GFT-060/40/H2. Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive CE

Similar documents
C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

LOW NOx MODULATING GAS BURNERS

RIELLO 40 GS/M SERIES

Industrial Cast-in Circulation Heaters for ATEX/IECEx hazardous areas or in non-atex version

RS /E-EV C01 SERIES

RS /E-EV C01 SERIES

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

CR A-F-A-E-HQQE 3x400/ HZ

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

CR A-F-A-E-HQQE 3x400/ HZ

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

SECTION PLUMBING EQUIPMENT

CR5-9 A-FGJ-A-E-HQQE 1x220/240 50HZ

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION AIR COILS

STREBEL S-CB + Cascade Kits

UV Flame Supervision System

CR20-07 A-F-A-E-HQQE 3x400/ HZ

CRN A-F-G-E-HQQE 3x400D 50 HZ

OPX INDUSTRIAL RANGE THERMAL OIL

SECTION PLUMBING EQUIPMENT

CR32-4 A-F-A-E-HQQE 3x400D 50 HZ

CR64-1 A-F-A-E-HQQE 3x400D 50 HZ

CR A-F-A-V-HQQV 3x400D 50 HZ

CR A-F-A-E-HQQE 3x400D 50 HZ

CRN90-1 A-F-G-V-HQQV 3x400D 50 HZ

1 VICTRIX ZEUS Superior kw I features

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

Hamworthy. Dorchester DR-SA & DR-SE Fully Automatic and Permanent Pilot Direct Gas-Fired Storage Water Heaters. Exceeds Minimum Requirements

Savile Plus. Steam Boiler. Suitable for Pressure Jet burners Oil, gas or dual fuel firing. Outputs kg/h

SECTION STEAM CONDENSATE PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

R-SERIES kW YEAR ROUND MAXIMUM CONDENSING BOILER. burning diesel oil, kerosene, natural gas or liquid petroleum gas

Solar Thermal Energy

Solar heating systems

Bryan Flexible Water Tube. Ultra-High Efficiency Condensing Hot Water Boilers. 3,000,000 BTUH Natural Gas Fired

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

SECTION DOMESTIC WATER HEATERS

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5

ENERGY TOP. Condensing boiler solutions

Ball Float Controlled. Thermo Dynamic(TD) Trap Safety Valve Condensate Pump Flash Vessel Moisture Separators Deaerator Head Steam Injector Sight Glass

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

SPECIFICATIONS MODEL E859C MINI DEHYDRATOR

LFE50. UV Flame Safeguard. Siemens Building Technologies HVAC Products DETACTOGYR. Series 02

ECONOFLAME R6000 GAS FIRED CONDENSING HOT WATER HEATER SUPPLEMENT

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

Aluminium range of condensing boilers. Works every time. Designed to meet carbon reduction targets. Lifetime service and support

FLOAT AND THERMOSTATIC STEAM TRAPS FLT17 (DN 1/2 to 1 ; DN15 to DN25)

Dovre 250 Cast Iron Gas Stove

Liquid Drainers LIQUID DRAINERS

HVAC BASIC MATERIAL AND METHODS 1.01 RELATED CORNELL DESIGN AND CONSTRUCTION STANDARDS

Technical Specification

CALEFFI. Anti-condensation circulation unit. 282 series 01225/14 GB. replaces dp 01225/11. Code completion Setting 45 C 55 C 60 C 70 C.

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

24/31-28/35-33/40 kw Premix System Condensing - ErP Combi Gas Boilers. Enerwa / EnerwaPlus.

Stokvis R600 LMS IP Water Heater Gas-Fired Floor Standing Condensing

TECHNICAL DESCRIPTION

THERMODYNAMIC STEAM TRAP

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

CR10-16 A-FJ-A-E-HQQE 3x400D 50 HZ

SERIES 24. Series 24 Features. Commercial, Forced Draft, Hot Water or Steam Boiler. The right fit for any commercial job

AFUE 95% Heating Input 50,000 to 200,000 Btuh

VAILLANT SPARE PART CATALOGUE

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE

Vent-Rite. Cast Iron And Steel Receivers. Simplex, Duplex, Triplex And Quadruplex Units. Pump Capacities To 150 GPM. Discharge Pressure To 75 PSI

Light oil burners. One stage operation

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw

Waste/Multi Oil Boilers from Flexiheat

KDE. PRESSURIZED STAINLESS STEEL CONDENSING BOILER FROM 124 kw TO 2160 kw

CPM, CPMSP Cascade header kits Installation, Commissioning and Maintenance Instructions

MAX O GAZ. Condensing water heater TECHNICAL MANUAL

Yarway Narvik Steam Desuperheater Series 4300 TempLow

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

SPECIFICATIONS MODEL EHV X VACUUM OIL PURIFIER

Technical Specification

Light oil - kerosene burner

Systems for central heating

Circulation Heaters. To order, call or shop online at omega.com SM. CHF Series

Shipboard Electric Water Heater

Ball Float Steam Trap with Integral Spiratec Sensor and Flanged Connections

TECHNICAL INSTRUCTIONS

AFUE up to 85.2% Heating Input 105,000 to 245,000 Btuh

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

Circulation Heaters. To order, call or shop online at omega.com SM. CHF Series

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

C D E F. Tubular Industrial Process Circulation Heaters. Circulation Heaters. View Product

YOUR PROCESS DEMANDS THE MOST DEPENDABLE TEMPERATURE CONTROL UNIT AVAILABLE.

Revitalize Building Mechanical Systems (4619)

Circulation Heaters. To order, call or shop online at omega.com SM. CHF Series

Bosch Buderus SSB1000TL/TL2/TL3/TL4 Stainless Steel Condensing Boiler

Circulation Heaters. To order, call or shop online at omega.com SM. CHF Series

PORTABLE HYDRANT PN10 1A; 2A; 1B; 2B; 1C; 2C TYPES

SL EX.4.51D

Transcription:

Item 1) TWO THERMAL OIL HEATERS OF 1200 kw EACH 1.1) THERMAL OIL HEATER BODY Brand PIROBLOC Model GFT-060/40/H2 Power 1200 kw Delta Temperature 40 ºC Execution Horizontal Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive 97-23-CE Test pressure 21 bar Maximum working pressure 9 bar Design pressure 10 bar Design temperature (1) 350 ºC Maximum working temperature 300 ºC Thermal efficiency (2) 87%-91% Thermal oil connections DN-80 Chimney flange connection 350 mm (1) Special execution till 400 ºC (2) It depends of the circulating fluid temperature, fuel, type of oil, orientative values: - 87 % a 300 ºC - 91 % a 100 ºC Inside coils made with seamless tube, quality ASTM A106 Gr.B. 25% of the total welding made on the pressure body has been radiographied and tested with penetrating liquids. Finished in anodized aluminium AlMg1 material in temper H14. High resistance to corrosion through anodizing for application outdoor and indoor. 1.2) SECURITIES (supported and assembled on the heater) 1 Pressure switch for inlet pressure. 1 Differential pressure switch for pressure. 2 Pressure gauges Ø 63, of 0-6 kg/cm2, with glycerine bath and with its own expansion quadrants and closure taps. 1 Safety and relief valve, PN-40, manufactured with carbon steel, inside and spring with stainless steel AISI-304, working maximum pressure 9,5 kg/cm 2. Flanges connection DN-20. 3 Temperature probes type PT-100 1 for inlet temperature, 1 for outlet temperature, 1 as safety outlet temperature). 1

1 Temperature probe type J, FE-KO as safety temperature limiter in flue gas. 4 Thermowells for the placement of the probes. 1.3) BURNER (supported and assembled on the heater) Brand M. WEISHAUPT Model WM-G20/2-AZM LN Fuel type Natural gas LPG Gas L.H.V. estimate 9.270 kcal/m3 11.082 kcal/kg Burner top power 1600 kw Fan motor power 3 kw Regulation Modulating One gas train 1 ½ Gas pressure required Between 100 and 300 mbar Pressure reducer From 4 bar to 250 mbar (*) Low NOx Yes Required electrical power 3 Ph 400 V and 50 Hz Electrical installation Yes (*) Please confirm the gas pressure arriving to the heater s room 1.4) MAIN RECIRCULATION PUMP (supported and assembled on the heater) Motor power 15 kw (to start up at 15ºC in thermal oil) Flow 50 m3/h @ 4 bar Working temperature Till 350ºC Closure Mechanical Built With spheroidal casting GS-42 specially designed for thermal fluid oil according to DIN 24256. Support-gantry Made of steel with coupling plate. Required electrical power 3 Ph 400V 50 Hz Electrical installation Yes 2

1.5) CONTROL PANEL (supported and assembled on the heater) Type Conventional Box Rittal RAL 7035 Designed and built According with UNE-EN 60439-1 / UNE-EN 60204-1 / EN 50081 Required electrical power 3 Ph 400 V+N 50 Hz Electrical installation Wiring to the pump and all securities (except such of expansion tank, but wires are supplied) 1.6) ELEMENTS FOR CONNEXION OF THE PUMP TO THE HEATER BODY 2 x Interruption valves, nodular cast body closing by STAINLESS STEEL BELLOWS with safety packing box and bell for heat isolation, connection by flanges DN-80 PN-16. 1 x Dirt collecting filter PN-16, flange connection DN-80. 2 x Gate valves, PN-16, for filling-draining. 3 x Ball valves, PN-16, connection by thread of ½ ". 1 x Motor-driven reversible pump group for filling and draining of the circuit. Seamless steel piping according to A106 GrB and accessories for this pipe such as neck clamps, forged curves for welding, concentrically reductions, caps, graphite seals, nuts and bolts, etc. Our Specialised employees labour. 1.7) GAS DETECTORS TO CUT GAS IN HEATER S ROOM 2x Gas detector placed beside every heater for detection of gas lakes and able to shut-off the main gas valve. Output 4..20 ma. Wall installation. 1x Control panel for both gas detectors, 230V 50Hz. Wall installation. 1x Electrovalve with flange connection of 1 ½. Manual reset. Electrical installation. 1.8) CO2 FIRE-FIGHTING FLANGES 2 x Fire-fighting flanges PN-16 to connect CO2, one in every heater body. Our Specialised employees labour. 3

1.9) ONE DRY CONTAINER OF 40 Supply of the described elements into a dry container of 40 as a mobile heater s room, ready to be connected to a thermal fluid circuit. The present container is provided with the following services: Lighting through three (3) rectangular fluorescent luminaire with two fluorescent light each. Ventilation through fans placed in two different points in the container. Total electrical consumption in heater s room (container): ~ 115 kw Item 2) UNION OF TWO THERMAL OIL HEATERS 2.1) ELEMENTS NECESSARY FOR THE CONNECTION OF BOTH HEATERS 2 x Retention valves PN-16, flange connection DN-80. 1 x By-pass valve PN-16, flange connection DN-65. 2x Connection flanges PN-16 DN-125 to connect the heater s room to your process plant. 2x Blind flanges PN-16 DN-125 to protect the previous ones. Seamless steel piping according to A106 GrB and accessories for this pipe such as neck clamps, forged curves for welding, concentrically reductions, caps, graphite seals, nuts and bolts, etc. Item 3) METALLIC CHIMNEYS Quantity 2 Height 6 meter Diameter 350 mm Ø Materials Manufactured in double wall of stainless steel AISI-304 plate and isolated among both walls with rock wool and ceramic fiber of high density. Provided with Straight modules of 1 m length, fixation clamp and deflector final module. 4

Item 4) THERMAL FLUID TANKS 4.1) ONE EXPANSION TANK placed over the heater s room container Capacity 4500 liters (*) Execution Horizontal and cylindrical Materials Made of carbon steel sheet, quality S-235-JR with curved bottoms and supplied with the following elements: - In-going and out-going branches for thermal fluid. - Level taps set, with drainage tap and glass tube, for oil level visual control. - Magnetic float switch, with STAINLESS STEEL AISI-316 buoy, flange of stainless steel and switch housing of die cast Al. This is in order to block the burner in case that oil gets to its minimum level. Measures: Diameter ~1750 mm Total Length ~2250 mm Supply of one support structure from container s floor till 4 meters height. 4.2) AIR SEPARATOR Supply of one (1) air separator consisting on piping, two bottoms, one in the up side and one in the down side, for the thermal fluid in-going, centrifugation system, drain and gases extraction and derivations for the connection to the expansion tank and the thermal fluid return network. 4.3) VENT VALVES Supply of two (2) ON/OFF valves, to vent the pressurized system, placed between the air separator and the expansion vessel: 2x Interruption valves PN-16, flange connection DN-125. Seamless steel piping according to A106 GrB and accessories for this pipe such as neck clamps, forged curves for welding, concentrically reductions, caps, graphite seals, nuts and bolts, etc. 5

Item 5) TRANSPORT ARRANGEMENTS From Way Incoterms 2010 ICC Our workshop in Barberà del Vallés One 40 Dry container + your carrier FCA PIROBLOC workshop Elements ready to pick up Item 6) SUPERVISION OF INSTALLATION AND START UP SERVICE Supervision of installation made by others and start up service of the heaters by one specialised technician, including the following actions: - Checking of the installation made by others, - The first ignition of burners, - Dilatations control, - Collection and cleaning of the welding rest of the circuit, - Burners end regulation, - Training to the people in charge of the use and maintenance of the heaters, etc. The price includes the employee s labor per day. In reference to the round trip flight ticket to Vilnus, hotel and food expenses, please be so kind to read the GENERAL CONDITIONS OF START UP included in the present offer. Item 7) SPARE PARTS FOR COMMISSIONING 2 Temperature probes Pt-100 1 Temperature probe J Fe-Ko 1 Pressure switch 1 Differential pressure switch 1 Set of spare parts for burner 1 Set of spare parts for pump Net Price 0,- 6

QUALITY CONTROL RECORD Documents included: Record of conformity to standards (CE) Quality assurance plan route sheet Material list Certificate of dimensional and visual test Material certificate type 2.2 or type 3.1/B according EN-10204. Material certificate type Film temperature not exceed certificate Welding procedure specification Procedure qualification report Welder qualification test record Test certificate of welded section Hydrostatic test report X-Ray test report (only if required) Electrical test report Operating technical description Lay-out with weight, connections, overall dimensions indications Technical manuals Start up and operation manual Electrical diagram Logical diagram (only if required) Flow sheet Handling operation notice 7