Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Similar documents
FIVE YEAR AUTOMATIC FIRE EXTINGUISHING SYSTEMS CERTIFICATION REPORT

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Annual Water-Based Fire Protection Systems Inspection

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

Report of Inspection/Test

SPRINKLER SYSTEM DRY WET

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 8 Annual Sprinkler System Inspection Revised

Inspection Report Nursing Home Life Safety Code Section 4 - Annual Fire Alarm Testing and Maintenance. For

TECHNICAL DATA OBSOLETE

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

Residential Fire Sprinkler Inspection

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

PLAN REVIEW CHECKLIST

Inspection and Testing of Water-Based Systems

Self Inspection Program

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Environmental Health & Safety

System Test Report CLEAN AGENT

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEUMATIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

Sprinkler Permit Applications

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC RELEASE

Safety Practices Fire Protection Equipment Cold Weather

TECHNICAL DATA. 319a. January 27, 2012

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Gas Station & C Store SECTION CWM Job No

False Sense of Security???

AUTOMATIC FIRE SPRINKLER SYSTEMS

USAutomatic Sprinkler Corporation

CITY OF PASADENA FIRE DEPARTMENT

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

Chapter 4: Fire Protection Systems

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

DIVISION 21 FIRE SUPPRESSION

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEU-LECTRIC RELEASE

Fire Sprinkler System Design and Installation Requirements

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

A. This section includes design and performance information for fire protection and suppression systems.

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

DIVISION 21 - FIRE SUPPRESSION

Box-in-Box Cold Storage Fire Protection Options

New Construction Fire Inspection Process

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

FIRE SAFETY SYSTEMS MAINTENANCE INFORMATION

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

TECHNICAL DATA. model c-2

DISTRICT OF SECHELT. Inspection and Testing of Fire Protection Equipment Bylaw No. 397, 2002

FIRE INSPECTION CHECKLIST

B. Section Identification for Fire Suppression Piping and Equipment.

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

SECTION SPRINKLER SYSTEMS

TECHNICAL DATA OBSOLETE

FIRE SPRINKLER SYSTEMS POLICY

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

FIRE SPRINKLER SYSTEMS POLICY

Design & Construction Standards, Revised January

DEPARTMENTAL GUIDELINES CHAPTER 6 TACTICAL OPERATIONS

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

DIVISION 21 - FIRE SUPPRESSION

Model: 400E-5M. Bermad Hydraulically Controlled Anti-Columning Deluge Valve, with Easylock Manual Reset. Installation Operation Maintenance

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

TECHNICAL DATA. Factory Mutual Approval is pending for the system as a whole.

McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION

A. Section includes wet-pipe sprinkler system, system design, installation, and certification.

TotalPac X Single interlock SUREFIRE system

Becoming an Expert on Dry-pipe, Preaction, and Deluge Sprinkler Systems

SECTION DRY-PIPE SPRINKLER SYSTEMS

MONTECITO FIRE PROTECTION DISTRICT

Advanced Integrated Fire Protection Systems TOTALPAC 2. Owner's Operation and Maintenance Manual FIRECYCLE III. September 2009 FM-086G-0-5E

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

2. Welding Materials and Procedures shall conform to the ASME Code.

TotalPac X Firecycle III Preaction Double interlock system

BERMAD Fire Protection

NFPA Edition Update

RAPID RESPONSE Series LFII Residential Sprinklers 4.2 K-factor Flush Horizontal Sidewall Wet Pipe Systems

NFPA Edition. NFPA 13 (2016 Edition) Hot Topics and NFPA 13 FAQ s. Highlights of 2016 Changes. Storage Commodity Classification 4/29/2014

RAPID RESPONSE Series LFII Residential Sprinklers 4.2 K-factor Flush Pendent Wet Pipe and Dry Pipe Systems General Description

9/15/ Cantara Lane Vista, CA (760)

PURPLE K POWDER EXTINGUISHERS INSTALLATION, OPERATION, MAINTENANCE AND RECHARGE MANUAL

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

TOTALPAC2 Integrated Fire Protection System

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

Deluge/Preaction Systems Annotated Instructor s Guide

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

SECTION SPRINKLER SYSTEMS

SPRINKLERS TABLE OF CONTENTS

Transcription:

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Building/Business Name: Address of Property: Inspector Name: Joe Price THE CORNERSTONE 1425 NE 7TH AVENUE PORTLAND OR Date of Inspection: 07/14/2016 08:00am PDT Inspection, testing, and maintenance of a sprinkler system shall be implemented in accordance with procedures meeting those established in NFPA 25 and in accordance with the manufacturer s instructions. The building owner or the owner s representative shall ensure that the frequency of inspection, testing and maintenance occur at intervals specified in NFPA 25. This report is not intended to document those frequencies for an entire year. Deficiencies, damaged parts, or impairments found while performing the inspection, test, and maintenance requirements shall be corrected promptly. Records of all system inspections, tests and maintenance shall be maintained on the premises for a minimum of 6 years, and shall be copied to the Fire Marshal s office upon request. TYPE OF SPRINKLER SYSTEM Wet Dry Preaction Deluge Combined Sprinkler/Standpipe SPRINKLER COVERAGE Total Partial Basement Exitways Monitored by Central station? Yes No Name of Monitoring Company: Simplex 1. GENERAL Y N a. Hydraulic nameplate for hydraulically designed system attached securely to riser and legible? See addendum on page 6. b. Sprinkler piping free of items resting on the pipe or being hung from the pipe? c. Pipe and fittings in good condition and free of mechanical damage, leakage, and corrosion? d. Hangers and seismic bracing not damaged or loose? e. Prior to the onset of freezing weather, were all areas of the building inspected to verify adequate heat (at or above 40 F) to prevent water filled sprinkler piping from freezing? f. Antifreeze system tested? See addendum on page 6. g. Prior to the onset of freezing weather, were low points drained in dry pipe, preaction and deluge systems? h. Are all gauges in good condition? i. Are all gauges in the system showing normal pressures? 2. SPRINKLERS Y N Last test date: a. Heads free from paint, corrosion, foreign materials, and physical damage? b. Proper sprinkler orientation? c. Proper clearances maintained below all heads? d. Proper number and type of spare heads available in a cabinet? Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 1 of 7

e. Sprinkler wrench(s) available for each type of head? f. Any heads manufactured prior to 1920? If yes, heads shall be replaced. g. Any heads in service for more than 75 years? If yes, replace or test representative samples At 5 year intervals. h. Any heads in service for more than 50 years? If yes, replace or test representative samples At 10 year intervals. i. Any fast-response heads in service for more than 20 years? If yes, replace or test representative samples at 10 year intervals. j. Any dry heads in service for more than 10 years? If yes, replace or test representative samples At 10 year intervals. k. Any solder-type heads with extra-high temperature classification (or higher), exposed to maximum allowable temperatures? If yes, test at 5 year intervals. l. Any heads exposed to harsh/corrosive environments? If yes, replace or test representative samples at 5 year intervals. 3. ALARM DEVICES Y N a. Inspected and free of physical damage? b. Waterflow devices tested? c. Supervisory signal devices tested? 4. VALVES, GENERAL Y N a. Are all valves properly labeled? (main drain, control valve, inspector s test, etc.) b. Valves accessible? c. Are all valves in their normal open or closed position and free of physical damage? d. Normally open control valves secured by means of a seal or lock, or electrically supervised? e. Normally closed control valves secured by means of a seal or electrically supervised? f. Valves free from external leaks? g. Operating stems of outside screw and yoke valves lubricated? h. Has each control valve been operated through its full range and returned to its normal position? i. Main drain test conducted at each water-based fire protection system riser? See addendum on page 6 for test chart. j. Partial flow test conducted on pressure reducing valves and relief valves? k. Full flow test conducted on each master pressure reducing valve? 5. PREACTION VALVES and DELUGE VALVES Y N a. Valve enclosures equipped with low temp alarms inspected? b. Low temperature alarms, if installed in valve enclosures, inspected and tested? c. Low air pressure alarms tested? d. Gauges that monitor the detection system pressure, if provided, tested to verify normal pressure is being maintained? e. Priming water level in supervised preaction system tested? f. Preaction valve trip tested with the control valve partially open? g. Deluge Valve trip tested at full flow in warm weather and in accordance with the manufacturer s instructions? h. Inspection of preaction or deluge valve interior and the condition of detection devices when trip test conducted? i. Automatic air pressure maintenance devices tested at time of preaction or deluge valve trip test? j. Interior of preaction or deluge valve cleaned thoroughly and parts repaired or replaced as necessary? Also see 5 year requirements. k. Manual actuation devices operated? 6. DRY PIPE VALVES/QUICK OPENING DEVICES Y N Y a. Valve enclosures equipped with low temp alarms inspected? b. Low temperature alarms, if installed in valve enclosures, inspected and tested? c. Low air pressure alarms tested? d. Priming water level tested? Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 2 of 7

e. Are all gauges indicating proper pressures and ratios? f. Each dry pipe valve trip tested in warm weather with control valve partially open? g. Dry pipe valve interior inspected when trip test conducted? h. Was the interior of the dry pipe valve cleaned thoroughly, and parts repaired or replaced as necessary? i. Automatic air pressure maintenance devices tested at time of dry pipe valve trip test? j. Quick-opening devices, if provided, tested? 7. WATER STORAGE TANKS Y N a. Exterior inspection of tank, supporting structure, vents, foundation, catwalks or ladders? b. Exterior painted, coated, or insulated surfaces of the tank and supporting structure inspected for signs of degradation? c. Expansion joints inspected? d. Tank full or at the designated water level? e. High and low water level alarms tested? f. Automatic tank fill valves inspected and tested? g. Strainers cleaned? h. Water temperature checked and maintained at or above 40 F? i. Heating system inspected and tested? j. Low water temperature alarms tested? k. High water temperature limit switches on tank heating system tested when heating system is in service? l. Air pressure in pressure tank inspected? 8. FIRE DEPARTMENT CONNECTIONS Y N a. Visible and accessible? b. Couplings or swivels not damaged and rotate smoothly? c. Plugs or caps in place and undamaged? d. If plugs or caps not in place, was the interior of the connection inspected for obstructions or pipe back flushed? e. Gaskets in place and in good condition? f. Identification signs in place? g. Check valve(s) not leaking? h. Automatic drain valve in place and operating properly? i. Clapper(s) in place and operating properly? 9. HOSE STATIONS Y N a. Nozzle(s) inspected to verify waterway is clear of obstructions, and all parts operate correctly and are undamaged? b. Hose valves inspected and caps in place if necessary? c. Was the hose removed, inspected, and returned to the correct stored position? d. Hose record maintained or tag fastened correctly with complete information? e. Is all hose lined? If not, the hose shall be replaced with lined fire hose. f. What date was the hose manufactured? g. When was the hose last service tested? Test 5 years from date of manufacture and every 3 years thereafter (or replace hose every 5 years). 10. 3 YEAR REQUIREMENTS Y N Date last completed: a. HOSE VALVES ON HOSE STATIONS: Tested by opening and closing? b. PREACTION VALVES: trip tested with control valve fully open? c. DRY PIPE VALVES: trip tested with control valve fully open and the quick-opening device, if provided, in service? d. DRY PIPE SYSTEM: tested for air leakage with satisfactory results? e. WATER STORAGE TANKS WITHOUT CORROSION PROTECTION (UNLINED): Internal inspection performed? 4-24-14 Unknown Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 3 of 7

11. 5 YEAR REQUIREMENTS Y N Date last completed: a. Internal inspection of piping and branch line conditions? b. Have all gauges been tested, calibrated or replaced? c. Internal inspection performed on check valves? d. Internal inspection performed on alarm valves and their associated strainers, filters, and restriction orifices? e. PREACTION AND DELUGE VALVES: Internal inspection and maintenance performed on valves that can be reset without removal of a faceplate? f. DRY PIPE VALVES/QUICK OPENING DEVICES: Internal inspection performed on strainers, filters, and restriction orifices? g. PRESSURE REDUCING VALVES AND RELIEF VALVES: Full flow test performed on each valve? See addendum on page 7 for test chart. h. WATER STORAGE TANK WITH CORROSION PROTECTION (LINED): Internal inspection performed? i. WATER STORAGE TANKS: Level indicators tested for accuracy and freedom of movement? Deficiencies found during inspection: 2a) found heads not free from paint or foreign materials 2d) not proper type of spare heads in box need tyco 1/2" brass 155 SR GB UPRIGHT 2e) not proper wrench in heads box need tyco w-type 7 2j) found dry heads in service for 10+ years need sample testing or provide documentation supporting test have been done 8f) FDC missing sign 10d) dry systems due for leak testing 11a,b,c,f) systems due for 5 year testing Deficiencies corrected: Please provide any further comments or issues of concern that may require follow up: Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 4 of 7

Has the building owner/representative been notified of any deficiencies? Yes No If Yes, who was notified? Tim If No, why was the owner/representative not notified? Declaration Completed Date and Time of Inspection: 7-14-16 Sprinkler system returned to service? Yes No If No, document reason I Joe Price, Joey Renard certify that I inspected and tested the sprinkler system at the address identified in this report, documented the conditions found during the inspection and have listed all deficiencies that were either corrected prior to leaving or require additional follow up. Any deviation or items identified by NFPA 25 to be tested that were not by nature of the site conditions or service contract have been identified on this report. Signature Date: 7-14-16 Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 5 of 7

ADDENDUM #1 Hydraulic Design Information System # Density Appl. Area Attic Dry.10 1950 Garage Dry.15 1950 Antifreeze Test Antifreeze type Freezing temp of solution Freezing temp correct? System # or location Main Drain Test Size test pipe Static pressure before Garage Dry 2" 75 64 4th floor 1" 50 40 3rd floor 1" 54 41 2nd floor 1" 53 42 1st floor 1" 60 40 Attic Dry 2" 50 33 Residual (flow) pressure Return time to static pressure System # Garage Dry Attic Dry 36 50 Dry Valve Trip Test Air Water Tripping air Trip time Time water flows steadily pressure pressure pressure from test connection psi 75 psi Pt psi Pt sec. Pt sec. psi 50 psi Pt psi Pt sec. Pt sec. psi psi psi sec. sec. psi psi psi sec. sec. Compared to previous tests? Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 6 of 7

ADDENDUM #2 PRV TEST Bldg Name Bldg Address Location or Floor Make and model Setting Inlet Static Pressure Outlet Residual Pressure Inlet Outlet Flow Rate Flow (gpm) Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System Page 7 of 7