Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Similar documents
Pontchartrain Coastal Lines of Defense Program. Lake Pontchartrain Basin Foundation Coastal Sustainability Program

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Lessons Learned from Katrina and Reducing Vulnerability Fall 2011

Russ J. Joffrion, P.E. Whitney Thompson, P.E.

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

NJ Department of Environmental Protection

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Introducing Green Infrastructure for Coastal Resilience

An Integrated Approach for Water Management Examples from The Netherlands. Addressing Climate Change and Sea Level Rise

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Restoring Water Ecosystems in NYC Parks

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Rhode Island Shoreline Change Special Area Management Plan

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

Louisiana Lawmakers Approve Historic Hurricane Protection Plan

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

Flood Mitigation Planning Bayou des Allemands St. Charles Parish, Louisiana

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Hunts Point Landing, Bronx, New York

Staff will be providing an overview of the project need, purpose and intent for consideration as part of the Amendment cycle.

Middle Mississippi River. Regional Corridor

Mitigation + Adaptation Strategies for Historic Structures and Sites

Monitoring and Maintenance Permit Process

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

September 30, 2011 REQUEST FOR PROPOSAL TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Inner Harbor Navigation Canal Lock Replacement General Reevaluation Report and Supplemental Environmental Impact Statement

Natural & Nature-Based Solutions for Risk Reduction & Resilience

Ecosystem Restoration Business Line Budgeting A Systems Approach

Northeast Florida Estuary Restoration Initiative: A District Perspective. Ron Brockmeyer, SJRWMD And a cast of thousands!!

After the Storms: Planning for Louisiana s Future. Larry Ardoin Coastal Protection and Restoration Authority Integrated Planning Team

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

AREA-WIDE PEDESTRIAN AND BICYCLE CIRCULATION

Nature-Based Adaptation Projects Challenges and Opportunities in California Marilyn Latta, Project Manager California State Coastal Conservancy

Blue/Green Infrastructure Study Accomack County, VA

Peninsular Florida Landscape Conservation Cooperative. Marine and Estuarine Priority Resources and Conservation Targets

In the Mississippi Delta: Building with Water

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Steering Committee 3. September 17, :30-7:30pm. Welcome.

BEACH AND INLET PROJECTS UPDATE

NEW ORLEANS LAKEVIEW FLOATING STREETS

The Moors at Arne Project, Managing Coastal Change

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Public Meeting Summary

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

SECTION 5: REACH RECOMMENDATIONS/MAPS

Appendix to Amicus Curiae Brief: Selected Provisions of the South Carolina Beachfront Management Act

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

2013 Summer Recap. Rockaway Beach

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Central Lake Ontario Conservation Conservation Lands Master Plan

VP for Public Service and Outreach Mark Risse Chuck Hopkinson David Bryant Mona Behl integrated

The Napa River Flood Protection Project

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

Virginia s Tidal Wetlands: Managing for Resilience. Pam Mason

systems is available on the Colorado Wetland Information Center (CWIC) website.

Prioritizing Tidal Wetlands: A Landscape Approach

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Memorandum Planning. Thursday, January 8, 2015

Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders. Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program

Recent Tidal Creek Restoration Efforts in Tampa Bay

Table of Contents TABLE OF CONTENTS SECTION TITLE PAGE

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

CHAPTER Committee Substitute for Senate Bill No. 1472

Saltmarsh Conference. 8 October in the Suffolk Coast & Heaths Area of Outstanding Natural Beauty

Photo by Carlton Ward Jr. Executive Summary

City of Newburyport Plum Island Beach Management Plan. Presented by:

Master Plan for Preservation and Scenic Conservation (1995)

New York City, 19 th c.

Ottawa County Parks, Recreation & Open Space Plan. February, 2006

Florida Forever Conservation Needs Assessment Overview Maps

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

EEA Capital Investment in Green Infrastructure

PLANTING OF LARGE SCALE MARSH PROJECTS. Eddie Seidensticker, biologist, Natural Resources Conservation Service

Regional Open Space Conservation Plan. Regional Staff Committee January 18, 2018

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

Stormwater Management at The University of New Orleans

OYSTER LAKE RESTORATION PROJECT

Lake Nokomis Shoreline Enhancement Project

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

TO: Port of Orcas FROM: Tina Whitman, Science Director SUBJECT: Master Plan Update DATE: September 7, 2018

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

Living Shorelines in Virginia: What s Happened Since the 2006 Living Shorelines Summit?

APPENDIX C NATURAL RESOURCES MANAGEMENT PLAN: ACTIONS AND PRIORITIES

The Louisiana 2017 Coastal Master Plan: Climate Change and Sea Level Rise Planning in the International Context

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

TAPPING THE INGENUITY OF STUDENTS TO DESIGN A RESILIENT TEXAS COAST

CHAPTER 1 Introduction

Broward County Shore Protection Project Segment II. Physical Monitoring Plan

Regional Restoration Planning:

RIVERFRONT REDEVELOPMENT PLAN

.MANAGED RETREAT. Need for managed retreat

Transcription:

Pontchartrain Coastal Lines of Defense Program Coastal Sustainability Program February 2006 The Pontchartrain Coastal Lines of Defense Program consists of ten priority project areas within the Pontchartrain Basin. These ten coastal restoration project areas were chosen from the Comprehensive Habitat Management Plan (LPBF, 2006), because of their importance to the regional habitat restoration and because they may provide important flood protection to residents of the Pontchartrain Basin. This approach is consistent with the Multiple Lines of Defense Strategy being adopted by LPBF (Lopez, 2006) to prioritize the recommendations of the Comprehensive Habitat Management Plan (CHMP). Under the Multiple Lines of Defense Strategy, coastal sustainability may be achieved with a restoration program utilizing maps which delineate two sets of landscape goals. The first landscape goal is the critical natural Lines of Defense such as barrier islands or marsh land bridges (Figure 1). The second is the target habitat distribution such as fresh, intermediate, brackish and salt marsh (Figure 2). In the Pontchartrain Basin, nine lines of defense project areas have been identified for Figure 1: The ten project areas in the Pontchartrain Coastal Lines of Defense Program including nine coastal Lines of Defense and a Mississippi River reintroduction at Violet, LA. These projects restore and sustain the lines of defense providing ecologic and flood protection benefits. restoration. These include the Chandeleur Islands, two Biloxi Marsh landbridges, the Bayou la Loutre ridge, the MRGO/Lake Borgne land bridge, the Breton Landbridge, the East Orleans landbridge, a Jefferson Parish wetland buffer, and the Maurepas landbridge. All nine of these lines of defense are in 1

need of some restoration and define nine project areas. A tenth project area is included to achieve the target habitat goals and help sustain the Lines of Defense in the Pontchartrain Basin. This project is an enlarged diversion located at Violet, La. (Figure 3). The complete list of ten projects areas are given in Table 1 and individual project summaries (attached). LPBF considers restoration of all ten of these project areas to be exceptionally significant and beneficial. Funding restoration within these project areas provides the dual benefits of habitat restoration and flood protection. Therefore, the project summaries include a description of these dual goals. Figure 2: Habitat goals as defined in the Comprehensive Habitat Management plan for the Pontchartrain Basin. LPBF plans to be opportunistic in achieving Pontchartrain Coastal Lines of Defense Program goals by working with any existing or new authorization that may provide expertise and funding for these projects. The ten project areas may ultimately consist of numerous projects within a single Line of Defense. LPBF suggests that emphasis should be placed on execution of these projects due to the state of urgency to enhance flood protection for Louisiana. Each project summary provides guidance for institutional participation with emphasis on project requirements for effective and expeditious project completion. LPBF welcomes the opportunity to partner with parishes, and state or federal agencies to further develop the Pontchartrain Coastal Lines of Defense Program. A PowerPoint presentation of this program may be found at saveourlake.org. A more complete restoration context of baseline conditions, historical impacts and recommendations for the projects is contained in the CHMP, which may be also found online. For more information or other inquiries, please contact the Coastal Sustainability Program Director John Lopez at 504 421-7348 or johnlopez@pobox.com., or Carlton Dufrechou - Executive Director at 504 836-2215. 2

Table 1: Pontchartrain Coastal Lines of Defense Program: Prioritized Projects Utilizing the Multiple Lines of Defense Strategy in the Pontchartrain Basin, i.e. providing dual benefits of habitat restoration and flood protection 1. Maintain the MRGO-Lake Borgne Landbridge 2. Restore the Bayou la Loutre Ridge (includes constriction of MRGO to GIWW dimensions) 3. Restore the Chandeleur Barrier Islands 4. Construct the Jefferson Parish fringe marsh buffer 5. Construct the Violet Reintroduction to maintain target salinity in LA and MS 6. Maintain and restore the Biloxi Marsh Landbridge and reefs (South) 7. Maintain and restore Breton Landbridge with Caernarvon and marsh creation 8. Maintain critical marsh shorelines and ridges of the East Orleans Landbridge 9. Maintain and restore Biloxi Marsh Landbridge and barrier reefs (North) 10. Maintain and enhance the Maurepas Landbridge with Maurepas Reintroduction Figure 3: Hydrologic restoration recommendations to sustain the Lines of Defense as proposed in the Comprehensive Habitat Management Plan. Recommendations include an enlarged Violet reintroduction to manage the Borgne-Biloxi Estuary (Table 1 # 5). It is also recommended that the MRGO channel is reduced to GIWW dimensions at Bayou la Loutre and re-build Bayou la Loutre ridge. The existing Caernarvon Diversion would be used to manage the Caernarvon-Terre aux Boeufs Estuary (Table 1 # 2). 3

CWPPRA PO-30 1-06 Where: Maintain the MRGO-Borgne Land Bridge What: Extensive Rock armoring, local marsh creation, Intermediate marsh Proposed Construction Team EPA LSU Hurricane Center Estimated Cost: $80,000,000 Flood Protection: Wetland buffer to St. Bernard levees and minimize encroachment of Lake Borgne into the MRGO Habitat Restoration: Typical intermediate marsh nursery and fringe marsh benefiting recreational and commercial fishing Coastal Sustainability Program February 2006 Where: Restore the Bayou la Loutre Ridge What: Constrict MRGO channel (GIWW dimensions), rebuild and re-forest natural ridge, natural ridge and intermediate marsh LSU SRC LSU Hurricane Center The Nature Conservancy Estimated Cost: $200,000,000 (see slides 24 & 25) Flood Protection: Impede northward movement of storm surges and reduce surge water elevation north of Bayou la Loutre ridge with soil foundation and ridge forest Habitat Restoration: Restore the natural ridge and hydrologic barrier between the Borgne-Biloxi estuary and the Caernarvon-Terre aux Boeufs estuary, restore the Natural levee ridge habitat of oak, black willow providing refuge of indigenous ridge species Coastal Sustainability Program Feb 2006 4

Where: Restore the Chandeleur (barrier) Islands What: Beach nourishment with sand and shell, saline habitat US Fish & Wildlife Service National Marine Fisheries Service USACE (Mobile District) Minerals Management Service US Geological Survey (Tampa Bay Office) Pontchartrain Institute for Environmental Sciences MS Dept. of Marine Resources Estimated Cost: $150,000,000 Flood Protection: Reduce wave heights and wave energy entering Chandeleur Sound (fair weather and storm generated) and impacting the Biloxi Marsh, reduce storm surge elevations east of barrier islands Habitat Restoration: Barrier Island dune and lagoon habitats, Saline marsh, bid rookery, recreational and commercial fishing, maintain benefits of National Wildlife Refuge Coastal Sustainability Program Feb 2006 Where: Jefferson Parish Shoreline Restoration and Protection What: Rock armoring, marsh creation, SAV habitat, reef balls, Intermediate marsh National Marine Fisheries Service LSU Ag Center LSU - SRC Jefferson Parish Estimated Cost: $62,500,000 Flood Protection: Wetland buffer to levees in East Jefferson Parish by reducing risk of levee failure and reducing shoreline or berm erosion lake ward of the levee Habitat Restoration: Establish intermediate, fringe marsh providing critical marsh nursery, recreational fishing, birding and other outdoor activities Coastal Sustainability Program February 2006 5

Swamp Intermediate marsh Brackish marsh Saline marsh Where: Mississippi R. Reintroduction at Violet, LA What: Reintroduce Mississippi R. water to achieve habitat goals of baseline, reestablish cypress forest, Swamp, intermediate to saline marsh National Marine Fisheries Service EPA MS Dept. of Marine Resources Estimated Cost: $135,000,000 Flood Protection: maintain salinity targets to develop a denser and more mature wetland forest east of Chalmette to buffer to St. Bernard levees, and to enhance oyster growth in the outer Biloxi marsh to maintain marsh reduce surge into Mississippi Sound and Lake Borgne Habitat Restoration: Reduce salinity intrusion into swamp or fresh marsh habitat, increase primary and secondary productivity including commercial species such as shrimp, blue crab and oysters. Typical intermediate marsh nursery and fringe marsh benefiting recreational and commercial fishing Coastal Sustainability Program February 2006 Where: Maintain and Restore the Biloxi Marsh Landbridge and reef (south) What: Salinity management, Oyster reef propagation (reef balls, etc.), rock armoring, marsh creation, terracing, brackish to saline Construction Team US Fish and Wildlife Service Natural Resource Conservation Service - Lead agency LSU SC&E LSU Ag Center LA Dept. of Wildlife & Fisheries MS Dept. of Marine Resources Estimated Cost: $60,000,000 Flood Protection: Maintain integrity of the marsh landbridge and natural ridges preventing Bay Boudreaux developing into a tidal pass or merging into Chandeleur sound which would increase storm surges in Mississippi Sound and Lake Borgne Habitat Restoration: Preserve and restore brackish marsh including robust oyster beds throughout the outer Biloxi marsh. Develop oyster barrier reefs within the or along the Fishing Smack Bay Coastal Sustainability Program Dec 2005 6

Where: Maintain and Restore the Breton Landbridge What: marsh creation (Sediment trap), land building (diversions), reefs, Intermediate to brackish marsh Construction Team Natural Resource Conservation Service US Fish and Wildlife Service Caernarvon Inter-Agency Advisory Committee Plaquemines Parish LSU SC&E Estimated Cost: $40,000,000 (Due to Hurricane Katrina this may be insufficient) Flood Protection: Wetland buffer to levees in St. Bernard and Plaquemines Parish by reducing storm surge height and energy Habitat Restoration: Typical intermediate to brackish marsh nursery benefiting recreational and commercial fishing Coastal Sustainability Program February 2006 Where: Maintain critical marsh, shorelines and ridges within the East Orleans Corridor Landbridge What: conservation, local rock armoring, marsh creation for critical areas of shoreline, Intermediate marsh LSU SRC LSU Hurricane Center UNO Social Sciences Orleans Parish St. Tammany Parish Estimated Cost: $87,500,000 Flood Protection: reduce storm surges into Lake St. Catherine and Lake Pontchartrain by maintaining or enhancing landbridge elements of marsh and Pine Island natural ridges Habitat Restoration: Typical intermediate marsh nursery benefiting recreational and commercial fishing, Maintain natural ridge habitat of the Pine Island ridges Coastal Sustainability Program February 2006 7

Where: Maintain and Restore the Biloxi Marsh Landbridge and reef (north) What: Salinity management, Oyster reef propagation (reef balls, etc.), rock armoring, marsh creation, terracing, brackish to saline Construction Team Natural Resource Conservation Service US Fish and Wildlife Service LSU SC&E LSU Ag Center LA Dept. of Wildlife & Fisheries Coastal Restoration Division MS Dept. of Marine Resources Estimated Cost: $60,000,000 Flood Protection: Maintain integrity of the marsh landbridge preventing Bay Boudreaux developing into a tidal pass and merging into Mississippi Sound which would increase storm surges in Mississippi Sound and Lake Borgne Habitat Restoration: Preserve and restore brackish marsh including robust oyster beds throughout the outer Biloxi marsh. Develop oyster barrier reefs within Mississippi Sound shoreline of the Biloxi marsh Coastal Sustainability Program Feb 2006 Where: Maintain and enhance the Maurepas Landbridge & Maurepas Reintroduction What: conservation of forests, River reintroductions, hydrologic restoration, marsh creation, swamp & fresh marsh EPA Southeastern Louisiana University Tangipahoa Parish St. John the Baptist Parish LA DWF Coastal Management Division Estimated Cost: $50,000,000 for conservation & $80,000,000 for diversion Flood Protection: Reduce storm surges into Lake Maurepas and adjacent shoreline regions by maintaining or enhancing landbridge elements of swamp and fresh marsh Habitat Restoration: Develop mature swamp and swamp canopy by increasing primary productivity. Increase productivity of fresh marsh. Enhance recreational and commercial fishing. Increase detrital export into Lake Pontchartrain Coastal Sustainability Program Feb 2006 8