Global Property. SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

Similar documents
Global Property. QUARTERLY FIRE PROTECTION EQUIPMENT INSPECTION REPORT Date of Inspection Location:

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

Self Inspection Program

False Sense of Security???

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

System Test Report CLEAN AGENT

FIVE YEAR AUTOMATIC FIRE EXTINGUISHING SYSTEMS CERTIFICATION REPORT

TECHNICAL DATA OBSOLETE

DISTRICT OF SECHELT. Inspection and Testing of Fire Protection Equipment Bylaw No. 397, 2002

Inspection Report Nursing Home Life Safety Code Section 4 - Annual Fire Alarm Testing and Maintenance. For

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

WHEA FSE inspections.

Winnipeg Fire Department Fire Prevention Branch

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Types of Detection. Fusible Link Detection - Most Common

Checklist For Life Safety

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

INSPECTION AND TESTING FORM

FIRE SAFETY SYSTEMS MAINTENANCE INFORMATION

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

DIVISION 21 FIRE SUPPRESSION

Inspection and Testing of Water-Based Systems

Deluge & Preac tion Systems

TOTALPAC2 Integrated Fire Protection System

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

MAINTENANCE AND INPSECTION OF FIRE PROTECTION SYSTEMS AND APPLIANCES

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

Other EC and LS documents may be requested by surveyors, as needed, throughout the survey.

USAutomatic Sprinkler Corporation

SPRINKLER SYSTEM DRY WET

BERMAD Fire Protection

TECHNICAL DATA. 319a. January 27, 2012

MODULE 2. Water-Based Suppression System Basics

NFPA 96, 2017 REVIEW SUMMARY

Advanced Integrated Fire Protection Systems TOTALPAC 2. Owner's Operation and Maintenance Manual FIRECYCLE III. September 2009 FM-086G-0-5E

Sheetz Inc. Fire Protection Service Guidelines

OWNER'S OPERATION AND MAINTENANCE MANUAL

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

Functional Performance Test

Florida Building Code 2010

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEU-LECTRIC RELEASE

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

Fire Safety Plan (Single-Stage Fire Alarm System) (Small Establishment):

Model: 400E-5M. Bermad Hydraulically Controlled Anti-Columning Deluge Valve, with Easylock Manual Reset. Installation Operation Maintenance

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Basic Vehicle Fire Protection Manual

Building Life Safety Systems Testing

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

Box-in-Box Cold Storage Fire Protection Options

Inspection, testing, and maintenance (ITM) Fixed fire protection and detection July 2016

Becoming an Expert on Dry-pipe, Preaction, and Deluge Sprinkler Systems

TECHNICAL DATA OBSOLETE

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

TotalPac X Firecycle III Preaction Double interlock system

TECHNICAL DATA. model c-2

Pre-Pack INTEGRATED PRE-ACTION SYSTEM

TECHNICAL DATA DOUBLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC/ PNEUMATIC RELEASE 1. DESCRIPTION 2. LISTINGS AND APPROVALS 3.

10/28/2015. Enjoy Your TJC Survey. Bill H. McCully CHFM SASHE. Senior Consultant MSL Healthcare Partners. MSL Healthcare Partners, 2015 PREPARATION

FIRE INSPECTION CHECKLIST

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH WET PILOT ACTUATION

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Chapter 4: Fire Protection Systems

Protecting Your Property: Well Do You Know Your Fire Fire Systems Systems. Joe Szewczyk, Risk Control Consultant

Final EC Inspection Report 03/2010

TotalPac X Single interlock SUREFIRE system

Datasheet. Vacuum Double-interlock Preaction System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description

TECHNICAL DATA SINGLE INTERLOCKED PREACTION SYSTEM WITH ELECTRIC RELEASE

FIRE PROTECTION SYSTEMS

Owner/Operator Guide for Successful Sprinkler and Fire Pump Systems

CONSTRUCTION REQUIREMENTS

TotalPac 3 Firecyle III Deluge Remote controlled system

FIRE PROTECTION SYSTEMS

DELUGE VALVE MODEL: SD-DVH2 TECHNICAL DATA TRIM DESCRIPTION DESCRIPTION VALVE OPERATION. 82 ASTM A 216 WBC.

Datasheet. Dry-pipe Vacuum Sprinkler System, Electric Release Self contained unit. Features. FIREFLEX VACTEC description

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

FIRE PROTECTION SYSTEMS

Not to be distributed outside of FM Approvals and its affiliates except by Customer APPROVAL REPORT

ClassNK Technical Information No. TEC-0970 For any questions about the above, please contact: NIPPON KAIJI KYOKAI (ClassNK) Survey Department, Adminis

THÔNG BÁO KỸ THUẬT TÀU BIỂN TECHNICAL INFORMATION ON SEA-GOING SHIPS

Kiddie After Discharge Clean-Up

Fire Protection Systems Operation and Maintenance 3 PDH / 3 CE Hours

Objective 1: Describe fire alarm systems.

EC 5.10 FIRE PREVENTION MANAGEMENT

MSC Guidelines for Watermist Fire Suppression Systems Procedure Number: E1-03 Revision Date: 02/16/2017

Operation & Maintenance Manual

Project Name: Project Address: Installer Name: Installer Address: Date of Inspection:

FIRE SAFETY PLAN. BUILDING NAME: Pathobiology / AHL BUILDING NUMBER: 089. DATE: 15-August-10 FPO #2

TECHNICAL DATA. Factory Mutual Approval is pending for the system as a whole.

SINGLE INTERLOCK, SUPERVISED PREACTION SYSTEM WITH ELECTRIC RELEASE

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Engine Module Page 1 of 8 Annual Sprinkler System Inspection Revised

DOUBLE INTERLOCK, PREACTION SYSTEM WITH ELECTRIC/PNEUMATIC RELEASE

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

Residential Fire Sprinkler Inspection

24V PCU CORE FIRE PROTECTION INSTALLATION SUMMARY

TRAINING BULLETIN TOOLS 1 May 27, 2011 PRESSURIZED WATER EXTINGUISHER

Transcription:

Global Property SEMIANNUAL FIRE PROTECTION EQUIPMENT INSPECTION REPORT Plant: Date of Inspection Location: Inspected By: Reviewed By CONTROL VALVES (If Valves are Not Locked Open or Electronically Supervised This Must Be Completed Weekly) Valve Number Area Controlled or Number Valve Open Valves Locked or Supervised Supervisory Alarms Tested Yes No Yes No Yes No Comment Page 1

CONTROL VALVES (If Valves are Not Locked Open or Electronically Supervised This Must Be Completed Weekly) Valve Number Area Controlled or Number Valve Open Valves Locked or Supervised Supervisory Alarms Tested Yes No Yes No Yes No Page 2

WATER SUPPLY TANKS Tank No. Tank Heater Working See Note 1 Record Tank Temperature See Note 2 Leaks or Corrosion Tank Level Full See Note 3 Tank Clear of Storage, Brush and Other Fire hazards Tank Free of Ice Build Up GLOBAL PROPERTY Embankment Support Coated Fabric Tank Free of Erosion Low Water Temp. Alarms Tested and Functioned ly Low Water Level Alarms Tested and Functioned ly Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Note 1: Tanks without a low temperature alarm to a constantly attended location the inspection must be conducted daily Note 2: For Tanks without Low Temperature Alarm, Tank Temperature must be recorded weekly. Temperature should be 40 0 F (4.44C) or higher Note 3: For Tanks without Supervised Water Level Alarm to a constantly attend location the Inspection can be conducted Monthly SPRINKLER, WATER SPRAY SYSTEMS, No. Type Dry Pipe, Preaction Deluge Static Water Dry Pipe and Preaction Air PSI Note Quick Opening Device Air PSI Ultra High Speed Water Spray s No Physical Damage Detector Lenses Clean Waterflow Alarms Free of Physical Damage Mechanical Water Flow Alarms Operated ly Dry Pipe Valve Priming Water at the Level Water Flow Alarms Operated ly Fire Department Connections Accessible, Caps Present, Swivels Free, Signs in Place, Check Valves not leaking Yes No Yes No Yes No Yes No Yes No Yes No Yes No Note 4: Dry Pipe s without Low Air Alarm to a constantly attended location or Alarm Company the inspection must be conducted weekly Page 3

SPRINKLER, WATER SPRAY SYSTEMS No. Type Dry Pipe, Preaction Deluge Static Water Dry Pipe and Preaction Air PSI Note 4 Quick Opening Device Air PSI Ultra High Speed Water Spray s No Physical Damage Detector Lenses Clean Waterflow Alarms Free of Physical Damage Mechanical Water Flow Alarms Operated ly Dry Pipe Valve Priming Water at the Level Water Flow Alarms Operated ly Fire Department Connections Accessible, Caps Present, Swivels Free, Signs in Place, Check Valves not leaking Yes No Yes No Yes No Yes No Yes No Yes No Yes No Page 4

Note 4: Dry Pipe s without Low Air Alarm to a constantly attended location or Alarm Company the inspection must be conducted weekly SPECIAL EXTINGUISHING SYSTEMS Carbon Dioxide s Item Tested High CO 2 s Cylinders in Place and Secured Cylinders Weight OK Date of Oldest Cylinder Hydro Test Low CO 2 s Liquid CO 2 Level Gauge Gages Shows Normal The Tank Shut Off Valve is Open and Pilot Valve is Open All CO 2 s CO 2 Storage is Connected to Discharge Piping All Manual actuator are in place and tamper seals intact Clear Access Provide to Manual Actuators Nozzles are Connected, Properly Aligned and Free of Obstructions Detectors are in Place and Free of Obstructions and are Not Coated with Foreign Material Control Panel is Connected and Shows Normal, Ready Condition Item Tested High CO 2 s Cylinders in Place and Secured Cylinders Weight OK Date of Oldest Cylinder Hydro Test Low CO 2 s Liquid CO 2 Level Gauge Gages Shows Normal The Tank Shut Off Valve is Open and Pilot Valve is Open All CO 2 s CO 2 Storage is Connected to Discharge Piping All Manual actuator are in place and tamper seals intact Clear Access Provide to Manual Actuators Nozzles are Connected, Properly Aligned and Free of Obstructions Detectors are in Place and Free of Obstructions and are Not Coated with Foreign Material Control Panel is Connected and Shows Normal, Ready Condition Comments Yes/ No Date MM/Yr Gauge Yes/ No Date MM/Yr Gauge # 1 # 9 # 2 # 10 # 3 # 11 # 4 # 12 # 5 # 13 # 6 # 14 # 7 # 15 # 8 # 16 Page 5

SPARK SUPPRESSION SYSTEM Item Tested Lens Clear # 1 # 2 # 3 # 4 # 5 # 6 # 7 # 8 Sensor Operational Flow Tested (Tripped) Sensors Calibrated Freeze Protection Equipment in Good Repair and Functioning Control Panel Dusted, Batteries Check or Replace & Connections Tightened Item Tested Lens Clear Yes/ No # 9 # 10 # 11 # 12 # 13 # 14 # 15 # 16 Sensor Operational Flow Tested (Tripped) Sensors Calibrated Freeze Protection Equipment in Good Repair and Functioning Yes/ No Control Panel Dusted, Batteries Check or Replace & Connections Tightened EXPLOSION PREVENTION SYSTEMS Item Tested Confirm the Hazard has Not Changed Since Last Inspection The Explosion Suppression was Installed Per Mfg and NFPA 69 Requirements Components are not Physically Damaged Operation Instructions are Provided Near Control Panel Components Clearly Identified as Explosion Suppression Components are not Painted or Coated Components are not blocked by Process Materials Components have not been Tampered With, Tamper Seals are In Place has not Discharged Control Panel In Service With NO Trouble Alarms Displayed Wiring is Free From Ground Faults Suppressors and Actuators are Pressurized and Operational Interlocks are Verified for Sequencing and Function Mechanical Isolation if Used (rotary valves, etc) is Maintained per Mfg Requirements and NFPA 69 Sequence of Operation is Verified by Simulated Operation # 1 # 2 # 3 # 4 # 5 # 6 # 7 # 8 Comments: Page 6

DRY CHEMICAL EXTINGUISHING SYSTEMS Item Tested Confirm the Hazard has Not Changed Since Last Inspection Detectors, Expellant Cylinder, Agent Containers, Release Devices, Piping, Hoses, Nozzles, Alarms and Interlocks in Good Condition Agent Discharge Piping Secure Inspect Dry Chemical Agent for Signs of Caking Blow-Off caps in Place and Nozzles Aligned Test Alarm, Release Devices and Manual Pull Stations Replace Fix Temperature, Fusible Element Heat Detection Sensors with Sensor of same Temp. Rating WET CHEMICAL EXTINGUISHING SYSTEMS Confirm the Hazard has Not Changed Since Last Inspection Detectors, Expellant Cylinder, Agent Containers, Release Devices, Piping, Hoses, Nozzles, Alarms and Interlocks in Good Condition Agent Discharge Piping Secure Blow-Off caps in Place and Nozzles Aligned Test Alarm, Release Devices and Manual Pull Stations Replace Fix Temperature, Fusible Element Heat Detection Sensors with Sensor of same Temp. Rating HALON SYSTEMS Halon Inspected and Tested per NFPA 12A within the Last 6 Months CLEAN AGENT SYSTEMS Clean Agent Inspected and Tested per NFPA 2001 within the Last 6 Months # 1 # 2 # 3 # 4 # 5 # 6 # 7 # 8 FIRE PROTECTION MAINS OR PIPING EXPOSED TO FREEZING TEMPERATURES Heating Tracing Insulation In Place or Area Operational Yes No Yes No Comments Comments: Page 7

This Page intentionally Left Blank Page 8

FIRE DOORS Fire Door, Shutter or Damper Number / Area Door In Operating Condition Metal Cladding No Damaged Stock Obstructing Door Yes No Yes No Yes No Comments Page 9

FIRE DOORS Fire Door, Shutter or Damper Number / Area Door In Operating Condition Metal Cladding No Damaged Stock Obstructing Door Yes No Yes No Yes No Comments Page 10

STANDPIPES, HOSE STATIONS, & MONITOR NOZZLES Hose Station No. Location Hose Diameter & Length GLOBAL PROPERTY F.D. Con. Monitor Nozzles Mechanical Hose Hse in Accessible, Caps Free of Nozzle and Waterflow Waterflow Working Order, Present, Swivels Leakage, Other Alarms Free Accessible Alarms Equipment Present Free, Signs in Corrosion, and Equipment of Physical Operated & in Good Place, Check Damage. Present Damage ly Condition Valves not Nozzles Move leaking Freely Yes No Yes No Yes No Yes No Yes No Yes No Yes No Page 11

STANDPIPES, HOSE STATIONS, & MONITOR NOZZLES Hose Station No. Location Hose Diameter & Length GLOBAL PROPERTY F.D. Con. Monitor Nozzles Mechanical Hose Hse in Accessible, Caps Free of Nozzle and Waterflow Waterflow Working Order, Present, Swivels Leakage, Other Alarms Free Accessible Alarms Equipment Present Free, Signs in Corrosion, and Equipment of Physical Operated & in Good Place, Check Damage. Present Damage ly Condition Valves not Nozzles Move leaking Freely Yes No Yes No Yes No Yes No Yes No Yes No Yes No Page 12