Rocky Mountain Public Media

Similar documents
VEHICULAR AND PEDESTRIAN CIRCULATION

(DC1) Direct Development Control Provision DC1 Area 4

CENTERS AND CORRIDORS

WEST LOOP DESIGN GUIDELINES CHECKLIST

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

PLANNING BOARD REPORT PORTLAND, MAINE

PUBLIC RIGHT-OF-WAY IN THIS CHAPTER PUBLIC REALM

BUILDING SCALE AND SETBACKS 5 ELEMENTS:... 5 FAÇADES (COMMERCIAL/RESIDENTIAL) 5

Site Planning. 1.0 Site Context. 2.0 Pedestrian Circulation Systems. Pag e 2-23

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

Figure Example of out door dining in the public right-of-way.

Residential Commons at Barry s Corner. Boston civic design commission February 5, 2013

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

FREEWAY/TOURIST DISTRICT

ZONING. 300 Attachment 1. City of Oneonta. Design Guidelines ( )

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

Future Five. Design/ Development Guidelines. January 2008 Amended June 08 per City Council motion

V. Streetscape Standards

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

180 ZONING 180. ARTICLE XLII STREETSCAPE ENHANCEMENT OVERLAY ( SEO ) DISTRICT [Added Ord. No. 1086]

Division VI Community Mixed Use (CMU) Architectural Guidelines and Standards

appendix and street interface guidelines

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Planning Board Hearing October 20th, 2016

VILLAGE OF SKOKIE Design Guidelines for Mixed-Use Districts NX Neighborhood Mixed-Use TX Transit Mixed-Use CX Core Mixed-Use

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

SECTION TWO: Overall Design Guidelines

CHAPTER 3. Design Standards for Business, Commercial, Industrial, Recreational and Institutional Uses

ATLAS, NEWCASTLE. (SP)A004 Scale ATLAS CONCEPT DESIGN FOR OCCUPANCY ARCHITECTURE, LLC. MATT KIRKPATRICK 1705 SE ASH STREET CONCEPT PAGE

TABLE OF CONTENTS: PROJECT TEAM:

Forest Hills Improvement Initiative A Partnership for Building a Better Community. Use & Design Guidelines September 23, 2008

Public Frontage Regulations Map

DITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA

To ensure human scale design, the towers step back from the facade of the building after four stories.

SITE PLANNING. USC Village will be a mixeduse urban environment. creating a common ground with the surrounding community. Our planning goals include:

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

WINDSOR GLEN DESIGN GUIDELINES

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

PROVO DOWNTOWN STREETSCAPE STANDARDS

VICINITY MAP 1" = 1000'

The Lincoln Neighborhood Corridor Plan. The LiNC

Corridor Investment Projects (FY FY2012)

Lambeth Main Street Streetscape Improvements

DRAFT. 10% Common Open Space

City of Redlands Architectural Guidelines for Non-Residential Development

Community Mixed Use Zone Districts (CMU)

Town Center Design Guidelines

Landscape and Streetscape Design 2.5

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Buildings may be set back to create small plazas provided that these setbacks do not substantially disrupt the street wall s continuity.

STAFF BRIEF. Project: 2016-COA-356 Meeting: September 8, th Street Oxford Hotel

PUBLIC FRONTAGE REGULATIONS MAP

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Building and Site Design Standards

BUSINESS DISTRICT DESIGN GUIDELINES

Urban Design & Placemaking

COMPLETE GREEN STREET CHECKLIST

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

PROPOSED WATERFRONT DISTRICT DESIGN STANDARDS

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

23 July Sunshine Alley Design Project Open House Exhibits

Sierra Springs Regional Commercial Master Site Plan Airdrie, Alberta Hopewell Development Corporation Project No May 26, 2010

601 Davis - Evanston PLAN COMMISSION 2017 SOLOMON CORDWELL BUENZ

Walnut Creek Transit Village Design Guidelines. Part Three III - 25

New Street Proposed Redevelopment Architecture & Urban Design Brief

WATERFRONT DISTRICT DESIGN STANDARDS

Section 511: 11 th Street Overlay District 1. Intent: 11 th Street is the primary entrance route into the city from the south, providing direct

7-PARKS, OPEN SPACE & PUBLIC ART

CPD Rules and Regulations. Arapahoe Square Zoning and Design Standards/Guidelines

6 STANDARDS THAT APPLY TO ALL

SQUARE ARAPAHOE DESIGN STANDARDS & GUIDELINES. Planning Board Review Draft - April 13, 2016 PLANNING BOARD DRAFT DESIGN STANDARDS & GUIDELINES

Resolution : Exhibit A. Downtown District Design Guidelines March 2003

T O W N O F A J A X URBAN DESIGN GUIDELINES FOR MOTOR VEHICLE GAS BARS / SERVICE CENTRES

general corridor design guidelines gen-0.0

/05 Architectural Response

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

Stadium District Masterplan

STANDARDS THAT APPLY TO ALL OR SOME DEVELOPMENT PROJECTS WITH RESIDENTIAL USES

Highland Village Green Design Guidelines

SECTION TWO: Urban Design Concepts

Design Guidelines. Roosevelt. Mike Podowski DPD Design Guidelines Ordinance ATT 13 August 13, 2012 Version #1

Millbrae TOD #2 Project Analysis

Eastcreek Farm. Planned Development Standards July, 2015

3.13. Development Guidelines

Community Design Plan

Design Guidelines and Standards for Sight Triangles. Sight Triangle MANUAL

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

Streets Vision

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only)

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Carlsbad Village Redevelopment Concept Summary of Features

Eastcreek Farm. Planned Development Standards September, 2014

Chapter Landscaping and Screening

Transcription:

19 June 2018 Arapahoe Square Design Review #1 2101 Arapahoe Street, Denver, CO 80205 Rocky Mountain Public Media

Table of Contents Gateway Corner Visualization...03 Arapahoe Square Map...04 Site Plan Boundaries & Circulation...05 Streetscape Design...06 Landscape Plan...07 Civil Engineering Plan...08 Existing Conditions...09 Floor Plan Diagrams...12 Floor Plans Parking Level P1...14 Level 02...15 Level 03...16 Sections...17 Massing Strategy...19 Visualizations Primary Entry & Future Cafe...20 21st Street...21 21st Street Entry...22 21st Street Metal Panel Facade - Day...23 21st Street Metal Panel Facade - Night...24 Masterpiece Studio...25 Performance Studio Engagement...26 Elevations Arapahoe Street...27 21 st Street...23 Alley...26 Courtyard...28 Exterior Assemblies...33 Garden Wall...34 Gateway Corner Rendering...38

Gateway Corner Arapahoe Street & 21st Street PROJECTING BANNER S I G N S A S PA R T O F FUTURE SIGNAGE S U B M I T TA L CORNICE HANDRAIL ADDITION RMPM BUILDING S I G N A S PA R T O F FUTURE SIGNAGE S U B M I T TA L Future Signage Locations Rocky Mountain Public Media Tryba Architects 3

Arapahoe Square Map Site Context VVVV Site Context The site sits on the corner of two Key Streets, Arapahoe Street and 21 st Street. This intersection is designated as a Gateway Corner in the Arapahoe Square Neighborhood. Site Information Zone District: D-AS=20+ LAWRENCE ST ARAPAHOE ST 22 ND ST 21 ST ST CURTIS ST CHAMPA ST STOUT ST BROADWAY CALIFORNIA ST WELTON ST ARAPAHOE SQUARE Stories Max: 12 Height Max (ft): 150-0 Site Area: Zone Lot Size (Gross Project Area): 37,776 SF Net Project Area (After Deeding Public R.O.W): 37,172 SF Frontage: 300.95 on Arapahoe Street 123.55 on 21 st Street Build-To: 70% at 0 /15 for Arapahoe Street & 21 st Street Setbacks: Arapahoe Street: 0 21 st Street: 0 Alley: 0 Key Legend Site Arapahoe Square Design Review Area Scale: 1 = 400'-0 Rocky Mountain Public Media Tryba Architects 4

Site Plan Boundaries & Circulation DEEDED TO CITY 3 2 1 12 11 11 ALLEY (18 R.O.W) 10 9 14 21 ST STREET GROUND STORY FRONTAGE LOADING 8 7 COURTYARD / EVENT SPACE NEIGHBORING COURTYARD PARIS HOTEL BUILDING 22 ND STREET 4 5 6 ARAPAHOE GROUND STORY FRONTAGE 13 Key Legend Site Boundaries & Circulation 1 Vehicle access point Pedestrian access point Zone lot boundary 2 2 Deeded to the City,taken from existing zone lot boundary 3 Development boundary, Includes the following: New 3 story building, 1 level below grade parking Sidewalk & streetscape improvements New alley paving 4 Community Event Entry into community event space Room, double doors serve as an event entry Satisfies design standards: 2.23 (B & C), 2.25, 2.28, 2.29, 2.30, 2.33, 2.34 5 Retail entry: located at the primary corner, storefront glazing system at Street Level Satisfies design standards: 2.23 (B & C, 2.25, 2.28, 2.29, 2.33, 2.34 6 Primary public entry: integrated into the wrapped storefront condition, located under a canopy with lighting Satisfies design standards: 2.23, 2.26, 2.28 7 Egress door to courtyard / parking. 8 Egress door to courtyard / parking. Scale: 1 = 40-0 9 Surface parking access: accessed from alley, landscaping and a garden wall provide a buffer between the Public Realm and parking. Satisfies design standards: 1.22, 1.29, 1.30, 1.32, 1.33, 1.36 10 Parking garage vehicle access: located off the alley near utilities, overhead coiling door with exterior lighting. Satisfies design standards: 1.22, 1.28, 1.46, 1.50 11 Egress door to alley 12 Accessible entry door 13 Manually operated ornamental metal fence with masonry wall and piers to match building 14 Power - operated metal fence Rocky Mountain Public Media Tryba Architects 5

Site Plan Streetscape Design 1 2 11 10 9 ALLEY (18 R.O.W) 3 4 12 4 5 6 LOADING 8 NEIGHBORING NEIGHBORING PARIS HOTEL COURTYARD COURTYARD BUILDING COURTYARD / EVENT SPACE PARIS HOTEL BUILDING 4 13 1 2 5 7 STREET TO BE RE-WORKED BY CITY Key Legend Streetscape Design 1 Amenity zone, new concrete paving 2 Pedestrian zone, new concrete paving Satisfies design standard 3.19 3 Street tree: 10 new street trees with 5 x20 tree wells built into the sidewalk per Denver standards, spacing between trees for future growth Satisfies design standards: 4.01, 4.02, 4.03, 4.04, 4.07, 4.09, 4.10 4 5 Existing street light to remain Bicycle parking, standard Denver inverted U bike rack, 7 racks, 14 bikes total Satisfies design standards: 1.38, 1.39, 1.40, 1.41, 1.42 6 7 Movable planters Existing light pole, upgrade to CCD/ EXCEL standards 8 Sign posts for ADA parking stalls Satisfies standard: 1.37 9 Utilities located off the primary frontages with exterior wall sconce lighting Satisfies design standards: 1.44, 1.45, 1.46 10 9 Trash and recycling located off the primary frontages - enclosed with overhead coiling door to match the parking access door Satisfies design standard 1.48 11 Ventilation shaft with exterior louver wall Satisfies standards: 1.47 12 RMPM community seating Cafe seating (by future tenant) Rocky Mountain Public Media Tryba Architects 6 13 Scale: 1 = 40-0

TREE SPECIES LEGEND BOTANICAL NAME COMMON NAME Landscape Plan RIGHT OF WAY TREES Quercus robur TREE SPECIES LEGEND ENGLISH OAK SYMBOL PRIVATE PROPERTY TREES Ulmus propinqua 'JFS-Bieberich' EMERALD SUNSHINE ELM ESE 1 Picea abies 'Cupressina' FASTIGIATE NORWAY SPRUCE FNS 6 Catalpa speciosa HEARTLAND CATALPA CAL 3 BOTANICAL NAME COMMON NAME SYMBOL QTY Gymnocladus dioicus 'Espresso' ESP. KENTUCKY COFFEETREE EKC 2 PRIVATE PROPERTY TREES Platanus acerifolia 'Bloodgood' LONDON PLANETREE LPT 3 Ulmus propinqua 'JFS-Bieberich' EMERALD SUNSHINE ELM ESE 1 Picea abies 'Cupressina' FASTIGIATE NORWAY SPRUCE FNS 6 EOA QTY 2 ROCKY MOUNTAIN PUBLIC MEDIA SITE DEVELOPMENT PLAN A PART OF THE NORTHEAST QUARTER OF SECTION 34, TOWNSHIP 3 SOUTH, RANGE 68 WEST OF THE SIXTH PRINCIPAL MERIDIAN, CITY AND COUNTY OF DENVER, STATE OF COLORADO LOCATED AT 2101 ARAPAHOE STREET RIGHT OF WAY TREES Quercus robur ENGLISH OAK EOA 2 Catalpa speciosa HEARTLAND CATALPA CAL 3 Gymnocladus dioicus 'Espresso' ESP. KENTUCKY COFFEETREE EKC 2 Platanus acerifolia 'Bloodgood' LONDON PLANETREE LPT 3 EOA - ENGLISH OAK ESE - EMERALD SUNSHINE ELM CAL - HEARTLAND CATALPA EKC - ESP. KENTUCKY COFFEETREE LPT - LONDON PLANETREE FNS - FASTIGIATE NORWAY SPRUCE YFI - ADAM S NEEDLE YUCCA ECO - PURPLELEAF WINTERCREEPER 10'x10' PEDESTRIAN SITE TRIANGLE (18' R.O.W.) 5214' - 9 5/8" (5214.80') ROADWAY SIGHT TRIANGLE (8) ECO (4) YFI (1) EKC (PRIMARY, 80' R.O.W.) BIKE RACKS (1) EOA (4) YFI BIKE RACKS 25' 25' 26'-2" 25' 2'-6" 5'-6" 20' LIGHT POLE LIGHT POLE 5214' - 7 1/2" (5214.63') 5215' - 1 1/8" (5215.09') ELEC TRAN GATE (48) FRG 2-4" COBBLE ROCK MULCH (17) MMG WOOD MULCH BEDS (22) FRG DRAINAGE INLET *REFER TO CIVIL (1) ESE (1) FSN (9) NMO (9) NMO (1) FSN (8) FRG (6) MAG WOOD MULCH BEDS EXISTING TRAFFIC SIGNAL POLE CORNER SITE TRIANGLE 25' 43'-5" 25' 11' 2'-6" 25' 5'-6" 20' 30'-6" 30' 47' 39'-6" 16' 5215' - 4" (5215.33') 7'-6" GATE 7'-6" (18) DMG (4) FNS (6) MAG 5'-6"'x20' CURBED PLANTERS PER DENVER PUBLIC WORKS DETAIL *SEE SHEET 6 FOR DETAIL. (1) LPT (1) CAL (1) LPT (1) CAL UPGRADE LIGHT TO CCD/ (1) LPT EXCEL STANDARDS BIKE RACKS *SEE SHEET 6 FOR DETAIL (1) CAL (1) EOA (32) YFI (1) EKC (PRIMARY, 80' R.O.W.) Scale: 1 = 40-0 Rocky Mountain Public Media Tryba Architects 7

Civil Engineering Plan Grading & Utility 4 6 Rocky Mountain Public Media Tryba Architects 8

Existing Conditions Arapahoe Street & 21 st Street Intersection 21 ST STREET FRONTAGE 123.55 ARAPAHOE STREET FRONTAGE 300.95 Rocky Mountain Public Media Tryba Architects 9

Existing Conditions Arapahoe Street Frontage Context Key Plan Rocky Mountain Public Media Tryba Architects 10

Existing Conditions 21 st Street Frontage Context Key Plan Rocky Mountain Public Media Tryba Architects 11

Floor Plan Diagram Ground Level Performance Spaces TRASH GAS METER MPOE BIKE MASTERPIECE EVENT SPACE CONTROL KITCHEN CONTROL / EVENT GREENSCREEN GREEN ROOM SHOWER CONTROL TECHNICAL CORE MEDIA PARKING RAMP ENTRY LOBBY / EVENT SPACE CONTROL EQUIP. RENTAL EDIT EDIT ROOM ROOM EDIT RM STR. LOBBY FUTURE CAFE EXHIBITION SPACE ENTRY BONFILS-STANTON PERFORMANCE VOLUNTEER HUB CLASSROOM DIGITAL EDIT & MC WORKSTATIONS Rocky Mountain Public Media Tryba Architects 12 NTS

Floor Plan Diagram Street Level Active Uses 21 st Street: 79-2 1/2 of Activated Use over 118-6, 67% Activated Arapahoe Street: 156-9 of Activated Use over 236-6,67% Activated 9-0 MPOE BIKE 8-0 / EVENT GREEN ROOM TECHNICAL CORE 8-0 MASTERPIECE 8-0 GREENSCREEN MEDIA 30-9 EVENT SPACE LOBBY / EVENT SPACE 17-3 1/2 RETAIL EXHIBITION SPACE ENTRY BONFILS-STANTON PERFORMANCE VOLUNTEER HUB CLASSROOM WORKSTATIONS 10-2 10-2 74-6 8-1 6-0 10-0 10-0 10-0 10-0 10-0 10-0 8-2 Rocky Mountain Public Media Tryba Architects 13

Floor Plan Parking Level P1 Floor Plan ROCKY MOUNTAIN PUBLIC MEDIA ARAPAHOE SQUARE DESIGN REVIEW 2' - 10 1/2" 235' - 7" 3' - 11 1/2" 118' - 1" 1' - 5 1/2" WATER ENTRY & PREACTION ROOM MAIN ELECTRICAL ROOM STR. 3' - 11 1/2" 118' - 1" BELOW GRADE PARKING RAMP UP 2' - 10 1/2" 235' - 7" Scale: 1/16 = 1-0 :02:38 PM Rocky Mountain Public Media Tryba Architects 14 DOWNTOWN TRUE

Floor Plan Level 02 Floor Plan ROCKY MOUNTAIN PUBLIC MEDIA ARAPAHOE SQUARE DESIGN REVIEW 236' - 4" 119' - 0" 7' - 0" 7' - 6" 6' - 0" 8' - 6" 3' - 6" 13' - 0" 5' - 6" 55' - 0" 1' - 6" 9' - 0" 2' - 6" 1' - 0" 8" 1' - 9" 59' - 6" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 5' - 2" 9' - 10" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 1' - 10" KUVO ROOM KUVO ON-AIR KUVO ON-AIR OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW KUVO LISTENING LOUNGE LOBBY KITCHEN KUVO BACKUP PROD. OPEN CONFERENCE HUDDLE FLEX FLEX MAIL FLEX OPEN FLEX MECH EDIT ROOM ELEC. OPEN HUDDLE FLEX EDIT ROOM STR. HUDDLE FLEX OPEN OPEN 3' - 6" 15' - 0" 4' - 0" 10' - 0" 7' - 11" 6' - 0" 4' - 1" 10' - 0" 5' - 0" 10' - 0" 5' - 0" 10' - 0" 4' - 0" 10' - 0" 6' - 0" 10' - 0" 1' - 10" 1' - 2" 3' - 6" 2' - 5" 23' - 0" 5' - 6" 5' - 6" 18' - 6" 5' - 6" 17' - 0" 13' - 0" 4' - 0" 4' - 0" 2' - 0" TYP. 236' - 6" 14' - 0" 16' - 9" 5/13/2018 2:14:08 PM Scale: 1/16 = 1-0 Rocky Mountain Public Media Tryba Architects 15 DOWNTOWN TRUE NORTH NORTH LEVEL 02

Floor Plan Level 03 Floor Plan ROCKY MOUNTAIN PUBLIC MEDIA ARAPAHOE SQUARE DESIGN REVIEW 34' - 6 5/8" 43' - 6" 43' - 11 3/8" 1' - 6" 66' - 9 3/4" 171' - 11 1/4" ELEV IDF MECH MECH ELEC. FUTURE TENANT / EXPANSION 66' - 9 3/4" 17' - 7 1/4" 6' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 4' - 0" 6' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 2' - 0" 172' - 1 1/4" 1' - 6" 2' - 0" 15' - 0" 4' - 0" 10' - 0" 7' - 11" 6' - 0" 4' - 1" 10' - 0" 5' - 0" 10' - 0" 4' - 6" 42' - 5 5/8" 1' - 0 3/8" 5/13/2018 12:51:12 PM Scale: 1/16 = 1-0 Rocky Mountain Public Media Tryba Architects 16 DOWNTOWN NORTH TRUE NORTH FLOOR PLAN_LEVEL 03

Building Sections FUTURE TENANT/EXPANSION MASTERPIECE LOBBY GREENSCREEN RESTROOMS MEDIA PARKING ENTRY Section A Arapahoe Street Scale: 1/32 = 1-0 BELOW GRADE PARKING 2 8 BETWEEN BRICK & F.O. ACM 3 0 BETWEEN BRICK & VERTICAL ARTICULATION Key Plan B MASTERPIECE BREAK A STR. LOBBY Section B 21 st Street BELOW GRADE PARKING Section B Enlarged 21 st Street Scale: 1/32 = 1-0 Scale: 1/16 = 1-0 119-0 Rocky Mountain Public Media Tryba Architects 17

Building Sections FUTURE TENANT / EXPANSION KUVO ON-AIR FLEX LOBBY/ BREAK EVENTS LOBBY VOLUNTEER ROOM COMM. CLASS EDIT RM. WORKSTATIONS Section C Arapahoe Street Scale: 1/32 = 1-0 BELOW GRADE PARKING 236-6 Key Plan FUTURE TENANT / EXPANSION D MAIL PARKING GREENSCREEN BONFILS- STANTON C Section B 21 st Street Scale: 1/32 = 1-0 BELOW GRADE PARKING 119-0 Rocky Mountain Public Media Tryba Architects 18

21 S T Massing Strategy Primary Frontages Rocky Mountain Public Media Offices ARAPAHOE ARAPAHOE Metal Panel Brick Base 21 S T Brick & Perforated Metal Screen Storefront Glazing System Masterpiece Studio Multi-Use Lobby, Retail and Flexible Meeting Space Rocky Mountain Public Media Tryba Architects 19