FTC-HST WARNING: CAUTION:

Similar documents
HWT-P HWAT POWER CONNECTION KIT WITH END SEAL INSTALLATION INSTRUCTIONS

JB-RTD-STAND RTD PIPE STAND FOR COMBINATION POWER CONNECTION BOX AND ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

JBM-100-LBTV2 Power Connection, Powered Splice, Dual Power Connection, or Splice with Junction Box

1SC-SSC Splice Connection Kit Installation Instructions

JBS-100-ECP-A COMBINATION POWER CONNECTION BOX AND DIGITAL ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

C A Heating Cable Gland Kit

HS-TSPLICE - HEATSHRINK TEE / SPLICE. Installation Instructions

H908 WinterGard Plug-in Power Connection Kit with End Seal

RayClic Connection System

JBS-100-EC Electronic controller replacement kit for JBS-100-ECP-A and JBS-100-ECW-A Installation Instructions

TT3000 and TT5000 Series

C Electrical Connection Kit

Data Sheet. Self regulating heating tapes. RS stock numbers

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Above Ground Greasy Waste Disposal Lines

NELSON HEAT TRACING SYSTEMS

COMMERCIAL & RESIDENTIAL SELF-REGULATING HEATING PRODUCTS APPLICATION AND DESIGN GUIDE EUROPE, MIDDLE EAST, AFRICA

Data Sheet. Self regulating process heating tapes RS stock numbers ,

Roof and Gutter De-Icing

XL-Trace System Application and Design Guide

HOT WATER TEMPERATURE MAINTENANCE HWAT SYSTEM

HEATING CABLE RATINGS APPROVALS* Drexan Energy Systems, Inc. Kelowna, BC, Canada, V4V 1S5

FreezGard. Self-regulating crankcase heater. Product Overview

IceStop System INSTALLATION AND OPERATION MANUAL FOR ROOF AND GUTTER DE-ICING SYSTEMS

Gardian W51. Approvals

Self-regulating Roof Heat and Gutter Trace Cable

ROOF ICE MELT (RIM) SYSTEM

THERMAL MANAGEMENT SOLUTIONS

SERGE BARIL GTKB GUT TRACE KIT BAG

THERMAL MANAGEMENT SOLUTIONS

Frost Heave Protection System Installation and Operation Manual

ROOF ICE MELT (RIM2) SYSTEM

IceStop System Installation and Operation Manual

Self-regulating Roof Heat Cable

Toll Free:

CSI Master Format 2012 Guide Specification for: Hot Water Temperature Maintenance (HWAT) Systems

ROOF AND GUTTER DE-ICING ICESTOP SYSTEM

NELSON HEAT TRACING SYSTEMS

XAGA 550/550-L. Aerial Splice Closure. 1. General Description. 2. Warnings. 3. Cautions

COMMERCIAL HEAT TRACING PRODUCTS AND SERVICES

Consignes d installation

Design Guide Design Notes Design Examples Technical Data Sheets Expanded Capabilities Specifications Warranty

TraceTek Sensing Cable for Aboveground Leak Detection Installation Instructions

Toll Free:

Toll Free:

FIRE SPRINKLER SYSTEM FREEZE PROTECTION XL-TRACE SYSTEM

XL-Trace System. Installation and Operation manual for pipe freeze protection and flow maintenance

Pipe Freeze Protection. Flow Maintenance. Introduction. XL-Trace System

HHS-WWH HOPPER HEATING SYSTEM WRAP-WOUND HEATER INSTALLATION INSTRUCTIONS DESCRIPTION. HHS-WWH PRODUCT SPECIfICATIONS

TECK-40 Series 1000V Class Splice for 4/C Armored Teck Power Cables

Longline Heating. Contents. Introduction

TT3000 and TT5000 Series

XL-Trace System Installation and Operation Manual

CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated)

ECW-GF, ECW-GF-DP DIGITAL ELECTRONIC CONTROLLERS AND REMOTE DISPLAY PANEL PRODUCT OVERVIEW

PLSRR Heat Trace Cable Data Sheet

COMMERCIAL & RESIDENTIAL MARKETS U.S. ELECTRICAL

NELSON HEAT TRACING SYSTEMS

NELSON HEAT TRACING SYSTEMS INSTALLATION

SAFETY & COMFORT FOR THE HOME RESIDENTIAL MARKET U.S. PLUMBING CANADA PLUMBING AND ELECTRICAL

EN RaychemRIM2StandardInstallationManual IM H /16 1

Installation Procedure for D-200 series Shielded Cable Splice Kits with MiniSeal Crimp Primary Splices

THERMAL BUILDING SOLUTIONS EN-TraceTekTTSIM1A-IM-H /16

Freezer Frost Heave Prevention

KE-Series Constant-Wattage Heating Cable

NELSON HEAT TRACING SYSTEMS

sulfur transport pipelines Safe, Reliable and Cost-Effective Heat Management System

TTSIM-2 TRACETEK SENSOR INTERFACE MODULE WITH LCD AND RELAY INSTALLATION/OPERATION INSTRUCTIONS

NELSON HEAT TRACING SYSTEMS ALT-BC STANDARD POWER CONNECTION KIT

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

Sensor Interface Module Installation/Operation Instructions

NGC-UIT-ORD User interface terminal for Raychem NGC systems Installation Instructions

Commercial and Residential Self-Regulating Heating Products

TraceTek Sensing Cable for Underground Leak Detection Installation Instructions. Description. Heat shrink tubing segments. Optional Materials

QAA 142 Termination instructions Self-regulating trace heaters type ELSR-NA and -HA in Div1 with heater entry kit EL-HAZELECT Kit part No: 09CA051

Union County Vocational - Technical Schools Scotch Plains, New Jersey

SEALING FIBER SEALING COMPOUND

DESCRIPTION. 42 mm. 125 mm

Skin-Effect Heat-Tracing System (STS)

HVS S Splice Series

SMPG3 SNOW MELTING AND DE-ICING POWER DISTRIBUTION AND CONTROL PANEL. For three-phase heating cables PRODUCT OVERVIEW

Heating cable solutions for temperature-related problems

Factory and Field Installed Splices

NGC-UIT2-ORD-R Remote User Interface Terminal for Raychem NGC Systems Installation Instructions

Raychem Heating System

HVS S 15kV Class

Air Conditioner. user installation & manual manual. imagine the possibilities

TOUCH 1500 User Interface Terminal for Raychem NGC Systems Installation Instructions

TT3000 and TT5000 Series

Modular Sensing Cable Installation Instructions

NELSON HEAT TRACING SYSTEMS

DISTRIBUTOR GUIDE FOR SELLING QUALITY TO CONTRACTORS

NELSON HEAT TRACING SYSTEMS

INSTALLATION INSTRUCTIONS

910 Series Single-point heat-tracing control system

HEATRACE. Young Chang Silicone Ltd, Co. SELF-REGULATING PIPE TRACING HEATER CABLE. Installation, Operation & Maintenance Manual

SERGE BARIL HEAT TRACING SYSTEMS

EasyWire Between Joists Installation Instructions

F1202 TRACE HEATING. Road & Ramp

INDUSTRIAL HEAT TRACING SOLUTIONS PRODUCTS & SERVICES

Transcription:

FTC-HST XL-Trace, RaySol, and IceStop Splice/Tee Connection Kit Installation Instructions Description The Raychem FTC-HST is used with RaySol system heating cables to make splice connections (on slab bottoms only), and with IceStop and XL-Trace systems to make splice and tee connections. Materials for 2 splice or tee connections are included in each kit. These installation instructions should be used in conjunction with the RaySol, IceStop and XL-Trace System Installation and Operation Manuals. For technical support contact your Pentair Thermal Management representative or call Pentair Thermal Management at (800) 545-6258. Approvals -W -W 718K Pipe Heating Cable or 877Z De-Icing and Snow-Melting Equipment or 9J86 Radiant Heating Cable Certified with XL-Trace, IceStop and RaySol heating cables For 12XL2-CT, -CR only With XL-Trace and IceStop heating cables only For Class I, Div. 2, Groups A, B, C, D hazardous locations-gm-1xt and GM-2XT only Kit Contents Item Qty Description A 4 Insulated bus wire crimps B 2 Uninsulated braid crimps C 6 Cable ties D 12 Mastic strips E 2 Heat-shrinkable caps F 2 Heat-shrinkable tubes (6 in long, 1 in dia.) G 2 Black cloth tapes (6 in long) H 2 Clamp ties Tools Required Diagonal cutters Needle nose pliers Utility knife Heat gun or torch Crimp tools (Ideal 30-425 and T&B WT112M or WT2000) Hammer and nail (for IceStop gutter/downspout applications only) Important: First verify heating cable is appropriate for the application. The cable type is printed on the outer jacket: IceStop: Roof and gutter de-icing XL-Trace: Above ground pipe freeze protection RaySol: Floor warming The minimum installation temperature for the FTC-HST splice and tee is 0 F ( 18 C). Additional Materials Required When using FTC-HST as a tee kit, a RayClic-E is required. G G H F B C D E F A B C D E WARNING: This component is an electrical device that must be installed correctly to ensure proper operation and to prevent shock or fire. Read these important warnings and carefully follow all the installation instructions. To minimize the danger of fire from sustained electrical arcing if the heating cable is damaged or improperly installed, and to comply with the requirements of Pentair Thermal Management, agency certifications, and national electrical codes, groundfault equipment protection must be used. Arcing may not be stopped by conventional circuit breakers. Bus wires will short if they contact each other. Keep bus wires separated. Keep components and heating cable ends dry before and during installation. The black heating cable core is conductive and can short. It must be properly insulated and kept dry. Component approvals and performance are based on the use of Pentair Thermal Management specified parts only. Do not use substitute parts or vinyl electrical tape. Leave these instructions with end user for reference and future use. CAUTION: Health Hazard: Overheating heat-shrinkable tubes will produce fumes that may cause irritation. Use adequate ventilation and avoid charring or burning. Consult MSDS RAY3122 for further information. CHEMTREC 24-hour emergency telephone: 800-424-9300. Non-emergency health and safety information: 800-545-6258. 1 / 6

Instructions are shown for a tee connection. Splice connections are done the same way, without the third heating cable section. 1 Braid Inner jacket Core Outer jacket Bus wires Allow 12 in of extra heating cable as shown. If necessary trim cables evenly. 12 in IceStop, XL-Trace and RaySol 2 3 2 in Lightly score completely around and then down outer jacket. Bend heating cable to break jacket at score then peel off outer jacket. Do not cut braid or inner jacket. Unravel the braid back to the outer jacket. Position braid on same side of each heating cable section. Straighten the braid and twist into a pigtail. 4 5 At the end of each heating-cable section lightly score completely around and down inner jacket. 1 in Do not cut bus wires. Bend heating cable to break jacket at score, then peel off inner jacket. Notch core at the end. Twist back and peel bus wires from core. 2 / 6

6 Score between bus wires at base jacket. Bend core to break free at base jacket. Do not cut bus wires. Peel core and any remaining material from bus wires. Repeat steps 2 through 6 for other heating cable sections. 7 1 in 8 Mastic Mastic 2 in Remove release paper from mastic strip. Wrap a piece of mastic around the outer jacket on each heating cable section. Pinch Remove release paper from mastic strip. Wrap a piece of mastic around the end of each heating cable section and position as shown. Pinch the mastic in the center to completely seal the core at the end of each heating cable. 9 Carefully align the heating cable sections and place them together. Press mastic strips firmly together. 9 in 6 in Fasten with a cable tie at each of the two positions shown. 3 / 6

10 Twist the braid pigtails together. Slide uninsulated crimp over braid to within of heating cable as shown. Crimp the braid, using the Ideal crimp tool. Cut off the extra braid. 11 Black tape 12 Select one bus wire from each cable section and twist the wires together. Fold the crimped braid back against the heating cables. Wrap black cloth tape evenly around crimp and heating cables. Cover crimp completely. Repeat with remaining bus wires. Be careful not to twist together bus wires from the same heating cable. Use insulated bus wire crimps and T&B crimp tool to crimp each set of bus wires together. 13 14 Slide heat-shrinkable cap over bus wire crimps. It is not necessary to shrink cap. Position the 6-inch-long heat-shrinkable tube as shown. Place edge of tube at edge of mastic 6-in tube Approx. 4-1/2 in 4 / 6

15 Immediately after shrinking, pinch the end of the tube with needle-nose pliers until the end stays sealed; this normally takes 10 seconds. Shrink the tube completely. Start at end farthest from the cap and work toward the open end. Keep heating after tube has shrunk, to melt adhesive and mastic inside tube. Total heating time should be about 5 minutes. Ring of mastic and adhesive will appear Important: Additional heat is needed after the tube is shrunk to melt mastic and adhesive inside. CAUTION: Health Hazard. Consult material safety data sheet RAY3122. CAUTION: To avoid burns allow heated sections to cool before touching. 16A For all applications except IceStop in gutters and downspouts Secure end of connection to heating cable 16B IceStop gutter and downspout applications GM-RAKE After the connection has cooled, fold over the connection and fasten it with the third cable tie. Secure heating cable with down-spout hanger (GM-RAKE). Fasten clamp tie to center of connection. Use a hammer, nail, and clamp tie to secure connection and keep it off of the gutter bottom as shown. 16C For RaySol splice applications in conduit 5 / 6

WWW.THERMAL.PENTAIR.COM NORTH AMERICA Tel: +1.800.545.6258 Fax: +1.800.527.5703 Tel: +1.650.216.1526 Fax: +1.650.474.7711 thermal.info@pentair.com Europe, Middle East, Africa Tel: +32.16.213.511 Fax: +32.16.213.603 thermal.info@pentair.com Asia Pacific Tel: +86.21.2412.1688 Fax: +86.21.5426.2917 cn.thermal.info@pentair.com Latin America Tel: +55.11.2588.1400 Fax: +55.11.2588.1410 thermal.info@pentair.com Pentair, RaySol, IceStop and XL-Trace are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners. Pentair reserves the right to change specifications without prior notice. 1994-2013 Pentair. PN 612283-000 6 / 6