Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

Similar documents
Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

BEACH AND INLET PROJECTS UPDATE

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit?

Improvement of the Atlantic Coast of New York City,

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Appendix to Amicus Curiae Brief: Selected Provisions of the South Carolina Beachfront Management Act

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

North Carolina Coastal Federation

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Living Shoreline Professionals Advanced Training. August 24 & 31, 2017 Hosted by Virginia Institute of Marine Science College of William & Mary

Applications of Coir Fibre Products in Environmental Erosion & Sediment Control and Restoration

Engineering of Dunes. Protection Benefits of Coastal Sand Dunes. FEMA Dune Standards

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

There is an ongoing regulatory concern that

CHAPTER Committee Substitute for Senate Bill No. 1472

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Scarborough Waterfront Project

Coastal Erosion Commission: context, examples, and next steps

5 TH ANNUAL CAPE COASTAL CONFERENCE

2013 Summer Recap. Rockaway Beach

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Post Construction BMPs

Coastal and River Erosion Control. Erosion

What Are Some Ways Erosion Can Be Managed?

Natural & Nature-Based Solutions for Risk Reduction & Resilience

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Town of Vershire Road Erosion Inventory Report

Building a Rain Garden in Colorado. Created By:

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

The use of low head weirs to. perennial streams with their floodplains:

Use of Best Management Practices

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Coffee Creek Park Development Low Impact Development (LID)

Homeowners Guide to Stormwater BMP Maintenance

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Erosion Control for Home Builders in the. City of Jacksonville

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Construction Progress Report

Weston s Wetlands, Stormwater, & Open Space

Information for File # ARC

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Memorandum Planning. Thursday, January 8, 2015

Hydrologic Assessment of using Low Impact Development to Mitigate the Impacts of Climate Change. Chris Jensen, AScT Master of Science Thesis

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

EROSION CONTROL Professional Development Training. Sean Crimmins, President Brian Barker, Southeastern Consultant

Lake Nokomis Shoreline Enhancement Project

EROSION & SEDIMENT CONTROL

REVETMENT WORKS- MUSKERS BEACH

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

Activity Residential Site Planning

Information for File # JTF

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Could this be a concrete solution to biodiversity loss?

Nick Sigmund, Sr. Zoning Officer

NC Coastal Management Program Update. Mike Lopazanski Policy & Planning Section Chief April 3, 2015

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Eco-engineering of artificial coastal structures to reduce their impact on the surrounding environment

Hunts Point Landing, Bronx, New York

Managing Shorelines: Control Erosion and Protect Water Quality. Ben Powell Clemson Extension

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

River Mile 10.9 Removal Action Overview

An Integrated Approach for Water Management Examples from The Netherlands. Addressing Climate Change and Sea Level Rise

EEA Capital Investment in Green Infrastructure

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

Rhode Island Shoreline Change Special Area Management Plan

Coastal Construction Setback Line Review

A: Downtown Diversion Pipe

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

Grand River Ravines Georgetown Township

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Broward County Coastal Engineering Consultant Services For Segment III Shore Protection T P1 R. Harvey Sasso, P.E. Danielle Irwin, CFM

Decision Notice. Proposed Action

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

.MANAGED RETREAT. Need for managed retreat

CHATHAM COUNTY S PATH TO SUSTAINABILITY - THE NATURAL RESOURCES SIDE

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Town of Corinth Road Erosion Inventory Report

Structural Storm Water Best Management Practices (BMPs)

New York City, 19 th c.

Broward County Shore Protection Project Segment II. Physical Monitoring Plan

CONTROLLING COASTAL BLUFF GROUNDWATER

Natural Infrastructure for Coastal Resilience Unlocking Funding Resources

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

New York State Department of Environmental Conservation

Royal River Youth Conservation Corps

Transcription:

Sconset Geotextile Tube Update Sconset Bluff, Nantucket Maria Hartnett, Associate www.epsilonassociates.com

Presentation Outline Project Setting & Need for Erosion Control Project Components Geotubes Sand Mitigation Vegetation Stormwater Management Monitoring Program Conclusions & Next Steps

Project Location Project Location Project site exposed to full fetch of the Atlantic Ocean Project site particularly vulnerable to nor easters

Sconset Bluff 70-90 feet tall Glacial origin Denuded (prior to 2015) Narrow fronting beach Vulnerable to wave attack

Sconset Bluff and Storm Waves

Community Setting Area known as Siasconset (Sconset) Many historic homes built in late 1800 s and early 1900 s Served by a single accessway known as Baxter Road Sankaty Light

Erosion History Sconset Bluff began eroding in the 1970 s Erosion is progressing from north to south Group of residents formed Sconset Beach Preservation Fund (SBPF)

Coastal Bank Retreat Long-Term Average: 4.6 feet/year Potential Single Season Loss: 20-30+ feet/year Winter 2012-2013 resulted in catastrophic erosion 8

Existing Conditions (June 2013) 109-91 Baxter Road Baxter Road Baxter Road, homes, and associated utilities (water/sewer) in imminent danger Geotechnical engineer advised closure of road when within 25 feet of bluff edge Town of Nantucket has legal obligation to provide access to homes Town of Nantucket and SBPF entered partnership to sponsor erosion control project

Alternatives Many alternatives evaluated in theory and in practice since the 1990 s: Managed retreat (house moves) Beach dewatering (installed in 2000 inconsistent results) Beach nourishment (applied 2006-2007 not approved) Marine mattresses and gabions (applied 2010 not approved) Biodegradable bags or envelopes (utilized since mid- 2000 s useful in smaller storms but not effective in major or successive storms) 10

Geotextile Tube Project Preferred due to ability to withstand storm waves, sloped design (decreases wave reflection), ease of installation and, if necessary, removal. Fabricated from high strength, woven polypropylene sewn into a tube shape. Three-four rows of 45 circumference geotextile tubes, each about 19 wide, 7 tall, and 100-200 long. Two phases of construction: three tiers installed in December 2013/January 2014; fourth tier and returns installed October through December 2015. Total length 947 feet.

Construction of Geotextile Tube Project December 2013/January 2014

Construction of 4 th Tier Geotextile Tube Project Fall 2015

Construction of 4 th Tier Geotextile Tube Project

Construction of 4 th Tier Geotextile Tube Project

Construction of 4 th Tier Geotextile Tube Project

Construction of 4 th Tier Geotextile Tube Project

Sand Mitigation August 2015 Protection of bluff prevents it from serving as a sediment source and requires mitigation Massachusetts typically requires annual mitigation equivalent to average annual contribution Project provides 22 cy/lf/yr, which is equal to 1.5 times average annual bank contribution Total volume ~20,000 cy sand/yr May 2015 June 2016

Sand Delivery Sand brought to the site by dump truck from on-island pits Sand delivery occurs during off-season months only

Sand Delivery

How Geotextile Tubes Work 2. The sand cover on the geotubes is washed away, contributing sand like the natural bluff would. 1. Wave runup during storms hits the base of the geotubes instead of the base of the bluff. 3. The sand template on the geotubes is regraded so the tubes are covered.

Vegetation Once the base of the bluff was protected by the geotextile tubes, the face of the bluff could also be stabilized by adding vegetation. Vegetation helps to prevent erosion from wind, rain, and stormwater runoff. American Beachgrass planted in spring 2015; additional planting occurred in spring 2016 above the new returns.

Stormwater Drainage System Top and face of bluff can erode from wind, rain, and stormwater runoff. In January and February 2016, a drainage system was installed on Baxter Road. This drainage system serves to capture stormwater runoff and redirect it, so that it no longer causes erosion from the top of the bluff. Berm installed along roadway where needed to redirect stormwater runoff away from the face of the bluff. June 2016

Monitoring Project is extensively monitored, including: Annual Bluff Monitoring Quarterly Shoreline Monitoring Wetland Well Monitoring Annual Beach Invertebrate Monitoring Semi-annual Underwater Video Monitoring Annual Drainage System Report Annual Sand Delivery Report

Monitoring - Key Findings Geotube system in place since Jan 2014 nearly 3.5 years/4 winters Base of bluff has been stabilized by the geotextile tubes. Shoreline monitoring data shows shoreline is within range of expected positions based on historic data, with no indication of accelerated erosion in front of or adjacent to the geotubes. 2016 bluff survey indicates that mitigation sand template is contributing more than the historic contribution rate and the unprotected bluff. No indication of adverse effect noted in beach invertebrate monitoring, wetland well monitoring, or underwater video monitoring. May 2017 June 2016

Annual Aerial Survey of Bluff The first annual aerial survey was performed of the Project area on April 2, 2016. Second annual survey just completed late May 2017. The results of the 2016 aerial survey were compared to the 2013 aerial survey for those unprotected areas immediately adjacent to the geotextile tube project. Unprotected bluff contribution volume was 12.9 cy/lf/yr, which is 59% of mitigation volume. To the North: 800 ft unprotected bluff Bluff Volume Loss in Unprotected Areas Adjacent to Geotextile Tubes Line Area Volume Lost (CY) Length (Feet) Duration (Years) Erosion Rate (CY/LF/YR) 1 North Unprotected Area 31,329 800 2.75 14.2 2 South Unprotected Area 4,370 210 2.75 7.6 3 Total Bluff Erosion for Adjacent Unprotected Areas 35,699 1,010 2.75 12.9

Summary Geotube Area (2013-2016): At least 22 cy/lf/yr sand delivered 18.1 cy/lf/yr contributed 14.8 cy/lf in template as of April 2016 Unprotected Bluff Areas (2013-2016): 12.9 cy/lf/yr contributed

Shoreline Monitoring Shoreline monitoring at 46 transects along 6 miles of shoreline conducted quarterly Shoreline monitoring measures: Change in position of the shoreline (MLW line) and Change in volume Bathymetry (-5 MLW out to 3,000 feet offshore or -35 MLW isobath) conducted in the spring and fall >20 years of historical data No indication of any adverse effect from the geotextile tubes.

Underwater Video Monitoring Underwater video monitoring at 10 transects immediately seaward of geotextile tubes and adjacent areas

Underwater Video Monitoring October 2016 June October 5. Sand Waves or Ripples 95%, Pebbles 5%). TR-400 9. (Flat Sand 30%, Pebble 5%, Cobble 30%, Boulder 35%). TR-710. 12. (Pebble 100%). TR-1020. 14. (Flat Sand 15%, Pebble 50%, Cobble 35%). TR-1265. 16. (Flat Sand 45%, Pebble 15%, Cobble 10%, Boulder 30%). TR-1500. 21. (Flat Sand 30%, Pebble 50%, Cobble 20%). TR-1925. Biota: June and October identified invertebrate species, fish species, and marine plant and algal species, with some seasonal variability (spider crabs bury into sediments; black sea bass, scup, and skates move offshore). Branching brown and red algae, bread crumb sponge, and rock crab were dominant biota. No indication of adverse effect on marine biota.

Underwater Video Monitoring Monitoring shows continued prevalence of cobble/bottom habitat located directly offshore of the geotextile tube Project, with no indication that cobble/boulder habitat is being covered by the mitigation sand.

Monitoring Conclusions Geotextile tubes have stabilized the base of the bluff. Mitigation sand from the project has contributed more sand than the historic erosion rate and the recent contribution from the unprotected bluff. Shoreline monitoring data shows no indication of accelerated erosion within or directly adjacent to geotextile tubes. No evidence of harm observed in wetland well monitoring, beach invertebrate monitoring, and underwater video monitoring.

Next Steps Expand current system to 3400 ft May 2017 Review sand source options Review monitoring program to focus on collecting most useful data Review mitigation program to consider more adaptive approach

Questions? Photo credits: George Riethof and the Sconset Trust, Rick Blair, Rob Benchley Maria Hartnett, Associate www.epsilonassociates.com 2014