WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS

Similar documents
LANGAN QUALIFICATIONS - INDIGO ASSET SERVICES

WEB TOUR FOR SHOOSHAN COMPANY. CONTACT Arlington Virginia 1300 Wilson Boulevard Suite 450 Arlington VA

LANGAN QUALIFICATIONS FOR THE MORGAN COMPANIES

WEB TOUR FOR URBAN GREEN PARTNERS

Splendor Test Tour TEST TOUR SPLENDOR - 08/02/17

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JUNE 2017

THE BAINBRIDGE COMPANIES

LANGAN QUALIFICATIONS

PROJECT SPOTLIGHT TOUR: LANGAN LEADER JANUARY 2018

SAN FRANCISCO PENINSULA EXPERIENCE. CONTACT Andrew Bro PE GE Senior Project Manager Direct:

PROJECT SPOTLIGHT TOUR: LANGAN LEADER FEBRUARY 2018

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

LANGAN IN LEHIGH VALLEY FOR EHDD

JERSEY CITY. CONTACT HEADQUARTERS Parsippany New Jersey 300 Kimball Drive 4th Floor Parsippany NJ

THE ASHLAND OVERVIEW. FXCollaborative SPAN Architecture WSP USA ICOR Associates Site/Civil Geotechnical Environmental Surveying/Geospatial

LANGAN LANDSCAPE ARCHITECTURE + PLANNING

BAY AREA PARKS & RECREATION

Washington Union Station s 2nd Century DEVELOPMENT PLAN

Project Overview. Washington s Most Exciting New Destination for Office and Retail PROPERTY GROUP PARTNERS

Welcome to Greenwood Village Corporate Capital of Colorado

Developer s Program. The Station at East 54

Phase I Redevelopment Plan. First Community Meeting

UNIVERSITY OF MICHIGAN:

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

IBM LANGAN CORPORATE CAMPUS & REDEVELOPMENT EXPERIENCE

GOODY CLANCY WITH KITTELSON & ASSOCIATES RHODESIDE & HARWELL FARR ASSOCIATES W-ZHA

SITE PLAN REVIEW COMMITTEE MEETING AGENDA Clarendon Boulevard Conference Room 311 Arlington, VA 22201

SPRC PRESENTATION MAY 13, 2015

ULI PLACEMAKING OBJECTIVES

ANC 2A Presentation. November 9, 2006

WRAPS Site Studies. Cooper, Robertson & Partners. December 8, Page 1

LANDSCAPE ARCHITECTURE - NEW JERSEY

Courthouse Square Implementation Comment/Response Matrix

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

ROSSLYN GATEWAY URBAN DESIGN MANUAL JULY 15, 2011 REVISED JANUARY 30, KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

WHAT MAKES A GREAT PLACE?

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

brookline place presentation to the Brookline Board of Selectmen February 11, 2014

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

Sustainable City of the Future LUSAIL

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

Pentagon Centre (SP#297) Phase I Site Plan Amendments SPRC #3

Capital Projects in and near Odenton Town Center

UMBC Facilities Management. UMBC Facilities Master Plan Update

PUBLIC HEARING. DRAFT Environmental Impact Statement. Matthews Memorial Baptist Church Washington, DC October 18, National Capital Region

The Village of Shirlington

40 Years of Smart Growth Arlington County s Experience with Transit Oriented Development in the Rosslyn-Ballston Metro Corridor

SITE PLAN REVIEW COMMITTEE MEETING AGENDA. Courthouse Plaza 2100 Clarendon Boulevard Cherry and Dogwood Rooms (C&D) Arlington, VA 22201

SAMPLE OF CURRENT PROJECTS. Page 1

McLean Main Street Public Forum Exchange of Ideas

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

V. Case Study Sites. Case Study Site Descriptions and Concepts. Case Study #1: Lake Street and Calhoun

SPRC PRESENTATION #3 JUNE 22, 2015

EMERYVILLE PLANNING COMMISSION STAFF REPORT

MOUNTAIN VIEW ELEMENTARY SCHOOL SITE REDEVELOPMENT OPEN HOUSE. MacPherson Room, 10 am 5 pm

Transportation Working Team Duane Diggs, Co-Chair (VOICE Buffalo) Kelly Dixon, Co-Chair (GBNRTC) Paul Ray, Facilitator (UB Regional Institute)

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

Each course is worth 1 American Institute of Architects CEU/HSW.

Germantown Forward Status Report to the Planning Board M NCPPC

Rosslyn Plaza PDSP (SP #422) SPRC Staff Presentation

Arlington County. Envision Courthouse Square Planning and Urban Design Study 21 May 2014

DESIGN CRITERIA PACKAGE

Sustainable Strategies for School Development in Urbanizing Areas

THE NEIGHBORHOOD TODAY

WORKING AT A HIGHER LEVEL

WORKING AT A HIGHER LEVEL

The Village. Chapter 3. Mixed Use Development Plan SPECIFIC PLAN

ARLINGTON COUNTY, VIRGINIA

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Prince George s County Economic Development Corporation David Iannucci President & CEO

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Cooper, Robertson & Partners Architecture, Urban Design

Landover Metro CONCEPT PLAN 2008 Landover Metro

2.0 PROJECT DESCRIPTION

LAND PARK COMMUNITY PLAN

PROJECT SHOWING MINUTES

SCIENCE AND ENGINEERING COMPLEX

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit.

Architectural Portfolio

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

DESIGN SERVICES FOR BALLSTON- MU METRO STATION AREA IMPROVEMENTS 90% PLAN PRESENTATION: DECEMBER 2015

GREEN BUILDING AND GREEN DEVELOPMENT

Strategic plan framework Steering Committee Meeting

Courthouse Square Planning & Urban Design Study Working Group Meeting #11 September 2, 2014

Envision Courthouse Square. Cultural Resources, Circulation, Open Space, & Buildings

Jeff Brasel, Senior Planner, Community Planning and Development Analiese Hock, Senior Planner, Community Planning and Development

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

The George Washington University Square Phase 1 Design Garage Base Building

Appendix A. SmartCode

Urban Form Case Studies

DOWNTOWN AREA PLAN. June 9, 2009

Taming Tysons Corner Transforming the Quintessential Edge City

Jack L. Robbins, AIA Principal

ARLINGTON COUNTY, VIRGINIA

Innovation. Collaboration. Inspiration.

City of Meriden Harbor Brook Flood Control Project Overview

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

U n i v e r s i t y o f S o u t h C a r o l i n a A i k e n. Land Plan Study

Transcription:

WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS

CONTACT Arlington Virginia 1300 Wilson Boulevard Suite 450 Arlington VA 22209-2323 571.366.6800 571.366.6801

JOHN F. KENNEDY CENTER FOR THE PERFORMING ARTS EXPANSION John F. Kennedy Center Paratus Group Architect: Steven Holl Architects Site/Civil Geotechnical Natural Resources & Permitting Environmental Terrestrial Scanning/BIM Traditional Surveying With over three million visitors annually the John F. Kennedy Center for the Performing Arts serves as an icon of the District of Columbia and the Potomac River presenting the greatest performances of music dance and theater. In need of additional space for its existing and growing programs the Kennedy Center is expanding its facilities by 78 000 SF including three pavilions and a pedestrian bridge. Langan is providing provide site/civil environmental and geotechnical engineering; natural resource permitting; survey (including 3D laser scanning); and hazardous materials consulting for the expansion.

UNION STATION - CAPITAL IMPROVEMENTS Burns Engineering Inc. Amtrak Site/Civil Geotechnical Traditional Surveying Terrestrial Scanning/BIM Langan was retained to perform multiple services at this busy landmark Amtrak facility for future proposed improvements including a mixed-use overbuild project below-grade parking and track service improvements. Langan performed a boundary topographic and utility survey to facilitate the design and permitting of site demolition work; and construction of a substation parking lot improvements and several new catenary structures. Langan also performed a 3D laser scan of the Amtrak rail lines and surrounding parcel features from an adjacent lot as well as geotechnical and civil engineering services to support the permitting and construction of the improvements.

HECHT WAREHOUSE REDEVELOPMENT Douglas Development Corporation Architect: Shalom Baranes Associates Antunovich Associates Geotechnical Environmental Langan provided geotechnical engineering services to assist in the redevelopment of the historic Hecht warehouse into a mixed-use development. Known as one of the most significant art deco commercial buildings in the region warehouse served as the company?s central warehouse from its construction in 1937 and expansion in 1948. Langan performed a series of geotechnical borings throughout the property to assess the subsurface conditions. The study also included a review of historic foundation drawings for the warehouse structure that was built in 1937 and its 1985 addition.

STATION HOUSE Fisher Brothers Architect: Hickok Cole Architects Handel Architects Partner: Plaza Construction Geotechnical Environmental Langan provided geotechnical and environmental engineering services for the Capitol Place mixed-use development project. The project included the construction of 375 residential units 20 000 SF of retail space two levels of below-grade parking and an interior courtyard with garden and eco-pond areas. Located near Union Station the project demonstrates transit-oriented green development and pedestrian improvements. AWARD LEED Gold Certification

UNIVERSITY OF THE DISTRICT OF COLUMBIA - NEW STUDENT CENTER Geotechnical Environmental Traditional Surveying Terrestrial Scanning/BIM The new three-story student center with a partial basement level encompasses approximately 30 700 SF. Langan completed a geotechnical investigation which detailed the existing foundations of adjacent buildings to assist the structural engineer and architect.

HOWARD UNIVERSITY INTERDISCIPLINARY RESEARCH BUILDING Howard University Architect: HDR Inc. Partner: Brailsford & Dunlavey Environmental Geotechnical Langan provided environmental and geotechnical engineering services to Howard University for the development of the Interdisciplinary Research Building. Services provided included Phase I II and III Environmental Site Assessments. Langan also completed a geotechnical investigation to provide recommendations for site preparation foundation design peer review of contractor specifications and drawings and other geotechnical aspects of the proposed development. AWARDS NAIOP DC/MD 2016 Award of Excellence - Best Institutional Facility

TRINITY UNIVERSITY - PAYDEN ACADEMIC CENTER Trinity University Architect: EYP Partner: Clark Construction Group JLL Geotechnical Langan provided geotechnical services for the new Trinity Academic Center at Trinity University. The four-story 80 000-SF building will house new science and health profession laboratories classrooms offices information technology support and learning spaces. Langan performed a geotechnical investigation consisting of seven borings and installed one temporary groundwater monitoring well. Due to the presence and variable density of the existing fill Langan recommended the existing fill soils be removed and recompacted or densified in place before raising grades within the building pad.

SOULCYCLE Henderson Engineers Inc. Site/Civil Traditional Surveying Langan provided site/civil engineering and surveying services for the improvement of existing tenant spaces which were then converted into SoulCycle indoor cycling locations in Georgetown and on 14thStreet. The facilities required upgraded water and sewer services and new electric and gas services. Due to limited street frontage a high level of coordination was necessary in order to accommodate the new utility services for DC Water as well as new PEPCO and Washington Gas service connections.

US COURT OF APPEALS OF THE ARMED FORCES IBI Group - Gruzen Samton Architects Terrestrial Scanning/BIM Traditional Surveying A full exterior laser scan of the building facades was performed as well as a control survey for the accurate merge of the laser scan point clouds. Detailed elevations and cross sections of the building were produced from the scan data for the planning and implementation of a new lighting scheme for the building.

WMATA SHEPHERD PARKWAY BUS GARAGE Washington Metropolitan Area Transit Authority (WMATA) Partner: Systra Consulting Hensel Phelps Construction Geotechnical Environmental This design-build bus garage facility is located in southeast at the site of the former DC Village. The facility includes a maintenance and administration building fueling station bus wash and a structured parking garage. The project also includes surface parking areas and utility infrastructure. The completed project will be an environmentally-friendly LEED Silver certified facility. Langan provided the necessary geotechnical and environmental engineering services to prepare plans bid specifications and written reports for approval by WMATA and the District of Columbia.

TURNBERRY TOWER Arlington VA Turnberry Associates Architect: BBGM Partner: SK&A Structural Engineers Geotechnical Environmental Turnberry Tower is a 25-story 247-unit high-end luxury condominium. The building soars nearly 400 feet above the Potomac River and is the tallest condo building in the metropolitan region. The 920 000 SF $250 million project also includes a six-level below grade parking garage. Langan provided geotechnical and environmental services for the project.

19NINETEEN CLARENDON BOULEVARD Arlington VA Harkins Builders Environmental Langan was retained to oversee and supervise the removal of two unknown underground fuel oil storage tanks during site development. A characterization investigation followed and a total of 1 373.59-tons of petroleum-contaminated soils were excavated from the site and transported off-site for disposal. Langan is also conducting the monthly testing and monitoring of the on-site dewatering system that was installed after the site investigation.

ANDREWS AIR FORCE BASE DEMOLITION - BUILDINGS 1535 AND 1513 Andrews Air Force Base MD ECC Demolition Site/Civil Environmental Traditional Surveying Langan provided design-build engineering services for demolition of the old headquarters building at Andrews Air Force Base. The project included hazardous material abatement and demolition of the 350 000-square-foot headquarters building and 7 000-square-foot boiler building. After the demolition phase is completed the project sites will be converted into landscaped parks.

WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS