MT 6/10 GALLON SERIES

Similar documents
OWNER S MANUAL MODULAR DIRECT CONNECTED TILTING STEAM JACKETED KETTLE

MT 25/40 GALLON SERIES

ME SERIES ELECTRICALLY OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE MODELS

FTM-L SERIES SINGLE OR TWIN DIRECT STEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INSTALLATION - OPERATION - MAINTENANCE

F-T, FT-P, F-L AND F-P SERIES

KPS-E, KLS-E AND KLT-E SERIES

MT 25/40 GALLON SERIES

MG SERIES GAS OPERATED BOILERS INSTALLATION - OPERATION - MAINTENANCE M24G M36G MODELS

Self-Contained Electric Steam Jacketed Kettle

INSTALLATION AND OPERATION MANUAL DIRECT STEAM COUNTER TILTING KETTLES MODELS: DC - 5 DC - 6 DC - 10 DC - 12 DC - 20

R-RCM & R-RSB SERIES

INSTALLATION and OPERATION MANUAL DIRECT STEAM KETTLES MOUNTED ON ELECTRIC BOILER BASE CABINET MODELS: EMT-6 EMT-10 EMT-12 EMT-6-6 EMT-10-6 EMT-10-10

OPERATOR'S MANUAL INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS SELF-GENERATING STEAM JACKETED COUNTER TILTING KETTLE

F-LF AND F-PF SERIES

ELECTRIC COMPACT DECK OVEN INSTALLATION - OPERATION - MAINTENANCE

southbend OWNER'S MANUAL INSTALLATION USER'S GUIDE DIRECT STEAM TILTING KETTLE MODELS: KDLT, KDPT

INSTALLATION AND OPERATION MANUAL GAS SKILLETS MODELS: GTS-30 GTS-40

PRICE LIST. Effective

ELECTRIC COUNTERTOP DECK OVEN INSTALLATION & OPERATING MANUAL

ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250 INSTALLATION/SERVICE MANUAL

SERVICE/INSTALLATION MANUAL ICE ONLY DISPENSERS MODELS-IOD150, IOD200 AND IOD250

FTM-LE SERIES SINGLE OR TWIN ELECTRIC STEAM MIXER KETTLE COMPLETE WITH HYDRAULIC POWER TILT BRIDGE INSTALLATION - OPERATION - MAINTENANCE

Installation, Operation, and Maintenance Manual RTE14S & RTE14S-2. For the Taco Bell "Rethermalizer" Model Numbers

Wilbur Curtis Company, Inc. Service Manual WB-10 Water Boiler

INSTALLATION & OPERATION Rev 1.00A DISTRIBUTED EXCLUSIVELY BY CMA DISHMACHINES KNOTT AVENUE GARDEN GROVE, CALIFORNIA 92841

OWNERS MANUAL INSTALLATION, OPERATION, & MAINTENANCE INSTRUCTIONS

OWNER S MANUAL INSTRUCTIONS, INSTALLATION, OPERATION, MAINTENANCE RHPE & RTGE SERIES (ELECTRIC COUNTERTOPS) RETAIN THIS MANUAL FOR FUTURE REFERENCES.

INSTALLATION AND OPERATION MANUAL STEAM COIL BASE CONVECTION STEAMER MODEL SCX-16

SE Series Modular Electric Stone-Hearth Deck Oven INSTALLATION & OPERATION MANUAL LBC BAKERY EQUIPMENT, INC st Ave NE Tulalip, WA 98271, USA

INSTALLATION, OPERATION & MAINTENANCE AVANTCO SERIES 177AG OWNER S MANUAL

DESIGN CLASS FUNCTION

TRI-STAR INC SOUTH STANDARD AVENUE, SANTA ANA, CA Ph: Fax: MODEL #. OWNER S MANUAL

USER'S INFORMATION MANUAL

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

Water Boilers ME10EN, ME15EN. Table of Contents

Cleveland. Operators Manual. Direct Steam Table Top Kettles. Installation & Operation. Table-Top Direct Steam Kettles. SD Stands. Kettles on SD Stands

Operator s Manual CAYENNE GAS COUNTERTOP CHAR BROILER ENGLISH

ECO-JET CONVECTION STEAMER W/TWIN GENERATORS INSTALLATION - OPERATION - MAINTENANCE EJ-10E MODELS

3500 SERIES CONVECTION STEAM COOKER PARTS AND SERVICE MANUAL

DISHWASHER INSTALLATION INSTRUCTIONS

Marco Beverage Systems Ltd.

KPT/KLT-DS Series DIRECT STEAM TILTING FLOOR KETTLE INSTALLATION - OPERATION - MAINTENANCE

INSTALLATION & OPERATION MANUAL

INSTALLATION, OPERATION AND REPAIR MANUAL GAS KETTLE KGL-T KET-07 (216) CLEVELAND RANGE INC East 179th St. Cleveland, Ohio U.S.A.

Plumbing System. Important Information. Shut-Off Valves

Product Manual. Scotsman. Models: 10150, and 10250

INSTALLATION & OPERATING INSTRUCTIONS FOR THE GARLAND 1/2-SIZE ELECTRIC MOISTURE PLUS, MODEL MPOE5L

AWP 3260 CWH Installation Instructions Hydro-massage Bathtub - UL 1795

DESIGN CLASS FUNCTION

ULTRA-MAX GAS RADIANT CHARBROILER. ULTRA-MAX GAS LAVA ROCK CHARBROILER MODELS 8024CBB, 8036CBB, 8048CBB, 8060CBB, and 8072CBB

Operators and Service Manual

Destination Collection Whirlpool Bath Installation Instructions

Jade Salamander Broilers Model: JSB Series

INSTALLATION & OPERATION MANUAL

STERILMATIC ANALOG ELECTRIC STERILIZER INSTALLATION - OPERATION - MAINTENANCE STM-E STM-EL STM-EX STM-ELX MODELS

DESIGN CLASS FUNCTION

Installation Guide. 5 Series VGC and VGSU Built-In Gas Cooktops

CC-2222C-PL, CC-2222C-PRL, CC-2222C-PR-2, CC-2222C-PL-2,

Owner s Guide Installation & Operation

Operator Manual Countertop Pizza Oven

ICE/BEVERAGE DISPENSER

Models: GW/R-T GW/R-2-T GW/R-3-T

Insta-Therm Series Service, Installation and Operation Manual

HOMEADVANTAGE II IMPORTANT SAFETY INFORMATION

USER'S INFORMATION MANUAL

Viking Installation Guide

Owners Manual MINI-CLASSIC II. Pure Water. Water Distiller

ALTAIR II CONVECTION STEAMER INSTALLATION - OPERATION - MAINTENANCE. Altair II-4 Altair II-6 Altair II-8 Altair II-10 Altair II-12 MODELS

PRO SERIES IMPORTANT SAFETY INFORMATION

An Important Message for Installers and Operators IMPORTANT. Model No. Serial No.

THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. READ, UN DERSTAND AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL.

User information. Cleaning/descaling and sanitizing

southbend A MIDDLEBY COMPANY INSTALLATION AND OPERATION MANUAL CG214 (E) CG314 (E) CG414 (E) CG220 (E) CG320 (E) CG325 (E) GAS BOILERS MODELS:

Glass and Dishwashers. BarAid 500/800. Installation and. Starting from Serial No.:

ECOJET EJ-10E & EJ-7E ELECTRIC CONVECTION STEAMER W/TWIN GENERATORS PARTS AND SERVICE MANUAL

USER'S INFORMATION MANUAL

OWNER S MANUAL. Models: Herkules Equipment Corporation 2760 Ridgeway Court Walled Lake, MI USA Fax

SBF Series ELECTRIC CONNECTIONLESS STEAMER INSTALLATION - OPERATION - MAINTENANCE

Viking Installation Guide

INSTALLATION GUIDE Dual Fuel Ranges

INSTALLATION INSTRUCTIONS

INSTALLATION, OPERATION and MAINTENANCE MANUAL for Cres Cor AQUATEMP TM HUMIDITY CONVECTION and RETHERM OVENS with MICROPROCESSOR CONTROLS

Using it in an enclosed space can kill you.

SERVICE & PARTS MANUAL

HOLDING DRAWERS INTENDED FOR OTHER THAN HOUSEHOLD USE THIS MANUAL FOR FUTURE REFERENCE KEPT CLEAR OF COMBUSTIBLES AT ALL TIMES

FCT-CE SERIES ELECTRIC TILTING KETTLE W/HAND CRANK PARTS AND SERVICE MANUAL

OWNER S MANUAL INSTRUCTIONS, INSTALLATION, OPERATION, MAINTENANCE RRE SERIES (ELECTRIC RANGE & CONVECTION)

user manual Model #: BLZ-HOOD

Columbia Boiler Company

DISPENSE TROUBLESHOOTING INDEX. Hot Tank Descaling Instructions are included in this Troubleshooting section.

F-P, F-L, FT-P AND FT-L SERIES 2/3 JACKETED DIRECT STEAM TILTING & STATIONARY KETTLES PARTS AND SERVICE MANUAL

Installation & Operating Guide

E-Chef Hot Food Table

USER MANUAL Gas Countertop Charbroilers

Owner s Guide Installation & Operation

USE AND CARE GUIDE WARNING WARNING WARNING WARNING

MAXUM 5 5 Gallon Box Extractor

VENTLESS EXHAUST HOOD OPERATORS MANUAL AND PARTS LIST REV. MAY 2016

NON-DUCTED TYPE SMOKELESS BBQ ROASTER MODEL NJG-C

Date: Project #: Engineer: Prepared By: Bid Date:

Transcription:

MT 6/10 GALLON SERIES MOULAR BASE IRT EAM TILTING KETTLES INALLATION - OPERATION - MAINTENANCE MOELS ON CABINET BASE MT6 MT10 MT6T6 MT10T6 MT10T10 MOEL WITH GAS BOILERS MT6G MT10G MT6T6G MT10T6G MT10T10G MOEL WITH ELTRIC BOILERS MT6E MT10E MT6T6E MT10T6E MT10T10E Telephone: (802) 658-6600 Fax: (802) 864-0183 www.marketforge.com PN 14-0325 Rev F (11/17) 2017 - Market Forge

Your Service Agency s Address: Model Serial number Kettle installed by Installation checked by

IMPORTANT WARNING: Improper installation, adjustment, alternation, service or maintenance can cause property damage, injury or death. Read the installation, operation and maintenance instructions thoroughly before installing or servicing this equipment. FOR YOUR SAFETY TABLE OF CONTENTS INALLATION Introduction... 2 Service Connections - Cabinet Base Models... 3 Service Connections - Gas Boiler Models... 7 Service Connections - Electric Boiler Models... 11 OPERATION Operating & Cleaning Instructions... 15 o not store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance. The information contained in this manual is important for the proper installation, use, and maintenance of this kettle. Adherence to these procedures and instructions will result in satisfactory baking results and long, trouble free service. Please read this manual carefully and retain it for future reference. ERRORS: escriptive, typographic or pictorial errors are subject to correction. Specifications are subject to change without notice.

Introduction Market Forge MT6 and MT10 series tilting steam jacketed kettles are mounted on a modular stainless steel cabinet, a gas boiler or an electric boiler. ouble wall construction around the lower half of the kettle forms a surrounding chamber inot which steam is introduced as a source of heat for cooking. Steam input plumbing is equipped with a manual control valve. Condensate is removed through a steam trap connecting with the kettle drain plumbing assembly. A swing nozzle, hot-cold combination faucet provides a source of water for addition to the kettle for cooking and cleaning. The 6 gallon kettle is mounted in a trunnion assembly to the modular base. The trunnion pivots include steam input and return connections for the kettle. Kettle tilting is accomplished manually by moving the handle fixed to the rim so as to rotate the kettle in a trunnion. CABINET BASE MOELS: MT6 - Single 6 gallon mounted on an 24 (457mm) wide x (711mm) tall cabinet base equipped for direct connection to a remote steam source MT10 - Single 10 gallon mounted on an 24 (457mm) wide x (711mm) tall cabinet base equipped for direct connection to a remote steam source MT6T6 - Two 6 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall cabinet base equipped for direct connection to a remote steam source. MT10T10 - Two 10 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall cabinet base equipped for direct connection to a remote steam source. MT10T6 - One 10 gallon and one 6 gallon kettle mounted side by side on an 36 (914mm) wide x (711mm) tall cabinet base equipped for direct connection to a remote steam source. GAS BOILER BASE MOELS: MT6G - Single 6 gallon mounted on an 24 (457mm) wide x (711mm) tall gas boiler MT10G - Single 10 gallon mounted on an 24 (457mm) wide x (711mm) tall gas boiler MT6T6G - Two 6 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall gas boiler MT10T10G - Two 10 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall gas boiler MT10T6G - One 10 gallon and one 6 gallon kettle mounted side by side on an 36 (914mm) wide x (711mm) tall gas boiler ELTRIC BOILER BASE MOELS: MT6E - Single 6 gallon mounted on an 24 (457mm) wide x (711mm) tall electric boiler MT10E - Single 10 gallon mounted on an 24 (457mm) wide x (711mm) tall electric boiler MT6T6E - Two 6 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall electric boiler MT10T10E - Two 10 gallon kettles mounted side by side on an 36 (914mm) wide x (711mm) tall electric boiler MT10T6E - One 10 gallon and one 6 gallon kettle mounted side by side on an 36 (914mm) wide x (711mm) tall electric boiler SERVICE: Modular kettles are durable cooking equipment requiring a minimum of service other then routine cleaning and preventive methods. Should repairs be required, a network of authorized service agencies is available to assist with prompt service. A current directory of authorized service agencies is available on our website, www.mfii.com. The model and/or serial numbers must be referenced when corresponding with Market Forge. The data plate containing model and serial numbers pertaining to the equipment is located inside the cabinet door on the right vertical frame member. INALLATION 2

Service Connections - Cabinet Base Models MT-6 & MT-10 S* Steam Supply - 1/2 (13mm) NPT for incoming steam at 15-50 PSI (1.0-3.5kg/cm2). rain - Pipe full 2 (50mm) NPT to flush floor drain. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. Hot Water - 3/8 (10mm) NPT for hot water to faucet. Hot water line will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure (Water may be filtered). CW Cold Water - 3/8 (10mm) NPT for cold water to faucet. Cold water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. CR** Condensate Return - 1/2 (13mm) NPT condensate return from kettle may be connected to condensate return line. IMENSIONS ARE IN INCHES [MM] CW 8.5 [216] 24 [610] CR S 12 [305] 14 [356] * Pressure reducing valve is required if incoming pressure exceeds 50 PSI (3.5kg/cm2). 9 [229] ** Optional at extra cost NOTES: PVC and CPVC pipe are not acceptable materials for drains. TS: 40-125 ppm [1043] MT6 58 [1473] MT10 Appliance to be installed with backflow protection according to federal, state or local codes. 18 [457] S CW CR Figure 1 3 INALLATION

Service Connections - Cabinet Base Models MT6T6 S* Steam Supply - 1/2 (13mm) NPT for incoming steam at 15-50 PSI (1.0-3.5kg/cm2). Hot Water - 3/8 (10mm) NPT for hot water to faucet. Hot water line will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure (Water may be filtered). CW Cold Water - 3/8 (10mm) NPT for cold water to faucet. Cold water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. CR** Condensate Return - 1/2 (13mm) NPT condensate return from kettle may be connected to condensate return line. * Pressure reducing valve is required if incoming pressure exceeds 50 PSI (3.5kg/cm2). ** Optional at extra cost NOTES: PVC and CPVC pipe are not acceptable materials for drains. TS: 40-125 ppm Appliance to be installed with backflow protection according to federal, state or local codes. IMENSIONS ARE IN INCHES [MM] 12 [305] [1403] CW 8.5 [216] 18 [457] 15 [381] 18 [457] S CR S CW CR Figure 2 INALLATION 4

Service Connections - Cabinet Base Models MT10T6 S* Steam Supply - 1/2 (13mm) NPT for incoming steam at 15-50 PSI (1.0-3.5kg/cm2). Hot Water - 3/8 (10mm) NPT for hot water to faucet. Hot water line will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure (Water may be filtered). CW Cold Water - 3/8 (10mm) NPT for cold water to faucet. Cold water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. CR** Condensate Return - 1/2 (13mm) NPT condensate return from kettle may be connected to condensate return line. * Pressure reducing valve is required if incoming pressure exceeds 50 PSI (3.5kg/cm2). ** Optional at extra cost NOTES: PVC and CPVC pipe are not acceptable materials for drains. TS: 40-125 ppm Appliance to be installed with backflow protection according to federal, state or local codes. IMENSIONS ARE IN INCHES [MM] 12 [305] 58 [1473] [1403] CW 8.5 [216] 18 [457] 15 [381] 18 [457] S CR S CW CR Figure 3 5 INALLATION

Service Connections - Cabinet Base Models MT10T10 S* Steam Supply - 1/2 (13mm) NPT for incoming steam at 15-50 PSI (1.0-3.5kg/cm2). Hot Water - 3/8 (10mm) NPT for hot water to faucet. Hot water line will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure (Water may be filtered). CW Cold Water - 3/8 (10mm) NPT for cold water to faucet. Cold water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. CR** Condensate Return - 1/2 (13mm) NPT condensate return from kettle may be connected to condensate return line. * Pressure reducing valve is required if incoming pressure exceeds 50 PSI (3.5kg/cm2). ** Optional at extra cost NOTES: PVC and CPVC pipe are not acceptable materials for drains. TS: 40-125 ppm Appliance to be installed with backflow protection according to federal, state or local codes. IMENSIONS ARE IN INCHES [MM] 12 [305] 58 [1473] CW 8.5 [216] 18 [457] 15 [381] 18 [457] S CR S CW CR Figure 4 INALLATION 6

Service Connections - Gas Boiler Models MT-6G & MT-10G G Gas Connection - 3/4 (19mm) NPT female Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain Pipe full 2 (50mm) N.P.T. female to flush floor drain. o not make solid connection to floor drain Electrical Connection - 120 Volts AC, 60 Hz, single phase, and a 9 foot Power Cord/NEMA 5-15. Steam Take-Off 3/4 (19mm) N.P.T. female for incoming steam from Market Forge boiler IMENSIONS ARE IN INCHES [MM] 12.5 [318 4[102] 8.5 [216] 24 [610] FLUE OPERATION WILL BE BY Gas fired, A.S.M.E. constructed and National Board Registered, 15 PSI (1 kg/cm 2 ) steam boiler rated at 200,000 BTU Notes: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installation altitude so that proper gas orifices can be provided. The only available space to supply utilities to the gas boiler is the 6 (152mm) space between the floor and the cabinet. Allow 3 (76mm) space from side wall and 6 (152mm) from rear wall if adjoining walls are combustible. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm 58 [1473] MT10G [1403] MT6G 22 [559] 3 [76] 8 [203] 5 [127] 5 [127] CW3 Figure 5 G 2.75 [70] G 7 OPERATION

Service Connections - Gas Boiler Models MT6T6G G Gas Connection - 3/4 (19mm) N.P.T. female for 200,000 BTU boiler. G1 Gas Connection - 1 (25mm) N.P.T. female for 300,000 BTU boiler. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. O NOT INLALL ELBOWS IN RAIN LINE. Electrical Connection - 120 Volts AC, 60 Hz, single phase, and a 9 foot Power Cord/NEMA 5-15. Steam Take-off - Connection for operations of adjacent steam powered equipment. Requires steam take-off kit (optional at extra cost). Notes: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installation altitude so that proper gas orifices can be provided. The only available space to supply utilities to the gas boiler is the 6 (152mm) space between the floor and the cabinet. Allow 3 (76mm) space from side wall and 6 (152mm) from rear wall if adjoining walls are combustible. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 4[102] 12.5 [318 [1403] 22 [559] 8.5 [216] FLUE 3 [76] 5 [127] 5 [127] 2.75 [70] 8 [203] G G1 Figure 6 G G1 27 [686] OPERATION 8

Service Connections - Gas Boiler Models MT10T6G G Gas Connection - 3/4 (19mm) N.P.T. female for 200,000 BTU boiler. G1 Gas Connection - 1 (25mm) N.P.T. female for 300,000 BTU boiler. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. O NOT INLALL ELBOWS IN RAIN LINE. Electrical Connection - 120 Volts AC, 60 Hz, single phase, and a 9 foot Power Cord/NEMA 5-15. Steam Take-off - Connection for operations of adjacent steam powered equipment. Requires steam take-off kit (optional at extra cost). Notes: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installation altitude so that proper gas orifices can be provided. The only available space to supply utilities to the gas boiler is the 6 (152mm) space between the floor and the cabinet. Allow 3 (76mm) space from side wall and 6 (152mm) from rear wall if adjoining walls are combustible. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 [318 58 [1473] 10 gal kettle 4[102] [1403 6 gal kettle 8.5 [216] 3 [76] 22 [559] 8 [203] FLUE 5 [127] 5 [127] 2.75 [70] G G1 Figure 7 G G1 27 [686] 9 OPERATION

Service Connections - Gas Boiler Models MT10T10G G Gas Connection - 3/4 (19mm) N.P.T. female for 200,000 BTU boiler. G1 Gas Connection - 1 (25mm) N.P.T. female for 300,000 BTU boiler. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. O NOT INLALL ELBOWS IN RAIN LINE. Electrical Connection - 120 Volts AC, 60 Hz, single phase, and a 9 foot Power Cord/NEMA 5-15. Steam Take-off - Connection for operations of adjacent steam powered equipment. Requires steam take-off kit (optional at extra cost). Notes: If equipment is installed where elevation exceeds 2,000 feet (609.6 meters) above sea level, specify installation altitude so that proper gas orifices can be provided. The only available space to supply utilities to the gas boiler is the 6 (152mm) space between the floor and the cabinet. Allow 3 (76mm) space from side wall and 6 (152mm) from rear wall if adjoining walls are combustible. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 [318 58 [1473] 4[102] 22 [559] 8.5 [216] FLUE 3 [76] 5 [127] 5 [127] 2.75 [70] 8 [203] G G1 Figure 8 G G1 27 [686] OPERATION 10

Service Connections - Electric Boiler Models MT-6E & MT-10E Volts Phase 24kW 36kW 42kW 48kW 208 (197-219) 3 66 100 117-240 (220-240) 3 58 87-116 480 (360-500) 3 29 44-58 etails of other electrical systems available upon request. SERVICE CONNTIONS EP Power Supply - Use wire suitable for at least 90 C. Nominal amp per line wire. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. Steam Take-off - Connection for operation of adjacent steam powered equipment. The only available space to supply utilities to the electric boiler is the 6 (152mm) space between the floor and the cabinet. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. WARNING: O NOT UNER ANY CIRCUMANCE CONNT THE EXHAU RAIN LINE IRTLY TO A SEWER LINE. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 8.5 [318] [216] [1043] MT6E 58 [1473] MT10E 3 [76] 5 [127] 22 [559] 24 [610] EP EP Figure 9 11 OPERATION

Service Connections - Electric Boiler Models MT6T6E Volts Phase 24kW 36kW 42kW 48kW 208 (197-219) 3 66 100 117-240 (220-240) 3 58 87-116 480 (360-500) 3 29 44-58 etails of other electrical systems available upon request. SERVICE CONNTIONS EP Power Supply - Use wire suitable for at least 90 C. Nominal amp per line wire. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. Steam Take-off - Connection for operation of adjacent steam powered equipment. The only available space to supply utilities to the electric boiler is the 6 (152mm) space between the floor and the cabinet. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. WARNING: O NOT UNER ANY CIRCUMANCE CONNT THE EXHAU RAIN LINE IRTLY TO A SEWER LINE. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 [318] 8.5 [216] [1403] 3 [76] 5 [127] 22 [559] EP Figure 10 EP OPERATION 12

Service Connections - Electric Boiler Models MT10T6E Volts Phase 24kW 36kW 42kW 48kW 208 (197-219) 3 66 100 117-240 (220-240) 3 58 87-116 480 (360-500) 3 29 44-58 etails of other electrical systems available upon request. SERVICE CONNTIONS EP Power Supply - Use wire suitable for at least 90 C. Nominal amp per line wire. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. Steam Take-off - Connection for operation of adjacent steam powered equipment. The only available space to supply utilities to the electric boiler is the 6 (152mm) space between the floor and the cabinet. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. WARNING: O NOT UNER ANY CIRCUMANCE CONNT THE EXHAU RAIN LINE IRTLY TO A SEWER LINE. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 [318] 58 [1473] 10 gal kettle 8.5 [216] [1403 6 gal kettle 3 [76] 5 [127] 22 [559] EP EP Figure 11 13 OPERATION

Service Connections - Electric Boiler Models MT10T10E Volts Phase 24kW 36kW 42kW 48kW 208 (197-219) 3 66 100 117-240 (220-240) 3 58 87-116 480 (360-500) 3 29 44-58 etails of other electrical systems available upon request. SERVICE CONNTIONS EP Power Supply - Use wire suitable for at least 90 C. Nominal amp per line wire. Cold Water - 3/8 (10mm) NPT for cold water to boiler. Cold water lines will have a maximum of 50 PSI (3.5kg/ cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure Cold Water - 3/8 (10mm) NPT for cold water to condenser and kettle fill faucet. Cold water lines will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/cw2) water pressure. Hot Water - 3/8 (10mm) NPT female for hot water to kettle fill faucet. Hot water line will have a maximum of 50 PSI (3.5kg/cw2) and a minimum of 25 PSI (1.8 kg/ cw2) water pressure. rain - Pipe full 2 (50mm) NPT to flush floor drain capable of receiving water flowing at a maximum rate of 5 gallons (19 liters) per minute. O NOT MAKE SOLI CONNTION TO FLOOR RAIN. Steam Take-off - Connection for operation of adjacent steam powered equipment. The only available space to supply utilities to the electric boiler is the 6 (152mm) space between the floor and the cabinet. PVC & CPVC PIPE ARE NOT ACCEPTABLE MATERIALS FOR RAINS. WARNING: O NOT UNER ANY CIRCUMANCE CONNT THE EXHAU RAIN LINE IRTLY TO A SEWER LINE. CAUTION: REMOTE KETTLE OPERATION If this boiler is feeding a remote kettle that will be more than 5 feet (1.5 meters) away, consult factory before ordering. TS: 40-125 ppm IMENSIONS ARE IN INCHES [MM] 12.5 [318] 8.5 [216] 58 [1473] 3 [76] 5 [127] 22 [559] EP EP Figure 12 OPERATION 14

Operating & Cleaning Instructions OPERATE KETTLE AS FOLLOWS: 1. Check pressure gauge of steam supply to ensure steam input is at approximately 15 PSI (1.0kg/cm2) to a maximum of 50 PSI (3.5 kg/cm2). For direct connected steam, turn on external steam supply valve. 2. Load kettle with food to be cooked. 3. Add water for cooking by turning swing nozzle over kettle and using combination faucet. 4. Turn steam valve to full counterclockwise position to allow steam to flow into jacket. Wait until food reaches desired temperature. 5. Adjust subsequent cooking temperature by turning steam control valve. Turn clockwise to reduce heat (steam flow) and counterclockwise to increase heat (steam flow). 6. Close steam control valve and remove food from kettles as soon as cooking is complete to prevent overcooking. NOTE: Before tilting kettle, ensure that a.) Swing nozzle is rotated clear of kettle. b.) Kettle is not full. If kettle is full ladle out 2 gallons of contents by hand. In the event that the kettle fails to operate correctly, the difficulty should first be isolated to either the kettle itself or the steam supply which heats the kettle. While mechanical problems are obvious faults of the kettle, any deficiencies in volume and pressure of the steam should be traced to the steam generator and the cause determined. Steam input requirements are listed below. This list recommends delivered boiler horsepower for kettle size and steam flow. MOEL BHP EAM FLOW MT6 1/3 BHP 15-30 PSI MT10 1/2 BHP 15-30 PSI MT6T6 1/3 BHP 15-30 PSI MT10T6 1/2 BHP 15-30 PSI MT10T10 1/2 BHP 15-30 PSI PREVENTIVE MAINTENANCE: The most important preventive maintenance operation on the steam jacketed kettle is the cleaning procedure. Cleaning should be faithfully completed at the end of each day, Including cabinet doors, counter-top, fixtures, kettle lid, etc, should be washed and rinsed to remove all food spills. CLEANING PROCEURE AS FOLLOWS: 1. Fill kettle with water and mild detergent immediately after removing food from the kettle. 2. Remove food soil using a nylon brush. (NOTE: Never scrape the inside of the kettle with metal tools, steel scouring pads or abrasive cleaners. Scratches will result which ruin the general appearance of the kettle and make it harder to clean and maintain in a sanitary condition). 3. Loosen food which is stuck to the kettle by allowing it to soak. Also, a small amount of steam may help. 4. Place clean-up pan under kettle being washed by inserting clan-up pan drain extension into counter-top drain opening. (NEW Style - Attach splash guard to clean-up pan). Tilt kettle to pour out wash water. 5. Rinse kettle with hot water. 6. Thoroughly wash and rinse kettle exterior and cabinet exterior. 7. Thoroughly dry unit. Weekly Cleaning In addition to the daily cleaning it is necessary to clean the air intakes on a weekly basis. Air intakes provide necessary cooling air to the internal components. They are generally located on the rear and sides of the equipment. 15 OPERATION