Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. For more information, see the Glossary.

Similar documents
Chapter 1. Introduction

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

3. Are there any projects exempt from the definition of Regulated Projects?

Storm Water Design Control Measures. Today s municipal sponsors

Post - Construction Hydromodification Development Requirements

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

Chapter 4 - Preparation of Stormwater Site Plans

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

Draft Rhode Island Stormwater Design and Installation Standards Manual

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

Background / Regulatory Requirements

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Working Group Meeting

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

Technical guidance to meet stormwater management design requirements; and,

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

City of Richland Stormwater Management Plan

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

Huntington Stormwater Utility

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

New Development Stormwater Guidelines

PRELIMINARY PROJECT REVIEW PROCESS

Stormwater Control Plan: Small (Tier 1) Land Development Project

Weston s Wetlands, Stormwater, & Open Space

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Worksheet #14 Water Runoff Management

Three threshold measures will be applied together to capture project scale and scope and impacts:

A P P E N D I X D. Project Stormwater Plan Worksheets

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Rule D Wetland and Creek Buffers

Chapter 3 Site Planning and Low Impact Development

WASHINGTON COUNTY OREGON

Introduction Post Construction Stormwater Management Performance Requirements

County of Fairfax, Virginia

Project phasing plan (if applicable) 12 copies of site plan

CITY OF HOLLY SPRINGS STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Zoning Ordinance Article 3

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Preparing Permit Application Submittals

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

Preparing a Stormwater Control Plan for a Small Land Development Project

Planning & Development. Background. Subject Lands

APPENDIX G: TOWN ORDINANCE REVIEW

Stormwater Technical Guide

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

Phase II Storm Water Permit Program MS4 Permit

HAZARD MITIGATION GOALS AND OBJECTIVES

Appendix I. Checklists

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Ventura County Stormwater Technical Guidance Manual

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Green Infrastructure Recommendations For Parks and Public Spaces

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Green Infrastructure and LID Practice Construction Workshop

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Chapter 1: General Program Information

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Planning and Growth Management Committee

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

GRACE CHURCH EXPANSION

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

CHOOSING A LANDSCAPE PROFESSIONAL FOR YOUR RIVER-FRIENDLY GARDEN

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: April 4, 2013

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

Part 5. Environmental Protection Overlay District Regulations

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Appendix 3-D LOCAL CODE AND ORDINANCE REVIEW AND EVALUATION

Section 3 Non-Structural BMPs

New Tools/Resources for

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Chesapeake Bay Critical Area Conservation Plan

USF System Campus Master Plan Updates Goals, Objectives and Policies

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Highlands Region Stormwater Management Program Guidance

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. Example Commercial Project. February 21, 2018

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Local Technical Assistance Program FREE Road Maintenance and Safety Training for Municipal Employees

Transcription:

1 Introduction Purpose This Stormwater Quality Design Manual for the Sacramento and South Placer Regions (manual) outlines planning tools and requirements to reduce urban runoff pollution to the maximum extent practicable (MEP) from new development and redevelopment projects. This manual is a collaborative effort of the Sacramento Stormwater Quality Partnership 1 and the City of Roseville, and it is intended to satisfy the regulatory requirements of their respective municipal stormwater permits. (See the section Background Information later in this chapter for more about the Partnership and permit requirements.) Goals The Sacramento and Roseville permitting agencies have the following goals for this manual: Protect the quality of our local creeks and rivers. Consolidate all stormwater quality design requirements into one document. Provide a consistent set of requirements for stormwater quality management that apply in the urbanized part of Sacramento County and the This Design Manual This comprehensive manual outlines a consistent set of stormwater quality management design standards for many new and redevelopment projects in the urbanized parts of Sacramento County and the City of Roseville. It provides planning and design tools for use by planners, architects, landscape architects, engineers and environmental professionals. The stormwater quality development standards are intended to protect our valuable creek and river resources for future generations. City of Roseville. That is intended to facilitate better areawide compliance with clean water laws. 1 The Sacramento Stormwater Quality Partnership includes the County of Sacramento and the Cities of Citrus Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. For more information, see the Glossary. May 2007 1 1

Chapter 1 Promote the consideration of stormwater management early in the site planning and project design process; the optimal, most cost-effective approach often involves integrating stormwater controls into overall site design. Provide tools and criteria (including maintenance and construction considerations) for selecting and designing a range of stormwater quality control measures. Incorporate recommendations of the local vector control districts so that stormwater quality control facilities do not create mosquito breeding habitat. Background Information Under the federal Clean Water Act, stormwater discharges are regulated through National Pollutant Discharge Elimination System (NPDES) Municipal Stormwater Permits. In California, the State Water Board and its nine Regional Boards oversee implementation of the Clean Water Act, and the Central Valley Regional Water Quality Board (Regional Board) issues and enforces NPDES stormwater permits within the Central Valley. Phase I NPDES permits have been issued to municipalities with a population greater than 100,000 (and certain industries and construction projects) since 1990. The Regional Board began issuing Phase II NPDES general permits to smaller municipalities in 2003. Municipal stormwater permits require municipalities to regulate and manage the quality of urban runoff throughout their jurisdictions, including runoff from new development and significant redevelopment projects. Sacramento Areawide Stormwater Permit Requirements The Sacramento Areawide NPDES Municipal Stormwater Permit is a Phase I permit and applies to the County of Sacramento along with the Cities of Citrus Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. Originally issued in 1990, the Sacramento stormwater permit has been reissued several times. The current permit (NPDES Permit No. CAS082597) was adopted in December 2002 and is anticipated to be reissued in 2008. The permittees function independently on many tasks, including reviewing, processing and permitting plans for new development and redevelopment in their respective jurisdictions. However, they work together on other tasks and projects, such as the creation of this manual. This manual is an outgrowth of prior steps taken to comply with the municipal stormwater permit. The permittees (collectively referred to as the Sacramento Stormwater Quality Partnership, or Partnership) began conditioning development projects in Sacramento County to include stormwater quality control measures in the mid 1990s. The City and County of Sacramento published the Guidance Manual for On-Site Stormwater Quality Control Measures in January 2000; that document was widely referenced by all the permittees and is now being replaced by this manual. This manual replaces and is an expansion of, the Guidance Manual for On-Site Stormwater Quality Control Measures produced by the City and County of Sacramento in January 2000. It consolidates all stormwater quality design information previously published by the agencies in several different documents. 1 2 May 2007

Introduction In July 2003, the permittees published their Stormwater Quality Improvement Plans, which describe their comprehensive program to comply with their municipal stormwater permit and reduce pollutants in urban runoff to the maximum extent practicable. The New Development program element of the plans called for an assessment of existing development standards and amendment/adoption of new standards as needed to better address the permit. (As used here, the term development standards collectively refers to the policies, ordinances, codes and design standards established and enforced by each of the permitting agencies.) In December 2003, the Partnership submitted a Development Standards Plan (DSP) to the Regional Board; the DSP assessed the existing development standards (as of 2003) and proposed actions that would be taken to amend the standards within one year of approval of the DSP. The Regional Board officially approved the DSP on May 18, 2005, giving the Permittees until May 18, 2006 to complete the process of amending/adopting new standards. According to the municipal stormwater permit, the Permittees have until May 18, 2007 to publish technical design guidelines to help the development community understand and implement the new standards. This manual constitutes those required technical design guidelines, completing the work begun with the DSP. The DSP affected the types of projects subject to this manual. The Sacramento municipal stormwater permit specifies eight categories of new development and redevelopment projects that are subject to development standards related to stormwater quality management. Some of the categories and corresponding thresholds specified in the stormwater permit were effectively modified when the Regional Board approved the DSP in May 2005. Those changes are reflected in this manual (Tables 1-2 and 3-2). City of Roseville Phase II Stormwater Permit Requirements The City of Roseville (located in South Placer County) obtained coverage under California s Phase II NPDES Municipal General Stormwater Permit in July 2004. Prior to that time, Roseville did not require post-construction stormwater quality control measures for new development. Under the terms of their Phase II permit, Roseville s program for controlling runoff pollution from development projects must comply with the requirements outlined in Attachment 4 of the permit or with a functionally equivalent program approved by the Regional Board. The City of Roseville opted to work collaboratively with the Sacramento area permittees to create this manual as a functionally equivalent program. Since the Phase I Sacramento and Phase II Roseville municipal stormwater permits have slightly different requirements regarding development standards, staff conducted an analysis at the onset of the project to verify that this single design manual would satisfy both permits. Agency Collaboration in Developing this Manual This manual is the result of a collaborative planning effort by a steering committee comprised of managers and staff from the following agencies: May 2007 1 3

Chapter 1 County of Sacramento, Department of Water Resources (also representing the Cities of Citrus Heights and Rancho Cordova) City of Sacramento, Department of Utilities City of Elk Grove, Department of Development Services/Public Works City of Folsom, Department of Public Works City of Galt, Department of Public Works City of Roseville, Departments of Environmental Utilities and Public Works. In addition, the local vector control districts were consulted, since several types of stormwater quality control measures could have the potential to support mosquito breeding habitat, if not properly designed, constructed and maintained. Other contributors included local sanitation districts, fire departments and districts and solid waste interests. Using the Manual Intended Audience This manual is primarily intended for people involved in the design or review/approval of development projects. Table 1-1 lists the different professionals who typically should be involved at each phase of a project. It is important to involve many different design professionals early in the planning process when the initial site layout is determined. It is equally important that those involved in site planning and design work collaboratively throughout the site design process; that way, stormwater quality features can be optimally integrated into the site and project design. Benefits of the collaborative team approach and strategies for involving everyone throughout the process are discussed more in Chapter 2. The manual also contains some information related to construction and maintenance of stormwater quality facilities; therefore it may be used by contractors, inspectors, property owners and others as shown in Table 1-1. Finally, the manual may be used by developers, property owners, contractors, elected and appointed public agency officials, environmental regulatory agencies and interested citizens. Projects Covered by the Manual Table 1-2 lists the types of projects and land uses generally addressed by this manual. If a project falls into one of those categories, see Table 3-2 (in Chapter 3) to see if the project meets the size threshold that triggers the requirements and, if so, to see which specific requirements apply. Development projects potentially subject to this manual include both new development as well as "significant redevelopment" projects. Significant redevelopment includes, but is not limited to: expansion of a building footprint; replacement of a structure; replacement of impervious surface that is not part of routine maintenance activity; and land-disturbing activities related to structural or impervious surfaces. 1 4 May 2007

Introduction For redevelopment projects subject to this manual, the applicable design standards apply only to the redeveloped area, and not to the entire site, except in cases where untreated drainage from the existing developed portion is allowed to enter/flow through the redeveloped portion. In such cases, any new required treatment control measures must be designed for the entire contributing drainage area. Redevelopment and infill project applicants should check with the local permitting agency at the start of project design to verify whether or not the manual requirements apply. Table 1-1. Applying the Design Manual to Every Phase of Development Project Phase Typical Decisions/Activities Professionals Involved Initial site layout and planning Building and parking footprints; site access; preservation/integration of existing natural resource features (trees and other vegetation, creek buffers, wetlands, vernal pools, open space); use of topographic lows for siting certain stormwater quality features; identification of existing sewer and drainage facilities; preliminary on-site soils testing to determine which stormwater quality features will work on the site Architects; planners; environmental consultants; geotechnical and drainage engineers; landscape architects; and permitting agency planning and engineering staff (initial consultations and preapplication meetings) Site improvement design Building design Landscape and irrigation design Construction Maintenance Site contouring and grading; on-site drainage and connections to municipal system; other utilities (sanitary sewer, water, power); pavement selection for parking, roads and walkways Final building footprint; building access; roof type and materials; roof drainage/downspout system; location/type water features (e.g., ponds, waterfalls, fountains); location of landscaping around the building (and possibly selection of vegetation type/style to complement building design or provide consistency with existing vegetation to be preserved on site or in the surrounding area) Final selection of type of trees and other vegetation; final contouring of landscaped areas; installation of vegetation and bark/other ground cover materials; design and installation of irrigation system; construction of water features Installation of stormwater quality facilities; installation of erosion and sediment control measures to protect the facilities from receiving high sediment loads during construction process; final clean-out and preparation of stormwater facilities prior to permitting agency acceptance Building, grounds and landscape maintenance, including maintenance of vegetated stormwater quality facilities (mowing, watering schedule, application of fertilizers, herbicides and insecticides, replacing/ repairing damaged vegetation and eroded areas) Civil and other engineers; landscape architects; permitting agency plan review staff (drainage engineers, traffic, fire, etc.) Architects; civil/structural, geotechnical and other engineers as appropriate Landscape architects, wetland specialists/ biologists if applicable Contractors; erosion control specialists; permitting agency inspectors Property owners and managers; maintenance and landscape contractors; permitting agency maintenance staff May 2007 1 5

Chapter 1 Table 1-2. Types of Projects Addressed By This Manual 1 Project Category 2 Single Family Residential Multi-Family Residential Commercial and Light Industrial Automotive Repair Shops Retail Gasoline Outlets Restaurants Hillside Developments Parking Lots Streets/Roads Heavy Industrial Description In general, this category includes detached single-family homes and duplexes. Check with local permitting agency for verification. In general, this category includes attached single-family homes (except duplexes), condominiums, townhomes, and apartments. Check with local permitting agency for verification. Development on private land that is not for heavy industrial or residential uses. This category includes, but is not limited to hospitals, laboratories and other medical facilities, educational institutions, churches, recreational facilities, parks, commercial nurseries, car wash facilities, mini-malls and other business complexes, shopping malls, hotels, office buildings, public warehouses, and other light industrial facilities. A facility that is categorized by one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. Any facility engaged in selling gasoline Any facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (SIC code 5812) and has 5,000 or more square feet of impervious area. Any development that creates 5,000 square feet of impervious surface in an area with known erosive soil located in an area with natural slopes having a twenty-five percent or greater grade. All or portion of parking lots exposed to rainfall (uncovered impervious area) for the temporary parking or storage of motor vehicles used personally, for business, or for commerce. Any paved surface used by automobiles, trucks, motorcycles, and other vehicles. Heavy industrial facilities (light industry covered under commercial category) 1 2 Thresholds for determining which types of stormwater quality measures apply to each project type can be found on Table 3-2 in Chapter 3. Refer to applicable permitting agency s zoning definitions. How the Manual is Organized Chapter 1 provides an introduction. Chapter 2 explains the benefits of integrating stormwater quality management into overall project design and describes strategies and principles for doing so. Chapter 3 outlines a step by step process for fulfilling the requirements of this manual and references the other chapters for more information. Chapters 4 through 6 provide specific siting and design criteria (as well as construction and maintenance considerations) for a range of stormwater quality control measures. Chapter 4 covers source controls, Chapter 5 covers runoff reduction measures, and Chapter 6 covers treatment controls. 1 6 May 2007

Introduction The Appendices provide additional detail on a number of topics. In addition: Appendix C lists permitting and contact information related to discharges to the sanitary sewer; that is included since some source control measures call for discharging potentially polluted site runoff to the sanitary sewer. Appendix H lists sources for stormwater management information not covered by this manual (as described in the next section). Reference materials used to develop each chapter are listed at the end of that chapter, and references used to develop the various control measure fact sheets are presented at the end of each fact sheet in Chapters 4-6. The two main reference documents were the City and County of Sacramento s Guidance Manual for On-Site Stormwater Quality Control Measures (January 2000) and the California Stormwater Quality Association s statewide document, California Storm Water Best Management Practice Handbook for Development (May 2003). CASQA s California BMP Handbook for Development was referenced in the creation of this Design Manual, with many adaptations made for the Sacramento Region. In the event of conflicts between this manual and the CASQA handbook, this manual will generally take precedence. Contact your local permitting agency for clarification. Stormwater Management Information Not in the Manual This manual does not include: drainage/flood control design standards temporary erosion and sediment controls and other pollution controls used during construction activities on-going operational practices to control pollution at industrial and commercial facilities once they are constructed (such as making sure employees don t dump hazardous or liquid wastes in the trash). For information about those topics, see the references listed in Appendix H. Obtaining the Manual and Updates Go to www.sacramentostormwater.org to download this manual (PDF format) and obtain information for ordering a hard copy. Make sure that you are always using the most current edition. The manual will be updated periodically to reflect new information. To determine if updated information or errata sheets are available, check www.sacramentostormwater.org regularly or contact one of the local permitting agencies listed in the front of this manual. Questions and Comments We welcome your questions and comments and will also consider this information in making future updates and improvements. May 2007 1 7

Chapter 1 For information related to projects in Sacramento County, contact the appropriate permitting agency listed at www.sacramentostormwater.org (new development). For projects in the City of Roseville, contact the Department of Public Works Engineering Division at (916) 774-5339 or e-mail the City at stormwater@roseville.ca.us. Send questions and comments on the design manual to: dwrw@saccounty.net with stormwater design manual in the subject line. Low-Impact Development Strategies and This Manual The process and requirements included in this manual are intended to promote effective stormwater quality control measures that are optimally integrated into the site and project design. This approach will result in built projects with lowered impacts to the environment, and therefore reflects the low impact development (LID) philosophy. For the purposes of this manual, LID is defined as follows: Low impact development is a stormwater management strategy that emphasizes conservation and use of existing natural site features integrated with distributed, small-scale stormwater controls to more closely mimic natural hydrologic patterns in residential, commercial, and industrial settings. (Puget Sound Action Team 2005). In this manual, Chapter 2 (and Step 3 in Chapter 3) promotes the conservation/use of natural site features, an important LID principle. Chapter 4 describes how site specific, lot-scale source control measures can keep pollutants from contacting runoff and leaving the site. Chapter 5 focuses on runoff reduction control measures integrated into site design; many of these techniques are intended to reduce site imperviousness, another important LID principle. And finally, Chapter 6 includes a variety of treatment control measures, some of which are intended to be applied at the lot level for pollution and runoff control. 1 8 May 2007