CITY OF MARIANNA. MUNCIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL (850) Major Development Order Approval Process

Similar documents
Major Development Order Approval Process. Introduction. In This Handout. Pre-Application Meeting. Meetings

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

ARTICLE 17 SITE PLAN REVIEW

Project phasing plan (if applicable) 12 copies of site plan

PLANNED UNIT DEVELOPMENT APPLICATION

SUBMITTAL REQUIREMENTS

Draft Rhode Island Stormwater Design and Installation Standards Manual

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Application for Site Plan Review

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Erosion & Sediment Control Plan Application Form & Checklist

Site Development Plan (SDP) Checklist

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Master Land Use Plan Application

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

ARTICLE VI: SITE PLAN REVIEW

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW

Chapter 4 - Preparation of Stormwater Site Plans

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

SITE PLAN REVIEW APPLICATION

Major Subdivision Sketch Plan Checklist

CHECKLIST FOR PHASE II DRAINAGE REPORT

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

4. To assure that adequate screening and buffering will be provided between the planned project and contiguous properties;

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Site Plan Review Residential Accessory Building

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

City of Waco Stormwater Management Regulations

Essential Skills: Reading and Interpreting Maps and Plans

Preliminary Subdivision Plan/ Site Development Order/Final Engineering Application

SITE PLAN REVIEW PROCESS

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

ARTICLE 3. LARGE-SCALE SOLAR PHOTOVOLTAIC INSTALLATIONS SECTION XXI

City of Reedley Community Development Department 1733 Ninth Street Reedley, CA (559) FAX

CRESCENT RESOURCES INC.

MAJOR SITE PLAN APPLICATION COVER SHEET

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

Old Brick Township DRI Recommendation Report

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

ARTICLE V PLANNED UNIT DEVELOPMENT DISTRICT

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

SEPA Modification Application

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

CITY OF ZEELAND PLANNING COMMISSION

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

ZONING COMPLIANCE PERMIT APPLICATION

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

Town of West Point Plan of Development

Community and Economic Development Department 100 N. Appleton St. PH: Appleton, WI FAX:

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

When planning stormwater management facilities, the following principles shall be applied where possible.

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

SPECIFIC PLAN Requirements

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

S I T E P L A N A N D A R C H I T E C T U R A L R E V I E W A P P L I C A T O I N

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

4. Contractor (and subcontractors if applicable) certification statement(s)

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

CITY OF KITCHENER CONDITIONS REQUIRED FOR ISSUANCE OF SITE PLAN APPROVAL

Neo-Traditional Overlay Application

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

DESIGN CRITERIA PACKAGE

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Appendix I. Checklists

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: March 15, 2012

CONCURRENT SUBDIVISION/SITE PLAN REVIEW APPLICATION TOWN OF CONWAY, NH

STREAM BUFFERS

APPLICATION FOR SITE PLAN REVIEW

LEVEL TWO UNIFIED PERMIT CHECKLIST FOR DETERMINATION OF COMPLETENESS [Devens Enterprise Commission Rules and Regulations 2018]

Article 20 Stormwater Management

Washington County, Maryland Division of Public Works Policy Manual

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1150 OF PUTNAM COUNTY, WEST VIRGINIA Page 95 ARTICLE 1150 SITE PLAN REVIEW

PUBLIC WORKS - COMMUNITY DEVELOPMENT. Staff Report. Site Plan Review. SP July 5, 2018

Drainage Control Plans

Camden County Development Regulations. Updated February 2017

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Huntington Stormwater Utility

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

ORDINANCE NO LC

Gadsden County Planning Commission Agenda Request

ARTICLE IX SPECIAL PERMIT USES

LND-B LAND USE APPLICATION FOR OFFICE USE ONLY:

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Transcription:

Approval Process Introduction CITY OF MARIANNA MUNCIPAL DEVELOPMENT DEPARTMENT Post Office Box 936 Marianna, FL 32447 (850) 482-2786 The City of Marianna requires developers obtain a major development order on projects that do not meet the scale for a minor development order. These projects include but are not limited to construction, placement renovation, and/or remodeling of large buildings or buildings utilized for public assembly, construction of parking areas, and construction of stormwater facilities. Pre-Application Meeting The City of Marianna Municipal Development Department provides the service of a voluntary pre-application meeting, which is intended to give developers an early indication of the requirements and issues their project will face as it moves through the City development review and approval process. It is the first step in the City s development review process. At the pre-application meeting, the developer will be provided fee and submittal requirements, and planning staff will identify any obvious issues that may affect the feasibility of your project. This meeting provides an opportunity for developers to learn general information about zoning, land use regulations and potential property uses. Pre-application meetings are not required, but recommended for all projects that require a recommendation from the Planning and Zoning Board and approval by the City Commission. It can be arranged for Building, Public Works and Fire Department staff to attend the meeting. In This Handout An overview of the pre-application meeting An overview of the major development order approval process Major development order submittal requirements This handout is a general guide to the major development order approval process in the City of Marianna. The pre-application meeting and this handout are provided for your convenience only, and are not intended to replace the City zoning regulations or other legal documents, and should not be construed as a right to development approval if the steps indicated are followed. Additional information may be requested, if deemed necessary for review. Meetings Once City staff has conducted all required reviews, a development review team meeting will be held. All comments will be provided to the developer in the form of a sufficiency review letter following the development review team meeting. While the Fire, Public Works and Building Departments will conduct separate reviews, whenever possible the comments will be combined and provided in the same letter. Comments should be addressed prior to the Planning & Zoning Board Meeting. Unless rescheduled for special circumstances, the City Planning and Zoning Board meets regularly on the fourth Monday of the month at 4:00 p.m. in the City Commission Chambers located at 2897 Jefferson Street, Marianna, Florida. Unless rescheduled for special circumstances, the Marianna City

Page 2 of 9 Commission meets regularly on the first Tuesday of the month at 6:00 p.m. in the City Commission Chambers. All meetings are open to the public. Although it is never mandatory the developer attend, your attendance could provide answers to questions which may arise. Application Checklist Incomplete pre-application submittals will not be accepted or processed, unless a requirement is waived by the Municipal Development Director. 1) Application form and appropriate supplemental form(s): --1 copy 2) Supplemental forms: Preapplication checklist, appropriate supplemental form for project type(s). 1 copy 3) Letter of description and justification: 5 copies. The letter should include a description of the proposed use and development, with details which might be considered important such as hours of operation, type of business, customer traffic, types of buildings, external effects, number of employees, existing and proposed nuisance issues (i.e. noise levels, toxic, noxious or smoke emissions, offensive odors, electric/magnetic fields, illumination, unsightly appearances when viewed from other properties, etc.) to be mitigated, and so on. 4) Copy of the Deed for Proposed Site 1 copy. 5) Copy of Lease Agreement or Letter of Authorization from Owner, If Necessary 1 copy. 6) Conceptual Site Plan: 5 copies in most cases. Upon approval four copies will be stamped approved by various City departments. The City will retain one copy, the building department will retain a copy and any outside reviewers will retain a copy for their files and the remainder of the stamped copies will be returned to the developer. Provide description of the land, a vicinity sketch showing the relationship of the site to the surrounding roadways, land use districts and flood zones with base flood elevations. Indicate the boundary lines and dimensions of the area or lots included in the site plan including angles, dimensions and references; a north directional arrow and map scale; and the proposed use of the land by areas. Indicate the existing and proposed grades, the drainage plan, erosion control plan and the proposed structures with appropriate topographic contour intervals or spot elevations. Include location and width of streets, alleys, easements, driveways and sidewalks, to include typical street or pavement cross-sections and dimensions. Note the elevation of the street adjacent to property. Show and total number and size of parking spaces. Show location of solid waste receptacles/dumpster, necessary enclosures and buffering. Show the shape, size and location of all existing and proposed building(s)/ structure(s), open areas, parking lots, access locations, and adjacent right-of-ways. Include sidewalks, streets and bike paths. Note: regular parking spaces should be a minimum of 10 wide by 20 long; handicap spaces should

Page 3 of 9 be a minimum of 12 wide by 20 long with 5 wide access aisles. Indicate all setbacks for parking areas, sidewalks, and buildings. Show location and size of all natural features such as wetlands, shorelines, lakes or ponds, protected trees, and manmade features such as walls, fences or other structures, indicating which are to be retained, removed or altered, and adjacent properties, their existing uses and land use designation. Provide a statement of methods for addressing unique features of the site. Provide a chart with the area and approximate percentage of the total site for the following: Total site area. Building coverage/floor area. Finished floor elevations. Relative finished ground and basement floor grades. Parking coverage. Other impervious surface coverage and ratios (including total impervious surface area). Open area or landscape coverage. Gross acreage of site. Proposed square feet of building area and floorarea ratio (FAR). Number of dwelling units and gross density. Minimum lot sizes. Show the location of existing billboards and signs. Identify the name, address, and telephone number of the owner, developer and designer/engineer/architect. Indicate location of nearest fire hydrants. Show date. Indicate location of flood zone and topographic information. Show the size and location of all existing and proposed public and private utilities and easements, water and sewer tap locations, sewer cleanouts and turns, and water meter types, sizes and locations. 7) Detailed development impact analysis, if necessary: -- 5 copies. Identify the suitability of site conditions including topography and soils, and the extent to which site modifications will be necessary to accommodate the proposed development. Show ingress and egress to roadways. Enclose required permits from other governmental agencies. Provide noise and lighting information. Lighting plans should indicate lumens or footcandles. Provide information regarding public safety and/or potential to create public nuisance. Provide information regarding traffic impacts the development will create within the development site and on adjacent streets. Provide information regarding potential impacts on natural resources. 8) Conceptual landscape plan: 3 copies. Show proposed and existing ground cover type. Show proposed and existing trees, shrubs, and flowerbed locations, to include visual screen barriers in parking/vehicular use areas and any adjacent properties. Show proposed and existing irrigated and non-irrigated areas.

Page 4 of 9 Show proposed and existing trees with a caliper of 6 or more to be removed. Show proposed and existing buffers. Identify plant types and spacing. 9) Landscape maintenance plan/narrative: 3 copies. Indicate in the narrative the manner in which all landscaping will be maintained for the life of the development. Illustrate in plans the location of irrigation systems, etc. to be utilized in landscape maintenance. 10) Conceptual building/road elevations: 5 copies. Indicate finished floor elevation and roof elevations. Indicate elevation of adjacent streets and manhole covers. 11) Structural building plans 5 copies. Identify directional door swings. Show fire prevention devices. Indicate wiring location and type of wiring utilized. Indicate location and structural detail of all water fixtures, grease traps, and backflow devices. Indicate other information determined necessary by the City of Marianna Public Works Director and Fire Chief, and Building Official. 12) Drainage and stormwater plans/ calculations, If necessary: 5 copies. All stormwater plans and calculations must be signed and sealed by a Florida licensed engineer. Post development runoff shall not exceed predevelopment runoff (25 year, 24 hour storm event). Sufficient information shall be provided to the City for evaluation of characteristics of the affected area, the potential impacts on City water and the acceptability of compensating measures including: maps, sketches, graphs, tables, photographs, narratives and other information. Illustrate existing and proposed drainage and stormwater treatment facilities. Illustrate existing and proposed drainage easements. Illustrate location of outfall ditches and right-of-ways. Illustrate finished grade of road and ditches. Location map and aerial photo outlining project boundaries. Existing environmental and hydrologic conditions of the site and receiving waters including: Predevelopment flow rate, direction and volume of stormwater runoff on the site. Off-site adjacent upland acreage, watercourses, water bodies and wetlands. Groundwater levels. Vegetation and soils. Existing and proposed topographic contours. Other appropriate site specific information including outfall system information. Components of proposed stormwater management system including: Postdevelopment flow rate, direction and volume of stormwater runoff with a comparison to predevelopment conditions. Construction plans for stormwater system improvements.

Page 5 of 9 Erosion and Sedimentation Control measure plan. Plan and schedule for maintenance of stormwater management system and erosion/sedimentation control measures. Other appropriate site specific information. Minimum stormwater quality standard is retention/detention with filtration of the runoff from the first one inch of rainfall or drainage areas less than 100 acres, facilities required to provide retention/detention with filtration of the first one-half inch of runoff from a 24 hour critical duration storm event. Minimum stormwater quantity standard is attenuation off the 25-year, 24-hour storm event while limiting discharge to the difference between predevelopment levels and post-development levels or to the capacity of the receiving water or drainage control structure. Minimum time of concentration shall be ten minutes. All stormwater discharge structures must have sediment controls and skimming devices. Stormwater calculations should include, but not be limited to: predevelopment runoff coefficients; post-development runoff coefficients; redevelopment runoff rates; and post development runoff rates. 13) Erosion and siltation control plans, if necessary -- 5 copies. Provide erosion and siltation control plans for temporary and permanent vegetative and structural control measures. Plans must follow Best management practices contained in the Florida Department of Environmental regulation s Florida Development Manual: A Guide to Sound Land and Water Management. Plans should indicate that denuded areas shall be stabilized with mulch, sod or other temporary vegetation measures will be in place within 60 days of final grading. Provide description of vegetative measures. Plans should indicate soil stockpiles are protected from erosion and dust is controlled. Plans should indicate storm drainage inlets are protected by hay bales, sod screens or other measures to prevent siltation during construction. Provide description and specifications for sediment retention, surface runoff and erosion control devices. Indicate calculations of maximum runoff based on the 25 year critical duration event. 14) Approved Florida Department of Environmental Protection (FDEP)/Northwest Florida Water Management stormwater permit, exemption, or other permits necessary 3 copies. 15) Approved Florida Department of Transportation (FDOT) drainage permit, if necessary -- 3 copies. 16) Approved Florida Department of Transportation (FDOT) right-of-way use and/or vehicular connection permit or Jackson County driveway

Page 6 of 9 connection permit, if necessary -- 3 Copies. 17) Approved Florida Department of Environmental Protection (FDEP) and Army Corp of Engineers dredge and fill permit(s), if necessary --5 copies. 18) Traffic circulation and parking plans and necessary documentation: 3 copies. Indicate size, location and spacing of access point entrances/exits or other vehicle connection points. Indicate parking area and access connections are compliant with technical construction standards. Indicate size, location and compliance of bicycle and pedestrian ways. Indicate the area is surfaced with hard, dustless material. Indicate proposed and existing vehicular turnarounds, turning radii, curb cutouts and loading areas. Show vehicular traffic patterns, including onsite parking. 19) Environmental protection information: 1 copy. In a narrative and drawings, if necessary, indicate the following: Does the proposed development involve impacts to the shoreline of Chipola River? Does the proposed development area contain any endangered or threatened species as specified in the Official Lists of Endangered and Potentially Endangered Fauna and Flora in Florida published by the Florida Game and Fresh Water Commission? (City may require an analysis.) Does the proposed development contain or involve impacts to FDEP/U.S. Army Corp. of Engineers jurisdictional wetlands? Is the development in compliance with environmental protection regulations (including, but not limited to: NPDES for sites with 5 acres or more area, asbestos removal, etc.)? If mitigation is required provide an approved FDEP, and U.S. Army Corps of Engineers wetland mitigation plan. 20) Water/sewer tap application, if necessary: 2 copies. 21) Driveway connection application, if necessary: -- 2 copies. 22) Traffic Impact Analysis/Transportation Concurrency --5 copies Letter of transmittal Title page, table of contents, list of exhibits (including figures and maps) and list of tables. Introduction and Executive Summary -- The introduction shall include a description of the location (including a general site location map), proposed development plan, current land uses (if proposal is a redevelopment), current and proposed zoning, phasing schedule and build-out year. The executive summary shall include a concise summary of the study purpose, conclusions, and recommendations. This section of the report shall not contain detailed technical information.

Page 7 of 9 Proposed Land Development Plan. The proposed land uses shall be identified by land use type with the intensity expressed in units. This information shall be submitted for each phase with the build-out year for each phase identified. In addition, a site plan showing internal traffic circulation shall be provided in each phase. Study Area. The methodology criteria for establishing the study area for determining the roadway segments in the Transportation Concurrency Network Existing PM Peak Hour Traffic Volume Conditions. An inventory of existing PM peak hour traffic volumes on all roadway segments in the Transportation Concurrency Network is maintained by the City of Marianna. The information contained in this database for existing conditions, as well as data for committed project demand, shall be used as the base traffic conditions for all roadways segments identified in the study area. Estimate of Site-Generated Traffic. A PM peak hour trip generation analysis shall be provided. Project Trip Distribution and Assignment Roadway Segment Analysis. An evaluation of PM peak hour project traffic impacts shall be provided for each segment in the Transportation Concurrency Network determined to be within the project study area. Intersection Operations Analysis. Analyses will be provided, if applicable, addressing intersection level of service and safety issues. Based on the type of development proposed, the City may require that additional time periods beyond the PM peak hour conditions be analyzed. Whether or not other time periods will need to be analyzed will be determined at the pre-application conference. Mitigation Plan. For any roadway segment or intersection level of service deficiency identified in the Roadway Segment Analysis and/or the Intersection Operations Analyses, a mitigation plan shall be provided identifying the strategy(ies) for addressing each deficiency. These strategies may be addressed through the Transportation Mitigation Proportionate Fair-Share Program. Site Circulation and Access Management. For each site access point onto a roadway in the Transportation Concurrency Network an analysis shall be provided addressing driveway separation, turn lane requirements, adequate site distance requirements, and minimum driveway throat length. Appendices. Based on the analyses required, the Applicant shall provide the following data (where applicable): a) Traffic count data summaries and raw data; b) Intersection capacity analysis worksheets; c) Arterial level of service (LOS) analysis worksheets; and d) Other applicable traffic analysis worksheets. 22) Building Department Permits Paperwork -- 1 copy. 23) A list of questions for which you want specific answers: -- 1 copy.

Page 8 of 9 There is no fee for a pre-application meeting. There is a fee for a zoning or flood determination letter. Review Schedule 1) Predevelopment Meeting, If requested. 2) Staff Review By ordinance staff has 90 days to review a complete development package. Incomplete packages do not start the development review period. Note: often staff review includes the review of consultant firms. At the time of application submittal, planning staff will post the property with public notification signs. It may be necessary to repost the property prior to approval. 3) Development Review Team Meeting A staff development review team meeting will be scheduled once all reviews of the project are completed. 4) Sufficiency Review Letter, If Necessary. Any concerns addressed by staff in separate reviews or at the time of the development review team meeting for the project will be forwarded to the developer in the form of a letter to address any unresolved issues. Resubmission of necessary information starts the project over at staff review. 5) Development Review Team Meeting with the Developer, If Necessary. After receiving a sufficiency review letter, any developer may request a second development review team meeting be called to address concerns related to the project. All interested parties are encouraged to attend. 6) Planning & Zoning Board Review Once all staff comments and concerns have been sufficiently addressed, the development will be advertised and scheduled for presentation before the City Planning and Zoning Board. Please note: advertisement requests must be received by the local newspaper a week in advance of the meting. The Planning and Zoning Board Meeting is open to the public and all interested parties are encouraged to attend. 7) City Commission Review The City Commission Meetings are open to the public and interested parties are encouraged to attend. Please note: A vote by the City Commission to table the development, could start the project over at staff review. 8) Administrative Completion Once approved or denied by the City Commission or if the project is dropped during the approval process, planning staff will complete paperwork and total charges. Fee payment is NOT contingent upon approval. Variance fees are due at the time of submittal. After approval and payment of fees, the developer will be provided with three sets of stamped plans and any development approval conditions. 9) Inspections Upon approval, the applicant must schedule two inspections with the Municipal Development Director: 1) prior to foundation installation; and 2) after all work has been completed. Upon passing the final inspection by the Fire, Public Works, Municipal Development and Building Department, the Certificate of Occupancy will be issued. Additional inspections may be conducted as deemed necessary.

Page 9 of 9 Variances Variances are reviewed separately according to the above schedule. Requested variances should be addressed prior to major development order approval. Interested applicants must submit a letter petitioning the City to grant a variance. Variance requests require public notification via a display ad in the local newspaper. Variances are presented before both the Planning & Zoning Board and the City Commission.