Jackson Highway Master Plans

Similar documents
NEWBRIDGE SPECIFIC PLAN PROJECT DESCRIPTION SEPTEMBER 24, 2012

COUNTY OF SACRAMENTO CALIFORNIA. PLNP Jackson Township Specific Plan. Workshop And Initiation of Environmental Review Process

Jackson Township Specific Plan Applicant Prepared Project Description Revised

COUNTY OF SACRAMENTO CALIFORNIA

COUNTY OF SACRAMENTO CALIFORNIA PLANNING COMMISSION REPORT

Natomas Vision Plan and PLNP

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division NOTICE OF PREPARATION

4.0 INTRODUCTION TO THE ENVIRONMENTAL ANALYSIS AND ASSUMPTIONS USED

2.0 PROJECT DESCRIPTION

Glenborough at Easton Land Use Master Plan

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

01 PROJECT DESCRIPTION

SHEFFIELD PARK Paulding County, GA DRI #588

APPENDIX C SPECIAL PLANNING AREAS

Joint Study Session of the Sutter County. March 2, 2009

CORDOVA HILLS COMPLIANCE WITH THE SACRAMENTO COUNTY GROWTH MANAGEMENT STRATEGY CRITERIA NOVEMBER 2011

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

DEPARTMENT OF COMMUNITY DEVELOPMENT Planning and Environmental Review Division DRAFT NOTICE OF PREPARATION

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

Land Use element LAND USE POLICY AREAS ESTATE AND RURAL RESIDENTIAL AREAS/RURAL SHELDON AREA OLD TOWN ELK GROVE

Glenborough at Easton Land Use Master Plan

Southeast Policy Area Community Plan

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Development Guidelines - Florin-Vineyard Community Plan Administrative Draft

Staff Report and Recommendation

III. PROJECT DESCRIPTION

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

Land Use Element. policy areas are discussed in this Element:

ACTION SUMMARY VINEYARD CPAC Smedberg Middle School Library 8239 Kingsbridge Drive Sacramento, CA 95829

Easton. Smart Growth Through Innovation. Easton

ELK GROVE GENERAL PLAN VISION

SECTION IV: DEVELOPMENT CONCEPT

Planning Commission Staff Report March 15, 2007

Southeast Policy Area Community Plan

7 PUBLIC SERVICES ELEMENT

Ten Mile Creek Planning Area

Dwelling Units Max 12 dwelling units per acre/min 8 dwelling units per acre. Development Mix 80% non residential/20% residential

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

An Amendment to the Hewlett- Packard Roseville Campus Master Plan

& 035; ; ;

7,600 Residential Units 1,700,000 SF Non-Res 300-Room ALF 300-Room Hotel University School, Park, Civic parcels 1,889 ac flow-way/preservation

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

COUNTY OF SACRAMENTO CALIFORNIA

Appendix PD-1. Mather South Community Master Plan

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

Parks, Trails, and Open space Element

4.1 LAND USE AND PLANNING EXISTING CONDITIONS REGULATORY BACKGROUND LAND USES IN THE PLAN AREA SURROUNDING LAND USES

Visioning Statement and Guiding Principles

A. WHAT IS A GENERAL PLAN?

SOUTHEAST AREA SPECIFIC PLAN. Planning Commission Study Session August 18, 2016

Pine Island Road Corridor Master Plan

Union City General Plan Update. City Council Meeting Item VII.a July 28, 2015 Land Use Concepts and Evaluation Criteria

Standards (R-3) Figure B-11: R-3 Residential Standards Exhibit

1. INTRODUCTION COMMUNITY PLAN OVERVIEW PURPOSE. A Community Plan serves as. a blueprint for future growth. and development within a

S C O P E O F W O R K A P R I L

MONTGOMERY COUNTY METRO STATION AREA DESIGN CHARRETTE

Report to: Development Services Committee Report Date: April 24, 2017

APPENDIX X. Analysis of Project Consistency with City Policies

GENERAL PLAN AND ENVIRONMENTAL IMPACT REPORT

DRAFT PLAN PRESENTATION

Westbound: A One-day Exploration of Growth

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

CITY OF SACRAMENTO GENERAL PLAN. UC Davis ESP 171 Urban and Regional Planning April 21, 2011

COUNTY OF SACRAMENTO Inter-Departmental Correspondence

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Property Profile 2954 WEST FRANKLIN ROAD MERIDIAN, ID

The transportation system in a community is an

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

Municipal Plan*Assessment

3.0 PROJECT DESCRIPTION

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

9 th Street Sub Area Plan

Chapter 5: Natural Resources and Environment

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Selected Area Study. Vision Plan Draft

1.0 VISION STATEMENT. December 6, PRINCIPLES

Overview of the Plan. The Building Blocks of Centers, Neighborhoods and Network INTERNAL DRAFT

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

Chapter 3 l a N D U S e

CHAPTER 7: Transportation, Mobility and Circulation

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

Conservation Development

Prepared by: Casey Kempenaar, Senior Planner

LAND USE MODEL UPDATE. Planning and Land Use Advisory Committee Meeting #2 September 4, 2014

Description of Preferred Alternative

Planning, Property and Development Department Report. To the Riel Community Committee

Introduction and Overview

MAYFIELD WEST SECONDARY PLAN PHASE 2

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Germantown Forward Status Report to the Planning Board M NCPPC

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Executive Summary. NY 7 / NY 2 Corridor

New Partners for Smart Growth Conference February 5, 2010

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

3. Project Description

Implementation Guide Comprehensive Plan City of Allen

Planning Commission Staff Report June 5, 2008

Transcription:

Jackson Highway Master Plans West Jackson Highway Master Plan (PLNP2008-00240) Jackson Township Specific Plan (PLNP2011-00095) NewBridge Specific Plan (PLNP2010-00081) Mather South Community Master Plan (PLNP2013-00065) Department of Community Development Planning and Environmental Review Todd Smith

Overview Purpose of Workshop: Provide current status of four adjacent master plans along the Jackson Highway Corridor and continue discussion of technical issues No action requested on projects Background 2030 General Plan Jackson Highway Visioning Study Project-Specific Information Introduction of transportation policy issues 2

Background: 2030 General Plan 2030 General Plan New policy framework for acceptance and approval of private applications to expand the Urban Policy Area (UPA) and creation of a master plan for the area. Intent reduction of VMT and GHG emissions by promoting smart growth principles, including a mix of residential densities and complementary land uses that support transit and other transportation modes Balance development with the need for habitat preservation that supports the proposed South Sacramento Habitat Conservation Plan (SSHCP) 3

Background: Visioning Study Jackson Highway Visioning Study (2008) o Town Centers o Mixed Use Activity Centers o Employment Areas o Open Space trails, parks, habitat preserves Significant outreach o 26 stakeholder interviews o Four large community workshops o Planning Commission workshop o Two Board workshops 4

Background: Visioning Study 5

Master Plan Locations Approved Master Plans 1. Vineyard Springs 2. North Vineyard Station 3. Florin Vineyard Gap 11. Cordova Hills Pending Master Plans 7. NewBridge 8. Jackson Township 9. West Jackson 12. Mather South 6

Master Plan Locations 7

Location 8

Land Use Summary Four Master Plans totaling 9,284 acres 28,421 housing units of varying density Commercial: 3,955,556 SF Employment: 14,382,641 SF Office: 911,800 SF Mixed Use: 1,630,318 SF Schools: 278 acres, 12 schools Parks: 324 acres of neighborhood and community parks Long-term buildout over decades Market conditions to drive phasing 9

Issues of Common Interest Transportation Joint Transportation Impact Study, involving Caltrans, adjacent jurisdictions Transit coordination between SacDOT and RT to create appropriate transit routes Trails combined effort of Regional Parks, SacDOT, PER staff Open Space variety of open space types involving Regional Parks, Cordova Recreation and Park District, Southgate Recreation and Park District 10

Issues of Common Interest Schools Elk Grove Unified School District Water Supply Sacramento County Water Agency and California American Water District Sewer Technical Studies reviewed by Sacramento Area Sewer District Drainage Drainage studies reviewed by Dept. of Water Resources 11

West Jackson Highway Master Plan 12

West Jackson Land Use Summary Residential Designations Acres Target Density Density Range (DU/acre) VLDR Very Low Density Residential LDR Low Density Residential MDR Medium Density Residential HDR High Density Residential 405.2 1,644.7 39.3 144.1 2.0 5.0 14.0 25.0 0.1-4.0 3.0-8.0 7.0-14.0 20.0-25.0 D.U. s 810 8,225 550 3,601 Subtotal 2,233.3 -- -- 13,186 Commercial, Office, Industrial & Acres F.A.R. Square Footage D.U. s Institutional Designations C Commercial 260.4 0.25 2,835,756 n/a E Employment MU Mixed Use I Industrial INS Institutional (existing use) 1,100.6 123.2 37.0 23.4 0.30 0.20/20 0.30 14,382,641 1,073,318 483,516 n/a 2,464 Subtotal 1,544.6 -- 18,775,231 2,464 Schools Acres ES/MS/HS Elementary School/Middle 150.7 School/High School Subtotal 150.7 Park & Open Space Designations Acres P Park OS Open Space OS/UF Open Space/Urban Farm 166.2 1,266.3 272.1 Subtotal 1,704.6 Arterial/Collector Roads 280.1 Acres Square Footage D.U. s Entire Project TOTAL 5,913.3 18,775,231 15,650 n/a 13

West Jackson Applicants Incorporated 1922 Est. 1887 Contractor License #8 14

West Jackson Property Ownership 5,913 Acres Total Stonebridge (blue): 3,016 Acres Granite (green): 1,063 Acres Other Owners (no color): 1,834 Acres 15 Community Development Department Making It Happen!

West Jackson Attributes As a result of the aggregate mining which occurred in the area over the last century, development has steadily encroached upon these properties and leapt across its borders. The project area now presents itself as a significant opportunity for infill development along a major transportation corridor and in close proximity to regional job centers. 16

West Jackson Attributes West Jackson Highway Master Plan Jackson Highway Vision Context Map 17

West Jackson Key Features Parkway Corridor Parkway Corridor Nodes Employment Node Urban Farm Locations

West Jackson Key Features Activity centers comprised of commercial, park and/or civic uses connected to linear parkways with transit and off-street trails Higher density residential areas clustered around activity centers and gradual reduction in densities toward the project area s eastern and southern border A variety of regional, community and neighborhood retail centers, office uses, research facilities, and employment centers Urban farms for community-based agriculture and education Abundant open space and recreational amenities 19

Jackson Township Specific Plan 20

Jackson Township Land Use Summary Land Use Designations Acres Ave. Density Density Range D.U. s % of D.U. s Residential LD- Low Density Residential MD-Medium Density Residential HD- High Density Residential 355.7 136.3 85.5 6.0 13.0 25.0 1.0-10.9 11.0-19.9 20.0-30.0 Subtotal 577.5 6,043 98.4% Commercial + Office Zones f.a.r. Approx. s.f. GC-General Commercial CC-Community Commercial MU-Mixed Use 59.3 17.6 19.6 0.25 0.25 0.50 645,700 191,600 427,000 n/a n/a 100 1.6% O- Office 33.6 0.50 731,800 n/a Subtotal 130.1 1,996,100 100 1.6% Public/Quasi Public Zones PQP-Fire Station/CommCtr/Tank Site PQP-High School/Middle School PQP-Elementary School 6.0 70.0 30.0 Subtotal 106.0 Park + Open Space Zones P- Community Park 23.6 P- Neighborhood Park 49.7 OS- Wetland Preserve 214.3 OS- Greenbelt/Drainage Corridor 57.7 OS- Landscape Corridor 14.5 OS- Detention Basin 3.2 Subtotal 363.0 AG-Agriculture 109.8 RW- Primary Roadways 104.6 2134 1772 2137 34.7% 28.9% 34.8% TOTAL 1,391.0 10.5 3 6,143 100% 21

Jackson Township Property Ownership 1,391 Acres Total Applicant owned: 862 acres Non-applicant owned: 529 acres 22 Community Development Department Making It Happen!

Jackson Township Key Features Commercial and civic amenities within walking distance of every residence Mixed-use nodes along Kiefer Boulevard, Excelsior Road and Jackson Highway Balanced mix of residential densities Three elementary schools and one middle/high school 225-acre wetland preserve in support of SSHCP Expansive greenway/drainage corridor including a trail to provide non-vehicular linkage throughout the project Connectivity to the greater Sacramento community through the use of public transit 23

Jackson Township Key Features 24

Jackson Township Key Features Town Center Vision 25

Jackson Township Key Features Low Density Residential High Density Residential Medium Density Residential Mixed Use 26

Jackson Township Key Features Mobility Master Plan 27

NewBridge Specific Plan 28

NewBridge Land Use Summary NewBridge North NewBridge South NewBridge West NewBridge Specific Plan Total DU AC SF DU AC SF DU AC SF DU AC SF Residential LDR Low Density Residential 945 203.6 140 23.6 1,085 227.2 (<7 du/ac) MDR Medium Density Residential 705 86.1 175 21.4 880 107.5 (7-22.9 du/ac) HDR High Density Residential 765 31.8 185 7.4 950 39.2 (23-40 du/ac) Subtotal 2,415 321.5 500 52.4 2,915 373.9 Commercial & Office C Commercial 9.1 120,000 11.9 70,000 21.0 190,000 MU Mixed Use 160 11.4 130,000 160 11.4 130,000 O Office 13.8 180,000 13.8 180,000 Subtotal 9.1 120,000 160 37.1 380,000 160 46.2 500,000 Open Space & Park OS Open Space - Preserve 133.2 197.8 331.0 OS Open Space Multi-Use Area 19.5 9.5 29.0 OS Open Space Folsom South Canal 46.5 12.4 58.9 OS Open Space Community Garden 4.5 4.5 OS Open Space Landscape Parkway 34.9 6.1 41.0 P Park 32.7 8.6 41.3 Subtotal 271.3 36.6 197.8 505.7 Public/Quasi-Public P/QP Elementary School Site 9.4 9.4 P/QP Sewer Lift Station 0.5 0.5 P/QP Electric Facility 0.7 0.7 P/QP Fire Station Site 2.5 2.5 Subtotal 12.4 0.7 13.1 Roadway RW Major Roadway 43.7 5.5 1.8 51.0 Agriculture AG Agriculture 105.4 105.4 Total 2,415 658.0 120,000 660 132.3 380,000 0 305.0 0 3,075 1,095.3 500,000 29

NewBridge Property Ownership East Sacramento Ranch, LLC (Sacramento Rendering Company) - 811.1 acres Triangle Rock Products, Inc./Vulcan Materials Co. 119.5 acres AG-80 uses west of Eagles Nest Road (existing) 105.4 acres Bureau of Reclamation (Folsom South Canal) 58.9 acres SMUD 0.4 acres 30

NewBridge Illustrative Land Use Plan 31

NewBridge Key Features A robust circulation system designed to encourage pedestrian and bicycle activity, integrated with public transit Connectivity to existing Folsom South Canal regional Class 1 trail A 4.5-acre community garden Vernal pool preserves east and west of Eagles Nest Road totaling approximately 331 acres within critical habitat for fairy shrimp to mitigate impacts to 4.5 acres of wetlands and vernal pool habitat Low Impact Development (LID) to reduce water usage by reducing impervious surfaces, reducing turf in public parks and frontages, disconnected roof drains, and similar features 32

Mather South Community Master Plan 33

Mather South Land Use Summary Land Use Designation Approx. Acres Approx. Residential Units Approx. Commercial Sq. Feet Open Space / Detention Basins 29.59 -- -- East Side Trail 9.91 -- -- Creek Corridor 38.95 -- -- Parks 43.25 -- -- Schools 17.88 -- -- Sports Complex 126.19 -- -- University 152.87 -- -- Public 9.81 -- -- Streets 58.09 -- -- Landscape Corridors 8.12 -- -- Mixed Use Area: Neighborhood Commercial Component Multi-Family Residential Component (RD-30) 10.00 37.94 47 1,068 92,500 -- 34 RD-3.5 18.63 65 -- RD-5 83.12 419 -- RD-6 38.02 219 -- RD-7 96.38 660 -- RD-8 19.95 159 -- RD-10 26.87 264 -- RD-11 58.54 644 -- Totals 884.11 3,545 92,500

Mather South Illustrative Land Use Plan 35

Mather South Key Features A 47-acre mixed use area consisting of 10 acres of commercial uses integrated with 37 acres of multiple family uses at up to RD-30 densities (approximately 1,068 units of the project s 3,545 residential units) Proximity to existing infrastructure and amenities 43 acres of neighborhood parks and trails, including connectivity to the existing trail along the Folsom South Canal Two elementary school sites A 126-acre Sports Complex A 152-acre site for a university 36

Identified Key Issues Provision of Infrastructure Infrastructure Master Plan to identify necessary public facilities and infrastructure Public Facilities Financing Plan must include an infrastructure phasing analysis Backbone infrastructure may be shared by master plans Unknown timing of development for each project 37

Identified Key Issues Urban Services Plan (PC-7 of LU-120) Urban Services Plan required for each master plan to demonstrate: 1. Services are cost neutral to County s General Fund and existing ratepayers 2. Public facilities and infrastructure O&M costs are cost neutral 3. Existing levels of municipal services will not be negatively impacted Coordinated effort between CFO s office, DCD s Special Districts staff, PER staff, and consultants Base fiscal model completed 38

Identified Key Issues Fiscal Impact Analysis Base Fiscal Model New General Plan requirement Thorough analysis involving CFO, peer review process Long-term growth projections Revenue assumptions by land use type Review of County budget by function and expenditure Timing - early in process rather than later Common foundation for project-specific FIA 39

Identified Key Issues Water Supply SCWA and Cal Am are water purveyors Three projects require amendments to current Zone 40 Water Supply Master Plan Project-specific Water Supply Assessments will determine water supply availability in normal year, dry year, and multiple dry years scenarios Water purveyors must demonstrate sufficiency of water supplies to satisfy the projects water demands while still meeting the current and projected water demands of existing customers 40

Identified Key Issues Water Supply Water conservation efforts regionally and in master plans Conjunctive use provides flexibility in dry years Sustainable groundwater management policy Long-term water supply planning process SB 221 water provision verification 41

Identified Key Issues Transportation Joint Transportation Impact Study to analyze impacts associated with all modes of transportation Coordinated effort involving four adjacent cities, Capital Southeast Connector JPA, and Caltrans Study area included over 250 roadway segments and 160 intersections Ongoing effort to refine analysis and cost estimates for roadway infrastructure Potential for SR 16 relinquishment 42

Identified Key Issues Transportation Second Workshop Jackson Corridor Mitigation Strategy Dynamic Implementation Tool Functional Improvements to Rural Roadways Jackson Corridor Transit Network and Service Jackson Corridor Trail Network Evaluation of financing strategy Evaluation of appropriate metric for transportation impact analysis Evaluation of appropriate roadway sizing 43

Next Steps Workshop #2 Transportation Workshop #3 Infrastructure (Water Supply, Drainage, Sewer) and Public Facilities Financing Plans, Fiscal Impact Analyses 44