 F [40 C] Maximum Relative Humidity: o Storage: Store in dry location in original packaging o Operating: 0% to 95% non-condensing Operating Altitude: o Up to 6,600 ft. [2,000m] above Mean Seal Level; the unit is de-rated if operated above this altitude. 1.3.2 Electrical Specification The PowerWave 2 Busway System shall accept input power rated at 250A, 400A, and 800A. The PowerWave 2 Busway System shall accept alternating current frequencies of 50 Hz, 60 Hz, and 400 Hz. The PowerWave 2 Busway System shall accept input voltages of 208/120V, 380/220V, 400/230V, 415/240V, 480/277V, 600/377V or any voltage less than or equal to 600V. Voltage drop-off along the bus run per 100' of installed system shall be approximately 2V. The PowerWave 2 Busway System shall have the following short-circuit withstand ratings: 250A Bus Systems: o 42 kaic up to 208VAC o 35 kaic up to 480VAC o 22 kaic up to 600VAC 400A Bus Systems: o 42 kaic up to 208VAC o 35 kaic up to 480VAC o 22 kaic up to 600VAC 800A Bus Systems: o 42 kaic up to 600V Power Distribution, Inc. Transform. Distribute. Monitor. 2

1.4 Documentation 1.4.1 Drawings PowerWave 2 Busway System submittal drawings shall be furnished for busway and Tap Off Units. 1.4.2 Installation and Operations Documentation A PowerWave 2 Busway System Installation and Operations Manual shall be furnished. 1.4.3 Contact List A contact list for PDI functions, such as Service and Accounting, shall be provided. 1.5 Warranty The manufacturer shall provide a warranty against defects in materials and workmanship for a period of 12 months from initial start-up or 18 months from shipping date, whichever period ends first. 1.6 Quality Assurance The PDI PowerWave 2 Busway shall be designed and manufactured according to internationally recognized quality standards, including those listed in section 1.2 Standards. The manufacturer shall be ISO 9001 certified. The PDI PowerWave 2 Busway shall be factory tested before shipment. Testing shall include at minimum: Hi-Pot Test at two times the unit s rated voltage plus 1000 volts, per UL 60950 Receptacle or Connector and Breaker Configuration Phase Wiring/ Connectivity Test Ground Fault Path Test 2 PRODUCT 2.1 Busway 2.1.1 Busway System The busway system shall be constructed to allow any individual section to be removed and replaced without disruption to adjacent sections. The busway system shall be finger safe IP2X rated and tested. Power Distribution, Inc. Transform. Distribute. Monitor. 3

2.1.2 Bus Rail Housing Bus rail housing shall be of single-piece extruded aluminum that is designed to act as a 100% ground conductor. The extrusion shall have a corrosion resistant anodized surface finish. Standard lengths shall include 3, 5, 6, 10, and 12 foot. Removing the end cap assembly shall allow extending the bus run length. The extruded housing must accommodate the direct insertion of hanger assemblies which attach directly to the housing assembly. The complete assembly shall be of the continuous opening design and shall have a slotted opening on one side of the bus to accommodate the insertion of the Tap Off Units. 2.1.3 Bus Rail System Weight The busway system shall be in accordance with the following weights: 250 Amp: 6.8 lbs/ft. [10.1 kg/m] 400 Amp: 9.6 lbs/ft. [14.3 kg/m] 800 Amp: 19.4 lbs/ft. [28.9 kg/m] 2.2 Busway 2.2.1 Bus Bar Construction All phase and neutral conductors shall be made of copper with a minimum of 98.9% electrical grade purity that is silver plated with a nickel undercoat per ASTM B700-08 and sized to handle a minimum of 100% of the continuously rated current. All conductors shall be electrically isolated from the housing using a Class H fiber-reinforced Glastic material with non-propagating properties. All insulators must be UL recognized. 2.2.2 Bus Power Junctions All critical bus power junctions shall be made with CouplerTek technology and shall be maintenance fee. Bolted bus connections that can loosen, sag, and result in connection hotspots are not allowed. 2.2.3 Bus Bar 150% Neutral (Optional) A 150%-rated Neutral shall be available as a factory integrated feature of the bus rails. 2.2.4 Isolated Ground Bus Bar (Optional) An Isolated Ground Bus Bar shall be optionally installed in the existing rail channel and tested. Power Distribution, Inc. Transform. Distribute. Monitor. 4

2.2.5 Conductive Fittings and Components All conductive fittings including Tees, Elbows, etc. shall be of the same material from the same manufacturer. All insulating material shall be Class H fiber-reinforced Glastic material. All insulators must be UL recognized. 2.2.6 Insertion Points The entire bus open channel with the exception of the small area at the bus bar coupling shall be available for Tap Off Unit insertion. The maximum busway coupler keep-out area shall be as follows: 250-400 Amp = 3.75" keep-out area 800 Amp = 9" keep-out area 2.3 Suspension and Bus Hangers 2.3.1 Hanger Assemblies Hanger assemblies shall allow ceiling mounting and must not interfere or obstruct the housing opening intended for the installation of Tap Off Units. The Installing Contractor shall supply threaded rod where required for hanging the busway. The busway shall be hung from the ceiling using threaded rod. The Installing Contractor shall be responsible for supplying the threaded rod and making connections to bus hangars and End Feed enclosures and to the supporting structure. Maximum hanger spacing will be no more than 10' on center. 2.3.2 Vertical or Horizontal Suspension Bus Hangers shall be available for vertical or horizontal bus mount applications. Hangers shall be compatible with standard hardware and Unistrut. 2.4 End Feed End Feeds shall be designed for conduit landing and input feed connection. Vertical or horizontal End Feeds shall be available. 2.5 Tap Off Units 2.5.1 Tap Off Unit Enclosure The Tap Off Unit enclosure shall be available in vertical- and horizontal-mount configurations and shall be compatible with the 250, 400, and 800 amp bus rails. Tap Off Units used for vertical-mount supporting a maximum of two receptacles shall be available with Infrared translucent material for the purpose of thermal scanning breaker terminals. Power Distribution, Inc. Transform. Distribute. Monitor. 5

Plug-in Tap Off Units shall be polarity matched to the busway system. 2.5.2 Tap Off Unit Electrical Specification The Tap Off Unit maximum amperage shall be 128A. The Tap Off Unit can support a maximum of 12 poles without BCMS monitoring or 6 poles with BCMS monitoring. Finger safe multi-pole fuse holders are optional and may be used for current limiting requirements. 2.5.3 Circuit Breakers Circuit breaker ampacity shall be appropriate for the NEMA or IEC / Pin-and-sleeve connector circuit as indicated on drawings and maybe installed directly on the Tap Off Unit or suspended from a multiconductor cable (drop cord). Plug-in Tap Off Units shall use Square D, Eaton, Siemens, Schneider, ABB, GE, or PDI factoryapproved circuit breakers for branch circuit protection. Circuit breaker withstand rating shall be 5, 10, 22, 35, or 50 kaic. 2.5.4 Connectors and Receptacles Connectors and Receptacles shall be as indicated on submittal drawings. 2.5.5 Drop Cords Drop cord length shall be specified by the customer at time of purchase order. The drop cord length shall be the length of the drop cord not including the pre-assembled connector. Plug-in Tap Off Units requiring a cord assembly shall be manufactured with cord grips and the receptacles as specified in the submittal drawings. 2.5.6 Tap Off Unit Safety Plug-in Tap Off Units shall have inherently safe two-step insertion and removal in isolate sequential steps: (1) mechanically securing and then (2) energizing contact with the bus rail conductors. Plug-in Tap Off Units shall make ground contact prior to full insertion into the bus rail. The two-step insertion and removal process complements safety and change procedures at Mission Critical sites. Power Distribution, Inc. Transform. Distribute. Monitor. 6

2.5.7 Tap Off Unit Monitoring All Tap Off units can be equipped to provide current/voltage information for optional Branch Circuit Monitoring System (BCMS) and BCMS Hub devices. When equipped with the BCMS option, the Tap Off Units shall be plug-and-play. No installer wiring shall be required. 2.6 Branch Circuit Monitoring System (Optional) 2.6.1 BCMS Integration and Protocols Branch Circuit Monitoring shall be optionally integrated into the busway delivering the measurement and management of the busway and Tap Off Unit loads to the customer s building management system through Modbus RTU, Modbus TCP/IP, or SNMP protocols. Modbus TCP/IP and SNMP each require a front-end converter. The BCMS option shall be integrated at the factory and shall not require any additional installed wiring between the End Feeds and Tap Off Units. 2.6.2 Monitoring Specification The Branch Circuit Monitoring System shall be capable of monitoring and providing all power calculations for the total input power for each busway run. It shall be housed on the outside wall of the power input End Feed Units monitoring and metering point shall include: Voltage (L-L, L-N) for all three phases Overvoltage/Undervoltage Alarm Threshold Voltage THD Current Phase, Ground, and Neutral Minimum & Maximum Current Demand and Percent Load Current Crest Factor Warning and Alarm Threshold kw, kva, kvar, Power Factor, kwh Tap Off Units monitoring and metering points shall include: Voltage Line-to-Line Voltage Line-to-Neutral Overvoltage Line-to-Neutral Alarm Threshold Undervoltage Line-to-Neutral Alarm Threshold Overvoltage Line-to-Line Alarm Threshold Undervoltage Line-to-Line Alarm Threshold Maximum Voltage Limit Line-to-Line Maximum Voltage Limit Line-to-Neutral Minimum Voltage Limit Line-to-Line Minimum Voltage Limit Line-to-Neutral Power Distribution, Inc. Transform. Distribute. Monitor. 7

Voltage Total Harmonic Distortion (THD) %F and (odd 3-21) Voltage Frequency (Phase A) Current per Phase Current Minimum per Phase Current Maximum per Phase Current Demand per Phase Current Percent Load per Phase Crest Factor per Phase Warning Threshold Alarm Threshold KW per Phase KVA per Phase KVAR per Phase Power Factor per Phase KWH per Phase Breaker trip status indication LEDs 2.6.3 BCMS Local Display (Optional) The 7 Local Touchscreen Display shall address up to 6 End Feeds, 15 Tap Off Units per End Feed or a total of 96 devices. The Display shall be wall-mounted at eye level. The Display shall not be mounted overhead on End Feeds. 2.6.4 BCMS Hub (Optional) The BCMS Hub shall integrate multiple BCMS devices (up to 240), from various PDI equipment with BCMS installed. The BCMS Hub shall include the following: Modbus RTU protocol and TCP/IP (with customer-provided Ethernet connection) allowing Modbus TCP/IP protocol for remote monitoring. WaveStar 10.4 color touch screen monitor shall display graphical representations with discrete addresses and event time stamps of all monitored devices, including End Feeds, Tap Off Units, and other BCMS-monitored equipment in connected PDI Remote Power Panels (RPPs) or JCOMMs. The BCMS Hub display should be wall-mounted at eye level in a central location. The display shall not be mounted overheard on End Feeds. 2.7 Load Bank Testing (Optional) Load Bank Connection Units shall be available for 250 Amp and 400 Amp PowerWave 2 Bus Systems. Load Bank Connection Units shall allow for 100% loading of an installed busway system. A Load Bank Connection Unit must be installed on a disconnected system for safety. Load Bank Connection Units shall be available for rental. Power Distribution, Inc. Transform. Distribute. Monitor. 8

3 EXECUTION 3.1.1 Packaging and Shipping The manufacturer shall provide adequate packaging for protection of shipped items during transport and normal handling circumstances. The Installing Contractor shall provide for receiving, unloading, and storage of busway components prior to installation. Storage shall be provided in accordance with the environmental requirements indicated in this specification. 3.1.2 Installation The Installing Contractor shall install all components of the new busway in accordance with the busway manufacturer s installation instructions. If Branch Circuit monitoring has been selected for this application the Installing Contractor must be sure to have the customer s Communications Systems Integrator on hand during the startup day for configuration of the busway communications features. The Installing Contractor is responsible for communications wiring to and from End Feeds, BCMS Hub, BCMS Local Display, and to end user systems. The Installing Contractor shall install the equipment as shown on the drawings and insure all required working clearances are maintained. 3.1.3 Busway Manufacturer s Field Service A Factory Assisted Startup is required. After the Busway has been installed and are ready to energize the Installing Contractor shall coordinate scheduling of the busway manufacturer s certified and authorized Field Service Technician to perform the manufacturer s standard one day on site factory startup procedure On the scheduled date of startup the factory-supplied Field Technician shall provide basic operational maintenance instruction. 3.1.4 Certified Test Report A certified factory test report shall be provided for each unit upon request. Rev 004 Changes: 1.2 Added C12.20 Class 0.5 Standard 1.3.1 Changed (2,000 m) to [2,000 m] 2.5.3 Added GE to breaker list Added Section 2.1.3 Bus Rail System Weights Power Distribution, Inc. Transform. Distribute. Monitor. 9

2.5.1 Added with Shall be compatible with 2.5.1 Added IR Translucent Material information The Tap Off Units shall have an enclosure with Infrared translucent material for the purpose of thermal scanning breaker terminals. 2.6.2 Added Tap Off Units shall provide monitoring in accordance with ANSI C12.20 Class 0.5 2.6.2 Added Breaker trip status indication LEDs Power Distribution, Inc. Transform. Distribute. Monitor. 10