San Mateo County Storm Water Resource Plan

Similar documents
Kristin Kerr EOA, Inc. February 1, 2017

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Note: Red text denotes additions/ changes from Dec 23, 2009 draft Page 1 of 12

Getting Started On Your Green Infrastructure (GI) Plan

Case Study: City of San Mateo

Water in storm drains does not go to a treatment plant

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

SCVURPPP Green Infrastructure Handbook. Kristin Kerr, P.E. EOA, Inc. April 19, 2017

Physical Connectivity Do not have structures that physically divide the community more than it is divided today

The Green Infrastructure Plan Requirement: shifting from gray to green infrastructure June 14, 2016

San Mateo County Fire Service POLICIES AND STANDARDS MANUAL

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Appendix E: Illustrative Green Infrastructure Examples

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

6.5 Lakewood Gulch. Basin Snapshot

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

1 North San Antonio Road Los Altos, California MEMORANDUM GREEN INFRASTRUCTURE PLAN FRAMEWORK

Watershed Planning Workshop

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

Green Infrastructure & Low Impact Development

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

The Benefits and Challenges Associated with Green Infrastructure Practices

SOUTH SAN FRANCISCO GATEWAY STUDY

Problem Understanding

Welcome to the San Francisquito Creek Flood Protection, Ecosystem Restoration, and Recreation Project Upstream of Highway 101

Post Construction BMPs

Leduc Industrial Outline Plan SE W4

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

Stormwater Project Meeting

Stormwater Low Impact Development - A Natural Solution

Exercises: Using LID Feasibility Worksheets

5.6 Valverde. Basin Snapshot. Valverde Land Uses

3. Are there any projects exempt from the definition of Regulated Projects?

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

STREET DESIGNATIONS AND STANDARD ROADWAY DIMENSIONS

LID Resources. Matt Yeager San Bernardino County Flood Control District. Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Program

ACCESS PLAN. SD 11/SPLITROCK BOULEVARD Brandon, SD. Prepared by South Dakota Department of Transportation City of Brandon

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

Post - Construction Hydromodification Development Requirements

Building Green into Complete Streets in the City of Lancaster, PA

Minnesota Department of Natural Resource - Natural Resource Guidance Checklist Conserving Natural Resources through Density Bonuses

Table of Contents G.1.a Water Resources - Surface Water - Drainage

Urban Sustainability Area Designation

920 BAYSWATER AVENUE PROJECT

Town of Vershire Road Erosion Inventory Report

Notice of Preparation of an Environmental Impact Report and Scoping Meeting for the Canyon Lane Roadway Improvements Development Project


Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

WEFTEC.06. ** City of Caldwell, Idaho

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

a great new program that helps make the best use of something we re all familiar with - rainwater. Building a Better Long Beach

Reducing New York City s CSOs Using Green Infrastructure

Going Green with the NYS Stormwater Design Standards

Green Infrastructure and Low-Impact Development Technologies

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

4 LAND USE DESIGNATIONS

Conservation in South Jersey Being Creative with Restoration

Firm Background and Contact Information. Interest, Availability and Commitment

SFE Policy Committee Presentation. Rachel Kraai

Managing Stormwater Naturally. July 17, 2013

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

The Art and Science of Stormwater Retrofitting

COMPLETE GREEN STREET CHECKLIST

Intentionally Left Blank

Appendix I. Checklists

When planning stormwater management facilities, the following principles shall be applied where possible.

Agilent Santa Clara CO-3

6.3 Elyria-Swansea. Basin Snapshot

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

Beyond Runoff Reduction: Thorough Green Infrastructure Design. Zach Sample, PE Innovyze

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

PARKS AND RECREATION ELEMENT

Green Infrastructure Implementation Planning for Multiple Objectives

THE PLANNING AREA 2.1 PLANNING AREA LOCATION

C.3 Stormwater Technical Guidance

A G E N D A Council Update Training Room September 26, :45 p.m.

Kirtland, Ohio - Comprehensive Plan Update 2022

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Stormwater Management in Ontario

Outfall Retrofit Feasibility Study

FACT SHEET: Pervious Pavement with Infiltration

Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

LID CASE STUDY DESIGN WORKSHOP HSG B/D SOIL EXAMPLE SINGLE FAMILY SUBDIVISION WITH OUTPARCEL

International Blvd. TOD Plan Public Workshop #1

Melissa Bernardo Hess, PE, CFM February 18, 2016

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

[FWS R8 R 2015 N087; FXRS282108E8PD0 156 F ] South Bay Salt Pond Restoration Project, Phase 2; Don Edwards National Wildlife

Recent experience on projects using Best Management Practices and Stormwater Detention:

COMMISSION ACTION FORM

Transcription:

San Mateo County Storm Water Resource Plan Matthew Fabry, P.E. CASQA Effectiveness Assessment Sub-Committee November 16, 2016

SWRP RAA GI Plan Characterization of watersheds Stormwater Capture Model Web-based tool for quantifying project stormwater capture Based on Bay Area Hydrologic Model (HSPF) and SUSTAIN Used to quantify stormwater capture for high priority projects Web-based GIS tool Identification and prioritization of projects Modeling (HSPF) to determine PCB & Hg TMDL load targets Quantify reductions associated with LID for new/redevelopment (SUSTAIN) Identify additional stormwater capture goals to meet TMDL reductions (SUSTAIN) Update Stormwater Capture Model based on refinements to HSPF and SUSTAIN Update Web-based GIS tool with results of RAA Develop guidelines, standard specifications, design details, and model plan update materials Develop projections of new and re-development Formal release of Stormwater Capture Model to support implementation and tracking of TMDL reductions Identify targets for retrofit of impervious surfaces with GI Identify projects to be implemented within the current permit term

Project Types Regional Projects Green Streets Low Impact Development

Screening of Sites for Onsite LID/Regional Projects Screening Factor Public Parcels Suitability Parcel Characteristic Ownership Land Use Parcel Size Criteria City, County or Town Park, School, Other (e.g., Golf Course) >0.25 acres All Site Slope < 10 % Reason Identify all public parcels for regional storm and dry weather runoff capture projects or onsite LID retrofits Adequate space for regional stormwater and dry weather runoff capture project Opportunity for onsite green infrastructure retrofit Steeper grades present additional design challenges

Green Street Screening Screening Factor Selection Suitability Street Section Characteristic Functional Class Ownership Road Slope Criteria S1400 S1730 S1780 Private < 5% Reason Local neighborhood road, rural road, city street, alley, parking lot roads Potential projects are focused on public and right-of-way opportunities Steep grades present additional design challenges; reduce capture opportunity due to increased runoff velocity

Example Regional Project Quantitative Scoring Table 4-1. Parcel prioritization criteria for regional stormwater capture Points Weight 0 1 2 3 4 5 Factor Parcel Land Use -- -- Schools/Golf Public Park / Open Parking Lot Courses Buildings Space -- Impervious Area (%) X < 40 40 X < 50 50 X < 60 60 X < 70 60 X < 80 80 X < 100 -- Parcel Size (acres) 0.25 X < 0.5 0.5 X < 1 1 X < 2 2 X < 3 3 X < 4 4 X -- Hydrologic Soil Group -- D Unknown C B A -- Slope (%) 5 < X 10 4 < X 5 3 < X 4 2 < X 3 1 < X 2 0 < X 1 -- Proximity to Floodprone Channels Not in sub-basin (miles) 3 < X -- 1 < X 3 -- X 1 2 Contains PCB Risk Areas Currently planned by City or co-located with other City project None Redeveloped -Low Redeveloped- Moderate Moderate High-Low / Redeveloped-High High-High / High- Moderate No Yes 2 Drains to TMDL water No Yes Above groundwater basin Augments water supply Water quality source control Reestablishes natural hydrology Creates or enhances habitat Community enhancement 2

Regional Projects Total # of Screened Parcels: 1,841 Low score: 1,091 Medium score: 670 High score: 80 Rank Score Jurisdiction APN Co-located Project 1 49 Menlo Park 071102400 Parking Plaza 7 Renovation 2 49 Menlo Park 071281160 Parking Plaza 7 Renovation 3 49 Menlo Park 071285160 Parking Plaza 7 Renovation 4 48 Menlo Park 071283140 Parking Plaza 7 Renovation 5 48 Menlo Park 071094180 Parking Plaza 7 Renovation 6 48 Menlo Park 071284100 Parking Plaza 7 Renovation 7 48 Menlo Park 071092290 Parking Plaza 7 Renovation 8 46 Menlo Park 071273160 Parking Plaza 7 Renovation 9 45 South San Francisco 015180180 10 45 South San Francisco 015180170

Example Green Street Quantitative Scoring Table 4-1. Right-of-Way prioritization criteria for green streets Points 0 1 2 3 4 5 Street Type Highway -- Arterial Collector Alley Local -- Imperviousness (%) X < 40 40 X < 50 50 X < 60 60 X < 70 60 X < 80 80 X < 100 -- Hydrologic Soil Group -- D Unknown C B A -- Slope (%) -- 4 < X 5 3 < X 4 2 < X 3 1 < X 2 0 < X 1 -- Proximity to Floodprone Channels 3 < X -- 1 < X 3 -- X 1 2 Not in sub-basin (miles) Contains PCB Risk Areas Currently planned by City or co-located with other City project None Redeveloped -Low Redeveloped -Moderate Moderate High-Low / Redeveloped-High High-High / High- Moderate No Yes 2 Weight Factor 2 Safe Routes to School program No Yes 2 Drains to TMDL water Above groundwater basin Augments water supply Water quality source control Reestablishes natural hydrology Creates or enhances habitat Community enhancement

Green Streets Total # of Screened ROW segments: 16,366 Median Segment Length: 320 ft Low score: 11,086 Medium score: 4,547 High score: 733 Rank Score Street Name TIGER Census Roads ID (STNA_ID) Length (ft) 1 49 Airport Blvd 322632 374 2 49 Santa Cruz Ave 1717 225 3 48 Grand Ave 269532 235 4 48 Airport Blvd 322632 370 5 48 Chestnut St 284618 145 6 47 Alma St 235064 798 7 47 E Grand Ave 327309 228 8 47 Meadow Ct 3011441 135 9 47 San Miguel Way 3010534 303 10 47 San Miguel Way 3010534 419

Reasonable Assurance Analysis Data Rainfall HRUs/Land Use Impervious Elevation Slopes Evaporation Infiltration HSPF Watershed Model Results Hourly runoff and sediment/pollutant loads SUSTAIN Stormwater Capture Model Calculation of project capture volumes Stormwater Capture Model GI Response 10

Additional Quantitative Modeling Analysis for High Priority Projects Modeling performed for highest ranked projects selected for project concepts Stormwater Capture Model will enable each city to perform similar analysis for future grant applications Project Name Jurisdiction Project Type Orange Memorial Park South San Francisco Volume Reduced (ac-ft/yr) PCB Reduced (mg/yr) Hg Reduced (mg/yr) Regional 455 7,081 50,242 Twin Pines Park Belmont Regional 9.95 155 1,098 Holbrook-Palmer Park Atherton Regional 242 3,769 26,746 Addison Avenue East Palo Alto Green Street 1.55 24.2 171.5 East Poplar Avenue San Mateo Green Street 1.46 22.7 161.1 Grand Avenue South San Francisco Green Street 1.31 20.3 144.3 San Anselmo Avenue Millbrae Green Street 4.56 71.0 503.7 Chapin Avenue Burlingame Green Street 4.93 76.6 543.7 Valley Drive Brisbane Green Street 2.16 33.5 237.9 Ruth Avenue Belmont Green Street 3.80 59.1 419.4 Alma Street Menlo Park Green Street 7.26 113.0 801.7 Rosewood Avenue and Elm Street Middlefield Road San Carlos Green Street 16.93 263.3 1,868.5 Redwood City Green Street 4.47 69.5 492.8 Hillside Boulevard Colma Green Street 2.67 41.5 294.8 Kennedy Middle School Green Streets Redwood City Green Street 3.51 54.6 387.7 Beach Park Boulevard Foster City Green Street 7.51 116.8 828.8 San Bruno Avenue East San Bruno Green Street 3.73 58.1 412.0 Rosita Road Pacifica Green Street 1.50 23.3 165.1 Middlefield Parking Lot City Hall Parking Lot San Mateo County Half Moon Bay LID Retrofit 0.56 8.7 61.6 LID Retrofit 0.66 10.3 73.0 Beresford Park San Mateo LID Retrofit 1.50 23.4 166.0 Doelger Senior Center Daly City LID Retrofit 3.07 47.8 339.4