Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Similar documents
Public Open House #1

Edmonton s Transit Oriented Development Journey

Port Credit Local Advisory Panel October 20 th Meeting

Green Line North Centre City Alignment

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

CITY COUNCIL AGENDA REPORT

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

Route 110 Alternatives Analysis

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

CHAPTER 7: Transportation, Mobility and Circulation

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Evaluation Criteria. Detailed Evaluation Criteria

West Broadway Transit Study Initial Screening of Alternatives Memo

Mississippi Skyway Preliminary Engineering Report

Local Growth Planning in North Central Green Line Communities

DELIVERING ON THE TRANSIT PROMISE

WELCOME and introduction

Tonight s Agenda. 6:00 6:30 Welcome and Tour Panels with Team 6:30 7:30 Presentation 7:30 8:45 Break Out Session 8:45 9:30 Feedback & Next Steps

Chapter 1.0 Introduction

Executive Summary. NY 7 / NY 2 Corridor

EDMONTON: Changing the Way We Grow and the Way We Move

Welcome. Walk Around. Talk to Us. Write Down Your Comments

REVIEW AND EVALUATION OF REGIONAL LAND USE

Century Park to Ellerslie Road Preliminary Engineering

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Key Themes and Responses May 2016

Chapter 1: Introduction

INDEPENDENCE BOULEVARD AREA PLAN. June 24, 2008

BeltLine Corridor Environmental Study

COMMUNITY OPEN HOUSE. March 28, 2012

Mill Woods Town Centre Proposed Rezoning LDA

Southeast Extension to RidgeGate Parkway Scoping Booklet

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Welcome to the Oakridge Centre Open House

BeltLine Corridor Environmental Study

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Status Report: MD 355 Project

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Integrated Urban Development. April Reflections from the NZPI Study Tour of Portland, Seattle and Vancouver

JASPER PLACE. Area Redevelopment Plan

CAPITAL LINE SOUTH LRT EXTENSION INTRODUCTION

AGINCOURT SECONDARY PLAN

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

edmonton.ca/ribbonofgreen #ribbonofgreen

East Corridor Final Environmental Impact Statement

Planning for TOD Implementation at a Corridor Scale

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

Midtown Greenway Land Use and Development Plan Executive Summary

DRAFT PLAN PRESENTATION

CHAPTER 3 VISION, GOALS, & PLANNING PRINCIPLES. City of Greensburg Comprehensive Plan. Introduction. Vision Statement. Growth Management Goals.

Urban Planning and Land Use

Shift Rapid Transit Public Participation Meeting May 3, 2017

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Laird in Focus Community Information Session

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

What We Heard Public Engagement - Stage 1

178 Carruthers Properties Inc.

Relief Line Project Assessment

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

Silverdale Regional Center

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

ESTABLISH AN EFFICIENT TOWN CENTER

PLAN ELEMENTS WORKSHOP. April 5, 2016

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

The Hartford Line Transit-Oriented Development (TOD) Action Plan. Maxwell L. Sokol, AICP WSP USA, Lead Planner New York, NY

Edmonton s LRT Setting the Stage for Heading Further South

Atlanta BeltLine. Subareas 9 & 10. Master Plan Updates. March 26, Washington Park Jamboree 1

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

U T D N o r t h C a m p u s T O D and D o w n t o w n D e n t o n T O D

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

Making Transit Oriented Development Work For Boonton, NJ

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

2018 Priority Regional Transportation Projects. Integrated Regional Transportation Master Plan

Bus Rapid Transit Backgrounder. December 2016

Enhanced Planning Process

TONIGHT S PURPOSE INFORMATION SESSION CANORA & WEST JASPER PLACE SIDE STREETS CONCEPT PLANNING STUDY. Share draft side streets concept plan

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

INDEPENDENCE BOULEVARD AREA PLAN

CITY OF PUYALLUP. Background. Development Services

Blue Line LRT Extension

Michigan City Alternative Analysis Realignment Study. Progress Status Update Report Presentation to City Council February 1, 2012

Building Great Neighbourhoods. Strathcona

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

Transcription:

Northwest LRT Downtown to Northwest Edmonton Study Public Workshops March 23 & 24, 2010

Welcome Thank you all for attending

Welcome Introductions

Welcome Our Team s Commitment to You for Tonight To provide you with as much information as possible about the LRT Planning process and inputs To provide an opportunity for you to provide your thoughts and comments about the planning to date and going forward

Purpose Statement To establish an LRT connection between the Downtown and Northwest Edmonton 5

Agenda Overview Four parts Display area with information boards and fact sheets Presentation Workshop Question and Answer Session 6

Development of LRT Northwest LRT North LRT (NAIT) 1 2 3 4 Strategic Planning Conceptual Planning Preliminary Engineering Detailed Engineering Construction Commitment to Budget/Project Approval LEVEL OF DETAIL Project Turnover Plan Produce

Critical Components Three components that will impact the decisions about the LRT Connection The overall LRT Network Plan Technical Analysis Public Input 8

Council Approved Corridor Screening Criteria Category Weighting Land Use/Promoting Compact Urban Form 4 Movement of People/Goods 3 Feasibility/Constructability 2 Parks, River Valley, and Ravine System 2 Social Environment 2 Natural Environment 2

Corridor Evaluation Criteria (Level 2) Land Use/Promoting Compact Urban Form Existing transit centres/park and ride Existing/future activity centres/destinations Land available with potential for redevelopment Existing/future population density Existing/future employment density Existing/future mix of housing/zoning/land use types Number of large development proposals under review or construction Existing land-use plans/bylaws support development/redevelopment Movement of People/Goods Percentage within existing public/rail right-of-way Projected ridership Estimated cost/rider Projected travel time Potential changes in roadway capacity within existing transportation corridors Includes existing/future bicycle/pedestrian facilities Potential for park and ride locations Feasibility/ Constructability Estimated capital/operating cost per kilometer How much of route is at grade (and gradeseparated)? Complexity to extend route in future Proximity to LRT maintenance facility Number of at-grade crossings

Impacts/benefits to parks/open space/river valley access Corridor Evaluation Criteria (Level 2) Parks, River Valley & Ravine System Need to acquire public land for the route Social Environment Need for private property acquisition Impact on local property values Ability to avoid, minimize, or mitigate neighbourhood impacts Potential for noise/vibration impacts Adjacent known cultural resource/heritage sites Student population near stations Number of low-income, no car, senior households near stations Natural Environment Impact on riparian habitat Number of river/stream crossings Potential for disruption due to construction

Northwest LRT Downtown to Northwest Edmonton Study Defining the Long Range Network

Edmonton s Planning Hierarchy The Way Ahead (Strategic Plan) City Vision The Way We Grow (Municipal Development Plan) The Way We Move (Transportation Master Plan) Integrated Transit & Land Use Policy Framework

Public Transportation - Strategic Objective 5.1 The City will pursue expansion of the LRT to all sectors of the city with a goal to increase transit ridership and transit mode split, and spur the development of compact, urban communities.

Integrated Transit & Land Use Framework Outlines land use and community investment recommendations near LRT nodes and along major bus corridors.

Station Typology Mixed Use / Town Centre Stations Employment Centre Stations Residential Centre Stations

Edmonton s LRT System First city in North America to develop a modern light rail system (1978) System State of the Art at time Serves key destinations and is continuing to expand Clareview Health Sciences South Campus Century Park

LRT System Style URBAN STYLE LRT 400m to 800m stop spacing 20-30 km/h average speed SUBURBAN STYLE LRT 1000m to 2500m stop spacing 40 km/h average speed

LRT - Urban Style LRT is part of the street Easy access for passengers LRT mixes with pedestrians Portland, USA

Closer Station Spacing Increase passenger catchment Support TOD, sustainable communities Less frequent transfers

Recommendations Urban style LRT system 6-line City-scale Network Design in flexibility and capacity with surface-level routes Downtown circulator Regional connections

Recommendations of the LRT Network Assessment

LRT Projects - Status Corridor Definition Concept Planning Alignment Definition Preliminary Engineering Detailed Engineering Construction South LRT (Health Sciences to Century Park) Spring 2010 North LRT (Downtown to NAIT) Fall 2010 South LRT (Century Park to Ellerslie Road) Spring 2010 Northeast LRT (Clarview to Gorman) Spring 2010 Southeast LRT (Downtown to Mill Woods) End 2010 West LRT (Downtown to Lewis Estates) End 2010 Northwest LRT (NAIT to Northwest Edmonton) Summer 2010 TBD

Northwest LRT Downtown to Northwest Edmonton Study LRT and Transit Oriented Development (TOD)

LRT and Transit Oriented Development (TOD) The transit - land use connection: How does it work? What can we learn from elsewhere?

The Transit - Land Use Connection Transit access affects location decisions

The Transit - Land Use Connection Amenities affect location decisions

Transit Alone Is Not Enough

3.3+ million population 4 LRT lines planned with 3 commuter rail corridors Region growing, with most growth projected in the urban area LRT viewed as a solution to traffic congestion Hiawatha line is 12 miles long, opened in 2004 Minneapolis LRT

Minneapolis TOD Policies Encourage development and reinvestment in centers combining transit, housing, offices, retail, services, open space and connected street supporting walking and bicycle use Livable Communities Funding Planned Unit Development overlays and station area planning Hennepin County TOD program

Minneapolis TOD

Calgary LRT 1.0+ million population 46.0 km of LRT Service Downtown line opened in 1981 Multiple lines and extensions

Calgary TOD Actions & Policies Calgary TOD planning objectives: Ensure transitsupportive land uses Increase density Create pedestrianoriented design Make each station area a place Manage parking, bus and vehicular traffic Plan in context with local communities

Calgary TOD Development

What Actions Are Needed? Steady, sustained, consistent policy Balanced, but consistent emphasis on the plan when conflicts arise Direct growth to priority areas for momentum / critical mass Consider impacts of other transportation investments that may not support the plan Consider impacts of other land use decisions in the city or region that may not support the plan

Northwest LRT Downtown to Northwest Edmonton Study Clarifying Question and Answer 15 minutes

Northwest LRT Downtown to Northwest Edmonton Study Public Involvement Process & Themes Heard to Date

Role of Public Involvement LRT will have advantages and disadvantages Public involvement is NOT about identifying the most popular route City Council will make final decision on which LRT route will proceed

Listening and Learning Online questionnaire hosted in Feb 2010 Open-ended questions - total of 1,199 participants Face-to-face interviews with stakeholders Purpose: Gain a greater understanding of benefits, issues, and impacts of LRT within the study area Refine discussion points

What we heard: Summary Traffic congestion is a key concern in this area Key opportunities for transit service St. Albert, shopping and recreation areas Development opportunities (City Centre Airport, Castledowns, Griesbach) Competing themes: Access to destinations vs. travel time Minimize disruption while maximizing ridership

What we heard: St. Albert Trail Corridor Key Benefit: Quickest and most direct option Travel time Best access for St. Albert Benefits to St. Albert Trail businesses Key Concern: Service to Edmonton Traffic impacts on St. Albert Trail Does not serve key areas in NW Edmonton and areas with growing populations

What we heard: 127 Street Corridor Key Benefit: Access to St. Albert Access to Airport and Yellowhead Trail Option to 118 Avenue provides service to Inglewood businesses Key Concern: Traffic congestion Most frequently cited as corridor with no benefits Misses desirable destinations 127 Street too busy now don t want to lose lanes

What we heard: 113A Street Corridor Key Benefit: Access to Shops and Parks Recreation centres and parks Access to North West Edmonton and City of St. Albert Key development areas in Griesbach and Castle Downs Key Concern: Community impacts Property acquisition Misses key high-density areas Traffic impact on key corridors

Underway now Public workshops March 23/24 econsultation March 22 to April 11 www.edmonton.ca/lrtprojects Information will help identify mitigation strategies for LRT Concept Plan for future study

Northwest LRT Downtown to Northwest Edmonton Study Corridor Route Analysis

LRT Corridor Planning Process

Study Area Overview

Purpose Statement Establish an LRT connection between Downtown and Northwest Edmonton The guiding principles supporting this purpose include: Maintain consistency with the Transportation Master Plan (TMP), Municipal Development Plan (MDP), the City s strategic direction, LRT System Network Plan, St. Albert's TMP and integrated land use framework, as well as the Capital Region Plan Shape land use to promote a more compact urban form Maximize use of existing transportation corridors Connect existing and future activity centers Increase transit system effectiveness Promote economic development/redevelopment Respect neighborhoods Respect parklands, river valley and ravine system Maximize cost effectiveness Provide opportunities for future system expansion

Route Alternatives Analysis Process

Initial Corridors Considered

North LRT Extension

Corridor Options

Potential Station Identification Process

Council Approved Corridor Screening Criteria Category Weighting Land Use/Promoting Compact Urban Form 4 Movement of People/Goods 3 Feasibility/Constructability 2 Parks, River Valley, and Ravine System 2 Social Environment 2 Natural Environment 2

Corridor Evaluation Criteria (Level 2) Land Use/Promoting Compact Urban Form Existing transit centres/park and ride Existing/future activity centres/destinations Land available with potential for redevelopment Existing/future population density Existing/future employment density Existing/future mix of housing/zoning/land use types Number of large development proposals under review or construction Existing land-use plans/bylaws support development/redevelopment Movement of People/Goods Percentage within existing public/rail right-of-way Projected ridership Estimated cost/rider Projected travel time Potential changes in roadway capacity within existing transportation corridors Includes existing/future bicycle/pedestrian facilities Potential for park and ride locations Feasibility/ Constructability Estimated capital/operating cost per kilometer How much of route is at grade (and gradeseparated)? Complexity to extend route in future Proximity to LRT maintenance facility Number of at-grade crossings

Corridor Evaluation Criteria (Level 2) Parks, River Valley & Ravine System Impacts/benefits to parks/open space/river valley access Need to acquire public land for the route Social Environment Need for private property acquisition Impact on local property values Ability to avoid, minimize, or mitigate neighbourhood impacts Potential for noise/vibration impacts Adjacent known cultural resource/heritage sites Student population near stations Number of low-income, no car, senior households near stations Natural Environment Impact on riparian habitat Number of river/stream crossings Potential for disruption due to construction

Space Trade Offs Constrained Right-of-Ways require further study Minimize property acquisition by removing: service roads traffic lanes on-street parking

C C St. Albert Trail Corridor B B A A

St. Albert Trail Corridor Section A-A Photo Credit: Google Earth Looking west High on Level 118 Avenue Bridge at 125 Street

St. Albert Trail Corridor Section A-A Existing: Option: Looking west High on Level 118 Avenue Bridge at 125 Street

St. Albert Trail Corridor Section B-B Photo Credit: Google Earth Looking northwest High on Level Groat Bridge Road at 121 Avenue

St. Albert Trail Corridor Section B-B Existing: Service Road Service Road Option: Service Road Service Road Looking northwest High on Level Groat Bridge Road at 121 Avenue

St. Albert Trail Corridor Section C-C Photo Credit: Google Earth Looking northwest on High St. Level Albert BridgeTrail at 128 Avenue

St. Albert Trail Corridor Section C-C Existing: Service Road Option: Service Road Looking northwest on High St. Level Albert BridgeTrail at 128 Avenue

D D C 127 Street C B B Corridor A A

127 Street Corridor Section A-A Photo Credit: Google Earth Looking north on 127 Street at 123 Avenue

127 Street Corridor Section A-A Existing: Service Road Option: Looking north on 127 Street at 123 Avenue

127 Street Corridor Section B-B Photo Credit: Google Earth Looking north on 127 Street at 130 Avenue

127 Street Corridor Section B-B Existing: Option: Looking north on 127 Street at 130 Avenue

127 Street Corridor - Section C-C Photo Credit: Google Earth Looking west on 137 Avenue at 135 Street

127 Street Corridor - Section C-C Existing: Service Road Option: Service Road Looking west on 137 Avenue at 135 Street

127 Street Corridor - Section D-D Photo Credit: Google Earth Looking west on 153 Avenue at 135 Street

127 Street Corridor - Section D-D Existing: Option: Looking west on 153 Avenue at 135 Street

B B 113 A Street A A Corridor

113 A Street Corridor Section A-A Photo Credit: Google Earth Looking north on 113 A Street at Grand Trunk Park

113 A Street Corridor Section A-A Existing: Option: Looking north on 113 A Street at Grand Trunk Park

113 A Street Corridor Section B-B Photo Credit: Google Earth Looking north on 113 A Street at 145 Avenue

113 A Street Corridor Section B-B Existing: Option: Looking north on 113 A Street at 145 Avenue

Next Steps Summer 2009 Fall 2009 Winter 2009 Spring 2010 Summer 2010 Fall 2010 Winter 2010 Technical Analysis Online Consultation Public Workshops March 23, 24 Public Information Sessions Week of June 7 Public Hearing Week of June 20 Further Planning and Engineering Studies

Northwest LRT Downtown to Northwest Edmonton Study Workshop 75 minutes

Public Involvement Objectives The public involvement process will identify: community/institution/business-specific issues that may impact the evaluation of route options. issues with respect to traffic and pedestrian impacts within communities and with respect to the overall transportation network. community, institutional, and/or business impacts that will affect the preliminary and detailed design.

Workshop Format and Ground Rules Workshop Goals To focus discussion on a specific question related to ALL the route options this is the information we need to take back and consider through the evaluation process To benefit from the wisdom of all the people around the table a chance to talk about all the route options and to mix it up and talk to some new people that maybe you haven t met before

Workshop Format and Ground Rules How it Will Work 3 different colors of tablecloths; one for each route Green for St. Albert Trail Corridor Yellow for 127 Street Corridor Blue for 113 A Street Corridor

Workshop Format and Ground Rules The questions for discussion and responses are: What are the advantages of this corridor? What needs to be addressed if this corridor is selected?

Workshop Format and Ground Rules After 10 minutes of discussion, I will stop you Each of you will have a maximum of 5 minutes to write down a maximum of 3 bullet points with your personal TOP three impacts on the route discussed at your table

Workshop Format and Ground Rules Post-it notes on each table One bullet point/thought per post-it note If you have a concern about a specific location on that route (like a certain intersection) make sure that is clearly marked on your post-it we will need to know this for our reference later

Workshop Format and Ground Rules Put your post-it notes on the blank board Our project staff will pick them up and the senior project leads will begin to sort them into major themes by route At my cue - switch to a table with a new route option and a new group of people Begin your 10 minute discussions on the new route

Givens and topics not on the table for discussion: The scope of the study is to define an LRT corridor between Northwest Edmonton and Downtown We will use High-Floor LRT technology on dedicated LRT right-of-way as much as we can All LRT will be at grade (street-level). Grade separations will only be pursued if it is required for technical reasons We will seek to minimize property acquisition, though some acquisition will be required

Workshop Format and Ground Rules After you have all had a chance to discuss all three routes, we will review the major themes that have come forward on all three route options

Northwest LRT Downtown to Northwest Edmonton Study Question and Answer Session 30 minutes

Question and Answer Session Ground Rules 2 minutes for each participant to ask a question or make a comment One follow-up question (1 minute) Will recognize 4 people for each round of questions; persons with microphones will go to those participants to ask their questions 3 rounds of questions Additional questions from same person not recognized until no new participants are wanting to ask questions Questions and responses will be recorded; please use microphones

Northwest LRT Downtown to Northwest Edmonton Study THANK YOU FOR YOUR PARTICIPATION