Downtown Denver Morrison. Located 30 minutes from downtown Denver behind the hogback

Similar documents
The following principles guide the development of goals and strategies to protect and promote these amenities:

GOCO Grants Awarded to Projects in Arapahoe County through June 2015

Potential Green Infrastructure Strategies May 6, 2015 Workshop

Mendota Heights 2040 Comprehensive Plan Draft Vers

Enhance the High Line Canal Projects

2017 General Obligation Bond

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

2011 ASLA Design Awards. Coyote Gulch Honor Award and Land Stewardship Designation Valerian LLC. Environmental Restoration and Reclamation

Working together to leverage limited Funds

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

San Diego River Coalition 2012 Work Plan

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

5. Father Hennepin Blufs Park and Hennepin Island Father Hennepin Bluffs Park Supporting Initiatives (see Figure 36): 7-22

Preliminary Sketch Plan for Fort Hunter Park

CHAPTER 7: Transportation, Mobility and Circulation

2011 ASLA Design Awards. Centennial Park Merit Award Design Concepts CLA, Inc. Design over $500,000 Construction Budget

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Floodplain Technical Memorandum

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

River Corridor Overlay Zone (RCOZ) Article 5

Johnson Street Bridge Public Realm Update

4.1 AESTHETICS AND VISUAL QUALITY

To: Planning Commission D.. June 3, 2009

Durango Parks & Recreation Department. Strategic Plan

A G E N D A Council Update Training Room September 26, :45 p.m.

Special Revenue Funds

MCCOYS CREEK RESTORATION 30% DESIGN

alum creek park public workshop January 16, 2014

RIVERFRONT REDEVELOPMENT PLAN

Rosemount Greenway Master Plan Executive Summary. draft. Spring for more information visit

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

MAYFIELD VILLAGE GREENWAY TRAIL

3.5. Visual and Aesthetic Qualities

SECTION 5: REACH RECOMMENDATIONS/MAPS

Parker Pine Curve Master Plan January 28th, 2009, Public Workshop Comments

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Draft Stillwater 2030 Comprehensive Plan- Goals and Policies

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

TABLE 5-3. EXISTING AND PROPOSED YAKIMA GREENWAY FACILITIES

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

Welcome to the Information Session for Little Sugar Creek Greenway, Tyvola Road through Huntingtowne Farms Park

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

Chapter 5: Recreation

An Ambitious Plan: Transforming the blighted South Platte River and surrounding environment into Denver s greatest natural resource.

3.5 VISUAL AND AESTHETIC QUALITIES

Meridian. Pathways Master Plan 2. EXISTING CONDITIONS. Needs Overview. Recreational Needs. Utilitarian Needs

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

Public input has been an important part of the plan development process.

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Daniels Park Master Plan

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

T O W N O F H I G H R I V E R

Balancing Conservation and Development on the Jordan River

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

2011 ASLA Design Awards

Public Meeting May 20, 2014

CRESCENT PARK GREENWAY VISION

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Green Infrastructure The Indianapolis Greenways Connection

A larger version of this map is located on the last page of this PDF.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

City of Nogales General Plan

Project Consulting Team:

RLRC COMMUNITIES THIEF RIVER FALLS AREA CHARACTER COMMUNITY TRAIL OPTIONS OAKLAND PARK EXISTING CONDITIONS OAKLAND PARK DESIGN DESIGN DETAILS

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

Regional Transportation District

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

Objective: Resolution to recommend adoption of the Big Thompson Assessment to the Planning Commission

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

university OF colorado boulder

Appendix A. Park Land Definitions

Las Colonias Park Master Plan

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

APPENDIX K WINDSOR OFFICIAL PLAN

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

REGIONAL ACTIVITY CENTER

A Vision for Walnut Creek

PARTF Scoring System for Grants

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Rotary Park / Railroad Lake

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

MetroParks Board Meeting 2018 Capital Improvement Projects

The Trinity River Corridor Project Update

SOUTH PARK. Construction of a Portion of South Park at Fresh Kills Park, Staten Island

Farmers Investment Co. (FICO) Continental Farms

Mendota-Lebanon Hills Greenway Master Plan Executive Summary. August draft for more information visit

Great Rivers Greenway CLEAN GREEN CONNEC TED T RAILS

Planning Districts INTRODUCTION

ALTERNATIVE STATION AREA -

VEHICULAR AND PEDESTRIAN CIRCULATION

Transcription:

Downtown Denver Morrison Located 30 minutes from downtown Denver behind the hogback

Founded in 1874 as a passageway gold mines to the west. Morrison is the gateway to the Bear Creek Canyon. Surrounded with parks and open space including Red Rocks natural amphitheater. Highway parallels Bear Creek which was hardly visible from its banks. Rock climbing at canyon opening

Population of 450 people Downtown comprised of antique shops, restaurants, boutiques and other stores. Area draws thousands of bicyclists, hikers, and those interested in the rich geologic and cultural landscape. Morrison had limited off-street bicycle facilities With disjointed downtown walkways, hardly accessible. Heavy concert and weekend traffic.

TNT, El Mercado, Blue Cow

Project: 1999 to 2004 Budget: $ 2.7 million Funded by: Jefferson County Open Space, Great Outdoors Colorado State Trails Program, and the Town of Morrison, Urban Drainage,! miles of 10 wide multi-use trail, pedestrian walks, signature bridge, decking, trail amenities, and revegetation of creek banks. Trail provides connectivity to the regional trail system of Denver.

CHALLENGES Tight Corridor Highway Traffic Pedestrian/ Bike Safety Eroding Creek Banks Downtown Parking Perception of Change Town Council Design Team Included: Greenway Planners Landscape Architects Civil Engineers Structural Engineers Traffic Engineers Ecologists

STREET INTERFACE Customized Concrete Barrier to accommodate grade change and limited width. Adjusted Lane Striping measured to the inch Reset Guardrail-Pedestrian Rail

STREET INTERFACE Custom Pedestrian Railing protecting trail users from back of guardrail

PARKING INTERFACE Parking Layout to maintain existing count Paving Treatment to demark pedestrians, car doors and bicycles Signage to direct and separate user types

PARKING INTERFACE Working with property owners to gain support and accomplish trail corridor

SIGNAGE Signage-Simple, attractive mounting, meeting MUTSCO

CREEK EXPERIENCE Volunteer plantings to restore creek banks, reducing erosion and making attractive. History

CREEK EXPERIENCE Deck structures constructed and poured in place. Preserved trees, but did disturb creek banks. Still less excavation and disturbance than a structural wall with footings or piles.

CREEK EXPERIENCE

CREEK EXPERIENCE

CREEK EXPERIENCE

CREEK EXPERIENCE Transparent Pedestrian Rail Place Trail along Creek Edge Provide Overlooks

CREEK EXPERIENCE Rest Area with seating and trash receptacles Gardens and Dining Along Trail

BRIDGE INSTALLATION Narrow Corridor- Just Feet From Restaurant Careful Installation-Seismic Monitoring Power shut-off, generators for freezers, lost revenue Bridge From California (Eisenhower Tunnel)

BRIDGE INSTALLATION Trail Accessible To All

DECK INSTALLATION

DECK INSTALLATION Difficult Construction Engineering Field Changes Piles moved horizontally when driven into bedrock 2 Precast Twin T s fit together to form deck

DECK INSTALLATION

DECK INSTALLATION Realign Highway at intersection Working with traffic engineer and CDOT

VETERAN S MEMORIAL Preserving The Past Working with veterans group to design plan that accepts trail while reestablishing an important memorial.

VETERAN S MEMORIAL Working With Veterans Group Integrating the Trail

VETERAN S MEMORIAL

TWO CREEKS PARK Urban Park-Rest Area Benches/ Bike Racks Trail Connection Interpretive Kiosk and Mural

TWO CREEKS PARK

RIBBON CUTTING

Downtown Denver Commerce City Located north of downtown Denver adjacent to The Rocky Mountain Wildlife Refuge

Population of 45,000 people City businesses include refineries, trucking companies, manufacturing plants and the new Colorado Rapid s Soccer Stadium

INDUSTRIAL CHARACTER!!! Active Petroleum and Chemical Plants Multiple Railroad Crossings Utilities and Security

INDUSTRIAL CHARACTER!!! Gravel Mining Devastated Landscapes Dumping

EXISTING BARRIERS!!! Highways/ Roadway Structures/ Railroads/ Canals Gabion Blankets Steep Slopes with debris/trash

DIVERSE LANDSCAPE!!! Wetlands Riparian Areas Cottonwood Galleries

WILDLIFE!!! Large number of Bird Species Reptiles and Fish Fox, Deer and Small Mammals

Master Plan Greenway extends 3 miles connecting Commerce City and eastern Cities into the Platte River Greenway system, which extends for over 50 miles Construction Cost of approx. $6 million Funded by GOCO/State Trails grants, Adams Co. Open Space funds, Regional Greenway, City, In kind donations Design Team Included: Greenway Planners Landscape Architects Civil Engineers Structural Engineers Geotechnical Engineers Ecologists

SEGMENT ONE: THE CONFLUENCE Challenges:!River and irrigation ditch crossing.!property acquisition / Landfill & concrete rubble.!gateway to the city / Image of overall corridor.

SEGMENT ONE: THE CONFLUENCE!Signature Bridge

SEGMENT ONE: THE CONFLUENCE

SEGMENT ONE: THE CONFLUENCE!Canal Crossings

SEGMENT ONE: THE CONFLUENCE!Confluence Design!Overlook Concept Challenges:! River and irrigation ditch crossing.! Property acquisition.! Landfill and concrete rubble.! Gateway to the city.! Image of overall corridor.

SEGMENT TWO: RESTORATION ZONE Challenges:!Steep slopes with landfill!adjacent property storage!sheet piles controlling drainage!railroad Crossings and Accessibility

SEGMENT TWO: RESTORATION ZONE Integral Retaining Wall/ Trail, Reduces Excavation Watch for hazardous materials when digging

SEGMENT TWO: RESTORATION ZONE!!!! Protection from falling debris. Removable panels. Frequent flooding. Adjacent traffic.

SEGMENT TWO: RESTORATION ZONE! Lessons Learned

SEGMENT TWO: RESTORATION ZONE! Lessons Learned

SEGMENT TWO: RESTORATION ZONE!! Fill used to create berming Images added to walls for interest

SEGMENT THREE: INDUSTRIAL ZONE Challenges:!Security for adjacent property owners!concerns about fire hazards!trail User safety and frequent flooding

SEGMENT THREE: INDUSTRIAL ZONE

SEGMENT THREE: INDUSTRIAL ZONE

SEGMENT FOUR: FOX FOREST Challenges:!Security for adjacent property owners!concerns about fire hazards!trail User safety and frequent flooding

SEGMENT THREE: INDUSTRIAL ZONE

SEGMENT FOUR: FOX FOREST Challenges:! Heavy landfill.! Creek not visible.! Screen industrial storage.! Railroad crossing.! Security for adjacent properties.

SEGMENT FOUR: FOX FOREST Site cleanup and grading. Volunteer opportunities.

SEGMENT FOUR: FOX FOREST

SEGMENT FOUR: FOX FOREST

SEGMENT FOUR: FOX FOREST

SEGMENT FOUR: FOX FOREST

SEGMENT FIVE: WETLAND PARK Challenges:!Steep slopes with landfill!utilities!protection of wetlands!accessible Trailhead

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK Before After

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT FIVE: WETLAND PARK

SEGMENT SIX: COTTONWOOD GALLERY Challenges:!Steep slopes!adjacent land uses!protection of existing vegetation

SEGMENT SIX: COTTONWOOD GALLERY

SEGMENT SIX: COTTONWOOD GALLERY

SEGMENT SIX: COTTONWOOD GALLERY

Continental Divide Silverthorne Dillon Population of 3,200 people Located approx. 75 miles west of Denver City businesses include refineries, trucking companies, manufacturing plants and the new Colorado Rapid s Soccer Stadium

Lake Dillon- Major Water Supply for Denver Factory Outlet Stores Yearround and Seasonal Residents

DILLON LAKE CONNECTION Connects Dillon with Silverthorne 200 Vertical Grade Change Series of Ramps with Landings Concerns with Security Design Team Included: Greenway Planners Landscape Architects Civil Engineers Structural Engineers Ecologists Wildlife Biologist

DILLON LAKE CONNECTION Protective Railing Signage Rest Areas with Seating

DILLON LAKE CONNECTION

DILLON LAKE CONNECTION

DILLON LAKE CONNECTION

BLUE RIVER Total Cost to date $1.5 Million

BLUE RIVER

BLUE RIVER

BLUE RIVER Majority of Trail is 10 Wide Asphalt on Grade Decking Through Riparian Areas

BLUE RIVER

BLUE RIVER

BLUE RIVER

BLUE RIVER Decking Through Riparian Areas Minimal Railings to Allow for Wildlife Movement

BLUE RIVER

BLUE RIVER

BLUE RIVER MSE Retaining Walls to Accommodate Grade Change Transparent Railing to Maintain Views of River

BLUE RIVER

Elementary School

NORTH POND

NORTH POND Destination-Public Park & School Fishing, Docks, Ice Skating, Fire Pit Trailhead

Big Dry Creek Trail An Urban Greenway Corridor S. Platte River Bridge S. Platte Windermere St. Belleview Park Progress Park Phase 2B Lehow Ave. to Broadway Phase 2A Broadway to Greenwood Point Phase 1 Progress Park to Lehow Funding Challenges South!Urbanized Suburban Area Park & Recreation District Phase 3 Greenwood Point to Washington St.!South!Multiple Suburban Jurisdiction Park Foundation!!City of Englewood!!City of Englewood!!City of Littleton!!City of Littleton!!City!!City of of Greenwood Greenwood Village Village!Constricted/encroached!!City of Cherry Hills Village corridor Arapahoe!Private County land acquisitions!numerous!!urban roadway Drainage & & railway Flood crossings Control

Bridge Span Across South Platte River Connection to Mary Carter Greenway Challenges Cross Channelized River with little freeboard available. Solutions Design free span bridge (200ft) with minimal deck thickness. Total Cost $385,000 Completed 2002 Completed 2002

Bridge Span Across South Platte River Connection to Mary Carter Greenway - Construction

Bridge Span Across South Platte River Connection to Mary Carter Greenway - Completion

S. Platte River to S. Windermere Street Challenges Underpass designs for 5 crossings BNRR RTD BNRR SPUR Santa Fe Drive S. Windermere Total Cost $592,530 Trail Length 2,500 LF Completed 2001

S. Platte River to S. Windermere Street Pre Construction & Construction

S. Platte River to S. Windermere Street Post Construction

Belleview Park City of Englewood

Progress Park City of Littleton

Phase 1 Progress Park to Lehow Avenue City of Englewood Challenges Eroding channel Creek crossing solution 100-yr floodplain Total Cost $417,600 Total Length 1,100 LF Completed 2004

Phase 1 Progress Park to Lehow Avenue City of Englewood Pre Construction and Construction

Phase 1 Progress Park to Lehow Avenue City of Englewood Completed

Phase 2A Broadway to Greenwood Point Challenges Narrow/encroached channel Steep channel banks Limited access Broadway underpass Total Cost $518,388 Total Length 1,000 LF Completed 2007

Phase 2A Broadway to Greenwood Point Pre Construction

Phase 2A Broadway to Greenwood Point Construction

Phase 2A Broadway to Greenwood Point Path with Wall Construction

Phase 2A Broadway to Greenwood Point Tributary Drainage Rundown

Phase 2A Broadway to Greenwood Point Completed

Phase 3 Greenwood Point to Washington Street City of Littleton Challenges Narrow encroached channel Steep channel banks Limited access Eroding channel Total Cost $680,000 Total Length 2,500 LF Completed 2006

Phase 3 Greenwood Point to Washington Street City of Littleton Pre Construction

Phase 3 Greenwood Point to Washington Street City of Littleton Construction

Phase 3 Greenwood Point to Washington Street City of Littleton Completed

Phase 2B Lehow Ave. to Broadway Challenges Eroding channel Two Crossings Ramp to Broadway Unsuitable soils Total Cost $631,577 (bid) Total Length 1,200 LF Est. Completion 2009

Phase 2B Lehow Ave. to Broadway Pre Construction and Construction

Big Dry Creek Trail An Urban Greenway Corridor Total Cost: $3.2 million Federal Enhancement Funds : $600,000