Maintenance Best Practices & Intervals for Substation Equipment. Presented by: Paul Schlies, President/CEO Energis High Voltage Services, Inc.

Similar documents
IEEE Transformer Committee PC Distribution Transformer Monitoring - User

Becoming a NETA Accredited Company

Property risk solutions

Guide to Transmission Equipment Maintenance

Monitoring of Electrical Equipment Failure Indicators and Alarming

Engineering Design & Testing Corp./EDT Engineers, P.C.

Appendix B. FRCC regional application of the term transmission Protection Systems

NERC PRC Compliance Guide

Predictive Maintenance Training

Balance of Plant Maintenance

SECTION AUTOMATIC TRANSFER SWITCHES

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Alarm Getting Started

What Utility Analytics means to Exelon

Energy Audit. This guide is for a 6 month Silver Award project. It is suitable for both group and individual volunteering.

PRASA S MISSION CRITICAL SERVICES UPS & ATS AMC BATTERY & INVERTER AMC DATA CENTERS AMC GRID-TO-CHIP MAINTENANCE FIRE DETECTION AMC DATA CENTER AMC

Security + Automation Made Easy QUICK START GUIDE

Standard PRC-005-3(i) Protection System and Automatic Reclosing Maintenance

Standard PRC Protection System and Automatic Reclosing Maintenance. Standard Development Roadmap

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

Batt-Safe Battery String Monitoring System

Preliminary Operations and Maintenance Plan Baron Winds Project

4. Applicability: 4.1. Functional Entities: 4.2. Facilities:

AT10.1 Series Microprocessor-Controlled Float Battery Charger (single phase input)

Standard PRC-005-3(X) Protection System and Automatic Reclosing Maintenance

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH)

Outages Happen 24/7. So Should Monitoring. / PREVENT POWER TRANSFORMER FAILURE WITH HELP FROM VAISALA

4. Applicability: 4.1. Functional Entities: 4.2. Facilities: 5. Effective Date: See Implementation Plan

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

PRC-005. Tips and Updates. February 25th, Jonathan Hayes

Chapter 8: Troubleshooting. 8: Troubleshooting 8 TROUBLESHOOTING... 3

Standard PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

WIRELESS CCTV. Utility Site Security & Surveillance.

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

Electrical Preventive Maintenance (EPM) Program

Power System Protection Part 2 Dr.Prof. Mohammed Tawfeeq. Zones of Protection

Transformer On-Line Monitoring

2 WOW MOP COMPONENTS. Spray Button Power Button Nozzle. Pad Attach (Shadowed Area) Handle. Reservoir. Base

410AREFRIGERANTTRANSITIONGUIDE

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

Emergency Evacuation Lighting Inspection & Maintenance

DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.

Model 3300 Technical Support and Installation Manual

Revision: None DCN No. First Issue Date: November 30, 1998 Product: Standard DCT, 120-volts

Refrigerator/Freezer Thermometer

Consumer Products Catalog

Protect anything, anywhere, anytime.

Standard Development Roadmap

Spectron LSN (Life Safety Network) Suggested Specifications

BE PREPARED FOR POWER OUTAGES

1126 Series Ceiling Mount PIR Motion Detector

Innovative EEE mini-projects list

Supplementary Reference and FAQ - Draft

Zerio Plus EDA-D6000 Radio Combined Heat Detector and Sounder Installation Instructions

Design Manual Installation Operation Maintenance

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

June 4, 2014 VIA ELECTRONIC FILING. Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C.

Standard PRC-005-4(X) Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

CAUTION & SYMBOL DEFINITIONS:

Nest Thermostat E Pro Installation & Configuration Guide

STA16 SELECTRONIC ALARM ANNUNCIATORS DESIGN, INSTALLATION AND OPERATING MANUAL STA16

Portable central unit for several parameters

Advantage Services Capabilities

LH 3 Resina Capper Document No. LH3

Quality Assurance/ Quality Control. Topic 4 - Audio 46. Key Points

WIRELESS CCTV. Site Security & Surveillance.

HOW TO SPECIFY A DELPHIAN SYSTEM

Standard PRC-005-X Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance

Guardian Home Technologies Technology for Living Catalog

The breaker trips at once when it is set to ON. The breaker trips in few minutes when it is set to ON.

FACILITY MANAGEMENT DEFICIENCIES IN ACUTE CARE SETTINGS

How to install your Nest Protect

WHY ELECTRICAL PREVENTIVE MAINTENANCE IS ESSENTIAL TO A SAFE AND PRODUCTIVE WORKPLACE

Analox 1000 Series. User Manual. Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK

Refrigerator/Freezer Thermometer

31.05/ Unit-1

POWER UP WITH TP ELECTRIC, INC.

C. The system shall be capable of turning luminaires on/off (where supported by the luminaire) as well as full range dimming.

The system is expanded via the RCC network with each RCC capable of passing information to and from up to 31 detection or output devices.

February 18, What is heat? Touch each image to see how the water molecules react.

NLR ELECTRIC MURRAY HYDRO PLANT NORTH LITTLE ROCK, ARKANSAS

R E C T I F I E R I N V E R T E R C O N V E R T E R SB7

17 TH APRIL 2017 Switch Board Monitoring Protecting Switchboard. Courtesy of ABB. Paul Lee

mtwfs.com Indigo Series Ice Machines: Intelligent thinking inside the box.

STCP 02-1 Issue 005 Alarm & Event Management

CONTROL YOUR HOME FROM EVERYWHERE

Drawing Submittal Package

Model 17A00 Expansion Enclosure

ANALOX 5001 Carbon Dioxide Monitor. User Manual ANALOX Analox 5001 Carbon Dioxide Monitor User Manual

ADAPT Australia Pty Ltd ADAPT-A-POLE Pty Ltd AEMC Instruments apt Group

A. Introduction 1. Title: Transmission and Generation Protection System Maintenance and Testing

SECTION SECURITY TESTING AND COMMISSIONING

Zerio Plus EDA-R6000 Radio Combined Optical Smoke Detector and Sounder Installation Instructions

Risk Mitigation of Aging Electrical Infrastructure

PIR Occupancy & Motion Sensor

Enhancing Current Maintenance Practices 04. Managing the Risk 06. Constant Monitoring of Electrical Enclosures 08

Certification of Thermographers

HONEYWELL PRO 6000 THERMOSTAT MANUAL ARCHIVE

Energy Audits. Central Wisconsin Electric Cooperative.

Transcription:

Maintenance Best Practices & Intervals for Substation Equipment Presented by: Paul Schlies, President/CEO Energis High Voltage Services, Inc.

Background - 40 Years in the Industry Education NWTC (Northeast WI Technical College) Work History Wisconsin Public Service (WPS) 24 years American Transmission Company (ATC) 6 years Energis High Voltage Resources, Inc. 10 years

No One Right Way There s no one answer to a perfect Substation Maintenance Schedule. Today we ll be using our industry and utility experience, but your engineering firm, the manufactures equipment spec s, insurance requirements, and NETA Standards should also be considered. Along with our recommendations, we ve included survey results of maintenance schedules from individuals within the electrical utility. The information is included in the handout for your review, but because of today s time limitations we won t discuss. Electronic copies of this presentation are available.

Why Perform Substation Equipment Testing? Safety Public Employees Improve Reliability Reduce customer outages Reduce Costs Reduce unplanned maintenance cost Reduce insurance/liability cost Plan and budget asset upgrades

Transformer Testing Power Factor Ratio Insulation Winding Resistance SFRA (Sweep Frequency Response Analysis) DGA and Oil Quality

Transformer Maintenance Verify oil level in main tank & LTC Verify oil level in bushing Verify insulator integrity Verify tank integrity and free of oil leak Inspect surge arrestors Verify paint is in good condition Record winding/liquid temperatures (current & max) Record LTC position indicator & operation counter (current & max raise/lower) Verify correct operation of fans and free of bird nests Verify correct operation pumps (if applicable) Verify nitrogen pressure (if applicable) Verify transformer and pad are level Verify control cabinet is free of moisture Verify cabinet heater operation Frequency

Transformer Maintenance Thermographic Imaging (Infrared) Transformer oil analysis (DGA) Power factor Winding resistance test Transformer turns ratio test Insulation test Calibrate temperature gauge Verify alarms points Verify Bucholtz relay operation Verify rapid pressure rise relay operation SFRA (sweep frequency response analysis) Vibration & acoustic testing Frequency Annual Annual New install & after fault operation Dependent on criticality of equipment

Industry Survey Results Transformers

Circuit Breakers Testing Power Factor Speed Micro-ohm Ratio Bushing Current Transformer SF6 Gas Installation Testing (e.g. Air Mag)

Circuit Breaker Maintenance Verify breaker is level Verify paint is in good condition Verify insulator integrity Verify SF6 gas pressure (check oil level in oil breaker) Record operation counter number Verify control cabinet is free of moisture and cabinet is working Check control voltages & operation of breaker Thermographic Imaging (Infrared) Verify tank heaters (if applicable) Motion testing (speed test) Micro-Ohm (ductor) contacts Test SF6 gas for moisture, purity & SO2 content Check alarm points in control house Frequency Annual Annual Annual

Battery & Charger Testing Specific Gravity Cell Strap Connection Resistance Internal Cell Resistance Voltage Readings

Batteries & Charger Maintenance Visual inspection of electrolyte levels Visual inspection of battery jars Verify no battery grounds exist Record battery voltage & current Specific gravity Intercell impedance/resistance Strap resistance Individual cell voltages/total cell voltage Equalize voltages Verify charger alarms Check voltage ripple Frequency Annual Annual Annual Annual Dependent on battery test results Annual Annual

Vacuum Breaker Testing Thermographic Imaging (Infrared) Insulation Resistance Test Micro-ohm Contact Resistance Hi-pot Vacuum Bottles

Vacuum Breaker Maintenance Verify insulator integrity Verify control cabinet is free of moisture Verify cabinet heater operation Record operation counter number Thermographic Imaging (Infrared) Insulation resistance test Hi-pot vacuum bottles Frequency

Relay Testing Perform as found test Perform as left test Test relays to installed setting Trip test relays

Relay Maintenance Check relays for damage Found test Left test Trip test relays Frequency 5-10 years 5-10 years 5-10 years

Voltage Regulator Testing Maintenance usually based on manufacturers recommended operations and load. DGA Oil Analysis Frequency - Annual or Biannual

Circuit Switcher Testing Micro-ohm Insulation Test Verify Mechanical Operation Verify Electrical Operation Frequency for All Every 5 years

Questions to Think About If asked by a lawyer that is suing you because of a piece of equipment that did not trip, how would you provide the information asked? How do you document the performed maintenance & testing results? What type of test forms do you have? Where do you have this information at your facility?

Testing to NETA Specifications NETA is an organization that serves the electrical testing industry by offering accreditations of 3 rd party electrical testing firms, certifying electrical testing technician and producing American National Standards. Free download available: Appendix B Frequency of Maintenance Test netaworld.org

Want a Copy of this Presentation? Talk to Paul, Brad, or Bill. or Send request to: info@energisinc.com Contact information: Paul Schlies pschlies@energisinc.com 920.632.7929 Bill Gilbert bgillbert@energisinc.com 920.370.2062 Brad Beyer bbeyer@energisinc.com 920.655.1102

Questions Thank you for your time and attention.