LPS 1014 Scheme Requirements for certificated fire detection and alarm system firms. Presented by - Reg Grigg LPCB

Similar documents
Standards and third party certification

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

Third Party Certification:

Loss Prevention Standard

Loss Prevention Standard

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

A GUIDE TO THE REGULATORY REFORM ORDER (FIRE SAFETY) 2005 (RRO)

PART 3 REQUIREMENTS FOR SPRINKLER SYSTEMS and SPRINKLER INSTALLERS

The Route to Third Party Certification

Loss Prevention Standard

BRE & LPCB Ruth Tucker -Passive Fire Protection

Electrical Safety The Hidden Perils

Cladding Screening Test Result

Type 5 Certifications:

Best Practice BS 3621: 2007 BS 8621: 2007 BS 10621: 2007 dhf

The Macro Quallty Assurance System for Fire Safety Engineering

7.3 Design and Development Design and development planning Design and development inputs Design and development outputs 7.3.

FIRE RISK ASSESSMENT COMPETENCY COUNCIL

Fire Safety in Places of Worship An Insurers Perspective. Kevin Thomas, FCII, CFIRM Principal Risk Management Surveyor

Personal Protection Systems (PPS)

Guide to Membership Assessments

Accredited SIA ACS & ISO 9001:2001 ISO & ISO BSIA Member

Security systems Protecting people and property

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

Loss Prevention Standard

CFOA Protocol for the Reduction of False Alarms & Unwanted Fire Signals

BS 5839: Part THE CHANGES

ESSEX POLICE, FIRE AND CRIME COMMISSIONER FIRE & RESCUE AUTHORITY Essex County Fire & Rescue Service

Fire prevention and protection

DOMESTIC SMOKE ALARMS AND SPRINKLERS. Introduction. Materials and methods. Frank SWANN 1. Legislative impact. Review article

A guide to the changes between BS 8418:2010 and BS 8418:2015

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

CERTIFICATION SAFETY & BEYOND

Fire prevention and protection

Guided Learning Hours (GLH) 16 Invigilated Assessment Hours (IA) 2 Total Qualification Time (TQT) 18

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734

Chief Operating Officer Giampiero Belcredi

The Legal Obligations of Employers to Maintain all Electrical Installations in a Safe Condition

Allianz Engineering Inspection Services Ltd. Electrical Services. Product Information

Red Book News November 2010

Learning from incidents IFE AGM and Conference 2014 Intelligent Engineering Reducing Risk 25 th and 26 th June 2014 Stratford on Avon

PERIODIC ELECTRICAL TESTING POLICY

MGN 453 (M) Maritime and Coastguard Agency Logo MARINE GUIDANCE NOTE

ISLE OF WIGHT FIRE & RESCUE SERVICE

Electrical Safety Policy

SUPPLEMENTARY REGULATIONS SPECIFIC TO CERTIFICATION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)

BSI Kitemark the business case

INTRUDER ALARM FOR BUSINESS SECURITY

FIRE ALARMS EMERGENCY LIGHTS NURSE CALL ACCESS CONTROL GK FIRE & SECURITY LTD, UNIT 1 GREBE RD, PRIORSWOOD IND EST, TAUNTON, TA2 8PZ

New Approaches to Design for Fire Safety

FIRE SAFETY MANAGEMENT PLAN

Periodic Electrical Testing Policy

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

Protocol between Local Housing Authorities and Fire and Rescue Authorities to improve fire safety

FINAL REPORT ON THE 4 TH JOINT CROSS-BORDER EMC MARKET SURVEILLANCE CAMPAIGN (2011) LED LIGHTING PRODUCTS

Maintenance of Fire Systems

Secretary of State determination under article 36 of the Fire Safety Order

LA AUDIT ASSISTANCE SURVEY: Pre-survey checklist

PD6662:2010. A guide from Honeywell Security Group

POLICY FOR FIRE SAFETY MANAGEMENT

Best Practice Guide. Windows and Doors. Single-axis hinges to BS EN

Construction Products Regulation (CPR) Update. Graham Simons Technical Manager, FIA

Fire risk management plan. MH/05/Revised/06/17

NOTTINGHAM CITY HOMES

SUMEDD03 Endorse the Positioning, Fixing and Fitting of Electrical Wiring Systems, Wiring Enclosures, Equipment and

AUTOMATIC FIRE DETECTION AND ALARM SYSTEMS

H&S Forum. Fire Safety Policy Glascote Academy

Electrical Safety Policy and Management System

ISO 9001:2015 TRANSITIONS

FIRE SAFETY POLICY June 2014

Millfield Schools Fire Risk Prevention Policy

INDEX INDEX 2 FOREWARD 3 SECTION 1 COMPANY INFORMATION 4 SECTION 2 GRADING AND CERTIFICATION 5 SECTION 3: ADDITIONAL REQUIREMENTS 6 7

Fire Risk Assessment 2017

Fire and Security Products and Services

Your specialist partner for total electrical compliance. Electrical Testing

A basic guide to BS 8418:2015 CCTV Systems for Installers

A GUIDE FOR SELECTING FLAT ENTRANCE DOORSETS. A publication for housing associations, landlords, building owners and local authorities in England

Abu Dhabi Conformity Assessment Scheme for Fire Pumps

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ROLE OF THE FIRE PROTECTION ENGINEER IN THE CONSTRUCTION DESIGN PROCESS

Controlled Door Closing Devices

COMMUNITY DEVELOPMENT. Automatic Fire Alarm Actuation Protocol

Swiftclean and ANSUL. AXA s Commercial Kitchen Fire Safety Service. Ansul is a leading brand of Johnson Controls International PLC

FIRE SAFETY LOG BOOK

Guidance Note. Visual Alarm Devices: Conflict between BS 5839 and EN 54-23

Dan Gray, Property Director. Date: November 2017 Review Due Date: November 2020

WORLDWIDE CABLE EXPERTS

Panic and Emergency Exit Devices

ALL YOU NEED TO KNOW ABOUT THE NEW STANDARDS IN ONE HANDY POCKET GUIDE. Updated for 2016 to include IA1501. Brought to you by: In association with:

A guide to the changes of Amendment 1 of BS

BSI the UK National Standards Body: The Role of Standards

False alarms research work Raman Chagger (BRE Global) 18 th June 2015 Firex International. Part of the BRE Trust

Guidelines for designating and monitoring notified bodies in Norway

A Gateway to Safety The New Powered Gates Certification Scheme

Burnham-on-Sea & Highbridge Town Council. Burnham Joint Burial Committee (BJBC) Closed Circuit Television (CCTV) Policy

ALARM RESPONSE POLICY

Membership Application

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

EMERGENCY LIGHTING COMPLETION CERTIFICATE For small installations and verification of existing installations

Transcription:

LPS 1014 Scheme Requirements for certificated fire detection and alarm system firms Presented by - Reg Grigg LPCB

The aim of this brief presentation Why are LPCB schemes specified? pedigree, experience, thoroughness, reliability, reputation LPS standards are highly regarded and specified to reduce risk An overview of the LPS 1014 scheme and an explanation of the scheme s procedures To create an awareness of improving reliability and quality throughout the fire industry.

LPCB risk reduction and business continuity Development of LPCB LPCB was formerly owned by Association of British Insurers (ABI) Supporting Insurers and working in risk reduction and business continuity for almost 150 years 1860 s Fire Insurers Research & Technical Organisation 1980 s 2000 2011 Development of the BRE Group Fire Offices Committee 1860 s

Loss Prevention Standards (LPS) Formerly Rules of the Fire Offices Committee Purpose To address risks not adequately addressed by existing national and international standards or : where no recognised standards exist or weakness in an existing standard to package a suite of standards to get innovative products to market LPS s include published standards if available Written reviewed and endorsed by Loss Prevention Standard Rules of the FOC LPCB working closely with a wide range of stakeholders forming technical groups BRE Global s Governing and technical bodies include representatives from: CFOA, CPNI, CAST(HOSDB), MOD(SSG), ACPO, ABI, Insurers, Risk Management, Fire & Security Consultancies, Trade Bodies, and of course Manufacturers LPS 1014 Expert Group A Published by BRE Global

Background to LPS 1014 For a considerable time very high levels of false alarms were a concern to the Fire and Rescue Service (FRS) Potential loss or reduction of FRS cover, or a lack of trust in the reliability of a fire detection and alarm system causes concern to insurers Part of the problem can be attributed to: Poor choice of equipment and poor design Poor or incorrect installation multiple overlapping responsibilities Poor housekeeping/maintenance in use Lack of end user training/change in use of building LPS 1014 aims to reduce false alarms and improve reliability, it is insurer and CFOA supported LPS 1014 first released in 1993

False alarms, CFOA concerns There are two distinct elements which this CFOA policy seeks to address: false alarms which may contribute to fire safety issues Unwanted fire signals which impact on the F&RS resources In part this is addressed by : Promoting the use of competent persons in the design, installation, commissioning and maintenance of systems. CFOA recommend that F&RS require the use of third party certification schemes. Certification through United Kingdom Accreditation Service (UKAS) (or equivalent) provides valuable reassurances and assists in the making of informed decisions as to the competency of the service provider.

Code guidance, evidence of compliance BS5839-1:2002-2008 Section 2 System components subclause 11.1 states : - The reliability of the system to perform its functions on demand will be governed by the reliability of individual components. In general, it is advisable that all components, such as manual call points, detectors, control and indicating equipment and fire alarm devices, comply with relevant British Standards, and have undergone type testing to these standards. It is advisable to use components having certification under a recognized product certification scheme (comprising third -party certification of product conformity against a relevant standard), based on testing and continuing surveillance, together with assessment of the manufacturer s quality assurance systems against BS EN ISO 9000).

The LPS 1014 scheme Loss Prevention Standard LPS 1014, is an LPCB scheme for firms engaged in the design, installation, commissioning and servicing of fire detection and alarm systems Scheme comprises of more than 50 major LPCB listed installers Some companies have several approved branches Some have experience of designing and installing to British Standards, Irish standards and installation Code s for US organisations such as NFPA (National Fire Protection Association)

Key requirements for entry Management systems for design, installation, commissioning and servicing processes to be approved by LPCB (BS EN ISO9001) The scheme also includes: Use of 3 rd party approved components Random LPCB site audits (typically two per year) Identified authorisation to sign CofC Power supply design capability Inspection and test record keeping Competence and number of staff Customer training Maintenance capability Use of approved key components Includes regional offices UKAS Accredited

Key requirements for entry LPS 1014 requires key identified components to be listed (approved or certified as it is also known) this is independent third party confirmation that products, meet and continue to meet appropriate standards It is different from a type testing Approval helps ensure, through regular audits and sampling, that the product continues to comply with the standards The auditing process also helps to confirm that the product remains exactly the same as was originally tested and approved

Key requirements for LPS 1014 entry The applicant firm must provide evidence of design, installation, commissioning and servicing of fire alarm installations, in accordance with installation rules (appropriate standards and codes) over a continuous period of not less than two years Once approved Installation and servicing may be subcontracted providing contractual responsibility for these services remains with the certificated firm A list of at least 8 completed installations will be selected for inspection by LPCB (random selection and number inspected at discretion of LPCB), selected from either: within previous 12 months where service contract is not held within 2 years where the service contract is held

Certificate of conformity ( CofC) The firm will issue a CofC, which is a vitally important document Issued for every installation the firm is contracted to install even where design responsibility may be 3 rd party or where the installation was sub-contracted Ensures a single point responsibility Includes Signed for agreed pre-notified variations included and all other aspects of relevant installation contract Only issued where approved products have been installed LPS 1014 FIRM REMAINS RESPONSIBLE

Site inspections as part of regular audits In brief: - ISO 9001 compliance must be maintained A random job file is reviewed (normally twice per year) for - client requirements, specification, category, standards, calculations, variations, specific requirements, drawings and certification of products An inspection of the installation is then carried out

Site inspections as part of regular audits In brief: - If any issues arise during the audit they are discussed with the LPS1014 company only, and documented At the end of the audit a full report is given listing any minor or major non-compliances, these are then required to be resolved within a given time, typically 30 days The evidence for closing out the noncompliances is then sent to LPCB for review and close out Providing compliance is satisfactory - LPCB approval and listing for LPS 1014 is maintained

Sample of typical site drawing Sample of a typical site drawing Short circuit isolator 86dB Cable type and size ie:-1.5 Red. Standard. 79dB Main entrance Actual sound decibel readings. Details removed for security reasons 75dB

Common major non compliances Call point, detector or other key component identified on drawing but not installed Decibel readings not sufficient Cables and/or Power Supplies not monitored Insufficient metal clips on vulnerable cable runs 230v mains not to IEE regs. ie: (single pole isolation) Cables not fire resistant Log book not issued / missing Lack of False Alarm considerations Power supplies not to BS EN54.4 batteries too small, or too large, and Power Supply Unit unable to recharge within 24 hrs

Unwanted fire activations Reducing risk to Life and Property and eliminating false alarms is the responsibility of everyone Those responsible for the use of the system must ensure that arrangements are made for proper training for its daily use And that testing of the system is carried out during regular maintenance visits once the premises have become occupied If the fire alarm is not maintained by an approved LPS 1014 company then the LPS 1014 certificate in not valid)

Statistics the effects of combined efforts 6 Month fire stats Apr Sept 2010: The total number of fire false alarms attended in England fell by 8 per cent 137,000 in April to September 2010 This is 31 per cent fewer than ten years previous (April to September 2000) Schemes such as LPS 1014 have helped to achieve this reduction Source CLG

The Red Book Please go to the Red Book for a: List of LPS 1014 approved firms List of compliant component parts List of cables New applicants that can t demonstrate LPS 1014 approval requirements can receive PROVISIONAL approval and receive a certificate this is reviewed at twelve months when full approval is reconsidered These pre-approved companies are NOT Red Book listed until fully compliant

Authentication Always check that a company is LPCB approved by checking www.redbooklive.com. OUR MARK The mark used for LPCB approval Cert. Number below As displayed on a CofC Thankyou for listening