SH20 WESTERN RING ROUTE OPEN SPACE REPORT

Similar documents
Implementation plan. 3.1 Staging

8.8 Sector 8 Hataitai Park

Section 6A 6A Purpose of the Natural Features and Landscapes Provisions

LANDSCAPE GUIDELINES. Countryside & Coastal Countryside Environments. Landscape, Natural Character & Amenity Values Guide

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

GREENBANK DEVELOPMENT MASTERPLAN

Public Consultation. Land at Monks Farm, North Grove. Welcome

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

SH20 Manukau Harbour Crossing Project Notice of Requirement Auckland City Council

Am I at risk of flooding?

SH1 - Causeway, Auckland, 2014 (Source: NZ Transport Agency)

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Las Colonias Park Master Plan

PART C DESCRIPTION OF THE PROJECT

I615. Westgate Precinct

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Description of Preferred Alternative

Rebuttal evidence of Lynne Hancock (urban design) on behalf of the NZ Transport Agency

Draft Ada Street Cardiff Area Plan

Monte Cecilia Park DRAFT CONCEPT PLAN FEBRUARY 2015 AUCKLAND COUNCIL

BEFORE THE AUCKLAND UNITARY PLAN INDEPENDENT HEARINGS PANEL STATEMENT OF EVIDENCE OF MARTIN PEAKE ON BEHALF OF AUCKLAND COUNCIL

Khandallah, Broadmeadows, Ngaio, Crofton Downs and Kaiwharawhara

Proposed Southland District Plan 2012 Appeal Version October 2016

M4-M5 Link Rozelle Interchange factsheet 2017

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Study Area Map. Wasatch Hollow Open Space Restoration, Use, & Management Plan. Legend. Harrison Ave East. Roosevelt East.

PHASE III: Reserved Matters Submission

DRAFT. October Wheaton. Design Guidelines

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

SH1 link to Matakana Road

8.2 Sector 2 Kelburn Park

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

Assessment of Landscape, Visual and Natural Character Effects

I611. Swanson North Precinct

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

GUIDELINES BAYVIEW INSTITUTIONS CONTEXT PLAN LOCATION PLAN COMPONENTS URBAN DESIGN GUIDELINES

8.3 Sector 4 Brooklyn Hills

I403 Beachlands 1 Precinct

Appendix E Section 4(f) Evaluation

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

MICHAELS AVE RESERVE. Draft Concept Plan of South Section September Contents. 1 Project Background. 2 Masterplan Timeline

As will be detailed, our site plays a strategic role in providing these opportunities.

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

6 BRIDGES. 6.1 Design philosophy. Proposed bridges

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

5. Initiating a restoration project

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

WELCOME TO OPEN HOUSE TWO November 28, 2018

Welcome to our public exhibition

TAKANINI STRUCTURE PLAN AREAS 6A & 6B: ARCHAEOLOGICAL ASSESSMENT

Brains and Archibald park concept plan

MCCOYS CREEK RESTORATION 30% DESIGN

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Mississauga Waterfront. Parks Strategy - Draft

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

I334. Wairaka Precinct

Master Plan Presentation August 12, 2015

Test Valley Borough Council Southern Area Planning Committee 8 January 2019

Wairaka Zoning and Precinct Section 32 evaluation for the Proposed Auckland Unitary Plan

A VISION FOR BLAIRGOWRIE

Rural (Urban Expansion) Environment

3.5 Principle 5/Response

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Ringsend & Irishtown Local Environmental Improvement Plan

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

Mount Maunganui North. Neighbourhood Plan

3. Highway Landscaping Assessment

HURON COMMUNITY PLAN

2.5 Roads. Loading and service areas adjacent to Highway 401 should be screened through architectural walls and/or landscape buffer planting.

Background Information

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

64 Mineral Extraction Area Rules

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

North Shore Trail. Council Meeting June 10, 2002

E m e r a l d N e c k l a c e. M a t t S e a r l e

7. Biodiversity & Conservation Areas

Key Open Spaces Recommendations

UTT/16/1466/DFO GREAT DUNMOW MAJOR

University Park, Worcester Non Technical Summary December 2011

3. Landscape and Streetscape

Unitec Proposed Auckland Unitary Plan Submission. Wairaka Zoning and Precinct Planning Report

Section 12C Subdivision in the Rural Residential Zone

North West Rail Link - Environmental Assessment Urban Design and Visual Assessment Prepared for Transport Infrastructure Development Corporation

B A S I N B R I D G E P R O J E C T

I404 Beachlands 2 Precinct

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

Redoubt Road-Mill Road Corridor Project. Notice of Requirement for Designation Volume 2:1 - Assessment of Environmental Effects

Land at Rampton Road. Cottenham

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Section C Bridges and retaining walls

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

Waterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan. G Issue D 14/07/16

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Westwind Developments Ltd. PIONEER LANDS AREA STRUCTURE PLAN - PROPOSED AMENDMENT

PART 5 - NATURAL AND PHYSICAL ENVIRONMENT

Wireless Hill Vision 2020

1 d 6 5 K Q P B M A K Hadfield Park, Wallan Community Consultation & Development Plan wallan -w hitt l e s e a r oa F O 2 K JUNE a1 J B

PARK M A I N T E N A N C E REPORT CARD

Transcription:

D R A F T May 2010 SH20 WESTERN RING ROUTE OPEN SPACE REPORT May 2010, Page 1

This report has been prepared for the benefit of the New Zealand Transport Agency (NZTA). No liability is accepted by this company or any employee or subconsultant of this company with respect to its use by any other person. Rev. Prepared by by Date Description A Dave Little (Stephen April Initial report Brown Environments) 2010 B Dave Little (Stephen Brown Environments) May 2010 Waterview Park section added, Alan Wood Reserve areas amended May 2010, Page 2

Introduction. This open space report examines the opportunities, impacts and proposals presented by the SH20 Western Ring Route Connection. This report does not deal with the SH16 portion of the Western Ring Route (WRR) where the issues were localised to small portions of existing parks and dealt with locally. This report is presented in two broad sections. The first section examines the existing open space situation, in terms of opportunities and challenges for integration of reserves within the project boundaries with the broader open space network from Pt Chevalier through to Mt Roskill. From this investigation, an overall concept proposal and set of open space principles are presented, along with a breakdown of the open space network into five distinct detail areas. The second section examines each area in detail, focusing on open space effects and mitigation, driven by the broad level concept and principles derived in section one. Where applicable, a breakdown of areas is presented, as are any alternatives considered and the rationale behind the chosen option. In reviewing this document it is necessary to appreciate that not all options have been approved by the NZTA Board, and that this is an interim discussion document not a final outcome. NB: This report represents the network planning approach, and represents a full suite of outcomes, not all of which may form part of the final project. Table of Contents. 01. Existing Situation PAGE 4 Existing Open Space 5 Existing Issues/Opportunities 6 Existing Challenges 7 Open Space Principles 8 Network Opportunities 9 02. Detail Areas PAGE 10 Waterview Park 11 Phyllis Reserve 23 Harbutt Reserve 31 Alan Wood Reserve 35 25 Valonia St / Hendon Park 45 top: Waterview Park. centre: Alan Wood Reserve. bottom: Hendon Park 03. Supporting Info PAGE 50 Existing Reserve Layouts 51 Alan Wood Reserve Motorway/Rail Layout Alternatives 53 References 54 May 2010, Page 3

Waterview Park Phyllis Reserve Hendon Reserve Alan Wood Reserve 25 Valonia St/Hendon Park 02. DETAIL AREAS May 2010, Page 10

Overview Mitigation Summary Open Space Plan Recreation Facilities Assessment of Alternatives Existing Aerial Design WATERVIEW PARK. Including: Waterview Esplanade, Cowley Reserve, Howlett Reserve & Waterview Glades Earlier proposals saw mitigation of the loss of this open space being largely carried out at Phyllis Reserve. The public consultation however came back strongly in favour of providing more open space locally, and improving local connections to open space. This has resulted in the provision of options for returning a section of Waterview Park, along with the area on Waterbank Crescent required for a construction yard during the construction process, as long term active and community open space. Options for return of this area as open space are contained within this section. May 2010, Page 11

Broader connections diagram 5. Key: EXISTING OPEN SPACE DELETED OPEN SPACE PEDESTRIAN/CYCLE ROUTE PROPOSED OPEN SPACE URBAN FOREST (ROAD RESERVE) ARCHAEOLOGICAL NODE 1. 6. EXISTING SH16 CYCLEWAY Waterview / Northern Portal Key Moves: 2. 1. Completion & upgrade of Oakley Creek esplanade open space network, including Great North Road with Oakley Ave. 3. 2. Relocation of Waterview Park & inclusion of properties along Waterbank Crescent to offset active open space. 3. Expansion of Saxon Reserve to provide expanded community open space, centrally located & an open space walking route. 4. 4. At grade bridge link to Unitec & associated recreation facilities (partnership with Council). 5. Creation of walking link to Eric Armishaw Park & wider Point Chevalier reserves network. Note: this is a graphic summary of the mitigation proposals outlined on the following page 6. Creation of Oakley Creek Heritage Area archeological node as part of passive open space network. NB: This plan details a full network suite of proposals, not all of which may form part of the lodged Project. Waterview Park Northern Portal: Overview May 2010, Page 12

Waterview Park, existing view looking NW Open Space Impact of project Loss of overall reserve area to motorway infrastructure Loss of senior playing field at Waterview Park Loss of community facilities at Waterview Park (toilets, playground, volleyball court, basketball court) Amenity impacts on open space in this area, caused by the motorway interchange Proposed Mitigation Retain or increase open space area locally. Active, community and passive replacement areas have all been considered in the makeup of the proposed reserve areas. Relocated to the west within new reserve area, fronting Waterbank Crescent. Relocated to the west within new reserve area, fronting Waterbank Crescent. A significant bunding and vegetative screening area (30m wide, max 5m in height) is proposed between the westernmost ramp and the relocated Waterview Park. As shown in the sections, this will largely screen views of the motorway, and it will also limit noise in the proposed Waterview Park area to the same levels as the existing park. Loss of reserve area for walking/fitness uses and severance of open space Overall provision generally maintained, and connections are substantially improved - with new walkable links connecting to; Eric Armishaw Park and the Pt Chevalier reserve network, Unitec and the Oakley Creek esplanade, and from the Waterview esplanade to Great North Road in the east and Oakley Avenue in the west. These links are in line with the aspirations of the Council's Future Planning Framework (FPF) and Council's Open Space Plan. Loss of existing or potential areas of urban forest Overall provision of open space area is generally maintained, with some 16Ha of 'road reserve' land restored as native habitat, including restoration of the ecological communities along the Oakley Creek coastal margin, and creation of representative 'coastal forest' and 'basalt forest' communities as appropriate. Cut and cover' works on 'Waterview Glades' area Loss of playing field during construction period Develop restoration plan. The Alford bridge improves access to the Unitec playing fields, the Phyllis bridge improves access to the Phyllis Reserve playing fields and consider providing replacement field at Waterview park as early works. Waterview Park Northern Portal: Mitigation Summary May 2010, Page 13

Detail from the Auckland City Operative District Plan (Isthmus Section- Map D04- not to scale) Waterview Park Northern Portal: Open Space Layout Proposal Note: this is a draft plan showing the open space areas as described in the mitigation table. More detailed GIS calculations are presented in section E4 of the AEE application. Scale 1:4000 @ A3, May 2010, Page 14

WATERVIEW PARK Recreation Facility Existing Quantity Proposed Proposed Location Notes Senior playing field 1 1 Relocated Waterview Park Netball/Tennis courts 1 (degraded) 0 None Basketball court 1 2 Co-located with senior field on Waterbank Crescent Volleyball court 1 1 Co-located with senior field on Waterbank Crescent 60x100m senior field, aligned north/south, with carparking provision fronting Waterbank Crescent. Illuminated to match existing. Not proposed for replacement - existing courts have not been used for a number of years, and focus appears on other priorities locally Two new courts proposed Toilet block/change facility 1 2 Toilet block at Saxon Reserve Playground 2 2 Saxon Reserve and Waterbank Crescent Change Facility 1 0 None Two smaller, more modern facilities proposed - one at Saxon Park and one at Waterview Park Two more modern facilities proposed - one at Saxon Park and one at Waterview Park None proposed as it appears more feasible to provide this elsewhere. Suggest compensation discussion between Council and the NZTA Waterview Park Northern Portal: Recreation facilities May 2010, Page 15

C C Option 1: Waterbank Crescent Housing Retained Option 2: Waterbank Crescent Housing Removed A number of houses are required for removal along Waterbank Crescent to create a construction yard for the northern portal works. Given the community s desire for a significant area of open space replacement locally, this area (which will become available post-construction) has been considered as part of the open space replacement package. Following a review of adjacent motorway levels, a 30m width vegetated bund, to 5m height has been proposed as mitigation buffering to offset the visual and acoustic impacts of the adjacent motorway development. Over time, this will fully screen views of the motorway from the park, as well as the adjacent housing to the west. It will also reduce views from Waterview Primary School. Given this buffer consideration, two options were investigated for replacement of open space. Option 1 retains those houses between the construction yard and the westbound ramp (ramp 2). This allows for a single senior playing field to replace that lost at Waterview Park, and associated carparking and toilet facilities. Option 2 incorporates the northern properties into the park, allowing for an expanded recreational hub in this location including such facilities as a playground, volleyball hoop and basketball courts to more completely replace those facilities lost at Waterview Park. The second option co-locates recreational activities - essentially providing like for like replacement of Waterview Park s existing facilities, and provides better connections through to the coastal esplanade to the north. It is therefore the preferred option. Waterview Park: Assessment of Alternatives Scale 1:4000 @ A3, May 2010, Page 16

section A-A, 600 Chainage (option 1) Waterbank Crescent Ramp 2 (westbound) Residential Property Ramp 2 (westbound) Senior Football Field SECTION B-B section B-B, 500 Chainage (option 1) Waterview Park: Preliminary Cross Sections Scale NTS, May 2010, Page 17

Ramp 2 (westbound) Volleyball Court SECTION C-C section C-C, 600 Chainage (option 2) Waterview Park: Preliminary Cross Sections Scale NTS, May 2010, Page 18

C Low native mass planting between cycleway & motorway. Allows fencing to be set back within the vegetation. Boardwalk section may be required where path crosses landing / boat slip lane associated with quarrying. 3m wide SH16 cycleway runs alongside Oakley Creek avoiding potential CPTED issues of running path through Oakley Creek. Cycleway set back from the motorway by to increase use experience. Historic stone quarry pit. Stone walls cleared & emphasised with planting. Historic stone working site & protected food pit site. No public access & planting restrictions in this area. Karaka grove consisting of existing historic planting & new species. Low earthen walls to be cleared & grassed. Existing forms to be emphasised & exaggerated using planting & mounding. Pedestrian path to be routed through mounds. Pedestrian path (1.8m wide) through archaeological park Existing quarry terraces & pits consisting of a series of low blue stone walls. To be cleared & planted accentuated by low mass planting. Low accent planting & pohutukawas to tie into the planting on the other eastern side of Great North Road & around the interchange. A To Te Atatu C To Point Chevalier SH16 slip lane c4.5m clearance where cycleway passes underneath on-ramp (assumes ramp depth of 1.2m). OAKLEY CREEK Great North Road Cycleway Overbridge To Waterview Reserves Network WATERVIEW ESPLANADE RESERVE B B To Waterbank Crescent Weed clearance & revegetation of Oakley Creek banks Existing mature trees to be retained if possible c4.2m clearance between cycleway & bottom of on-ramp (assumes ramp depth of 1.2m) GREAT NORTH ROAD Oakley Creek Esplanade Reserve A Sections of boardwalk where path passes over or through historic midden sites to protect the middens. Quarry Pits / stone walls to be cleared and planted. Weed clearance & revegetation of steep banks of Oakley Creek 20m esplanade reserve Blue stone sea walls fronting the mill site Bridge crossing at the location of the original bridge associated with the historic activities of the site. Pohutukawa Forest with mass underplanting Proposed gabion wall to enclose the mill site. Gabions to be filled with combination of blue stone & artefacts from the site. Historic Star Mill / Tannery & Quarry site. Original foundations to remain. Area to contain seating & signage. Waterview Park: Archaeological Park Concept Scale 1:1250 @ A3, May 2010, Page 19

section AA scale c1:600 @A3 Pedestrian walkway to historic quarry past protected food pit & midden sites through regenerating bush Existing stone walls & pits alongside footpath to be cleared & planted Pedestrian bridge across Oakley Creek Oakley Creek. Star Mill Archaeological Site Education & interpretation area with the incorporation of archeological remnants associated with the mill & tannery such as rock walls, machinery & signage Piers located to avoid high value archeological sites Mangroves lining Oakley Creek Oakley Creeks banks to be cleared of weeds & revegetated Partial stone walls to be cleared & planted Partial stone walls to be cleared & planted Protected archeological site - food pits, No access 1.8m wide footpath runs through old quarry Historic stone quarry site Existing stone faces cleared to revel underlying structure & gaps to be planted with ferns 3m wide cycleway runs alongside SH16, separated from road carriageway by generous planted buffer Boundary fence SH16- Great North Road slip lane 1.8m wide footpath, c4.8m clearance between footpath & bottom of on-ramp (assumes ramp is 1.2m deep) Existing mature trees to be retained where possible Oakley Creek channel. Banks to be revegetated as per Oakley Creek Rehabilitation Guidelines 3m wide SH16 cycleway, c4.5 m clearance between path & bottom of ramp (assumes ramp is 1.2m deep) 15.5 Ramp 2 - SH16 Westbound 9.5 650 chainage 700 chainage 750 chainage 800 chainage 850 chainage Ramp 4 SH16 City bound Ramp 3 SH20 Southbound MHWS (1.63) section BB scale c1:500 @ A3 section CC scale c1:500 @ A3 Notes: Levels are indicative only, to be confirmed with survey information Exact location of archeological features to be confirmed on site Waterview Park: Archaeological Park Cross Sections Scale as shown @ A3, May 2010, Page 20

Waterview Park: Existing Aerial Photograph May 2010, Page 21

Waterview Park Northern Portal: Conceptual Design Outcome Scale 1:2000 @ A3, May 2010, Page 22