RUTGERS UNIVERSITY TRANSPORTATION MASTER PLAN JULY 19, 2017

Similar documents
Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

Executive Summary. NY 7 / NY 2 Corridor

Transportation. Strategies for Action

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

38 Queen s University Campus Master Plan Part 1

11.0 TRANSPORTATION ELEMENT

Route 1 Corridor Study

Bus Rapid Transit Backgrounder. December 2016

CHAPTER 7: Transportation, Mobility and Circulation

18 May 2016 CAMPUS MASTER PLAN UPATE

NorthPoint, Inc. Community-Based Development Concept

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

This Review Is Divided Into Two Phases:

FDOT D4 Complete Streets

St. Clair Avenue West Area Transportation Master Plan

Access to the University of North Carolina at Chapel Hill, UNC Hospitals, and Chapel Hill Transit.

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Shift Rapid Transit Public Participation Meeting May 3, 2017

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

South Davis County COMMUNITY SPOTLIGHT

SPRINGHILL LAKE TRANSIT VILLAGE

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

CONNECTING CAMPUS AND COMMUNITY

University of Denver Land Use Plan Update I. Executive Summary

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Chapter 1: Introduction

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Public input has been an important part of the plan development process.

CAMPUS MASTER PLAN UPATE

1.0 INTRODUCTION & BACKGROUND

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

East Bench Master Plan Update

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

Issues Requiring Future Study

Town Center (part of the Comprehensive Plan)

CITY S GOALS DRIVE MODE CHOICE IN WINSTON-SALEM, NC

Making Transit Oriented Development Work For Boonton, NJ

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

The Lincoln Neighborhood Corridor Plan. The LiNC

AMITY STATION Revised Concept Plan Review West Rosemary Street Chapel Hill, NC September 27, 2016

WESTERN ILLINOIS UNIVERSITY

History: a Grand Urban Boulevard


Town of Oakville Streetscape Strategy

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

REPORT TO BOARD ON PREFERENCES tbp/architecture CCSF Facilities Master Plan, October 23, 2016

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

SOUTH UNIVERSITY Street Design Alternatives in Progress

FLORIDA STATE UNIVERSITY MASTER PLAN

A. INTRODUCTION B. PROJECT LOCATION

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage

WELCOME and introduction

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

TAC/CAC, TPO Project Update February 2016

Blue Line LRT Extension

Building Great Neighbourhoods. Strathcona

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

SCTPO Project Summary September 2014

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

TRANSPORTATION ELEMENT

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

REVIEW AND EVALUATION OF REGIONAL LAND USE

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

This page left intentionally blank.

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

Green Line North Centre City Alignment

The University District envisions, in its neighborhood

Existing Conditions. Planning and Design Principles

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

Riverwalk Dreams compiled by Thomas P. Healy November 16, 2017

Study Area. Capitol Way. Greening America s Capitals 11/13/2014. A Greening America s Capitals Project

10 February CAMPUS MASTER PLAN UPDATE Focus Group - Landscape & Hensel Park

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Stadium District Masterplan

Public Forum. Kelley s Corner: The Corner that Connects Us. The Cecil Group. March 7, Acton 2020 Town of Acton.

Small Area Plan. South Gateway

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT PUBLIC INFORMATION MEETING SEPTEMBER 18, 2014 JACKSON MANN COMMUNITY CENTER

UNCW CAMPUS MASTER PLAN

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

UNION STUDIO Greater Kennedy Plaza!

CAMPUS MASTER PLAN UPDATE Transportation Element Focus Group Meeting #3

Transit-Oriented Development

Committee Meeting: Downtown Today & Concept Refinement September 11, 2017

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Planning Commission Report

Welcome to the. Open House

1 INTRODUCTION Purpose Project Background PROJECT CONTEXT Background The Capital City Downtown Plan...

Transcription:

RUTGERS UNIVERSITY TRANSPORTATION MASTER PLAN JULY 19, 2017

On June 18, 2015 Rutgers University s Board of Governors approved a new physical master plan, entitled Rutgers 2030. Rutgers 2030 is the first comprehensive master plan to incorporate the Rutgers Biomedical and Health Sciences (RBHS) and was the first comprehensive physical master plan in over a decade for the University. Rutgers 2030 complements the Rutgers University Strategic Plan, and the chancellor-led strategic plans for Rutgers University Camden, Rutgers University Newark, Rutgers University New Brunswick, and Rutgers Biomedical and Health Sciences. Rutgers 2030 envisions development at Rutgers University over a 15 year time frame, 2015 2030, identifies additional development opportunities beyond 2030, and is comprehensive in its scope; taking into account buildings, the natural and constructed landscape, and infrastructure. Rutgers 2030 provides a vision and road map to enhancements that will drive the success of the University into the coming decades. The vision and road map established by Rutgers 2030, with the proposed development, redevelopment and relocations on the campuses have a direct correlation with transportation access, mobility and other transportation related elements such as the university transit service, use of alternate modes of travel, parking demand, among other elements. Integral to the growth envisioned in Rutgers 2030 is how to move people within and among the campuses. Access to, and circulation among and within the campuses is a vital component of the campus experience for students, faculty, staff, and visitors alike. For New Brunswick, the overall size of the campus, spread out locations of various districts, traffic congestion hot spot locations impacting access to and between these districts and geographical features such as the Raritan River, which separates the campus districts are some of the key challenges. For Newark, the congested downtown environment as well as the physical seperation between the Rutgers- and RBHS-Newark are the key challenges. As such, while transportation and mobility are not a core deliverable of the University, they are crucial to meeting academic and research goals. There are many transportation related challenges resulting from distances and connectivity between various campus districts, and these challenges are compounded by regional traffic congestion issues experienced during the peak periods, creating transit service reliability issues and deteriorating user experience. The Rutgers University Transportation Master Plan (RUTMP) focuses on establishing a framework to achieve a holistic resolution of these challenges. It also focuses on advancing various transportation related objectives identified by Rutgers 2030, such as transit hubs and place-making initiatives focused on enhancing student experience such as the Raritan River Multimodal Bridge and Raritan Riverwalk; and by developing conceptual recommendations based on preliminary assessment of various elements (structural and geometric requirements, access considerations, visual /aesthetic effects, and environmental regulatory requirements). The overarching goal of this Rutgers University Transportation Master Plan is to set forth a plan to create a transportation environment that enhances mobility alternatives transit, bicycling, and walking as well as addressing parking for students, faculty, staff and visitors. The transportation planning process examined, in detail, the goals, recommendations, and projects specified in Rutgers 2030 and generated this Transportation Master Plan that assesses existing performance of various transportation elements, estimates the extent of proposed growth and change, identifies the current as well as long-term transportation needs on the Newark and New Brunswick campuses and develops conceptual recommendations to address these needs. The Transportation Master Plan team carefully structured a data-driven analysis and stakeholder outreach based approach as shown in the figure on the following page. ES-3

RUTGERS UNIVERSITY TRANSPORTATION MASTER PLAN Transportation Master Plan Approach N TO GS IN TO LIV LIGHTWEIGHT CONC OVERLOOK TERRACE (20 CANTILEVER) ACCESSIBLE ROOF 20 CANTILEVERED GLASS CANOPY BUILT-UP ROOF FOR QUAD ROUTE 18 PEDESTRIAN BRIDGE COLUMN SUPPORT, BEYOND, TYP FOR 2 ROAD RO AD DAVIDSON INGSTON PEDESTRIAN BRIDGE WITH EMBEDDED SNOW-MELT SYSTEM, BEYOND, TYP FOR 2 E BRIDG STATION PYLON AT LEAD BUS DOOR, 18 FROM F.O. CURB ES HO NE W 16-6 (MIN) CA MP US BUSCH-LIV LA NE ST WE ALLISON ROAD 2-9 BEVIER ROAD 1-6 1-6 12 5 12 4 12 5 12 15 BR ET T RO A D 15 TRANSIT HUB BART HOLO MEW ROAD LOUNGE AREA 1-6 OFFSET FROM F.O. CURB RO AD BUS QUEUE (5 x 8 ) RAISED 4 MEDIAN PAINTED ASPHALT BIKE LANE RETAIN EXISTING STREET ELEVATION D A RO N FITCH ROAD FR ELIN G HU YS EN EXISTING CENTERLINE OF STREET TO REMAIN BENCH TRASH/RECYCLING RECEPTACLE GEORGE STREET TRANSIT HUB OPTION 3.6 - SECTION 4 0 4 4' 0' 4' FEBRUARY 2017 RO AD GEORGE STREET TRANSIT HUB N HE SCARLET KNIGHT WAY CAMPUS Estimate Proposed Growth by Location and Type and Determine Transportation Implications Develop and Refine Transportation and Infrastructure Requirements to Advance Rutgers 2030 Plan Vision Assemble and Review Data Transit Bicycle and Pedestrian Parking Understand Growth and Change Number of Classroom Seats Number of Housing Units/Beds Parking Spaces Recommend Conceptual Transportation/Infrastructure Improvements SU TP Review Rutgers 2030 Plan Assemble and Assess Transportation Data ES-4 Transit Bicycle and Pedestrian Parking

Recommendations were centered around the following themes: Transforming the student experience Improving campus connectivity Accommodating all travelers Navigating Rutgers efficiently The recommendations are organized by campus and by travel mode: transit; automobiles and parking; and bicycle and pedestrian improvements. See Section 3 of this report for further details on the Transportation Master Plan approach, themes and stakeholder engagement efforts. It should be noted that the conceptual recommendations contained in this plan are at the master planning level. Further in-depth analysis, review, and design of these recommendations are essential as each of these recommended projects moves through the project development pipeline toward implementation. The Transportation Master Plan is organized by individual districts on the New Brunswick Campus including the RBHS-Downtown New Brunswick and RBHS-Piscataway Districts as well as the Rutgers University-Newark and RBHS-Newark Campuses. The Transportation Master Plan components include: Transit Operations and Infrastructure Existing Transit Operations: assessed existing transit operations based on field observations as well as data analysis using bus boarding video counts; observed actual bus arrival times at key transit stops; identified user wait times; and analyzed NextBus data to understand transit travel times along various routes accompanied by actual travel time runs to determine congestion hotspots and their impacts on transit operations. Existing Transit Ridership: estimated daily transit ridership between campus district pairs based on class schedules and registration data as well as review of actual transit boardings. Future Transit Ridership Projections: estimated based on a quantification of the growth and change anticipated by Rutgers 2030 on various districts and campuses coupled with transit ridership impact assessment of various policy applications such as Course Schedule Planner (CSP) and other technological investments (like synchronous classrooms). Advancement of Rutgers 2030 Transit Infrastructure Vision: assessed geometric, functional and access requirements to develop concept plans and cross-sections for the proposed transit hubs in Rutgers 2030. Determination of Transit Infrastructure Improvement Needs: identified conceptual busonly infrastructure needs based on an assessment of reliability issues plaguing existing transit operations caused by external factors, such as traffic congestion, that lead to other issues such as overcrowding on buses. Development Transit Service Improvement Concepts: determined transit service modifications that can improve transit reliability and reduce transit travel time considering the anticipated growth and change proposed by Rutgers 2030 and proposed busonly infrastructure improvements. Identification of Coordination Requirements: identified stakeholders and regulatory agency coordination to advance improvement concepts. ES-5

Bicycle Pedestrian Infrastructure and Street Treatments Existing Bicycle and Pedestrian Facilities: identified existing facilities such as bicycle lanes, bicycle parking and repair locations, sidewalks and shared use paths etc. Bicycle and Pedestrian Improvement Concepts: determined location-specific improvement concepts to promote vibrant bicycle and pedestrian activity as envisioned by Rutgers 2030. Identification of Coordination Requirements: identified stakeholders and regulatory agencies to advance improvement concepts. Gaps in Bicycle and Pedestrian Networks: determined gaps in bicycle and pedestrian networks that may impact the extent of activity by these modes under existing conditions. Existing Bicycle and Pedestrian Activity: observed existing activity levels during the peak afternoon period on weekdays along with bicycle and pedestrian counts at several key intersections. Development of Street Treatments: developed consistent street treatments across the campuses based on identification of available roadway widths promoting safe accommodation of multiple modes of travel. Advancement of Rutgers 2030 Bicycle and Pedestrian Infrastructure Vision: assessed structural, geometric, functional, access and environmental regulatory requirements to develop Two-Way Separated Bike Lanes 8 Pedestrian Fence Buffer 3 Travel Lane 10 Travel lane 10 Bus Pull Out 8 concept plans and cross-sections for the new Raritan River Multimodal Bridge and Raritan Riverwalk proposed in Rutgers 2030. Pedestrian Area ~25 (not to scale) Total Cartway Width 39 ES-6

Autos and Parking Intersection Traffic Counts: determined traffic volumes at key intersections during weekday AM and PM peak periods that can be further used to advance roadway improvement concepts into project development and design. Existing Parking Utilization: identified the number of parking spaces by district and campus and assessed existing parking utilization based on weekday afternoon peak period parking utilization surveys. Parking Garage Access: identified appropriate access requirements to streamline vehicular access to the new parking garages to complement the vibrant bicycle and pedestrian friendly district and campus cores envisioned by Rutgers 2030. Parking Garage Construction Sequencing: recommended appropriate construction sequencing to ensure availability of sufficient parking supply to meet the parking demand through the construction phase. Identification of Coordination Requirements: identified stakeholders to implement construction of new parking garages. Rutgers 2030 Impacts on Parking: determined impacts on existing parking due to the proposed development in Rutgers 2030 by quantifying number of parking spaces that will either be relocated or will be lost. Future Parking Demand and Supply: estimated future parking demand based on the identified growth and change related to the Rutgers 2030 proposed development and determined how to meet the anticipated demand by providing strategically located parking supplies. Parking Garage Sizing and Location Recommendations: determined the sizing and location for each of the newly proposed parking garages based on future demand estimation and Rutgers 2030 vision. ES-7

ES-8

Transit: Summary of Conceptual Recommendations Rutgers University- New Brunswick College Avenue, Cook/Douglass, Busch and Livingston Districts RBHS-Downtown New Brunswick and RBHS-Piscataway Rutgers University-Newark RBHS-Newark Initiate coordination with the City of New Brunswick, the County of Middlesex and the New Jersey Department of Transportation (NJDOT) to advance improvement concepts Advance conceptual plans and crosssections prepared for all 5 transit hub locations proposed by Rutgers 2030 to the next phase (final design and engineering) in the implementation process Advance conceptual plans for busonly infrastructure elements (such as Huntington Street Roundabout, NJ Route 18 bus-on-shoulder and busonly ramp etc.) necessary to improve reliability of transit operation by bypassing congestion hotspots to the next phase of project development Initiate transit shuttle service connecting the RBHS Downtown New Brunswick District with potential remote parking locations (such as Busch and/or Livingston Districts) to address surplus parking demand in Downtown New Brunswick Provide a new commuter hub Assess signal coordination improvement potential for University Avenue and Washington Street corridors Continue conducting user surveys at regular intervals to assess future transit service modification needs (recent transit service reorganization is working well) Conduct a detailed origin-destination survey to understand opportunities for improved coordination with Newark Light Rail Initiate coordination with the City of Newark and NJ TRANSIT to advance improvement concepts Provide transit bus stop shelters at the School of Dental Medicine stop and the International Center for Public Health (ICPH) stop Assess potential for providing bus priority treatments for transit service along W. Market Street /Market Street to improve transit travel time and bypass peak period congestion related delays Initiate coordination with the City of Newark and NJ TRANSIT to advance improvement concepts Implement conceptual plans for transit service routing improvements on all districts upon completion of supporting infrastructure improvement needs ES-9

ES-10

Bicycle and Pedestrian: Summary of Conceptual Recommendations Rutgers University- New Brunswick College Avenue, Cook/Douglass, Busch and Livingston Districts RBHS-Downtown New Brunswick and RBHS-Piscataway Rutgers University-Newark RBHS-Newark Implement street treatment typologies for consistent application across the campus with short-term and longterm applications improving bicycle connectivity within and between districts and pedestrian connectivity within individual districts Advance conceptual plans for the following to the next phases (stakeholder coordination, permitting, design and engineering) towards implementation: Raritan River Multimodal Bridge Raritan Riverwalk College Avenue multimodal improvements Hamilton Street pedestrian improvements Albany Street Bridge improvements for bicycles and pedestrians Implement street treatment typologies for consistent application across the campus with short-term and longterm applications improving bicycle connectivity within and between districts and pedestrian connectivity within individual districts Implement street treatment typologies for consistent application across the campus with short-term and long-term applications improving bicycle connectivity between Rutgers University Newark and Newark Penn Station as well as Rutgers University Newark and RBHS-Newark Advance conceptual plans for the following to the next phases (stakeholder coordination, permitting, design and engineering) towards implementation: Pedestrian upgrades at the intersection of University Avenue and James Street Pedestrian upgrades at the intersection of University Avenue and New Street Bicycle and pedestrian improvements along Central Avenue and at Central Avenue/Park Place and Broad Street intersection Implement street treatment typologies for consistent application across the campus with short-term and long-term applications improving bicycle connectivity between Rutgers University Newark and RBHS- Newark Advance conceptual plans for the following to the next phases (stakeholder coordination, permitting, design and engineering) towards implementation: Bicycle and pedestrian upgrades along 12th Avenue and at the intersection of 12th Avenue and W. Market Street Bicycle and pedestrian upgrades along South Orange Avenue ES-11

ES-12

Parking: Summary of Conceptual Recommendations Rutgers University- New Brunswick College Avenue, Cook/Douglass, Busch and Livingston Districts RBHS-Downtown New Brunswick and RBHS-Piscataway Rutgers University-Newark RBHS-Newark Provide nine new parking garages with over 5,300 parking spaces as follows: College Avenue District Morell Street Garage: 440 spaces George Street Garage: 375 spaces Student Quadrangle Underground Garage: 375 spaces Cook/Douglass Districts Mason Gross Garage: 625 spaces West Parking Garage: 470 spaces Bush District North Parking Garage: 1,000 spaces South Parking Garage: 750 spaces West Parking Garage: 750 spaces Livingston District Athletics Multiuse Facility Garage: 540 spaces Relocate nearly 3,000 surface parking spaces as a part of Rutgers 2030 Eliminate the need for using leased parking spaces in downtown New Brunswick for RBHS Build 6-level structured parking under the proposed new RBHS expansion space in the RBHS - Downtown New Brunswick District to provide 700 spaces Assess additional need for parking related to increased student presence downtown, to be assessed in subsequent phases of development Accommodate additional parking need for the RBHS - Downtown New Brunswick District with remote parking on Busch and/or Livingston District Provide a new parking garage on Warren Street next to Bradley Hall with1,000 spaces Provide 400 new surface parking spaces identified as a part of the Rutgers 2030 development Accommodate parking need for the proposed private development in the new 12th Avenue Garage with 1,050 spaces Accommodate the parking need for the RBHS development (except the University Hospital and Ambulatory Care Center expansions) by building a parking garage on Parking Lot #1 with 2,250 spaces Parking need for the proposed University Hospital and Ambulatory Care Center expansions is estimated roughly to be 3,000 spaces (locations not identified) - identify locations for additional parking in the subsequent phases of development Any additional parking need to be addressed in the subsequent phases of project development ES-13