SCADA / Electrical Refurbishment Construction Contract. Tommy B. Strowd, P.E., Director Operations & Maintenance

Similar documents
WLAC Facilities Committee Meeting. September 18, 2017

4/8/2015 Item #10D Page 1

National Grid Residential Active Demand Reduction Demonstration Project. MA EEAC Demand Reduction Sub-Committee February 23, 2017

City of Deerfield Beach. Fire Rescue

National Grid Residential & C&I Active Demand Reduction Demonstration Projects. MA EEAC March 15, 2017

Doing Business with Bartlett Cocke General Contractors

GATEWAY BUILDING ELEVATOR AND ESCALATOR SERVICES

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Request for Qualifications For Administration of the 2016 Summer Sprout Program

Attachment 5 -- PowerPoint. Item 6C- Attach 5- PPT Presentation Page 1 of 15

Board of County Commissioners Agenda Request

BEACH AND INLET PROJECTS UPDATE

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

Grand River Ravines Georgetown Township

REQUEST FOR QUALIFICATIONS

Public Services Department

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Request for Proposals (RFP) for: Columbia County Facilities Fire Detection and Security Improvements

OF AIRPORT COMMISSIONERS

City Commission Agenda Cover Memorandum

3/22/2011. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

SOUTH LAKE TAHOE LINEAR PARK LANDSCAPE IMPROVEMENTS

Pre-Bid Meeting Minutes 2018 A & E RFP February 6, :00 a.m.

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Center for Biosphere Restoration Research (CBRR) Bowman-Oddy Laboratories and Wolfe Hall Renovations

Consent Agenda. Meeting of June 14,2018

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

CITY COUNCIL STAFF REPORT

Presentation Title. Subtitle (optional) Wastewater Treatment Operations. O&M Contract Procurement. Vancouver City Council Workshop/Public Hearing

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

Sacramento Public Library Authority

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

DATE: February 12, 2013 ITEM: PROJECT AREA: PREPARED BY:

EASTSIDE REGIONAL PARK MASTER PLAN

Ashbridges Bay Erosion and Sediment Control Project

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

Request For Quotations. For The. Fire Sprinkler Retrofit Program For Licensed Small Or Rural Retirement Homes. October 11, 2017

Mayor Dave Netterstrom and Members of the City Commission. Anthony Caravella, AICP, Director of Development Services

UNIVERSITY OF NORTHERN IOWA

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

VDOT Tunnel Facilities Action Plan

COST-EFFECTIVE SCADA SYSTEMS

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

ROICC Camp Lejeune Acquisition Methods. Kelly J. Cannon Supervisory Contract Specialist ROICC Camp Lejeune

Listening Sessions: Guiding Principles and Unified Development Code New Castle County, Delaware

WORLD S BIGGEST PPP HOSPITALS: MADE IN TURKEY. Omer Unlu. Arcihtect / General Coordinator, PMP. 4 th Annual Investing in Turkey Forum

City of Langley, WA, Request for Qualifications (RFQ) Seawall Park Design

St. Elizabeths East - 5 Year Anticipated Use Plan

Update on the State of California Model Water Efficient Landscape Ordinance (CA MWELO)

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

UNIVERSITY OF NORTHERN IOWA

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Monthly Financial Review. September, 2017

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

Electronic Safety and Security

11 CONTRACT AWARD FOR SECURITY SERVICES

CITY OF MEXICO BEACH REQUEST FOR QUOTES: LIFT STATION PANELS REPLACEMENT

ARLINGTON COUNTY, VIRGINIA

Randle Siddeley associates landscape architecture environment urban design

Tucson Fire Department Early Alarm System, 3rd Edition

UPDATE MEMORANDUM. PS COMMITTEE #1 November 30, November 28, TO: Public Safety Committee

Calgary s Integrated Biosolids & Source Separated Organics Composting Facility Natasha Harckham, City of Calgary Residuals and Biosolids Seminar -

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Standard Development Timeline

CITY OF NAPA PARKS AND RECREATION SERVICES DEPARTMENT AGENDA SUMMARY REPORT

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

LAKE COUNTY SCHOOLS. Leading our Children to Success

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

Engineering and Design of Fire Alarm Systems

Design Review of Facility Improvement Projects

Coffey Neighborhood Park Master Plan/Design/Rebuild Workshop. August 4, :00pm 4:00pm

HISTORIC SITE AND MONUMENT COMMISSION (HSMC) Instructions for Historical Markers, Monuments, and Public Art Application

Brunswick-Glynn County Joint Water & Sewer Commission

13 Extending the Esri Enterprise Licence Agreement

Agenda Repo~ ' TO: Honorable Mayor and City Council. FROM: Public Works Department RECOMMENDATION:

City Council Special Meeting AGENDA ITEM NO. C.

Capital Projects impacting Odenton Town Center

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

RFP/RFQ. for Concept & Schematic Design Services. for Outdoor Garden Enhancements. to Cleveland Botanical Garden

BALTIMORE COUNTY PUBLIC SCHOOLS

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

Garver Feed Mill Timeline

Pebble Beach Community Services District

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

William S. Hart Union High School District. MODERNIZATION UPDATE May 7, 2008

THE TOWN OF WASAGA BEACH

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

California Environmental Quality Act (CEQA) Environmental Review Process

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office

Agenda Report. TO: CITY COUNCIL April 6, 2009 FROM: RECOMMENDATION: BACKGROUND: CITY MANAGER

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Transcription:

SCADA / Electrical Refurbishment Construction Contract Tommy B. Strowd, P.E., Director Operations & Maintenance

SCADA Supervisory Control And Data Acquisition LWDD Interbasin Study (c. 1992) concluded with the recommendation for installation of water control structure automation Several sites were subsequently automated, but currently are not functional District began initial work on fullscale SCADA implementation in 2013

Telemetry (SCADA) Provides capability to automate water control operations Provide real time data to make instant water supply and flood control decisions Enable staff to communicate in the field using software specifically designed for LWDD operations Provide security notification for control structures Provide backup power for emergency operations Improve communication with other flood control first responders including SFWMD and Palm Beach County to better coordinate efforts

Existing Major Control Structures

Water Control Operations Summary 13 Basin HW (ft. NGVD) CS#4 CS#6 CS#8 Gate Summary 13.51 Site Alarms 16 Basin HW (ft. NGVD) Pump Summary CS#9 CS#11 CS#12 Gate Summary 15.31 Site Alarms Pump Summary CS#2 CS#1 CS#3 Gate Summary Pump Summary Boca CS#X HW (ft. NGVD) CS#x Gate Summary 7.31 Site Alarms Gate Open In Range Pump Summary Gate Closed Near Range Communication Exceed Range Failure Good

Water Control Operations Basin Summary Elevation 13 Basin Control No. 4 HW (ft. NGVD) 13.41 North Gate Center Gate South Gate Pump Alarm Display TW (ft. NGVD) 7.78 Site Alarms Control No. 6 HW (ft. NGVD) 13.51 North Gate Center Gate South Gate Pump TW (ft. NGVD) 7.78 Site Alarms Control No. 8 North Gate Center Gate South Gate Pump HW (ft. NGVD) 13.46 TW (ft. NGVD) 7.78 Site Alarms Stage Display Control No. X HW (ft. NGVD) 15.41 North Gate Center Gate South Gate TW (ft. NGVD) 7.78 Site Alarms Gate Open Gate Closed Communication Failure In Range Near Range Exceed Range Good

Water Control Operations Structure Summary Elevation 13 Basin (Page No. 1) Next Page Previous Page Control No. 4 North Gate Center Gate South Gate 8 ft. 8 ft. 8 ft. HW (ft. NGVD) 13.41 TW (ft. NGVD) 7.78 6.5 6.5 0 Pump Gate Open (ft.) HW/TW/Gate Opening High Alarm 14.00 0 ft. 0 ft. 0 ft. Gate Open 13.10 Stage Alarm Gate Alarm Gate Close 12.40 Power Alarm Door Alarm Low Alarm 12.00 Gen. Alarm Well Alarm Control No. 6 North Gate Center Gate South Gate 8 ft. 8 ft. 8 ft. HW (ft. NGVD) 13.51 TW (ft. NGVD) 7.78 6.0 6.0 0 Pump Gate Open (ft.) HW/TW/Gate Opening High Alarm 14.00 0 ft. 0 ft. 0 ft. Gate Open 13.10 Stage Alarm Gate Alarm Gate Close 12.40 Power Alarm Door Alarm Low Alarm 12.00 Gen. Alarm Well Alarm

Structure Refurbishment Program Improvements to Aging Gates and Control Buildings New and/or Refurbished Water Control Gates New Gate Lifting Mechanisms (Actuators) New Electrical Systems Power systems Control Panels Site Lighting Fencing / Security

SCADA / Electrical Refurbishment Relationship SCADA System Implementation Refurbishment of Existing Water Control Structures Separate but interrelated activities Both are related to the need for consistent and reliable electrical power

Budget Extraordinary Account Funding SCADA $2.7M Total Capital Refurbishment Funding Refurb. $1M/yr $3.7M

Original Conceptual Layout Proposed microwave communication system for LWDD Remote/automated control of LWDD flood control gated spillways 12 hurricane hardened microwave communication towers 10 major control structures 1 microwave waypoint 1 LWDD main campus location

Tower Height Design Issues 250 200 150 100 50 0 50 50 45 30 20 20 20 20 20 20 CS 1 CS 2 CS 3 CS 4 CS 6 CS 8 CS 9 CS 11 CS 12 CS 17W HQ Intial Est. Field Test Est. 220 MHz Design 0

Revised Conceptual Layout Revised microwave communication system for LWDD Remote/automated control of LWDD flood control gated spillways 10 hurricane hardened microwave communication towers No Network Bandwidth Use existing main campus tower

Example Site Plan (CS# 2) Elevated Monitoring Platforms (Upstrm & Dwnstrm) Elect. Bldg Generator Propane Tank Antenna Fence

Example Site Plan (CS# 11) Elevated Monitoring Platforms (Upstrm & Dwnstrm) Elect. Bldg Generator Propane Tank Antenna Fence

Control Structure #8 SCADA Visualization

Control Structure #8 SCADA Visualization

SCADA Construction Elements Site No. New Building Generator Controllers CS#1 CS#2 CS#3 CS#4 CS#6 CS#8 CS#9 CS#11 CS#12 CS#17W Headquarters Monitoring Platforms Antennas

Electrical Refurbishment Construction Elements Site No. Pump Control Panel Motor Starters Distb. Panel Lighting CS#1 CS#2 CS#3 CS#4 CS#6 CS#8 CS#9 CS#11 CS#12 CS#17W Headquarters

SCADA Project Cost Estimate History SCADA PROJECT COST ESTIMATE HISTORY General Construction Cost Tower Constrcution Cost SCADA Integration Asset Management Integration Related Project Costs Engineering Fees Asset Management (Phase 2) Post Construction SCADA Integration Tower Construction General Construction $4,400,000 $570,000 $570,000 $260,000 $1,100,000 $1,900,000 $3,273,200 $3,573,200 $2,893,200 No Asset Mgt. Tower Hgt increase Reduced tower hgt Reduced # of Bldg. due to field test and configuration Refurbishment Items based on 220MHz. Removed Waypoint $424,600 & HQ towers $424,600 $148,600 $ $148,600 $ $444,600 $1,400,000 $148,600 $ $1,100,000 $700,000 $1,600,000 $1,600,000 $1,600,000 ORIGINAL PREVIOUS CURRENT 220 MHZ OPT.

SCADA Construction Cost Estimate History $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $3,000,000 $2,700,000 $3,000,000 $2,300,000 $2,635,019 $500,000 $0 Original Est. Revised Orig. Est. Preliminary Est. Mod. Prelim. Est. Engineers Estimate

Engineers Estimate of Probable Const. Costs Extraordinary Account Funding CH2MHill SCADA $2,635,019 One Construction Contract Total $3,793,886 Capital Refurbishment Funding Refurb. $1,158,867 Smith Engineering

Original Budget Extraordinary Account Funding SCADA $2.7M Total Capital Refurbishment Funding Refurb. $1M/yr $3.7M

Timeline Feb, 2014 Request for SCADA RFQ May, 2014 Initiated SCADA Design Contract Negotiations June, 2014 Presented Capital Improvement Plan to Board August, 2014 Contract for SCADA Design Services February, 2015 Authorization to Procure Gate Actuators March, 2015 SCADA Design Contract; Amendment No. 1(Actuators/Geo-Tech) April, 2015 Request for Electrical Design RFQ May 2015 Board discussion of SCADA 220 Mhz Re-Design June, 2015 Initiated Electrical Design Contract Negotiations July, 2015 Contract for Prelim. Electrical Engineering Services July, 2015 SCADA Design Contract; Amendment No. 2 (220 KMZ) November, 2015 Contract for Electrical Design & Const. Serv. August, 2016 Request for SCADA/Electrical RFB

Bid Timeline Date Request for Authorization August 17 th 1 st Advertisement August 19 th 2 nd Advertisement August 28 th Pre Bid Meeting September 5 th Site Access Available to Bidders September 6 th Bidder Request For Information (RFI) September 8 th RFI Response September 18 th Bid Opening October 4 th Bid Review October 5 th Contract Award October 12 th Notice To Proceed November 9 th Notice

Estimated Construction Schedule Project Phase 2014 2015 2016 November December January February March April May June July August September October November December January February March April May June July August September October November December Engineering Design & Construction Documents FCC Frequency License Bids Construction Start Up & Training Design Bidding Construction Start Up

CH2MHill Proposed Contract Amendment No. 3 Two Previous Amendments to Original Contract Authorization Tech Services for Actuator Installation / Geo-tech Services for SCADA design Redesign based revised 220 MHz microwave frequency Proposed 3rd Amendment (Not-To-Exceed $24,000) Existing Gate Control Panel Replacement Automation of Center Hurricane Gates Technical coordination with electrical design Contract Item Fee Total Fee Scope Original Authorization $ 478,800 $ 478,800 SCADA Design, Programming, Construction Engineering Amendment No. 1 $ 128,433 $ 607,233 Actuator Technical Services, Geotech Services Amendment No. 2 $ 19,112 $ 626,345 Redesign w/ 220MHz Frequency Amendment No. 3 $ 24,000 $ 650,345 Control Panel, Center Gate Automation, Elect. Coord.

SCADA / Electrical Installations On Site SCADA Control CH2MHill Contract Existing Gate Control Panel Existing Electrical Power Controls Smith Engineering Contract

SCADA / Electrical Installations On Site SCADA Control CH2MHill Contract Existing Gate Control Panel Existing Electrical Power Controls Smith Engineering Contract

DISCUSSION