Marriott Autograph Collection San Juan Capistrano

Similar documents
Table with Chairs. Slate Tile. Concrete Planter PRELIMINARY LANDSCAPE IMAGES L 1.3

plant hack guide our mission: to maintain the beauty and function of the urban landscape and the communities that surround it

UNIVERSITY AVENUE STREETSCAPE LA MESA, CALIFORNIA

PISMO BEACH HOTEL 147 STIMSON AVENUE PLANNING APPLICATION 01/23/2014 PROJ. NO.: 14120

BROOKLYN BASIN - PHASE I ON SITE FINAL DEVELOPMENT PLAN - EXISTING SITE PHOTOS October 13, 2014 L-1

PCH & GOLDEN LANTERN. CHARLES COMPANY DANA POINT, CALIFORNIA September 8, 2014

Tree Town USA Bunnell Availability List

S T I R L I N G ARCHITECTS IN C Second Street Suite A188 Tel: (925)

GROUND LEVEL ENLARGEMENT / STREETSCAPE AT PIER AVENUE STRAND & PIER HOTEL HERMOSA BEACH HARDSCAPE MATERIAL KEY MAP PIER AVENUE

AVAILABILITY LIST 10/15/2018

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

Mission Dolores Park Rehabilitation Project

ZONING: C-1-T. PARKING PROVIDED On-Site Valet 51 On-Site Holman Dedicated 14 Off-Site Valet TOTAL 113. (Mechanical Lifts)

A SPANISH INSPIRED GARDEN DESIGN. Marie Myers Shearing SPA101-U1 Summer Synthesis 6

A3-2 REDWOOD CITY UNIT PLAN - C (LOT 11) LOT MAP N.T.S. CLASSIC COMMUNITIES BREWSTER AVENUE FULLER STREET WARREN STREET

Elsinore Valley Municipal Water District California Native and Drought Tolerant Plants for the Garden

PAGE: 1 EXHIBIT 1

City of San Juan Capistrano Agenda Report

RENWICK HOUSE RELOCATION PROJECT. RENWICK HOUSE RELOCATION 211 N. College Avenue, Claremont, CA February 14, 2016

190 W. CLIFF DR. LANDSCAPE LANDSCAPE A. VISION / NARRATIVE B. LANDSCAPE PLANS C. MATERIAL BOARD D. PLANTING LIST / IRRIGATION NOTES

Installed Hardiness Zone 9b

5Irrigating With. Recycled Water

THE SETTLEMENT AT WILLOW GROVE LANDSCAPE CODE

3.13. Development Guidelines

AHBE Landscape Architects Revitalizes Southern California Streetscapes

ROVEY FARM ESTATES HOMEOWNERS ASSOCIATION DESIGN GUIDELINES FOR LANDSCAPING

Hardiness Zone 6a S. LA CIENEGA BLVD. LOS ANGELES, CA T

LIVE WALL LIVE WALL TRELLIS FROM SECOND FLOOR 36"H LOW WALL W/ STUCCO FINISH. COLOR TO MATCH ARCHITECTURE TRELLIS, SEE ARCHITECTURAL'S DRAWINGS

California Native Garden

FINAL DEVELOPMENT PLAN: JUNE 12, Shoreline Park Design Plan, Brooklyn Basin Prepared for Signature Development / Zarsion by ROMA Design Group

101 TILIA 102 PYRUS 103 PYRUS 104 PYRUS

tarleton oak Board of Architectural Review Original Submission Date: April 24, 2018 (Phase I & II) Resubmission Date: June 26, 2018 (Phase II Only)

Oct. 19th, 2015 Civic Design Review Submittal - Phases 1 & 2. Noe Valley Town Square

AGENDA ITEM CITY COUNCIL. Item Number: Submitted By: Douglas D. Dumhart, Community Development Director

Salvia leucantha 'Santa Barbara' MEXICAN BUSH SAGE 'SA

PRUNING SHRUBS IN THE LOW AND MID-ELEVATION DESERTS IN ARIZONA. How to prune? Why prune?

SAN LEANDRO TECHNOLOGY CAMPUS

Mixed Clematis. Installed Hardiness Zone 7a S. LA CIENEGA BLVD. LOS ANGELES, CA T

Horizon at Playa Vista- Playa Vista, CA

A garden is a planting area, of soil, pavers, or pots/plants only, outside the building and uncovered except for the roofline.

Strategically Choosing Plants. MWELO Compliance Through Planting

CHAPTER V: PUBLIC REALM DESIGN GUIDELINES. Public Realm

2221 Main Street LANDSCAPE ARCHITECTURAL SET - REVISED REZONING APPLICATION - 19 MAY 2017

Budgeting For a Better Landscape 1

WILSON PLACE FINAL DESIGN

DESIGN REVIEW COMMITTEE AGENDA ITEM

Client: Job site: Report Date:

PC RESOLUTION NO GRADING PLAN MODIFICATION (GPM)

Purtis Creek Farms Availability List

461 Crystal Springs Road, St. Helena. Property Details. Coldwell Banker Brokers of the Valley

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

Saturday March 8th at 9am - 5pm

See pricing, information, and more pictures of all plants featured in this video!

Hydrozoning Your Garden

LANDSCAPE PLAN - GROUND

Ocean Avenue 2019 Spring Plant Sale Order Form

ARDEN PARK HOMEOWNERS ASSOCIATION DESIGN GUIDELINES FOR LANDSCAPING Adopted September 2002 (Revised October 2002) (Revised August 22, 2013)

MUTUAL OPERATIONS PHYSICAL PROPERTY. Landscape Areas, Trees, and Shrubs Mutual Two

POOL PAVILION RESIDENCE

WELCOME! Landscape Renovation Community Meeting

CONDITIONAL USE PERMIT SITE PLAN

Installed Hardiness Zone 9b. Bougainvillea S. LA CIENEGA BLVD. LOS ANGELES, CA T

Civic Design Review - Phase 1 Presentation August 15, Building Design & Construction

6 STANDARDS THAT APPLY TO ALL

ST. PETER ACADEMY 2018 SPRING FLOWER SALE

QUEEN CREEK STATION HOMEOWNERS ASSOCIATION DESIGN GUIDELINES FOR LANDSCAPING Adopted April 1, 2015 Amended November 24, 2015

2012 ASLA ANNUAL MEETING & EXPO FS017 Residential Jewels in the Desert Fri 9/28 1PM Field Session

Southern States Nurseries, Inc. Availability List

buffer park park in rooms braided spaces ENTRY PLAZA ENTRY RELAX ENTRY GROW LEARN PLAY EAT ENTRY exercise GATHER

Celebration Florida Friendly Pattern Book

Office of the Chief Medical Examiner Building

2017 Spring Plant Fundraiser Plant and Flower Guide

LANDSCAPE PLAN - GROUND

RFB NO ANNUAL CONTRACT FOR LANDSCAPE SUPPLIES AND SERVICES

The Preserve Specific Plan APPENDICES

PLANNING COMMISSION STAFF REPORT

17 th & Folsom Park. Civic Design Review Phase 2 December 2012

Drought-Tolerant Planting & Design

Plant Propagation. What are the cultural requirements necessary for growing a plant from cutting to a gallon pot?

Urban Movement. invites the occupant to interact with it. The sight lines from within the home offered a number of opportunities that

Burdett Condo 1120, 1124 & 1128 Burdett Avenue, Victoria

Gruene River Place PDD CONCEPT PLAN AND DEVELOPMENT STANDARDS

LELAND & VISITACION PARK COMMUNITY MEETING

Architectural Review Board Report

DITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA

1. Enhance the view and image of the community, particularly in commercial areas.

Larrabee Park Chicago, IL

Office of the Chief Medical Examiner Building. 1 Newhall Street, San Francisco, California

LANDSCAPE GUIDELINES. Maintaining Our Community s Harmony and Beauty is Important

C L I N E NOT FOR CONSTRUCTION CONCEPTUAL SITE PLAN SITE DATA TABLE TMS # E N G I N E E R I N G COMPREHENSIVE DESIGN CONSULTING

HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012

STAFF BRIEF. Project: 2016-COA-356 Meeting: September 8, th Street Oxford Hotel

PART TWO: PROJECT SPECIFIC DESIGN GUIDELINES

Landscape Design Assistance Program Approval Questionnaire

Houston s Guide to Planting Organic

#16 ) FDP THE HABIT BURGER GRILL FINAL DEVELOPMENT PLAN

Maximizing Your Space with California Friendly Plants

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

Planting Combinations and Schemes. Acer. Acer Hosta - green leaves, ed Hosta - white & green m

Ash, Texas 15G 8' H. Aspidistra (Cast Iron Plant)

Transcription:

Marriott Autograph Collection San Juan Capistrano JOB #:205- REV. //

Table of Contents Preliminary Grading Plan Context Map & Project Summary 2-8 Conceptual Site Plan 9 Below Grade Parking 20 Level Floor Plan 2 Level 2 Floor Plan 22 Level Floor Plan 2 Roof Plan /Typical Guest Rooms 2 Southeast View Rendering 25 Hotel Elevations 2 Hotel Elevations 2 Restaurant Elevations 28 Restaurant Plans 29 Building Sections 0 2 JOB #:205- REV. //

NOT A PART Preliminary Grading Plan -ISSION )NN AN *UAN #APISTRANO JOB #:205- REV. //

Comparison of the Plaza Banderas Project Approval to the Proposed AC Modification EIR Project Description Prior 20 Plaza Banderas Approval Proposed Mission Inn Project Differences Between 20 Approval and AC Mod Application Site Area (acres)...8 0.08 Quit Claimed Right Of Way Per Development Agreement * 0 0 0. 0. Total Site Acres.0.0.2 0.52 Total Site Square Feet 5,0 5,0 5,8 22,5 SPRING STREET Building Area Hotel Basement 0 0 5, 5, First Floor 2,25 5,5 8,9,599 Second Floor 2,52 2,2 2,5,05 Third Floor,2, 2,929 8,5 Total Hotel:,9,5 9, 20,8 Retail and Office Building First Floor,509, 0, Second Floor,9,02 0,02 Total Retail/Office GSF: 8,80 0,9 0 0,9 Restaurant Building (Relocated To Ortega Hwy Frontage) First Floor 5,,095, 2,8 Second Floor 0 0,2,2 Total Restaurant GSF: 5,,095,8,2 EL CAMINO REAL HOTEL Total Building Floor Area (GSF): 89,200 92, 0,95 9,8 Total Above grade Floor Area (GSF): 89,200 92, 9,25, MISSION SAN JUAN CAPISTRANO Room Count 2 2 2 0 Site Coverage Total First Floor Footprint,98,90 2,5 5, Percent Site Covered.% 5.5% 2.0% 8.5% Total Floor Area Ratio.% 8.%.%.9% HOTEL RESTAURANT ORTEGA HWY. DEL OBISPO Required Parking For Proposed AC Modification Calculation Quantity Total Required Hotel.8 space per room 2 00 Restaurant Per Parking Study space per 00 SF,8 8 Events space per 00 SF 5,500 Total Code Required Parking 85 2 Code Required Parking Provided Site Level 09 Basement Parking Total Code Required Parking Provided Included in AC Mod Application Plans** Other Parking Provided Added Spring Street Parking Per License Agreement (Separate Submittal) Added Parking in Excess Right Of Way Per Master Plan (Separate Submittal) Tandem Parking Stalls Added in Basement 2 Additional Parking Capacity In Valet Configuration 0 Total Additional Parking Created By Project 9 Total Project Parking Created In Master Plan 2 * The Plaza Banderas Project was processed under a stated acreage of.. However the approved site plan, in coordination with the approved Development Agreement, included the. acre excess right of way which is being deeded back to the property. ** The Plaza Banderas Project was approved to provide 85 parking stalls. *** The 20 Project Description lists,5 as the total hotel square footage, but there is 50 SF discrepancy in the floor plan total. Context Map & Project Summary JOB #:205- REV. //

SPRING STREET 2 NOT A PART 25 22 0 2 20 9 EL CAMINO REAL 2 2 9 8 2 0 0 9 5 2 0 8 5 2 0 9 2 2 5 29 8 R.O.W. 5 2 28 2 ORTEGA HWY. R.O.W. 2 UNDER SEPARATE SUBMITTAL Landscape Key EL CAMINO REAL ENTRY WITH SIGNAGE PILASTER 2 HOTEL GARDEN PLAZA KITCHEN GARDEN CORNER PLAZA FOUNTAIN 5 CONTROLLED ACCESS TO HOTEL COURTYARD STREETSIDE DINING PATIO FIREPIT COURTYARD LOUNGE 8 COURTYARD WITH SEASONAL COVER 9 FOUNTAIN COURT MOTORCOURT WITH UPGRADED 0 PAVING MOTORCOURT FOUNTAIN RESTROOM & POOL EQUIP. BLD. 2 OUTDOOR LOBBY LOUNGE LINEAR FOUNTAIN OR FIREPIT VEHICULAR ACCESS CONTROL 5 CABANAS POOL & SPA RIM FLOW 8 9 20 2 22 2 2 25 2 2 28 29 POOL DECKING POOL LIVING WALL WITH FOUNTAIN POOL ACCESS GATE ENTRANCE TO UNDERGROUND PARKING TRUCK/BUS ENTRY REAR HOTEL ENTRY MAIN LOBBY DROP-OFF PORTE COCHERE STREET PARKING STALLS SPRING STREET IMPROVEMENT TREE SCREENING HISTORIC PROGRAMING ELEMENT (TENTATIVE LOCATION) ARCHITECTURAL ENTRY STATEMENT PEDESTRIAN ENTRY GATE AND PERGOLA SHOT CRETE RETAINING WALL FICUS & BOSTON IVY VINE PLANTING Hardscape Key NUMBER ITEM COLOR/ FINISH Colored Concrete Palomino Wash Finish 2 Colored Concrete Palomino Heavy Wash Concrete Pavers Belgard: Mega-Lafaitt Concrete Pavers Belgard: Lafaitt Grana 5 Concerete Paving Belgard: Mega-Lafaitt Stone Paving Stone Paving 8 Stone Paving 9 Concrete Pavers 0 Tile to match architecture interior 80mm Ashlar Bella 80mm 5x5 Montecito 80mm 8x8 Bella Cameron Flagstone Cameron Recs & Squares Cameron Planking Linear Planking Herringbone Color:Terracotta --- Asphalt Paving --- 2 Colored Concrete City Sidewalk City Standard Olsen Pavers Wash Finish --- Tree Palette SYMBOL NAME SIZE ARBUTUS MARINA STRAWBERRY TREE CUPRESSUS SEMPERVIRENS ITALIAN CYPRESS EUCALYPTUS SIDEROXYLON RED IRON BARK (OFF-SITE) JACARANDA MIMOSIFOLIA JACARANDA OLEA EUROPAEA MISSION OLIVE PARKINSONIA DESERT MUSEUM PALO VERDE PHOENIX CANARIENSIS CANARY ISLAND DATE PALM PHOENIX DACTYLIFERA DATE PALM TRISTANIA CONFERTA BRISBANE BOX 8 BOX BOX 2 BOX 2 BOX 2- HIGH 8 BOX 20 HIGH BROWN TRUNK 20 HIGH BROWN TRUNK BOX Shrubs BOTANICAL NAME Anigozanthus spp. 'Sprengeri' Bougainvillea 'Raspberry Ice' Bougainvillea 'San Diego Red' Buxus japonica 'Green Beauty' Callistemon 'Little John' Carissa macrocarpa Cistus x hybridus Clivia miniata Dianella spp. Dietes bicolor Dodonaea viscosa 'Purpurea' Dymondia margaretea Feijoa sellowiana Grewia occidentalis Hemerocallis species Heuchera sanguinea Juniperus chinensis 'Blue Point' Juniperus chinensis 'Torulosa' Lantana montevidensis Lavandula spp. Ligustrum japonicum 'Texanum' Limonium perezii COMMON NAME Kangaroo Paw Sprenger Asparagus NCN NCN Japanese Boxwood Dwarf Bottlebrush Natal Plum White Rockrose Gray Paroo Lily Fortnight Lily Purple Hopseed Bush Dymondia Pineapple Guava Daylily Coral Bells Blue Point Juniper Hollywood Juniper Lantana Lavender Wax Leaf Privet Statice, Sea Lavender Shrubs BOTANICAL NAME Melaleuca nesophila Myoporum parvifolium Nandina spp. Pelargonium peltatum Phormium spp. Photinia fraseri Pittosporum spp Podocarpus spp. Prunus caroliniana 'Bright 'n Tight' Rhapheolipis spp. Rosmarinus spp. Salvia spp. Santolina chamaecyparissus Strelitzia reginae COMMON NAME Pink Melaleuca NCN Heavenly Bamboo Ivy Geranium Flax Red Tip Photinia Tobira Fern Pine Carolina laurel cherry Indian Hawthorn (Pink) Flower Carpet Rose Rosemary Sage Lavender Cotton Bird of Paradise Succulents BOTANICAL NAME Aeonium spp. Agave spp. Aloe spp. Bulbine frutescens Calandrinia spectabilis Crassula spp. Echeveria spp. Graptopetalum paraguayense Hesperaloe spp. Sedum spp. Senecio spp. COMMON NAME NCN Agave Aloe Orange Stalked Bulbine Rock Purslane Silver Dollar Plant Hens and Chicks Ghost Plant Red Yucca Paddle Plant Sedum NCN Vines BOTANICAL NAME Bougainvillea Calliandra haematocephala Distictus buccinatoria Distictus 'rivers' Gelsemium sempervirens Hardenbergia violacea Jasminum polyanthum Parthenocissus tricuspidata Tecomaria capensis Grasses COMMON NAME San Diego Red Pink Powder Puff Blood Red Trumpet Vine Royal Trumpet Vine Carolina Jessamine Lilac Vine Jasmine Boston Ivy Cape Honeysuckle BOTANICAL NAME COMMON NAME Carex praegracilis Western Meadow Sedge Carex tumulicola Berkeley Sedge Festuca spp. Fescue Juncus patens California Gray Rush Muhlenbergia 'Regal Mist' Pink Muhly Muhlenbergia rigens Deer Grass Pennisetum spathiolatum Slender Velt Grass Hesperaloe spp. Red Yucca 50 DEERE AVE, SANTA ANA, CA 9205 O 99.250.822 www.landconcern.com INN AT THE MISSION SAN JUAN CAPISTRANO, CALIFORNIA 0 8 2 SCALE: = May 2, 20 L-

-0 HIGH EL CAMINO REAL ENTRY - STONE PILASTER W/ SIGN POTENTIAL 5 - WROUGHT IRON FENCE 0-0 HIGH PLAZA PORTAL -STONE TO MATCH ARCHITECTURE -WOOD BEAM -DECORATIVE IRON GATES -LANTERNS PLAZA FOUNTAIN -0 HIGH STUCCO WALL TO MATCH ARCHITECTURE. 0-0 HIGH EVENT GARDEN PORTAL -STONE TO MATCH ARCHITECTURE. -RUSTIC WOOD GATES -LANTERNS OLIVE TREE BOSQUE BEYOND El Camino Elevation A 0 8 KEY MAP Plaza Portal Elevation B 0 2 8 A B NOT TO SCALE JOB #:205- REV. //5 REV. //

0-0 HIGH STONE PORTAL WITH DECORATIVE WOOD GATES 8-0 STONE MONUMENT - LANTERNS 8-0 HIGH STONE MONUMENT - BRONZE PLAQUE STUCCO CURVED WALL ORTEGA HWY. CURB LINE Ortega HWY. Entry Monuments Elevation C 0 8 MOTOR COURT FOUNTAIN OLD WORLD SPECIMEN OLIVE LIVING WALL GLASS POOL FENCE STUCCO WALL TO MATCH ARCHITECTURE. STONE WALL TO MATCH ARCH. SWALLOWS ART ELEMENT Elevation D 0 8 OVERFLOWING POT KEY MAP LOW STONE WALL WITH SCUPPERS STONE CURBING D Motorcourt Fountain Enlargement Motorcourt Fountain Concept Sketch C NOT TO SCALE JOB #:205- REV. //5 REV. //

PHOENIX DACTYLIFERA IN RAISED PLANTER BED POOL 5-0 HIGH GLASS POOL SAFE FENCING PHOENIX DACTYLIFERA IN RAISED PLANTER BED Pool Walls Elevation E 0 2 8-0 STUCCO WALL - MISSION STYLE ARCHITECTURE. 5-0 HIGH GLASS POOL SAFE FENCING FOUNTAIN SCUPPER 0-0 HIGH LIVING WALL POOL 5-0 HIGH GLASS POOL SAFE FENCING - STONE WALL KEY MAP Pool Walls Elevation F 0 2 8 E F NOT TO SCALE 5 JOB #:205- REV. //5 REV. //

POOL POOL TILE 5-0 HIGH GLA SS POOL SAFE FENCING 2 HIGH LIVING WALL INTEGRATED SCUPPERS AND FOU NTAIN BASIN 0 2 KEY MAP G NOT TO SCALE JOB #:205- REV. //5 REV. //

PHOENIX DACTYLIFERA IN RAISED PLANTER BED 5-0 HIGH GLASS POOL SAFE FENCING 0 STONE WALL - RECESSED CANDLE VOTIVES SPA KEY MAP Spa Wall Elevation H 0 2 H NOT TO SCALE JOB #:205- REV. //5 REV. //