9IMPLEMENTATION AND PHASING

Similar documents
A. LAND USE AND PLANNING POLICY

PROJECT DESCRIPTION A. PROJECT SITE. 1. Location. 2. Site Conditions and Surrounding Land Uses

APPENDIX B RELATIONSHIP OF MASTER PLAN TO RELEVANT PLANS AND POLICIES

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

The transportation system in a community is an

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

The West Vaughan Employment Area Secondary Plan Policies

Town Center (part of the Comprehensive Plan)

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

appendix and street interface guidelines

CHAPTER 7: Transportation, Mobility and Circulation

Potential Green Infrastructure Strategies May 6, 2015 Workshop

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Town of Oakville Streetscape Strategy

Asbury Chapel Subdivision Sketch Plan

3.4.5 Roadway System and Infrastructure Phase I (Project) Roadway System Components E Street Extension (Phase I).

Development Guidelines - Florin-Vineyard Community Plan Administrative Draft

ARTICLE 6: Special and Planned Development Districts

Planning Districts INTRODUCTION

3. STRATEGY FOR NEIGHBORHOOD SUSTAINABILITY

8implementation. strategies

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

Waterfront West December 6, 2016

Policies and Code Intent Sections Related to Town Center

Hockessin Community Redevelopment Plan

M E M O R A N D U M SITE DATA

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

WEST LOOP DESIGN GUIDELINES CHECKLIST

SUBCHAPTER 4-B GUIDELINES FOR THE B-3 COMMERCIAL CHARACTER AREA

Toronto Complete Streets Guidelines

DRAFT. October Wheaton. Design Guidelines

Planning Commission Staff Report June 5, 2008

PLAN ELEMENTS WORKSHOP. April 5, 2016

P A I N E S V I L L E D O W N T O W N P L A N

38 Queen s University Campus Master Plan Part 1

CHAPTER 20 THE RAILROAD CHARACTER AREA. The Railroad Character Area contains the railroad tracks and those lands flanking them.

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

East Corridor Final Environmental Impact Statement

Capital Improvement Program. Development Services Staff Recommended Projects

ARLINGTON COUNTY, VIRGINIA

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

CHAPTER 3 DOWNTOWN COMMERCIAL DISTRICT CHARACTER AREA

DRAFT Civic Center Station Area Plan. Executive Summary

... the real city lives on... Character Area 5: LOWER WASHINGTON

CHAPTER FIVE COMMUNITY DESIGN

CRYSTAL CITY BLOCK PLAN # CCBP- G 1

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

Table 8-4: Road Classification Local Roads, second table, of Chapter 8 Create a Multi-Modal City, be amended by adding the following:

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

3.1 community vision. 3.3 required plan elements

Existing Conditions. Planning and Design Principles

Volume 2: Implementation Plan

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

SECTION TWO: Overall Design Guidelines

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Complete Neighbourhood Guidelines Review Tool

Tonight s Agenda. Summary Presentation Open House. Group Discussion Next Steps: online community wide survey

URBAN DESIGN BRIEF REPORT

COMPLETE GREEN STREET CHECKLIST

Developer s Program. The Station at East 54

City of Woodinville Planning Commission Study Session. Development Regulations 101: An Overview of Specific Regulatory Items To Help You in 2012

Draft Memorandum #1: Goals and Vision for Revitalization

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

(DC1) Direct Development Control Provision DC1 Area 4

Public Meeting May 20, 2014

Cit of Kitchener Ur 6 an Design Manual PARTA. Desi n for _--::

Derry Green Corporate Business Park

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Olde Towne Vision Plan

PORT WHITBY COMMUNITY

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

Cha p t e r 2: Ge n e r a l De s i g n Gu i d e l i n e s

Capital Projects impacting Odenton Town Center

Civic Center District

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

TOWN COUNCIL / PLANNING COMMISSION

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Chapter 5: Recreation

Urban Design Brief Fanshawe Park Road. Competition Toyota

City of Bristol Route 6 Corridor Implementation Program

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

R STREET CORRIDOR NEIGHBORHOOD Site Plan and Design Review Supplemental Guidelines Checklist

Chapter PEDESTRIAN COMMERCIAL (PC) ZONING DISTRICT

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

Major Subdivision Sketch Plan Checklist

APPENDIX 4 NEWBURY TOWNSHIP TOWN CENTER MASTER PLAN

4.500 Preston Road Overlay District

Transcription:

9IMPLEMENTATION AND PHASING Purpose A key objective of the Railyard Master Plan is the integration of the public and private realm to provide a network of places that connect to and complement Commercial Row and to offer up a sequence of unfolding spaces that inspire people to walk and to linger in Downtown Truckee. This chapter provides implementation measures for these improvements, and a discussion of project phasing. This chapter also includes the Action Items listed throughout the Master Plan. Timing and implementation of the Master Plan EIR mitigation measures are outlined in the Mitigation Monitoring and Reporting Program (MMRP, Appendix C). 9.1 Implementation Measures Implementation of the Master Plan will focus on allowing the project to grow organically, developing the Master Plan in phases that grow east from the existing commercial uses in Downtown Truckee, and creating flexible spaces and transitional uses that will evolve over time as the market permits. Understanding these key elements, it is still important to plan for adequate utility corridors and to ensure that the appropriate planning processes are completed and the Master Plan has undergone adequate environmental review. Implementation measures that shall be completed as part of, or prior to, development within the Railyard Area and the Action Items throughout this Master Plan are provided in Table 9-1, at the end of this chapter. 9.2 project phasing In general, the Railyard Master Plan Area will be developed from west to east, with the first phase of development to include mixed land uses with ground floor retail as an extension of Commercial Row. The entire Railyard Area is intended to develop over a period of approximately 10 to 20 years, with build-out to street C targeted for 5 to 10 years and build-out of the remaining Master Plan Area targeted for 15 to 20 years. Residential development will be incorporated into each District of the Master Plan. Figure 9-1 shows proposed modifications to existing site conditions. Figure 9-1 also includes a proposed expansion of the Truckee-Tahoe Lumber Company yard within the Master Plan Area, illustrated in greater detail in Figure 9-2. The proposed expansion will provide space within the lumberyard property for activities currently taking place on the Railyard, including snow storage, truck maneuvering and queuing, and customer parking. Lumberyard employee parking, also currently on the Railyard, will temporarily be shifted eastward as part of Phase 1, and eventually be accommodated in Parking District employee lots south of Donner Pass Road Extension and east of Street B. These changes will allow Truckee-Tahoe Lumber Company to continue its operations within the Master Plan Area indefinitely, but without precluding the possible future redevelopment of its expanded property in a manner consistent with the Master Plan. Development of the Railyard Area from west to east is not only desirable from a land use planning perspective; it is also highly desirable from a utility and infrastructure phasing standpoint. Project Truckee Railyard Master Plan Page 113

9. Implementation and Phasing phasing is very important in planning the on-site utility system and infrastructure construction. The utility service systems (see Chapter 8 for a discussion of utility improvements) can be expanded from existing lines within developed portions of the Town in an easterly direction to serve each particular phase of development. Phase 1A would include an extension of commercial and residential uses of compatible scale and character to Commercial Row. The proposed scope Phase 1A is shown in Figure 9-3. Phase 1A RELOCATED BALLOON TRACK FUEL PUMPS TO BE RELOCATED COMMERCIAL BUILDING TO BE REMOVED EXISTING LUMBER YARD EMPLOYEE PARKING TO BE RELOCATED RAILROAD YARD OFFICE AND SIDING TO BE RELOCATED Figure 9-1: Proposed Modifications to Key Site Conditions Truckee Railyard Master Plan 100 YEAR ANTICIPATED FLOOD PLAIN LUMBER YARD EXPANSION AREA RELOCATED LUMBER YARD EMPLOYEE PARKING IN PARKING DISTRICT EMPLOYEE LOT REPLACEMENT RAILROAD YARD OFFICE AND SIDING EXISTING BALLOON TRACK TEMPORARY BALLOON TRACK ALIGNMENT Source: Acumen Engineering Company, 2007. Page 114

9. Implementation and Phasing Figure 9-2: Expansion of Truckee - Tahoe Lumber Company Truckee Railyard Master Plan Source: Acumen Engineering Company, 2007. Page 115

9. Implementation and Phasing would include: 17,000 square feet of new retail and restaurant space; 16,000 square feet of live/work and work/live space; 36 residential units; and a 52-room boutique hotel. Relocated temporary TTL employee parking for Phase 1A Temporary snow storage and storm water retention PHASING LEGEND PHASE 1A: PARCEL DELINEATOR Figure 9-3: Proposed Phasing Plan for Phase 1A Truckee Railyard Master Plan -RECONFIGURE EXISTING LEASED TOWN PARKING LOT -REMOVE COMMERCIAL BUILDING -RELOCATE CARD-LOCK FUEL STATION -RELOCATE UPRR YARD OFFICE AND STORAGE TRACKS -TEMPORARILY RELOCATE TTL EMPLOYEE PARKING -RELOCATE AND EXTEND DONNER PASS ROAD -IMPROVE CHURCH STREET -RELOCATE AND EXTEND UTILITY SERVICES -PROVIDE TEMPORARY SNOW STORAGE AND STORM WATER RETENTION ON PARCEL 4 -CONSTRUCT TEMPORARY VEHICULAR ALLEY EAST OF PHASE 1A -CONSTRUCT PHASE 1A OPEN SPACE -CONSTRUCT HOTEL BLOCK -CONSTRUCT WESTERLY PORTION OF THEATER BLOCK Source: Acumen Engineering Company, 2007. Page 116

9. Implementation and Phasing The proposed scope of Phase 1B is shown in Figure 9-4. Phase 1B would include: 10,000 square feet of new retail and restaurant space; 16,000 square feet of theater space; 8,000 square feet of work/live space; and 34 residential units Temporary snow storage and storm water retention Relocated temporary TTL employee parking for Phase 1A PHASE 1A: - Reconfigure existing leased town parking lot - Remove commercial building - Relocate card-lock fuel station - Relocate UPRR yard office and storage tracks - Temporarily reconfigure UPRR balloon track - Temporarily relocate TTL employee parking - Relocate and extend Donner Pass Road - Improve Church Street - Relocate and extend utility services - Provide temporary snow storage and storm water retention on Parcel 4 - Construct temporary vehicular alley east of Phase 1A - Construct Phase 1A open space - Construct Hotel Block - Construct westerly portion of theater block Figure 9-4: Proposed Phasing Plan for Phase 1B Truckee Railyard Master Plan Phase 1B: - Relocate SPPC transmission lines - Relocate UPRR balloon track - Realign Glenshire Drive to accommodate new balloon - Restore Trout Creek through Reach 5, including new DPRE and railroad crossings - Improve and extend Church Street to new TTL driveway - Extend Donner Pass Road to new Glenshire Drive intersection - Construct parking lots south of DPRE from DPR to Street B; provide temporary Phase 1 parking in lots between streets A and B - Construct permanent pedestrian alley through theater block - Construct Street A - Relocate and Extend utility services - Provide temporary snow storage and storm water retention on Parcel 4 - Construct remaining portion of Theater Source: Acumen Engineering Company, 2007. Page 117

9. Implementation and Phasing Phase 1A Hotel Parcel Figure 9-5: Conceptual Site Plan for Phase 1A and 1B Phase 1B Theater Block Source: Landscape Office, 2007. Figure 9-5 shows conceptual site plan of Phases 1A and 1B. Buildings within Phase 1A and 1B would be 2 to 3 stories tall, with a maximum height of 50 feet. Required land uses within Phase 1 include a hotel or a multi-screen movie theater. Additional desirable land uses include small shops and restaurants. All development within Phase 1 will be subject to the development standards and design guidelines within Chapter 5 of this Master Plan. The railroad operations will be relocated to the eastern-most portion of the project prior to construction on the Theater Block will require construction of new temporary and/or permanent utility infrastructure until the remainder of the project catches up. While providing early utility service to the railroad operations building is challenging, the relatively small demands associated with a building/use of this type allow the consideration of a number of alternatives to meet the building s needs. Prior to any development in the Master Plan, the developer shall provide confirmation from Union Pacific Railroad that the balloon track can be relocated. It should be noted that construction of the Hotel Parcel and the western portion (including the alley if necessary) of the Theater Block may occur without relocating the balloon track or realigning Glenshire Drive, provided that the Town secures right-of-way to accommodate these future needs. Construction of the remainder of the Theater Block and any further development within the Master Plan Area shall only proceed after relocation of the balloon track and realignment of Donner Pass Road to Glenshire Drive improvements are complete. Truckee Railyard Master Plan Page 118

9. Implementation and Phasing Table 9-1: Implementation Measures and Action Items No. Implementation Measures/Action Items Timing Responsible Party 1 Development Agreement. approvals or development activity in the Master Plan Area, the Town and the developer shall enter into a Development Agreement. permit issuance. 2 Additional Economic Analysis. Prior to construction of Phase 2 of the Master Plan, additional economic impact analysis shall be completed. The analysis shall reevaluate the findings of the Railyard Master Plan Economic Analysis dated March 20, 2009, prepared by Strategic Economics, to determine if development proposed beyond Phase 2 is appropriate for Downtown Truckee. The Town shall consider the report findings prior to any new construction in Phase 2 and may modify the Master Plan based on the report findings. For purposes of this implementation measure, Phase 2 is the development stage following the theater block and hotel block conceptually shown in Figure 9-5. Prior to development of Phase 2. 3 Infrastructure Plan. Prior to implementation of each phase of development, the project developer shall work with the appropriate utility agencies and the Town Engineer to create of a detailed Infrastructure Plan for water, sewer, stormwater, electrical, gas, and telecommunication services and roadway extensions and improvements necessary for the anticipated mix of land uses within each phase of development. (Action Item 8.2) 4 Union Pacific Agreement. The developer shall submit written confirmation from Union Pacific Railroad confirming that the relocation of balloon track is acceptable to Union Pacific Railroad and the balloon track can, in fact, be relocated. Right-of-way for the balloon track relocation shall also be secured. 5 Maintenance District. Establish a Maintenance District to ensure public spaces, streets, creeks and other infrastructure are properly maintained. The District shall fund the maintenance of sidewalks, trails, landscape, snow removal and off-haul, ongoing transit subsidy, and other maintenance/public services to the extent those services are not typically provided by the Town. The services to be provided and an outline of the terms and conditions of the Maintenance Agreement shall be included as part of the Development Agreement to be entered into prior to approval of the first phase of development. (Action Item 6.1) 6 Financing. The financing of infrastructure improvements within the Master Plan area shall be formalized within a Development Agreement between the Town and the project developer. permit issuance. Prior to issuance of any building permits for development in the Master Plan Area. To be determined in Development Agreement. To be determined in Development Agreement. Truckee Railyard Master Plan Page 119

9. Implementation and Phasing No. Implementation Measures/Action Items Timing Responsible Party 7 Affordable Housing. Housing options within the Master Plan should include a mixture of housing types to support and serve the needs of employees, first time home buyers and young families. A program for providing affordable housing within the plan area should be created to balance the interests of the Town, the residential homeowners (current and future), and project development applicants in compliance with the General Plan. This program shall be formalized within a Development Agreement between the Town and project developer. 8 Streetscape Plan. Prepare a Streetscape Plan for each District within the Master Plan Area. The Streetscape Plans shall be coordinated with existing downtown streetscapes and shall contribute to a sense of visual continuity between Districts while allowing for unique and eclectic variations between Districts. The plan shall provide details for curbs and gutters, parkway strips, crosswalks, street furniture, transit shelters, landscaping, paving, lighting and signage. Unless otherwise specified, the streetscape guidelines for the Downtown Commercial Core shall apply in the Downtown Extension District (DTSP, Chapter 5.D through 5.J). Streetscape Plans shall be subject to review and approval by the Town Engineer. 9 Master Sign Program. The design and placement of signage throughout the Master Plan Area and within each District will affect the character of the development and its sense of place. Master Sign programs will be prepared for each District prior to any development occurring. The sign programs shall address sign standards (e.g., size, height, and area) and design guidelines (e.g., materials, lighting, and shape) for commercial signs (advertisement and identification) and public signs. The following sign guidelines are excerpted from the Downtown Specific Plan to provide a foundation for the sign program that will be created for the Master Plan Area. (1) Sign Context. Signs should be subordinate to the overall building composition and should not cover architectural features that are important to the overall building design. (2) Sign Types. Appropriate signs include flushmounted wall signs, awning signs, window signs and projecting signs. Freestanding signs and building directory signs may also be considered. To be determined in Development Agreement. permit issuance within each District. permit issuance within the Downtown Extension and the Industrial Heritage Districts. (3) Sign Materials. Sign materials and colors should be compatible with the design theme and materials of the structure on which it is placed. (Action Item 5.1) 10 Access Plan. Develop an Access Plan to incorporate transit services into the Railyard Area including TART, Truckee Trolley, Dial-A-Ride, and ski resort shuttles, as appropriate. (Action Item 7.2) To be determined in Development Agreement. Truckee Railyard Master Plan Page 120

9. Implementation and Phasing No. Implementation Measures/Action Items Timing Responsible Party 11 Parking Management Plan. Incorporate parking in the Master Plan Area into the existing Downtown Commercial Core Parking Management Program. Public parking within the railroad right of way available for use by the Downtown Parking Management Program at no cost to the Parking District. (Action Item 7.1) 12 Snow Removal Program. Establish a snow removal program for the entire Master Plan Area and for each interim phase of development with the Master Plan Area. On-street parking areas in the Downtown Extension shall be included in the program. Important sidewalks throughout the Master Plan Area shall be included in the program sufficient to maintain pedestrian circulation through the area during winter months (DTSP, Chapter 4, Pedestrian Circulation Policy 1). The snow removal program shall be developed in combination with the parking plan. (Action Item 8.1) 13 Sun/Shade Analysis. Prior to design approval of each phase of development, the project developer shall complete a shade and shadow analysis for the proposed project area. The analysis is a tool to aid in optimizing solar exposure for the reduction of energy consumption, the unique requirements snow and winter conditions, and to create pleasant streetscapes and functional projects. The analysis shall indicate seasonal sun exposure on streets, sidewalks, public places, and adjacent structures and shall ensure that the proposed project design considers the impact of microclimates on the functionality of spaces, consistent with this Master Plan. To be determined in Development Agreement. permit issuance within each District. permit issuance. 14 Coordinate the design of public open space areas with the Truckee Donner Recreation and Park District, the entity responsible for establishment and maintenance of park facilities (per DTSP chapter 9, Park and Gateways). (Action Item 6.2) Ongoing after implementation of the Railyard Master Plan. 15 Coordinate the design and location of proposed trailheads within the Master Plan Area with the Truckee River Watershed Council and provide opportunities for facilitated community input throughout the design process. (Action Item 6.3) 16 Consider moving the linear park from Street C to Street B as part of the Streetscape Plan for the Trout Creek and Industrial Heritage District Ongoing after implementation of the Railyard Master Plan. Prior to development in the TC and IH district. 17 Pedestrian/Bicycle Crossing Study. Prepare a feasibility study for an eastern undercrossing, overcrossing, or atgrade crossing for pedestrians and bicycles. The purpose of the study is to determine if and when the crossing is necessary, feasible designs, and financing of a crossing if the study finds an improvement is necessary. Prior to completion of Phase I. Truckee Railyard Master Plan Page 121

9. Implementation and Phasing No. Implementation Measures/Action Items Timing Responsible Party 18 Focused Intersection Study. Reevaluate the timing and improvements for the West River Street/McIver Crossing intersection, the Donner Pass Road/West River Street intersection, and Donner Pass Road/Bridge Street intersection, in accordance with General Plan Circulation Policy P2.3. Prior to issuance of any building or grading permits, or approval of any improvement or streetscape plans. Town Truckee Railyard Master Plan Page 122