CURL CURL BEACH LANDSCAPE DRAFT MASTERPLAN

Similar documents
Wentworth Point July Community Information Session Feedback Summary

Visualisations of reimagined Italian Garden & Rose Garden. Italian & Rose Gardens

Foreshore Redevelopment Masterplan

PART 5 : TEXTURE : PUBLIC DOMAIN CONCEPTS

KAMBAH INN SPRING GARDEN CHINESE RESTAURANT

Walkway position / alignment. Maintains a 1.5 to 2m separation to existing Norfolk Island Pines to provide usable grassed open space.

Port Macquarie Town Centre Landscape Architects

Proposed Pedestrian and Cycle Routes. Headland to Spit Great Ocean Walk and coastal path network* (Regional scale path)

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

PART 05 VISUAL SETTING

Seven Creeks Neighbourhood. Community Plan

project background relationship to the spit Guiding Principles Mooloolaba Spit Futures Plan (2009) Vision one

Ohlone College Measure G Project Scope Revisions

Waterlily Playscape Committee Waterlily Playscape, Waterlily Park, Ocean Shores Draft Concept Plan. G Issue D 14/07/16

VEHICULAR AND PEDESTRIAN CIRCULATION

A CONCEPTUAL PROPOSAL BY THE UMDLOTI FORUM Representing the Umdloti Ratepayers and Residents Association and the emdloti UIP

Four Big Ideas. Three Key Opportunities. Principles. Draft Place Making Master Plan. 1. The Foreshore 2. Green Links. 3.

ACADEMY AREA CONCEPT PLAN

Master Plan Presentation August 12, 2015

BAY DRIVE PARK Questions and Answers

Legend Explanation CONCEPT PLAN

Woods Chapel Park. Park Amenities: Playground, basketball court, single table shelter, small pond and multi-use trail.

1999 Approval to replace World War I monument and relocate plaques Approval to rehabilitate the Chase Mill building and surrounding site

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

Tangimoana Community Plan Presentation

BACKGROUND CONTEXT & ANALYSIS MASTER PLAN KEY PRECINCTS IMPLEMENTATION 5.1 IMPLEMENTATION OVERVIEW 5.5 POSSIBLE PROJECTS PRECINCT D

BACKGROUND INFORMATION DOCUMENT

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

TONIGHT S MEETING DRAFT SUMMARY REPORT CAPE WOOLAMAI COASTAL RESERVES MASTER PLAN PHILLIP ISLAND SOUTH AND NORTH COAST KEY AREA PLAN OCTOBER 2014

City of Rockingham. Local Management Practices, Costs and Strategic Coastal Planning

ROAD AND CAR PARK DESIGN GUIDELINES

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

KEY MAP DEVELOPMENT PERMIT AREA MAP. Sunnymede North Sub-Area Plan

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

5.0 Key Implementation Areas

Long Branch-Wayne Local Park Renovation Project

4.1 Build Alternative 1 Construction Phasing

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

ADELAIDE COMETS CLUBROOMS DESIGN CONCEPT

Point Defiance Park. Master Plan Update. April 23 rd 2015

MICHAELS AVE RESERVE. Draft Concept Plan of South Section September Contents. 1 Project Background. 2 Masterplan Timeline

Blue Springs Park. Park Land Established: Developed Acres: 12 acres Undeveloped Acres: 2 acres

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

Achieving a Vision. Master Plan 2009 Belknap Campus August 10 11, UofL Belknap Campus Master Plan Update

Preferred Riverwalk Alternative Components August 17, 2017:

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

DICKY BEACH PRECINCT PLAN. 10 November 2016 ENDORSED REV D

ANCHORAGE PARK REPORT CARD Assessing A Park s Appearance, Function, & Condition

Pedestrian and Bike Bridge LOGO

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

PASSENGER RAIL NETWORK LIGHTING OF STATION ENVIRONMENT TO COMPLY WITH DISABILITY STANDARDS FOR ACCESSIBLE PUBLIC TRANSPORT

Overview Report. Proposed Development

FORD PARK MASTER PLAN SEPTEMBER 2016

Mount Maunganui North. Neighbourhood Plan

New Berlin City Center Plan Commission Review PDQ Food Stores, Inc

CARDIFF STREETSCAPE MASTER PLAN. Warners Bay. Belmont. Glendale. Swansea. Toronto. Morisset. ADOPTED - Mar Issue 01, Version 02.

14-18 Gallway St, Windsor. Revision D

CONICAL HILL RESERVE Landscape Concept Plan. January 2018

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

BRITTINGHAM PARK DOG PARK IMPROVEMENTS PUBLIC INPUT MEETING #2. Sarah Lerner, Landscape Architect - City of Madison Parks Division

11.0 TRANSPORTATION ELEMENT

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Wilbur Young Park. Park Land Established: Developed Acres: 15 acres Undeveloped Acres: 25 acres

2. reimagine kings way undercroft as a community space

Elsternwick Park Northern Sector. Phase 2 Community Engagement Summary Report

MUNICIPALITY OF ANCHORAGE

ENVISION. Planning and Policy Initiatives Maintenance and Operations Initiatives Programming Initiatives

CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

PRELIMINARY DESIGN + DEVELOPMENT PLAN

BRIGHTON BEACH TO FERDINANDO GARDENS DRAFT MASTERPLAN. Thompson Berrill Landscape Design P/L 26 July 2016

Monte Cecilia Park DRAFT CONCEPT PLAN FEBRUARY 2015 AUCKLAND COUNCIL

WELCOME TO YOULBURY. WELCOME TO YOULBURY EXISTING SITE

Chapter 4: Jordan Road Character District

GRASS CREEK PARK WASHROOM AND AND FACILITY UPDATE: CONCEPT A A FLOOR PLAN AND ELEVATIONS 2/5 PRELIMINARY ARCHITECTURAL FLOOR FLOOR PLAN_CONCEPT A A

PLANNING RATIONALE FOR THE PROPOSED RIVERSIDE SOUTH ELEMENTARY SCHOOL 715 BRIAN GOOD AVENUE, OTTAWA, ON

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

East Grove Public Realm

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

Revitalization of Durand Park. Durand Park Proposal June 2008

HOOVER-UNION TRIANGLE

CRA Five Year Capital Improvement Plan. September 2, 2015

Point Grey Precinct Plan Final Plan

Design & Access Statement

Devil s Slide Coastal Trail Improvements Project. County of San Mateo

Ward Park. Park Land Established: Developed Acres: 9 acres Undeveloped Acres: 4 acres

WALLACE EMERSON. Visioning Open Houses Summary Report

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Report or technical documentations of the target areas in Siauliai

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

Implementation plan. 3.1 Staging

Brains and Archibald park concept plan

Wentworth Point Peninsula Park

Hidden Pointe Landscape Master Plan. June, archi terra

Foreshore Community Reference Committee

7.5 Impacts on the Section 4(f) Properties

Lower Merion Commercial Districts Issues and Characteristics Handbook November 2013

The principal elements of the NTC Strategic Vision plan are as follows.

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Transcription:

LANDSCAPE 03 04 05 07 06 08

LANDSCAPE KEY BENEFITS OPEN SPACE EXISTING = 25600m2 PROPOSED = 29000m2 NATURAL/LANDSCAPED AREA EXISTING = 36200m2 PROPOSED = 38450m2 PARKING SPACES MAIN CAR PARK EXISTING = 172 PROPOSED = 174 SOUTH CURL CURL SLSC EXISTING = 36 PROPOSED = 36 COASTAL WALK CAR PARK EXISTING = 20 PROPOSED = 18 PEDESTRIAN WALKS CONCRETE = 860m DECOMPOSED GRANITE = 1290m BOARDWALK = 40m 64 SPACES AREAS TO BE FENCED OFF TO PROTECT AND WILDLIFE MAINTAIN ACCESS TO LAGOON FOR DOG PLAY MAIN OFF LEASH DOG AREA. POTENTIAL FOR DOG PLAY EQUIPMENT DECOMPOSED GRANITE PATH AROUND OFF LEASH DOG PLAY AREA DECOMPOSED GRANITE MEETING POINT PEDESTRIAN LINK FROM BEACH TO ADAMS STREET OVAL AND ADJACENT PEDESTRIAN WALKS DECOMPOSED GRANITE SECONDARY PATH LINKING PRIMARY PATH TO DOG PLAY AREA OFF LEASH DOG PLAY AREA AND KICK-ABOUT SPACE. IMPROVEMENTS TO TURFED AREAS THROUGHOUT SITE 28 SPACES ENTRY FEATURE AND LINK TO CURL CURL BEACH FROM ADJACENT STREETS. CLEARING OF EXISTING TO CREATE VIEWS 32 SPACES 24 SPACES PRIMARY DECOMPOSED GRANITE PATH LINKING THE NORTH AND SOUTH AREAS OF THE SITE REPLACEMENT OF SELECTED TO INCREASE SURVEILLANCE INTO SITE 26 SPACES INVESTIGATE NEW ENTRY OPTIONS TO IMPROVE TRAFFIC FLOW AND SAFETY START OF OFF LEASH DOG AREA. INFORMATION SIGN AND CHANGE IN SURFACE SURFACE OF EXISTING PARKING IMPROVED CONNECTIONS FROM CAR PARK AND PRIMARY PATH TO BEACH EXTENSION OF GREEN SPACE WITH NEW SHELTERS AND BBQ FACILITIES TO CREATE VIEWING AREA PRIMARY CONCRETE PATH CONNECTION THROUGH SITE. CREATING SEPARATION FROM SAND DUNES BUS STOP TO REMAIN IN EXISTING LOCATION RAISED ACCESSIBLE RAMP ABOVE EXISTING DUNE PROMENADE IN FRONT OF SOUTH CURL CURL SLSC AND CONNECTION TO ROCK POOL CARPARK AND LOADING ZONE 52 SPACES ACCESSIBLE RAMP CONNECTING COASTAL WALK TO CURL CURL BEACH WALK 18 SPACES SURFACE OF EXISTING PARKING

LANDSCAPE - DOG PLAY AREAS KEY EXISTING OFF LEASH DOG PLAY PROPOSED OFF LEASH DOG PLAY

LANDSCAPE - 03 OFF LEASH DOG PLAY AREA. POTENTIAL FOR DOG PLAY EQUIPMENT DECOMPOSED GRANITE PATH AROUND OFF LEASH DOG PLAY AREA DECOMPOSED GRANITE PEDESTRIAN LINK CONNECTING BEACH TO ADAM STREET OVAL, ADJACENT DOG PLAY AREAS AND PEDESTRIAN TRAILS RELOCATION OF EXISTING SHOWER TURNING CIRCLE AND DROP OFF ZONE DECOMPOSED GRANITE MEETING POINT WITH SEATING AT END OF CAR PARK AND MAIN ENTRANCE TO NORTHERN END OF CURL CURL BEACH SURFACE OF EXISTING CAR PARK. NEW LANDSCAPING INCLUDING TREES AND MEDIAN PLANTING IMPROVED LANDSCAPING WITH IMPROVED TURFED AREAS AND CLEARING OUT OF WEEDS AND DEAD OFF LEASHED DOG PLAY AREA DECOMPOSED GRANITE WALKING PATH LINKING NORTH AND SOUTH AREAS OF SITE

LANDSCAPE - 04 SURFACE OF EXISTING CAR PARK KICK-ABOUT SPACE. IMPROVEMENTS TO TURFED AREAS THROUGHOUT SITE LINKING ROAD FOR NORTH AND SOUTH SECTIONS OF CAR PARK CLEARING OF EXISTING DENSE AND REPLACE WITH SUITABLE TREES TO INCREASE SURVELLIANCE INTO SITE AND CREATE STRONG VIEWS FROM STREET DECOMPOSED GRANITE PEDESTRIAN WALK LINKING NORTH AND SOUTH AREAS OF SITE DECOMPOSED GRANITE PATH CONNECTING MAIN BEACH PATHWAY LINK TO CARRINGTON PARADE PATHWAY PRIMARY PATH LINKING THE NORTH AND SOUTH AREAS OF THE SITE ENTRY FEATURE TO CURL CURL BEACH. VIEWS FROM CARRINGTON PARADE, GRIFFIN ROAD AND ADAM STREET TURNING CIRCLE FOR VEHICLES TO MINIMISE CONGESTION WHEN LOOKING FOR PARKING PROTECTION OF ADJACENT DUNE IMPROVED CONNECTIONS TO BEACH WALKWAYS SURFACE OF EXISTING CAR PARK

LANDSCAPE - 05 SURFACE OF EXISTING CAR PARK UPGRADED CAR PARK LANDSCAPING, INCLUDING NEW TREES AND MEDIAN PLANTING IMPROVED LANDSCAPING WITH MASS PLANTING OF TREES ALONG PEDESTRIAN WALK IMPROVED CONNECTIONS TO BEACH WALKWAYS REPLACEMENT OF SELECTED TO INCREASE SURVEILLANCE TURNING CIRCLE AND DROP OFF ZONE RETAIN EXISTING MEMORIAL SEATING EXTENSION OF GREEN SPACE WITH NEW SHELTERS AND BBQ FACILITIES PRIMARY CONCRETE PATH CONNECTION THROUGH SITE. CREATING SEPARATION FROM SAND DUNES NEW SEATING ALONG PEDESTRIAN WALKWAY UPGRADE OF EXISTING SITE FURNITURE REMOVAL OF EXISTING FURNITURE TO CREATE LARGER OPEN PLAY SPACE PROTECTION OF ADJACENT DUNE

LANDSCAPE - 06 PRIMARY PEDESTRIAN PATH CONNECTING SOUTHERN AND NORTHERN AREAS OF SITE RELOCATION OF EXISTING SITE SHOWERS 1 : 14 RAISED ACCESSIBLE RAMP OVER DUNE MAINTAIN EXISTING RAMP ACCESS UPGRADE EXISTING SITE FURNITURE AND LIFEGUARD VIEWING AREA MAINTAIN EXISTING STAIR ACCESS FROM CARRINGTON PARADE TO BEACH PROMENADE PROMENADE IMPROVED OUTDOOR DINING NEW STAIR CONNECTION FROM CARRINGTON PARADE. SEPARATING PEDESTRIAN AND VEHICULAR ACCESS ADJUSTED ENTRY RAMP TO CAR PARK FROM CARRINGTON PARADE TO ACCOMMODATE NEW PEDESTRIAN CONNECTION SCREENING FOR EXISTING BIN STORAGE AREA SURFACE OF EXISTING PARKING AREA AND LOADING ZONE PROMENADE AND CONNECTION TO ROCK POOL 1 : 13 ACCESSIBLE RAMP CONNECTING TOP CAR PARK WIDENING OF EXISTING STAIRS TO ROCK POOL VIEWING POINT WITH SEATING 1 : 13 ACCESSIBLE RAMP CONNECTING EXISTING COASTAL WALK TO CURL CURL BEACH AND PROPOSED PEDESTRIAN LINK NEW RETAINING WALL TO ALLOW FOR RECONFIGURATION OF CAR PARK NEW VIEWING AREA AND MEETING POINT AT END/BEGINNING OF COASTAL WALK SURFACE OF EXISTING CAR PARK ALLOWING EASY TURN AROUND POINT

LANDSCAPE - 07 PRIMARY PEDESTRIAN PATH CONNECTING SOUTHERN AND NORTHERN AREAS OF SITE IMPROVED BEACH ACCESS RELOCATION OF EXISTING SHOWER 1 : 14 RAISED ACCESSIBLE RAMP OVER DUNE AA PROTECTION OF ADJACENT DUNE MAINTAIN EXISTING RAMP ACCESS PROMENADE RETAIN EXISTING STAIR ACCESS EXISTING FOOTPATH RELOCATED SHOWER NEW CONCRETE PATH DUNE WITH PROPOSED RAISED TIMBER BOARDWALK CURL CURL BEACH SECTION AA - 1 : 100

LANDSCAPE - 08 AA IMPROVED SURFACE TREATMENT TO EXISTING PROMENADE AND CONNECTION TO ROCK POOL WIDENING OF EXISTING STAIRS TO 1500mm WIDE VIEWING POINT WITH SEATING 1 : 13 ACCESSIBLE RAMP CONNECTING TOP CAR PARK AND COASTAL WALK TO CURL CURL BEACH NEW WHEEL STOPS TO ACT AS BARRIER FOR PEDESTRIAN WALK SURFACE OF EXISTING CAR PARK, MAINTAINING VIEWS TO BEACH BEGINNING/END OF EXISTING COASTAL WALK. NEW SEATING AND SHELTER TO CAPTURE SURROUNDING COASTAL VIEWS CARRINGTON PARADE RECONFIGURED CARPARK NEW CONCRETE PATH HEADLAND EXISTING CONCRETE PROMENADE ROCK POOL SECTION AA - 1 : 100