Job Reference of Threaded Rod & Holding Down Bolt

Similar documents
SMOKE AND FIRE CURTAINS

4-Wire Photoelectric Duct Smoke Detector-D4240

Pedestrian Connectivity Facilities. Consultation Digest

THE HONG KONG INSTITUTION OF ENGINEERS

Environmental Permit No. EP-457/2013/C. Central Kowloon Route. Independent Environmental Checker Verification

** Different Phases with no other specific names will not be stated separately in the list. New Territories East

** Different Phases with no other specific names will not be stated separately in the list. New Territories East

BA(Hons)(Town Planning) Glasgow; MPhil(Landscape Architecture) Edinburgh; MSc(Conservation)(Distinction) HKU; PhD HKU

Solving urban land use conflict!

Planning for Liveability in Hong Kong

THE HONG KONG INSTITUTION OF ENGINEERS

THE HONG KONG INSTITUTION OF ENGINEERS Scheme "A" Graduate Training List of Organisations Approved to Offer Scheme "A" Training (updated July 2018)

Task Force on Water-land Interface

MKS ADVANCE II EXPLAINED

3 Summary of Major Views and Responses

Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Silt Curtain Deployment Plan

Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Agreement No. CE 57/2013 (TT) Pedestrian Environment Improvement Scheme for Transformation of Kwun Tong Business Area.

Traffic Control and Surveillance System (TCSS) Infrastructure, Challenges and Trends

Task Force on Kai Tak Harbourfront Development

The HKIE Environmental Division Annual Seminar Environmental Impact Assessment for Sustainable and Quality Living

New Towns in Hong Kong: Planning for the Next Generation

C O V E R S T O R Y Tamar Development

Extension of the CITIC Tower Footbridge to the Legislative Council Complex at Tamar

Institution Information 2016/2017

Provisions for the Means of Escape and Means of Access by Using Lifts and Escalators in the MTRC Main (U/G) Station

Group Profit Increased by 30% to HK$22 billion

LAI MEI YUE, DAISY Master of Science in Real Estate University of Greenwich, UK (SPACE, University of Hong Kong)

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

Seminar Series on New Horizon in Greening Skyrise Greenery

Hong Kong New Town Sustainability Analysis from the Perspective of Low-Carbon Eco-City Taking Tseung Kwan O New Town as an Example

LONGITUDINAL VENTILATION FOR SMOKE CONTROL IN A TILTED TUNNEL BY SCALE MODELING

FITTING OUT SOLUTION + INTERACTIVE SOLUTION

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

Institution Information 2009/2010

Task Force on Kai Tak Harbourfront Development

Alexander [Sandy] M Duggie

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Hong Kong Collection

MICHAEL KOKS LANDSCAPE ARCHITECT

INTERNATIONAL COMPETITION: TOWNLAND S RECENT AWARDS TOWNLAND S MAINLAND CHINA AWARDS

WHEELOCK AND COMPANY LIMITED. Annual Report 2000 / 2001 BUSINESS REVIEW. Gateway, Hong Kong

Land Use/Transport Integration. Land Use as an end Transport as a means

Paradigm Shift: Emergence of Environmental Management and Engineering in the Development of Hong Kong into a World City

Minutes of Seventeenth Meeting

MANKS LTD. S-shape dinning chair HKD 10,080. White Laminate Panton Table HKD 21,320

Planning Underground in Singapore

Task Force on Harbourfront Developments on Hong Kong Island

Representing Hong Kong Institution of Engineers. Representing Society for Protection of the Harbour

Core Business Steady Despite Mixed Outlook

Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak. Harbourfront Commission Aug 2015

Pole Mounting System Installation & Certification Manual

Exploiting Transit s City Shaping Powers Robert Cervero University of California, Berkeley

(Toll Free); 7am-7pm Pacific Time, Monday-Saturday. Assembly instructions for: DUSTIN S FACE TO FACE GLIDERS WITH XW ROOF

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

DOWNLOAD OR READ : CHINESE GARDEN ESTATES IN CHINESE ZHONGGUO TINGTANG JIANGNAN PIAN PDF EBOOK EPUB MOBI

Fostering a Quality and Sustainable Built Environment in HK. A presentation by Robert Lam Fellow HKIA

Installation Manual Universal Top-of-Pole Mount UNI-TP/02

6ft Wide Polytunnel Assembly Instructions

COHERE DESIGN COMPANY LIMITED ALBERT CHENG CHAK LAM FOUNDER & MANAGING DIRECTOR

Events At Ovolo Southside

Preliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island

DWYER AROUND THE GLOBE CONTACT INFORMATION DWYER INSTRUMENTS, INC. P.O. Box 373. Michigan City, IN Return Service Requested

Growth opportunities in Asia Pacific. 18 September 2013

Minutes of Tenth Meeting

10ft Wide Polytunnel Assembly Instructions

Task Force on Kai Tak Harbourfront Development. Proposed Establishment of Government Flying Service Kai Tak Division at Ex-Kai Tak Runway Tip

1SC. Instructions for HORIZONTAL 43 to 54 TV Mounting Bracket

Task Force on Kai Tak Harbourfront Development

Football field lighting (Morocco) 500W LED Project Light

Training Course on HVAC System & Product Updates 2018

Evacuation Hazards in Crowded Subway Stations

HONG KONG S OLD VILLAGES

Alan Macdonald. BA, MA, MRTPI, MZIRUP, FHKIP, RPP, MHKIUD Director Urbis Limited

Pole Mounting System Installation & Certification Manual

Minutes of Eleventh Meeting

Electronic Control Systems Sensors

FSD Circular Letter No. 4/2006

Media Briefing. 07 Mar 2018

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

IMMERSED TUNNEL An innovation to cross a water-body. Presented by: Sumit Kar & Vishnu Saini On 20 February 2015 Page 1

Content. 1. Introduction. 2. Particular Permeable of Planter Tube System. 3. Particular Specification of Planter Tube System. 4.

P R O D U C T C A T A L O G U E

Hong Kong and Salutogenic Outcome

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

Chilled Ceilings / Beams Working Principles & Applications

Symposium on Green Building Labelling 2004

CONTENTS. About ELAN Group International Partners. ELAN URBAN About ELAN Urban One-Stop Partner Products Our Partners Some of our Success Stories

Minutes of First Meeting

Design Criteria and Action Checklist on Sustainability and Green Issues for New Capital Projects

Integrated Planning for a Sustainable & Compact City: Singapore s Experience

Green Neigbourhood in High-Density High-rise Contexts

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Standard Specification for Hardened Steel Washers [Metric] 1

Newsletter Issue No WHAT S YOUR BRIGHTER LIVING HARRY WINSTON BASEL WORLD IN HONG KONG MEMBERS PRIORITY VIEWING OF KENSINGTON HILL

SCALE MODEL STUDIES ON SMOKE MOVEMENT IN INCLINED TUNNEL WITH LONGITUDINAL VENTILATION AND SMOKE BARRIERS

Standard Specification for Hardened Steel Washers [Metric] 1

Transcription:

Job Reference of Threaded Rod & Holding Down Bolt 5 pages Products Project Contractor Date 1.) Grade 8.8 threaded rod M20*1000mm MTRC Express Rail Link Contract 821- Dragages - Bouygues Joint Venture 6/4/2011 Grade 8 hex nut M20 Shek Yam to Mei Lai Road Tunnels 50*50*5mm-T square washer M20 2.) Grade 4.6 zinc plated threaded rod M10*3000mm Venetian Macau Phase 5 & 6 GTECH Engineering (Macau) Limited 16/4/2011 3.) Grade 8.8 hot dip galvanized threaded rod Venetian Macau Phase 5 & 6 Mercurio Servicos De Engenharia 11/5/2011 M20*500mm with 2 nuts & 1 washer M30*900mm with 2 nuts & 1 washer M33*1200mm with 2 nuts & 1 washer 4.) Grade 8.8 hot dip galvanized holding down bolts Tsz Shan Monsastery - Tai Po Sundart Timber Products Co Ltd 21/5/2011 M16*770mm L shape with 2 nuts and 2 washers M20*770mm L shape with 2 nuts and 2 washers 5.) Grade 8.8 hot dip galvanized holding down bolts Ocean Park Kong Sing Construction Engineering 11/5/2011 M20*750mm with 4 nuts and 1 washer Company Limited M33*1430mm with 4 nuts and 1 washer M36*1445mm 4 nuts and 1 washer 6.) A4-80 stainless steel holding down bolt Venetian Macau Phase 5 & 6 Mercurio Servicos De Engenharia 3/6/2011 M10*200mm with nut and washer M12*200mm with nut and washer M16*300mm with nut and washer M20*300mm with nut and washer 7.) Grade 8.8 hot dip galvanized holding down bolts University of Macau Kong Sing Construction Engineering 21/6/2011 M20*360mm with 2 nuts and 1 washer

8.) Grade 8.8 round bar 30mm diameter*770mm Tamar Government Headquarter Minmetal Condo (HK) Engineering 11/6/2011 and 30mm diameter*1100mm Co Ltd 9.) Grade 8.8 hot dip galvanized holding down bolts Ho Man Tin site Rakin Construction Engineering Co Ltd 21/7/2011 M16*500mm*150mm L shape with Temporary staircase of King Man House 2 nuts and 1 flat washers (Housing Dept) M24*1000mm Striaght bolts 24/8/2011 10.) Grade 8.8 hot dip galvanized holding down bolts City University of HK 3.2M Lamp Pole Winner Link Engineering Co Ltd 3/8/2011 M24*300mm x 50mm L shape with 3 nuts and 3 flat washers 11.) Grade 4.6 zinc plated threaded rod M12*3000mm MTRC West Isalnd Line Contract No.704 Gammon Nishimatsu WIL Joint Venture 5/8/2011 SYP & UNV Stations and SYP to KET Tunnels 12.) Grade 8.8 hot dip galvanized threaded rod Shek Pai Wan site, Macau Mercurio Servicos De Engenharia 8/8/2011 M42*600mm with 3 nuts & 1 washer (Ou Shun Structure Steel Eng Co Ltd) 13.) A4-80 stainless steel holding down bolt MTRC Tseung Kwan O Station MetalArt Limted 8/8/2011 M16*220mm, M16*370mm M16*400mm & M24*400mm 14.) A2 stainless steel holding down bolt Kerry Centre, 683 King's Road Yun Fat Steel Works Limited 16/8/2011 M10*300mm with 30mm thread at Quarry Bay both ends c/w nut and washer 15.) Grade 8.8 hot dip galvanized threaded rod Mongkok Stadium Goldenwall Engineering Ltd 27/8/2011 M16*3000mm with 3 nuts & 1 washer 31/8/2011 M12*3000mm with 3 nuts & 1 washer

A4-80 stainless steel threaded rod rod M16*3000mm c/w nut and washer M24*3000mm c/w nut and washer 16.) A2-50 stainless steel holding down bolt Construction of Tseung Kwan O Complex Yee Tung Fibre Glass Mty Eng Co Ltd 26/9/2011 M20*300mm*600mm L SHAPE with in Tseung Kwan O Area 44 Main Contractor: China State Construction nut and washer Engineering (Hong Kong) Ltd 17.) A4-80 stainless steel threaded rod M16*300mm Redevelopment of Lower Ngau Tau Kok Yau Lee Curtain Wall and Steel 20/10/2011 c/w nut, washer, spring washer and nylon washer Estate Phase 1 Works Limited (Housing Dept.) 18.) Grade 8.8 hot dip galvanized holding down bolts Job Redevelopment of Hong Kong Sport Yuanda Curtain Wall (HK) Co Ltd 8/11/2011 M16*350mm with 2 nuts and 1 washer Institute Contract 3 Works A2-50 stainless steel L-shape fully threaded rod M20*250mm*200mm c/w nut 19.) Grade 8.8 hot dip galvanized holding down bolts Job Redevelopment of Hong Kong Sport Hop Hing Construction & Eng (HK) Co Ltd 26/11/2011 M36*2000mm with 2 nuts and 1 washer Institute Contract 3 Works M39*2000mm with 2 nuts and 1 washer M42*2000mm with 2 nuts and 1 washer 20.) A4-80 stainless steel threaded rod M24*320mm Heng Sang Bank Hang Yue Engineering Limited 10/12/2011 c/w nut, washer and nylon washer No. 618 Nathan Road (BD) 21.) Grade 8.8 hot dip galvanized holding down bolts Contract K0736-11C, New Entrance and Wai Kee (Zens) Const & Trans Co Ltd 21/12/2011 M16*400mm with 2 nuts and 2 washers Concourse at University Station 22.) Grade 8.8 hot dip galvanized holding down bolts Construction of An Annex Building at Minmetals Condo (Hong Kong) Eng Co Ltd 28/12/2011 M16*400mm with 2 nuts and 2 washers Ko Shan Theatre

23.) A4-80 stainless steel threaded rod M24*450mm Contract No.: HY/2010/07 Wai Kee (Zens) Construction & 3/1/2012 A4-80 stainless steel threaded rod M24*650mm Wong Chuk Hang Road / Yip Kan Street Transportation Co Ltd c/w 3 nuts and 3 washers Accorss Leighton Road / Irving Street S355JO M.S. plate 400*400*10mm thk. (Hyd) 24.) A4-80 stainless steel threaded rod M30*950mm Contract No.: HY/2010/07 Wai Kee (Zens) Construction & 3/1/2012 c/w 3 nuts and 3 washers A bridge across Tuen Mun Road / Tsing Transportation Co Ltd H.D.G. S355JO M.S. plate 360*80*10mm thk To Path and a subway across Pak Wo Road / H.D.G. S355JO M.S. plate 320*80*10mm thk Fung Ying Sin Koon (Hyd) 25.) Grade 8.8 hot dip galvanized holding down bolts Kai Tak Cruise Terminal Site Dragages Hong Kong Limited 12/1/2012 M30*1450mm with nut, thin nut and structural steel washer M12*700mm with nut, thin nut and structural steel washer M20*1000mm with grade 10.9 nut and washer L shape hot dip galvanized grade 8.8 threaded rod M39 x 850mm x 450mm 16/2/2012 Hot dip galvanized grade 8.8 threaded rod M39 x 1300mm L shape hot dip galvanized grade 8.8 threaded rod M39 x 250mm x 200mm c/w grade 10 nut and washer 26.) A4-80 stainless steel threaded rod M36*1500* Improvement of Pedestrian Access Wan Chung Construction Co Ltd 24/2/2012 950mm L shape c/w 2 nuts and 1 washer CB20090022 Oi Man Estate Lift Tower Foundation (Housing Dept.) 27.) Zinc plated grade 8.8 threaded rod M27 x 370mm Project: West Island Line - 703 Dragages-Maeda-BSG Joint Venture 9/2/2012 SHW TO SYP TUNNELS (MTRC)

Zinc plated grade 8.8 threaded rod M20 x 370mm 27/2/2012 Zinc plated grade 8.8 threaded rod M20 x 293mm 29/2/2012 Zinc plated grade 8.8 threaded rod M24 x 350mm 2/3/2012