NAPA COUNTY PUBLIC WORKS Standards & Specifications

Similar documents
CHECKLIST FOR PHASE II DRAINAGE REPORT

City of Richmond. Engineering Design Specifications

When planning stormwater management facilities, the following principles shall be applied where possible.

Draft Rhode Island Stormwater Design and Installation Standards Manual

Title 11 Streets and Sidewalks

DEPARTMENT OF PUBLIC WORKS & UTILITIES

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

A. Regional Detention Requirements

Appendix I. Checklists

SITE PLAN REVIEW APPLICATION AND CHECKLIST

NEWPORT NEWS/WILLIAMSBURG INTERNATIONAL AIRPORT DESIGN AND SUSTAINABILTY GUIDELINES

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST


CITY OF FORT LUPTON STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 10 STREETS

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

TENTATIVE MAP CHECKLIST

SEMSWA s Role in the Land Development Process

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

South Bismarck Watershed Model Update and Stormwater Improvement Project

4. Contractor (and subcontractors if applicable) certification statement(s)

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

CHAPTER 1. GENERAL PROVISIONS

Town of West Point Plan of Development

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

APPENDIX F: DETAIL DRAWINGS

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

City of Waco Stormwater Management Regulations

Article 20 Stormwater Management

Chapter 1 GENERAL SOUTH DAKOTA DRAINAGE MANUAL

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

Blake C. Kronkosky, PE, Ph.D.

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

STORMWATER - GENERAL NOTES

Erosion & Sediment Control Plan Application Form & Checklist

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Appendix K. Stormwater Management Plan

Washington County, Maryland Division of Public Works Policy Manual

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Going Green with the NYS Stormwater Design Standards

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

At Your Disposal CUP Amendment, Lot 20, Village Service Commercial, at 128 Bastille Dr. (PLN17-208)

CHAPTER 5: SITE DEVELOPMENT

Gloucester County PLAN SUBMITTER'S CHECKLIST

Chapter 4 - Preparation of Stormwater Site Plans

Problem Understanding

ARTICLE III COMBINED SEWERS

Town of Excelsior, Sauk County, Wisconsin DRIVEWAY ORDINANCE

DESIGN SCENE SUBJECT INDEX

Zoning Ordinance Chapter 10

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Plan Review Checklist

Pollutant Removal Benefits

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Appendix A - Submittal Checklists

Drainage Control Plans

Table of Contents. Preface... xv

PLAN SUBMITTER'S CHECKLIST

Soil Erosion and Sediment Control

Overall Drainage Report

Chapter 14. Stormwater Quality Introduction

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

APPLICATION SUBMITTAL CHECKLIST LAND USE PERMITS

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

SITE PLAN REVIEW APPLICATION

Attachment 2: Permeable Pavement Design Guidelines

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

Figure 1 Cypress Street Study Area Location Map

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

THE CITY OF DELAWARE, OHIO ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN

Kingswood Site Development Preliminary Site Evaluation Report March 23, 2015

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

STANDARD DETAILS QUICK REFERENCE

STATUS OF REVIEW: ENGINEER WILL COMPLY

PLANNED UNIT DEVELOPMENT Date: April 5, 2018

Floodplain Technical Memorandum

ZONING AMENDMENT & PLANNED UNIT DEVELOPMENT STAFF REPORT Date: April 4, 2013

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

County Council Of Howard County, Maryland

DESIGN CRITERIA PACKAGE


Sewer & Storm Drain Systems

LDC Amendment Request

Stormwater. Management Manual

Town of Windsor. Stormwater Manual

Transcription:

Roadway Design & Construction Manual (Table of Contents) 1. Chapter 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6 Enforcement Responsibility 1.7 Review and Approval 1.8 Interpretation 1.9 Other Regulatory Agencies 2. Chapter 2: Construction Drawing Requirements 2.1 Cover Sheet 2.2 Plan 2.3 Profile 2.4 Cross Sections 2.5 Striping and Signing Plan 2.6 Details 2.7 Standard Notes 2.8 GIS Requirements (Digital Records) 2.9 AS Built Standards and Requirements (can we just AS BUILT or RECORD DRAWINGS??) 3. Chapter 3: Design and Technical Criteria 3.1 General Requirements 3.2 Street/ Road Types 3.3 Functional Classification 3.4 Standard Templates 3.5 Horizontal Alignment 3.6 Vertical Alignment 3.7 Intersections and Driveways 3.8 Sight Distances 3.9 Drainage 3.10 Traffic Control 3.11 Miscellaneous

4. Chapter 4: Pavement Design and Technical Criteria 4.1 General Requirements 4.2 Pavement Design and Report Submittal 4.3 Subgrade Investigation 4.4 Pavement Design Criteria 4.5 Pavement Design Procedure 4.6 Material Specifications 5. Chapter 5: Construction Specifications and Standards 5.1 Construction Specifications 5.2 Construction Standards 6. Definitions 7. Examples: Standard Templates 8. Examples: Construction Standards 9. Design Nomographs for Pavements 10. Resolution

Storm Drainage Design & Technical Criteria (Table of Contents) Section 1: General Provisions 1.1 Short Title 1.2 Jurisdiction 1.3 Purpose and Effect 1.4 Enactment Authority 1.5 Amendment and Revisions 1.6 Enforcement Responsibility 1.7 Review and Approval 1.8 Waivers 1.9 Interpretation 1.10 Relationship to Other Standards 1.11 Abbreviations Section 2: Drainage Planning Submittal Requirements. 2.1 Introduction 2.2 Phase I Drainage Report 2.3 Phase II Drainage Report 2.4 Phase III Drainage Report 2.5 Abridged Drainage Report 2.6 Exception to The Requirement for a Drainage Report 2.7 Construction Plans 2.8 As Built Drawings and Final Acceptance Certificate 2.9 Residential Lot Grading Certificate Section 3: Drainage Policy 3.1 Introduction 3.2 Basic Principles 3.3 Multi Purpose Resource 3.4 Water Rights 3.5 Major Drainageway 3.6 Regional and Local Planning 3.7 Post Development Flow Conditions 3.8 Master Planning 3.9 Drainage Problem Areas 3.10 Public Improvements 3.11 Basin Transfer 3.12 Storm Runoff Detention 3.13 Stormwater Quality

3.14 Floodplain Management 3.15 Operations and Maintenance 3.16 Drainage Easement Requirements 3.17 Storage Facilities 3.18 Inadvertent Detention Storage 3.19 Planning and Design 3.20 Minor and Major Drainage System 3.21 Storm Runoff 3.22 Streets 3.23 Flood proofing Existing Structures Section 4: Floodplain Regulations 4.1 Introduction Section 5: Rainfall 5.1 Introduction 5.2 Napa County Rainfall Zones 5.3 Description of the Zones 5.4 Selecting the Rainfall Zone 5.5 California Urban Hydrograph Procedure Deign Storms 5.6 Time Intensity Frequency Curves Section 6: Runoff 6.1 Introduction 6.2 Rational Method 6.3 California Urban Hydrograph Procedure 6.4 Storm Flow Analysis Section 7: Open Channels 7.1 Introduction 7.2 Channel Types 7.3 Flow Computation 7.4 Design Standards for Major Drainage ways 7.5 Design Standards for Small Drainage ways 7.6 Street/ Roadside Ditches 7.7 Channel Rundowns 7.8 Cross Sections Section 8: Storm Sewers 8.1 Introduction 8.2 Construction Materials

8.3 Hydraulic Design 8.4 Vertical Alignment 8.5 Horizontal Alignment 8.6 Pipe Size 8.7 Manholes Section 9: Storm Sewer Inlets 9.1 Introduction 9.2 Standard Inlets 9.3 Inlet Hydraulics 9.4 Inlet Spacing 9.5 Inlet Capacity Section 10: Streets 10.1 Introduction 10.2 Function of Streets in the Drainage System 10.3 The Allowable use of Streets/ Roads as a Drainage System 10.4 Hydraulic Evaluation Section 11: Culverts 11.1 Introduction 11.2 Culvert Hydraulics 11.3 Culvert Design Standards 11.4 Design Example 11.5 Culvert Sizing Criteria Section 12: Hydraulic Structures 12.1 Introduction 12.2 Conduit Outlet Structures 12.3 Channel Grade Control Structures 12.4 Bridges 12.5 Irrigation Ditch Crossings Section 13: Erosion Control 13.1 Introduction 13.2 Temporary Erosion Control for Construction Activities 13.3 Permanent Controls for Storm Water Quality Management Section 14: Detention 14.1 Introduction 14.2 Detention Methods

14.3 Design Criteria 14.4 Design Standards for Open Space Detention 14.5 Design Standards for Planned Unit Development 14.6 Design Standards for Parking Lot Detention 14.7 Design Standards for Underground Detention 14.8 Design Standards for Combined Detention Ponds 14.9 Design Examples Appendix Checklist Standard Forms Standard Details List of Tables List of Figures