TRINITY LUTHERAN SCHOOL RENOVATIONS

Similar documents
CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Riverview West Side Elementary 160 Isabel Avenue East

New High School Concept

Forest Hills Facilities Plan

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Master Facility Planning Update School Board Meeting May 26, 2016

Surface Materials. Surface Material Reflectance. Acoustic Ceiling 80% Tile. Painted Gypsum 75% Wall Board. Vinyl Composition 32% Tile

Columns REF, RESPONSIBLE and COMPL TD are provided for your numbering, assignments and control. REF ISSUE RESPONSIBLE COMPL TD

HELENA PUBLIC SCHOOLS FRONT STREET LEARNING CENTER CLEANING OUTCOMES ASSESSMENT. May 2013

Imagine RBC 2010 The Plan

Briar Crest Elementary

New Brunswick Campus Operations Service Guide. Maintenance repair or replacement in

COSMETOLOGY September 30, 2010

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Beaufort County Community College. Maintenance and House Keeping Plan

Custodial Guide

Stanfield School District Cleaning Standards

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

3.2.4 OFFICE FACILITIES

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

2014 Bond Project Guide

Jewel. Platte. of the. Plattsmouth Main Street Landscape Architecture by HDR

Cleaning Service Levels

Design Presentation. Chief Operations Officer Willie Burroughs

CENTRAL CITY NEIGHBORHOOD Site Plan and Design Review Guidelines Checklist

Master Project List Report

r.i.s.e demonstration center washington, dc project category: architecture

Bethlehem University 2008 Projects Summary

University of Wisconsin - Whitewater Universal Design Guidelines

Main Street Conversion Site

2017 Design Awards. ASID Minnesota Chapter. SUBMISSIONS DUE (by Noon) AWARDS GALA MN.ASID.ORG. 1 of 21

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Bluejack Builders Total House: $250,000-$500,000. St. Paul

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Oregon Non-Residential Building Energy Code

Port Lavaca Future Land Use

Center for Health Research and Rural Advocacy

BURLEIGH MANOR MIDDLE SCHOOL HOWARD COUNTY PUBLIC SCHOOL SYSTEM

SPACE TYPE: JUDICIAL CHAMBER

PLANNING COMMISSION AGENDA REPORT NOVEMBER 15, 2012

ATTACHMENT A - Services Specifications

Board of Directors Meeting Minutes October 1, 7:00 p.m. in the Lobby Hallway

TERMS OF REFERENCE (as of 02 April 2018)

Design Review of Facility Improvement Projects

SOFIA UNIVERSITY AUDITORIUM CONCEPTUAL DESIGN 08/03/2013

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

G W C C GREENMOUNT WEST COMMUNITY CENTER GWCA - COMMUNITY CENTER. design recommendations

Renovation Elements Landscaping Building Entries Signage and Identity Lobbies Lobby Seating Areas Elevators Restrooms. The Pyramids at College Park

JANITORIAL SPECIFICATIONS

Custodial. Customer Service. Guide. What We Clean & How Often We Clean It

Element C Interiors Interior Construction

Motor City Re-Store Design Guidelines

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Edith Wolford Elementary School Site Improvement Committee

Campus Outdoor Lighting Plan

Albany Senior Center Remodel

Depth Work Part 1: Lighting Design

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

West Hartford Public School District

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

John Palmer Elementary School

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

RETAIL DESIGN GUIDELINES

PROCEDURE: FURNITURE, ART, & DÉCOR STANDARDS & REQUESTS

Community Design Plan

Alessandro Volta Elementary School

Facilities Management State-Funded and Billable Services

EXISTING CONDITIONS SUMMARY

School District of New London. Community Listening Session & Referendum Consideration

5 Year Capital Improvement Plan Update

F & S Caretaking Department Design Standards For New or Renovated U of T Premises February 2015

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

Measure W Review. East Nicolaus High School District March 9, 2017

Facilities Management Services

Preliminary Capital Fund Appeal Renovation Priorities

Palmyra High School 07/16 Addition and Renovation Palmyra, Nebraska

Church Restoration & Renovations

Some Basics of School Library Design

implementation r expression in landscape

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

Request for Proposals Design Services for Kitchen Remodel and Second Floor Layout

PLATTEVILLE MIDDLE SCHOOL

HVAC / Boilers / Hot Water. Expected Life Span. very rough estimates Condition/Issue Age. Athletics / Gyms

ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION

Sidney Sawyer Elementary School

NUUC CONGREGATIONAL MEETING

WATER WISE SURV EY. Santa Barbara City College

LEASIDE UNITED CHURCH FEASIBILITY STUDY TORONTO, ONTARIO

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

Interior signs are an extension of the exterior sign system and their content and design should take this into consideration.

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Transcription:

MASTER PLAN FOR PHASED IMPROVEMENTS AUGUST 26, 2013 WITH DESIGN AND PLANNING GUIDANCE FROM WIGHT & COMPANY`

Recognizing the importance of its school facility s general appearance, school officials initiated a feasibility study in April 2013, appointing an administrative guiding committee, school staff and community members as a focus group, and Wight & Company as design consultant. OVERVIEW OF PROPOSED IMPROVEMENTS Renovate: make like new again The study is focused on apprearance, with the goal of modernizing the school s interior and entrance features, giving students, teachers, and visitors a visual environment that corresponds with today s aesthetics in terms of color, design and material. Make the school look new again. entry addition OFFICE office remodeling: inner office outer office Through the study, and informed by the opinions of focus group, priorites were established among the many parts of the school that could benefit from an aesthetic modernization. Subsequent pages provide a little more detail into the top two priorities: priority interiors and entry addition. priority interiors including remodeling Similar detail on other potential improvements, though in consideration, are not within the purview of the study. swap locations: existing secondary interiors optional basement beneath addition OFFICE GYM GYM priority interiors secondary interiors existing site configuration August 26, 2013 Wight & Company

PRIORITY INTERIOR IMPROVEMENTS office or commons concept for multi-use study feature at classroom entries pre-k OPTIONS FOR REFINISHING THE INTERIORS Lobby proposed remodeling as illustrated Corridors new vinyl and walk-off carpet flooring resurfacing selected walls new acoustical ceiling with features, lighting new cabinetry, millwork, seating, furniture new vinyl composition tile flooring tackable wall surfacing classroom entry features Restrooms new porcelain tile flooring and ceiling new acoustical ceiling with lighting new lighting repaired and re-painted lockers new lavatory fixtures new counters and dispensers floor area 1,100 sq ft upper level floor area lower level floor area 800 sq ft 1,800 sq ft upper level floor area lower level floor area 500 sq ft 1,200 sq ft August 26, 2013 Wight & Company

ENTRY ADDITION new view of addition concept plan F view of addition existing entry area, seen from parking lot monument sign (future potential) monument sign new new (portion open for daylight) signage walls (portion open for daylight) signage walls signage wall plan A (extend facing to corner) existing plan reconfigured office space (future potential) added office added office plan B plan C plan D signage wall plan E August 26, 2013 Wight & Company

COLORS AND MATERIALS Interior Color Palette An aspect of the study, with a focus on apprearance, was to adopt a palette of colors and materials for all interior surfaces. Though the various improvements may be implemented in increments according to funding, each increment adheres to this coordinated groups of finishes and, with each stage, brings the overall school closer to a fully-coordinated and updated look. Alternatives were reviewed by the focus group, and this palette was preferred as being lively and energizing without being overly juvenile, appealing to all ages. The photo below is taken from a collage of actual matertial samples. The colors may not be represented accurately due to the variations in printing systems. Refer to the actual sample panel, maintained in the school office, for true color reference. This is simply a palette, and not a complete color and finish design. With each improvement, the specific applications will need to be determined by the designer to both adhere to the palette and to coordinate with any foregoing applications at the time. feature at classroom entries office multi-use study paint colors, school pre-k OPTIONS FOR REFINISHING THE INTERIORS Lobby proposed remodeling as illustrated Corridors new vinyl and carpet flooring resurfacing selected walls new acoustical ceiling with features, lighting new cabinetry, millwork, seating, furniture new vinyl flooring new acoustical ceiling with lighting tackable wall surfacing classroom entry features Restrooms new porcelain tile flooring and ceiling new lighting repaired and re-painted lockers new lavatory fixtures new counters and dispensers note: The colors on this exhibit do not represent the actual proposed colors. See accompanying Colors and Materials exhibit for proposed palette of materials. All materials are contract grade products for use in commercial and institutional applications. vinyl composition tile field color paint colors, gym field color (most walls) solid surfacing modular carpet sheet vinyl for commons field pattern and color concept for walk-off carpet field color accents furniture grouping August 26, 2013 Wight & Company