Charles River Reservation Footbridge Projects/Trail Corridor Proposal. May 7, 2009, 6:30 8:00 pm Newton-Wellesley Hospital Auditorium, Newton

Similar documents
The DCR Neponset River Trail Central Avenue to Mattapan Square

Victoria Bridge Municipal Class EA Civic Works Committee

Conceptual Design Meeting. River Street and Western Avenue Bridge Rehabilitation Project

ERIE-ATTICA RAILROAD BRIDGE AND TRAIL FEASIBILITY STUDY

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

DRAW SEVEN PARK RENOVATION PROJECT SOMERVILLE, MASSACHUSETTS

Concord, BRF-X-5099 (021), Draft Alternative Analysis

Enhance the High Line Canal Projects

Anderson Memorial Bridge Rehabilitation Project Boston/Cambridge

National Register of Historic Places Continuation Sheet

HISTORIC BRIDGE FOR SALE COLUMBIA BRIDGE IN JACKSON PARK, CHICAGO, ILLINOIS

Corridor Enhancements

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

Historic Bridge Adoption Information Packet

Welcome to the Sellwood Bridge Project Pre-Construction Open House

Middlebury RS 0174(8)

6:00 8:00 PM I-95 FROM EXIT 57 TO EXIT 60 PROJECT

CENTERTON ROAD BRIDGE REPLACEMENT

The purpose of tonight s PIC is to:

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

Final Design Meeting. September 25, Creating Bridges As Art. Welcome & Introductions. Terry Ward - Project Manager

Design Public Hearing. River Street and Western Avenue Bridge Rehabilitation Project

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

SECTION 5: REACH RECOMMENDATIONS/MAPS

MINNESOTA ARCHITECTURE - HISTORY INVENTORY FORM

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

FY Capital Improvement Program Arroyo Projects - Central Arroyo Summary

Mendota Heights 2040 Comprehensive Plan Draft Vers

Pennsy Greenway Trail

Great Lakes North Central South Central FAX: (718) CONTACT PERSON: ADDRESS: Daniel Hom, PE, Engineer-in-Charge

Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

STREAM ALTERATION PRACTICES

DRAFT SECTION 4(F) EVALUATION LIFT BRIDGE

FURNEAUX CREEK 5 CHANNEL

River Corridor Overlay Zone (RCOZ) Article 5

MEADOWVIEW HOMEOWNERS ASSOCIATION

Green Roof Case Study

REHABILITATION FEASIBILITY STUDY ER#

Turkey Creek Streamway Corridor

Overview Report. Proposed Development

Pedestrian Trails Within Regulated Areas

Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

RE: Comments on the Environmental Notification Form (ENF) for the I 90 Allston Interchange Project MEPA #15278

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Chapter 5: Natural Resources and Environment

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

PIQUA OHIO PLACEMAKING INITIATIVE

The Trinity River Corridor Project Update

Rights-of-Way Preservation Guidelines

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Information for File # SEK

Los Angeles River-Arroyo Seco Confluence Restoration Vision Plan. Professor Meredith McKenzie, JD Urban & Regional Planning Dept Cal Poly Pomona

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

TABLE 5-3. EXISTING AND PROPOSED YAKIMA GREENWAY FACILITIES

Table of Contents Programmatic 4(f) Evaluation. Programmatic 4(f) Evaluation 77

Green Infrastructure The Indianapolis Greenways Connection

Hydraulic analysis marks start of rebuilding after bridge collapse

Southern Windsor County RPC Transportation Project Priorities January 2015

Weston s Wetlands, Stormwater, & Open Space

Victoria Street Pedestrian Bridge

North River Mills Bridge Hampshire County State Project # S314-45/ Federal Project # ARRA-4520(003)D FR#: HM-1

City of Missoula and Missoula County Open Space Planning Open House

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Whitemarsh Township Greenway Plan

APPENDICES: GREENWAY REPORTS

A larger version of this map is located on the last page of this PDF.

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

This page intentionally blank.

Low Level Road Project. Canadian Consulting Engineers Award 2016

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

WELCOME TO OPEN HOUSE TWO November 28, 2018

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Preservation: Why Not In Pennsylvania? Presented By: Nathan Holth

DRAFT SECTION 4(F) EVALUATION KOLLINER PARK

Floodplain Discipline Report

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

Welcome to the 2018 FRPA Conference!

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

How can landscape architects aide in transportation planning process? John Dempsey, PLA Toole Design Group July 24, 2015

MCCOYS CREEK RESTORATION 30% DESIGN

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

PREVIOUS PUBLIC PARTICIPATION BRIEF October 2014

PURPOSE AND NEED FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT

Mississippi Skyway Preliminary Engineering Report

GUIDELINES FOR ECOLOGICAL PERFORMANCE

Pinellas County Greenways

The MSII reports for the bridge indicate that the Annual Average Daily Traffic at the bridge is 100. The road can be considered a low volume road.

Preliminary Sketch Plan for Fort Hunter Park

GUIDELINES WESTON LOCATION: URBAN DESIGN GUIDELINES

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Transcription:

Charles River Reservation Footbridge Projects/Trail Corridor Proposal May 7, 2009, 6:30 8:00 pm Newton-Wellesley Hospital Auditorium, Newton

Commonwealth of Massachusetts Governor Deval L. Patrick Lieutenant Governor Timothy Murray Energy and Environmental Secretary Ian A. Bowles Department of Conservation and Recreation Commissioner Richard K. Sullivan, Jr.

Accelerated Bridge Program Overview Authorization: C. 233 of the Acts of 2008 Program Goals: Improve the condition of the Commonwealth s bridges Stimulate economic development and job creation Save money by completing projects sooner Complete projects efficiently and innovatively Transparency and accountability

Accelerated Bridge Program Overview Size and Scope MassHighway: $2.078 billion Rehabilitation or replacement of 191 bridges Preservation of 305 bridges DCR: $906 million Rehabilitation or replacement of 29 bridges Preservation of 50 bridges Total Program: $2,984,000,000

Charles River Reservation Footbridge Projects Consultant Design Team Simpson Gumpertz & Heger: Project Management and Structural Engineering Michael McCall, P.E. Principal in Charge Gregory Imbaro, P.E. Project Manager Welch Associates: Land Surveying Epsilon Associates: Environmental Permitting GEI Consultants: Geotechnical Engineering Childs Engineering: Underwater / Diving Inspection

Charles River Reservation Footbridge Projects Recreation Road Footbridge Stringer bridge Riverside Park Footbridge Pony Truss bridge Lower Falls Footbridge Trestle bridge

Aerial View

Charles River Reservation Footbridge Projects Project Benefits: Improved public safety for bridge users Improved pedestrian access across Charles River Recreational use Commuter use Access to commercial center Improved connections to existing trail segments

Recreation Road Footbridge A former road bridge (Riverside Road) previously converted to pedestrian use, circa 1980 Connects the Towns of Newton and Weston Downstream from Riverside Park and an active railroad bridge Near Lasell College boathouse and MWRA facility

Recreation Road Footbridge History and Description Original bridge constructed circa 1850 Road use abandoned circa 1980 Approximately 200 ft. long Three spans across the Charles River Two steel stringer construction Abutments have concrete footings and timber-tie walls Piers have reinforced concrete caps over original mortared stone masonry walls

Recreation Road Footbridge Existing Conditions Concrete parts of abutments and piers are in generally good condition From divers inspection, large holes (5 ft wide) found in stone walls of piers, below normal waterline Steel stringers in good condition, but no spare capacity for higher loads Timber deck and railings are rotted and have surpassed their useful life

Recreation Road Footbridge Project Scope Restore footbridge for pedestrian use Remove existing timber deck and railings Construct new preservative-treated timber deck and timber railings Use stainless steel and galvanized/coated steel hardware Provide same width path (6 ft, 2 in.) as existing over bridge between railings existing steel stringers cannot handle loads from wider superstructure Replace timber portions of abutments with concrete

Recreation Road Footbridge Project Scope (continued) Repair holes in masonry pier walls with concrete Dewater around piers to perform repairs within temporary cofferdam or porta-dam structure Investigate scour potential of riverbed around piers Provide scour countermeasures (riprap), if susceptible Clean and paint existing structural steel, implementing full lead abatement measures and using shielding

Recreation Road Footbridge Staging Use existing parking lot In discussions to use unused portion of road at MWRA facility Use DCR property at each end of bridge restore any damaged grass areas at completion of project

Recreation Road Footbridge Existing Cross-Section

Recreation Road Footbridge Proposed Cross-Section

Recreation Road Footbridge Drawing of completed footbridge

Riverside Park Footbridge A historic steel pony-truss bridge Connects the Towns of Newton and Weston Provides a path from Riverside Park to trails along railroad and trolley lines Upstream from active railroad bridge across Charles River

Riverside Park Footbridge History and Description Constructed circa 1920 Approximately 78 ft. long Always used only as a pedestrian bridge Riveted steel pony-truss construction Newer timber floor (stringers & deck) Single span across the Charles River Mortared stone masonry abutments Unknown foundations below masonry

Riverside Park Footbridge Existing Conditions Timber deck is in fair condition, but nearing the end of its useful service life Steel floorbeams at ends of bridge heavily rusted, need replacement Steel trusses in generally good condition; paint system on trusses is compromised to various extents Parts of original pipe railing have failed; top pipe rail on upstream side has fallen off, is lying on deck

Riverside Park Footbridge Existing Conditions (continued) From divers inspection, large hole in west abutment due to partial collapse of breast wall only partially visible above normal waterline Entire west abutment leans down toward downstream side of bridge, causing some racking distortion in steel superstructure Movement of west abutment may be causing compression/buckling of bottom chord

Riverside Park Footbridge Project Scope Restore historic footbridge for pedestrian use Remove and replace existing preservative-treated timber floor system deck and stringers Remove and replace deteriorated steel floorbeams Install mesh panels as part of railing structure Repair steel trusses and bearings in place Provide same width path as existing over bridge between trusses Clean and paint existing structural steel, implementing full lead abatement measures and using shielding

Riverside Park Footbridge Project Scope (continued) With trusses temporarily supported, dismantle the west abutment, construct a new reinforced concrete footing and backup walls, and rebuild stone masonry outer walls with existing stones Dewater around abutment to perform repairs within temporary cofferdam or porta-dam structure Investigate scour potential of riverbed around abutments Provide scour countermeasures (riprap) if susceptible

Riverside Park Footbridge Staging Use existing DCR parking lot Use paved trail to bring in materials and equipment Use DCR property at each end of bridge restore any damaged grass areas at completion of project

Riverside Park Footbridge Existing Cross-Section

Riverside Park Footbridge Proposed Cross-Section

Riverside Park Footbridge Drawing of completed footbridge

Lower Falls Bridge A former railroad bridge to be converted to pedestrian use Connects the Towns of Newton and Wellesley Near Newton Lower Falls Near former Grossman s site in Wellesley

Lower Falls Bridge History and Description Constructed as railroad bridge in 1910 Railroad use abandoned circa1970 Approximately 100 ft. long Two spans across the Charles River Riveted steel girder construction Abutments and center pier are reinforced concrete construction Current deck consists of old timber railroad ties

Lower Falls Bridge Existing Conditions Concrete abutments and pier are in generally good condition Steel girders have surface rust, but were designed for railroad loading, so have spare capacity for foot traffic Old railroad ties are rotted and not reusable Soil has eroded around abutments, especially at Newton end of bridge

Lower Falls Footbridge Project Scope Convert former railroad bridge to pedestrian bridge having 10 ftwide path between railings Remove existing timber ties Construct new preservative-treated timber deck and timber railings Use stainless steel and galvanized/coated steel hardware Clean and paint existing structural steel, implementing full lead abatement measures and using shielding Stabilize trail/top of slopes immediately adjacent to Newton abutment with stone riprap

Lower Falls Footbridge - Staging Negotiate use of existing parking lot Use former railroad bed to bring in materials and equipment Limit tree removal to recent volunteer growth in former rail bed

Lower Falls Bridge Existing Cross-Section

Lower Falls Footbridge Proposed Cross-Section

Lower Falls Footbridge Drawing of completed footbridge

Charles River Reservation Footbridge Projects Schedule P40 Lower Falls Footbridge P34 Riverside Park Footbridge P35 Recreation Road Footbridge

Lower Falls Footbridge and Trail Segments Lower Falls Footbridge at 90% design, funded through the Accelerated Bridge Program Trail segments between Concord Street and Washington Street in design phase

Lower Falls Trail Segments Design funding in partnership with: Wellesley NRC gift funds Wellesley trails funds Newton Conservators Newton Bicycle/ Pedestrian Task Force Charles River Watershed Association

DCR s Upper Charles River Reservation Initiative

DCR s Upper Charles River Reservation Initiative In the 1990 s, DCR completed an 8 year planning effort for the entire Charles River Reservation, including six miles of new pathway, three mini parks, and three new pedestrian bridges. Implement strategies for sustainable greenways, balancing access and impacts of trails in sensitive areas Minimize site disturbance, restore degraded sites, preserve and enhance wildlife habitat, use native planting Minimize material impacts and life-cycle costs, use vandalproof, enduring materials, minimize water needs and use and energy use, and use recycled materials

DCR s Upper Charles River Reservation Initiative (Commonwealth Ave. to Watertown Square view) Insert ma

Alternative Pedestrian/Bicycle Routes for Newton/Wellesley/Weston Area Recreation road corridor Leo J. Martin hiking trail Riverside rail trail

Recreation Road Corridor Connects Recreation Road/Park Road/Concord Street On-road route for advanced cyclists and sidewalk route for pedestrians to walk to Wellesley and the Lower Falls area

Leo J. Martin hiking trails Off-road trails along both sides of the Charles River Offers hikers scenic vistas and access to nature Hard surface trail design at this site would be problematic due to environmental issues, including flood plains, wetlands, mature native tree growth, and habitat Proximity to golf course and safety implications Limited design capacity for handicapped accessibility

Proposed Riverside Rail Trail Located between Riverside Park in Newton and Washington Street in Wellesley Handicapped accessible,10-foot wide, 1.1 mile asphalt path with two-foot shoulders

Proposed Riverside Rail Trail Public Benefits Improved off-road access for pedestrians, bicyclists, and handicapped persons to park, T station, and commercial center Reduced risk of fire from removal of overgrown brush Community cohesion

Additional Information For more information Web: www.mass.gov/dcr Email: dcr.updates@state.ma.us Phone: 617-626-4974 For more information on Accelerated Bridge Program Web: www.mass.gov/acceleratedbridges

Questions & Answers

DCR Mission Statement To protect, promote and enhance our common wealth of natural, cultural and recreational resources.