Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

Similar documents
PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Port Credit Local Advisory Panel October 20 th Meeting

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Edward R. Sajecki Commissioner of Planning and Building

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Trafalgar Road Corridor Planning Study Open House

Sustainable Growth. Sustainable Growth

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Eglinton West LRT Update

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

Lakeview and Port Credit District Policies Review Public Engagement Process

5 Direct Growth. 5.1 Introduction

Welcome to the Oakridge Centre Open House

SECTION ONE: INTRODUCTION. introduction

Contact: Alex Taranu ( ) or Karl Walsh ( )

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

WELCOME and introduction

CITY COUNCIL AGENDA REPORT

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

Employment and Commercial Review Analysis of Policy Directions

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

1 Introduction. Chapter. In this chapter:

1.0 PLANNING MARKHAM S FUTURE CONTENTS

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Plano Tomorrow Vision and Policies

PUBLIC MEETING April, 20161

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

178 Carruthers Properties Inc.

Urban Planning and Land Use

Mobility Hub Guidelines: Tools for Achieving Successful Station Areas

Transit-supportive development and city-building

Chapter 4. Linking Land Use with Transportation. Chapter 4

Complete Neighbourhood Guidelines Review Tool

MAYFIELD WEST SECONDARY PLAN PHASE 2

EDMONTON: Changing the Way We Grow and the Way We Move

The West Vaughan Employment Area Secondary Plan Policies

Municipal Network in Place and Moving Forward May 9, 2014 Chris Murray, City Manager City of Hamilton

Figure 4-1: Mississauga is situated near the centre of the Greater Golden Horseshoe, one of the fastest growing regions in North America.

Shift Rapid Transit Public Participation Meeting May 3, 2017

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN

CHAPTER 7: Transportation, Mobility and Circulation

Municipal Development Plan 2013

Executive Summary. NY 7 / NY 2 Corridor

Animating the Rideau Canal December 2013

Lesson 6. Corridor Planning

SCHEDULE 'A' TO BY-LAW as Amended by AMENDMENT NO. 90 TO THE WHITBY OFFICIAL PLAN

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

Niagara GO Hub and Transit Stations Study

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Town of Oakville Streetscape Strategy

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

TransitSupportive. Guidelines GHD. Canadian Institute of Planners 2012 Awards for Planning Excellence Award Category: Planning Publications

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JULY 17, 2017

Chapter 1: Introduction

Edward R. Sajecki Commissioner of Planning and Building

Implementation Guide Comprehensive Plan City of Allen

3. Urban Design in the Central Area

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

HEMSON C o n s u l t i n g L t d.

South Yonge Street Corridor

Silverdale Regional Center

Bus Rapid Transit Backgrounder. December 2016

New Official Plan. Policy Paper. Urban Design

Local Growth Planning in North Central Green Line Communities

Issues Requiring Future Study

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.

Welcome. Walk Around. Talk to Us. Write Down Your Comments

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Municipal Development Plan Update Urban Service Area and Hamlets

CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY

REVIEW AND EVALUATION OF REGIONAL LAND USE

The Corporation of the Town of Milton

New Official Plan Quest November 2013

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

MAYFIELD WEST SECONDARY PLAN PHASE 2

This page has been intentionally left blank.

CITY OF LANGLEY OFFICIAL COMMUNITY PLAN BYLAW, 2005, NO APPENDIX II - REGIONAL CONTEXT MAP

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Ann Arbor Downtown Street Design Manual. Ann Arbor DDA IDA 2015 Awards Planning Category

Route 110 Alternatives Analysis

AGINCOURT SECONDARY PLAN

Official Plan Review

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Relief Line Project Assessment

RECOMMENDATION REPORT

Transcription:

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor Martin Powell, Commissioner of Transportation and Works, City of Mississauga Paper prepared for presentation at the Success in Integrating Sustainable Transportation and Land Use Session of the 2011 Annual Conference of the Transportation Association of Canada Edmonton, Alberta Mississauga has successfully grown to be Canada s 6 th largest municipality and recognizes that for success to continue, we need to adapt and change. Brampton is currently undergoing significant growth and is Canada s 10 th largest municipality. This paper will focus on the development of an integrated plan for transforming the Hurontario/Main Street Corridor, a major arterial road linking the Cities of Mississauga and Brampton within the Greater Toronto Area. Development of the plan has been built around partnerships, with the study undertaken by the two cities, working within the framework provided by the Province and Metrolinx the regional transportation authority. In addition to taking a multi-jurisdictional approach, a decision was made at the beginning of the study to establish a multi-disciplinary project team that would ensure the integration of land use, transportation and urban design for this 20 km corridor. The plan has established a new vision for a street that is to be fundamentally sustainable increasing the overall transportation capacity through the provision of rapid transit, being a focus of growth that supports vibrant, mixed use, transit oriented development, while being sensitive to the presence of adjacent stable neighbourhoods. Light Rail Transit (LRT) was selected to build upon an existing successful bus service already in place and one of the key catalysts for transforming land use along the corridor. This paper focuses on key challenges including replacing two existing traffic lanes with LRT, creating a corridor suitable for pedestrians and cyclists, and integration with the regional transit services along the corridor. Another key challenge will be to take a context sensitive approach to design that integrates well with the different land uses along the corridor, including both established stable areas (Mineola, Main Street South Heritage Area), and areas with significant redevelopment potential (Cooksville, Brampton Gateway), along with the rapidly evolving Downtown Mississauga and Brampton areas. This paper will also discuss how both cities are building upon the recently approved LRT Master Plan for the corridor. 1

Introduction The Cities of Mississauga and Brampton, along with the Town of Caledon form the Region of Peel, located immediately west of the City of Toronto in the Greater Toronto and Hamilton Area (GTHA). Mississauga was incorporated in 1974 and has grown significantly through an era of suburban greenfield development supported by excellent highway access, a hierarchical road network, three Regional GO commuter rail services, the third largest municipal bus system in Ontario and the largest international airport in Canada, Toronto Pearson. With greenfield opportunities now diminishing and the City maturing, new growth has evolved towards significantly higher densities with a focus on infill and redevelopment opportunities. The City s new Strategic Plan espouses a more sustainable and urbanized approach to growth, which places a strong emphasis on developing a more transit oriented city. Hurontario Street is a major municipal arterial with significant traffic levels Brampton is located north of Mississauga and was originally incorporated as a village in 1854 and a City in 1974. Brampton has been one of Canada s fastest growing Cities and is served by a hierarchical municipal road network, Brampton Transit, the Georgetown GO Transit rail corridor, east-west Highway 407ETR and the north-south Highway 410. The City has recently updated their Transportation and Transit Master Plan (TTMP) that embraces compact communities, sustainable development, and efficient transportation. The TTMP has been built upon a vision of public transit being the first priority for moving people and increasing the transit modal share. This paper will focus on the development of an integrated plan for transforming the Hurontario/Main Street Corridor, some of the challenges that we face and how we are positioning this key city corridor for future success. Context With a population exceeding 700,000, Mississauga is the 6 th largest City in Canada and the 25 th in North America. Mississauga is also home to over 54,000 businesses, of which 63 are Canadian head offices of Fortune 500 corporations, providing approximately 422,000 jobs and making Mississauga a net importer of labour within the GTHA. While historically regional transit has focussed on moving commuters into Downtown Toronto, rapid growth is occurring in the outlying 905 area which surrounds the City of Toronto. Regional transit projects such as the Hurontario LRT are needed to serve these rapidly changing travel patterns in a sustainable way. 2

Just to the north of Mississauga is the City of Brampton, the 10 th largest City in Canada with a population in excess of 500,000 residents. A municipality still expanding rapidly through greenfield opportunities, while being anchored on a significant and historic urban core. Brampton is also moving forward with new rapid transit initiatives such as their new Züm program, which will introduce BRT type services along key corridors, including the Hurontario corridor or Main Street as it is called in Brampton. In 2006, the Province of Ontario released Places to Grow, a growth plan that outlined their policies for shaping growth and planning for new infrastructure in the GTHA. The underlying philosophy is directed towards intensification of existing built up areas and maximizing the use of existing infrastructure. The plan identifies Downtown Brampton and Downtown Mississauga as Urban Growth Centres and the focal point for intensification and growth. Furthermore, the Hurontario/Main Street corridor connecting these centres was identified as a Higher Order Transit Corridor and several mobility hubs with major transit station areas located at the interchange of rapid transit corridors are identified along the length of the Hurontario/Main Street corridor. Places to Grow also identifies that public transit will be the first priority for transportation infrastructure planning and major transportation investments and provides further criteria for planning and investment decisions. Hurontario Street facing south from Downtown Mississauga Metrolinx, an entity of the Province was created to coordinate regional transportation planning and developed The Big Move Regional Transportation Plan in 2008. The Big Move identified the Hurontario/Main Street corridor from Port Credit in Mississauga to Downtown Brampton as one of their top fifteen priority projects. In 2010, Metrolinx also completed the Hurontario/Main Street Rapid Transit Benefits Case, which made the case for supporting the introduction of light rail transit technology in the corridor and for proceeding with further planning, design and engineering work. 3

Development of the Corridor Master Plan The City of Mississauga and the City of Brampton are both large and growing municipalities that have recognized the opportunities and challenges associated with accommodating the Places to Grow vision. They joined together as partners in undertaking the Hurontario/Main Street Corridor Master Plan to examine the feasibility of incorporating rapid transit; engaging the various stakeholders through initiation of the Class Environmental Assessment Act process, and through the development of an integrated land use and urban design framework for the corridor. The corridor is more than 20 kilometres in length stretching from Port Credit in the south to Downtown Brampton in the north and traversing various distinct character areas. It functions as a major arterial with high traffic volumes that can exceed 80,000 Average Annual Daily Traffic (AADT) in peak sections while carrying over 28,000 transit riders per day on Mississauga Transit bus routes (2007). Mississauga Transit (MiWay) currently operates some limited stop express bus services and the Brampton Transit is in the process of introducing their ZÜM BRT service with limited stops and advanced technology within the north segments of the corridor. In late 2011, Mississauga Transit and Brampton Transit will introduce an integrated limited stop service between Shoppers World Transit Terminal in Brampton to Downtown Mississauga. One of the key strengths of the corridor is the transportation linkage it provides to several existing and planned regional transit corridors, including three existing GO Transit commuter rail corridors (Lakeshore West, Milton, and Georgetown), the Brampton Queen Street Züm BRT service, the Mississauga Bus Rapid Transit corridor under construction, the future Highway 407 Transitway, Dundas Street and Lakeshore Road Rapid Transit Corridors. The approach of integrating the rapid transit feasibility analysis with a comprehensive review and analysis of the land use and urban design was critical as the project is ultimately about citybuilding and creating a new main street for the 21 st century, where people can live, work and play in a highly sustainable way (Development of the corridor in accordance with the Master 4

Plan will help the municipalities enhance mobility options, economic viability and quality of life in order to become more socially, environmentally and economically sustainable and competitive). One of the big challenges was to meld together the aspirations of various staff and stakeholders from both municipalities. This was achieved through the establishment of a strong multijurisdictional and inter-disciplinary project team, directing the work of a multi-disciplinary consulting team and the use of an extensive public engagement process which included: public information centres; community workshops; community television; presentations and displays at a range of public events, stakeholders circulations and project newsletters that went out to over 40,000 addresses along the corridor and were also available in various other locations. The project also reached out to stakeholders through electronic media such as the web site (www.hurontario-main.ca), emails and Facebook. A business /developer symposium was also held to target the perspective of these critical stakeholders whose input and support was critical to the success of this project. The first Phase in the project culminated in a Directions Report that defined a vision for the corridor that would: Provide easy, reliable, frequent, comfortable and convenient rapid transit service throughout the corridor, with effective connections to other links in the inter-regional transit network; Create a beautiful street, with attractive places along the corridor featuring expanded mobility, vibrant economic activity, and livable, connected, mixed-use neighbourhoods, integrated with the transportation infrastructure; and Recognize and reinforce the Regional Urban System and the planned urban structure of each City, and accordingly, encourage mixed-use, compact, intensified Transit Oriented Development directed along the corridor, customized to suit the varying and distinct nature of each existing community and sensitive to the presence of adjacent stable neighbourhoods. A set of guiding principles was developed for the Master Plan to focus the development of a sustainable transportation solution for the corridor that included the following principles: Maintain the focus on the big picture ; Make it sustainable and integrated; Support transit through built form and densities; Put pedestrians first; Plan for development that is compact and complete; Facilitate multimodalism; Create connectivity; Focus on place-making; Ensure the plan is both visionary and attainable; and Protect stable neighbourhoods. 5

From a transportation perspective, the Master Plan evaluated rapid transit technology options and recommended the use of Light Rail Transit (LRT). It identified the general corridor alignment including looping the service through Downtown Mississauga and Downtown Brampton. The Master Plan identifies key transit stop locations and recommends a location for the future maintenance facility. The vision is for a centre median LRT system with primarily far side on-street transit stops at key crossing streets, intersecting transit routes and destinations. The transportation vision is about making transit a realistic option for choice riders and balancing the needs of other corridor users within a limited available rightof-way. In order to realize the vision of the Corridor, the Master Plan integrates the transportation elements with a land use and urban design strategy to provide a comprehensive transportation and land development framework. The intent was to inspire design excellence while incrementally supporting the development of the long term vision. The key ideas and concepts of the policy framework include: Vibrant and healthy mix of uses; Higher density centred around the transit stops; Pedestrian-friendly streets and neighbourhoods; Active main streets with retail uses at grade and continuous street walls; Interconnected network of open spaces and local street network; On-street and/or structure parking; Protection for stable neighbourhoods; Protection of natural areas; Phased development; Cycling as an integral component of the transportation network; and Place making to create memorable and unique places. Master Plan corridor alignment and stations Visualizations of the potential for change in the Downtown Hospital character area (existing/potential) 6

The Master Plan applied the overall corridor strategies to the various unique character areas that form this corridor, with recommendations regarding permitted uses; densities, heights; street frontage; network connections; setbacks; public spaces; transitions and place-making. Variation in Maximum Building Heights Further detailed proof of concept sites were then used to test the impact of the proposed policies. Proof of Concept site (existing/potential) Master Plan Challenges During the course of the Master Plan development, numerous challenges needed to be overcome. It may be beneficial to discuss and share some of the key challenges identified. The stakeholder engagement process went beyond regulatory requirements for Environmental Assessment in order to build a true community/stakeholder vision and promote wide-spread support for this showcase project. In order to accommodate more development along this 7

already busy corridor, it was necessary to carefully communicate the key message that we need to shift our focus from moving vehicles to moving people. This is a difficult message to deliver in communities which depend so heavily upon automobiles, and where transit is often not seen as an attractive alternative to the car. Another key challenge is building support for the project in the absence of a firm funding commitment. A symposium was held as part of the engagement process in an effort to target developers and significant land owners who play a major role in shaping the corridor today. Accommodating the competing interests for space within a limited right-of-way was yet another challenge. This is fuelled by growing community pressure for complete streets. One of the biggest remaining challenges is to obtain public/stakeholder acceptance for the replacement of two of the six existing general purpose lanes for LRT along most of the corridor. Newer cities such as Mississauga and Brampton are still growing in terms of the level of community participation there are areas along the corridor with well established and active community organizations or stakeholder groups, while others have little organized presence. This requires innovative forms of outreach. In addition to the methods noted above, the team also developed a Facebook page and pursued other aspects of social media. Developing the Master Plan involved working with residents, developers, staff, and many other stakeholders to craft a vision for the ultimate transformation of the corridor. There are a variety of land uses and interests along the corridor, including stable low density residential communities with limited mixed use (Mineola), significant employment hubs with no permitted residential due to airport noise restrictions (Mississauga Employment Area), mixed use 8

communities that are already in the process of transformation (Port Credit) or are ready for future redevelopment (Cooksville), and Downtown Mississauga that is experiencing tremendous growth and transportation pressures. This range of character areas also extends to the communities within the City of Brampton. Bringing together this diversity to support a common vision for the corridor remains an enormous and challenging task that will continue as the project moves forward towards implementation. The municipal transportation network and land use has developed under an existing model that needs to adapt to the new pressures and the level of intensification and infill that both cities are now facing. Opportunities to increase capacity through the road network are limited and traffic congestion levels continue to increase. The communities are moving forward to accommodate growth levels; however there is a growing urgency for rapid transit infrastructure funding to ensure that timely and effective transformation towards truly transit oriented development occurs. While the Master Plan supports the reprioritization of existing traffic lanes for dedicated LRT along the six lane segments of the corridor, it also acknowledges the land use and stable neighbourhoods especially those found in the narrower sections of the corridor to the north and south, and supports opportunities for mixed use LRT operations for these segments. Mixed use configuration will have implications on LRT operations but were considered acceptable to support the stable neighbourhoods on the extremities of the corridor, where area specific priority treatment may be an option and end of the line recovery can mitigate impacts on LRT reliability. Assessing impacts of rapid transit on the road network 9

Next Steps The Hurontario/Main Street Master Plan represents a fundamental building block for achieving the respective municipal visions, which include placing a greater emphasis on transit to accommodate mobility needs and developing more transit oriented communities. Both municipalities plan to move forward on initiating required Official Plan and Zoning By-law reviews bases on the framework provided by the Master Plan. Mississauga and Brampton also plan to continue working in cooperation as the next phase of the Hurontario/Main Street Project commences, which is intended to complete preliminary design for LRT and obtain necessary Environmental Assessment approvals. This paper has been based upon the efforts and work of the combined Hurontario/Main Street Corridor Master Plan project team and the consultant consortium led by MMM Group (LRT graphics prepared by VIA Architects). 10