SCIENCE AND ENGINEERING COMPLEX

Similar documents
SCIENCE AND ENGINEERING COMPLEX

THE GEORGE WASHINGTON UNIVERSITY School of Public Health and Health Services

The George Washington University Square Phase 1 Design Garage Base Building

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

The George Washington University Museum Foggy Bottom Campus Plan Site 102B - Z.C. Case No F/06-12F April 5, 2012

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

CORCORAN HALL ADDITION

THE GEORGE WASHINGTON UNIVERSITY MOUNT VERNON CAMPUS

ANC 2A Presentation. November 9, 2006

2007 Foggy Bottom Campus Plan

The George Washington University

A /19/2017 GAGAN RESIDENCE 1043 CENTINELA AVE. SANTA MONICA, CA CENTINELA AVE

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Agenda Item # 1. Meeting Date September 21, Prepared By. Approved By

WORKING AT A HIGHER LEVEL

WORKING AT A HIGHER LEVEL

Project Overview. Washington s Exciting Destination for Office & Retail. For More Information, Visit CapitolCrossingDC.com PROPERTY GROUP PARTNERS

Project Overview. Washington s Most Exciting New Destination for Office and Retail PROPERTY GROUP PARTNERS

The subject site plan amendment proposes the following revisions to the approved site plan:

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

F. The following uses in the HR District: attached single-family dwellings, condominiums, and institutional uses; and

2.0 PROJECT DESCRIPTION

SPRC PRESENTATION #3 JUNE 22, 2015

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND, SITTING AS THE DISTRICT COUNCIL ORDER AFFIRMING PLANNING BOARD DECISION, WITH AMENDED CONDITIONS

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

Blue Line LRT Extension

SPRC PRESENTATION MAY 13, 2015

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

A/E REVIEW CHECKLIST SITE & LANDSCAPE

Whitehurst Freeway Deconstruction Feasibility Study

TO: CITY COUNCIL DATE: MARCH 23,2009

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Planning Districts INTRODUCTION

JOB CREATION PROJECTS

THE CITY OF MOBILE, ALABAMA

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

UNIVERSITY OF WASHINGTON Mercer Hall Project, Terry/Lander Hall Project, and Development Capacity Re-allocation from Central to West Campus

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

PARK PLAZA EXHIBIT A UNIVERSITY PARK, TX LAND USE STATEMENT TABLE OF CONTENTS CONCEPTUAL PD SUBMISSION OCTOBER 26, 2016

IV. ENVIRONMENTAL IMPACT ANALYSIS B. AESTHETICS 1. VIEWS

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

WASHINGTON DC METROPOLITAN AREA QUALIFICATIONS

East Whiteland Township Current Land Development Projects

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

The West College Avenue Corridor Redevelopment Plan

New Berlin City Center Concept Review PDQ Food Stores, Inc

CONCEPT PLAN APPLICATION

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

CRYSTAL. DRIVE NORTH DISTRICT RETAIL Crystal Drive Arlington, VA KEY PLAN LANDSCAPE CONSTRUCTION LEGEND MATCHLINE - SEE L1.

LANGAN QUALIFICATIONS - INDIGO ASSET SERVICES

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Project phasing plan (if applicable) 12 copies of site plan

AMEND DMENT H HOSPITAL

Developer s Program. The Station at East 54

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

SITE PLAN REVIEW APPLICATION AND CHECKLIST

B. DESCRIPTION OF THE PROPOSED ACTION

ARTICLE 6: Special and Planned Development Districts

CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO EAST 124TH AVE WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION PRIVATE DRIVE

Derry Green Corporate Business Park

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

Carrville District Centre Urban Design Streetscape Master Plan Study

GRACE CHURCH EXPANSION

THE FOLGER SHAKESPEARE LIBRARY ANC 6B Meeting

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

PLANNED UNIT DEVELOPMENT APPLICATION

UNIVERSITY OF WASHINGTON MASTER PLAN SEATTLE CAMPUS

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

Planning & Zoning Commission Meeting Date: June 18, 2012

Chapter 8. Visualizations

Oehme, van Sweden Principals

Historic District Commission Staff Report September 7 th 2016

CRESCENT RESOURCES INC.

UMBC Facilities Management. UMBC Facilities Master Plan Update

General Location Courtyard at LMH Final Development Plan and Final Plat

New Library Building Proposal

NOTICE OF PREPARATION OF ENVIRONMENTAL IMPACT REPORT

HILLSIDE BUILDING COMMITTEE PLAN REVIEW DIRECTIONS

Town of West Point Plan of Development

TENTATIVE MAP CHECKLIST

Water Conservation Technologies, Larc 380 Semester Assignment

Description of Preferred Alternative

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Main Street Conversion Site

LANGAN LANDSCAPE ARCHITECTURE + PLANNING

Meeting Purpose & Agenda

Illustrative Campus Plan with Proposed Development

SITE PLAN REVIEW APPLICATION

Transcription:

PROJECT TEAM OWNER CONSULTING PROJECT MANAGER BOSTON PROPERTIES 505 9T SUITE 800 WASHINGTON DC 20004 202.585.0844 LAND USE COUNSEL GOULSTON & STORRS 2001 K STREET NW SUITE 1100 WASHINGTON DC 20006 202.721.0011 ARCHITECTS BALLINGER 833 CHESTNUT STREET SUITE 1400 PHILADELPHIA, PA 19107 215.446.0900 HICKOK COLE ARCHITECTS 1023 31st STREET NW WASHINGTON DC 20007 202.667.9776 LANDSCAPE ARCHITECT DRAWING LIST A-00 COVER SHEET A-01 PUD CHECKLIST AND ZONING DATA A-02 DEVELOPMENT SITES A-03 ZONE BOUNDARY SITE PLAN A-04 AERIAL PLAN A-05 ARCHITECTURAL VICINITY PLAN A-06 ARCHITECTURAL BLOCK PLAN A-07 CONTEXT PHOTOS A-08 SITE PHOTOS A-09 BLOCK ELEVATIONS - H and EYE STREET A-10 BLOCK ELEVATIONS - 22 nd and 23 rd STREET A-11 G4 & G3 PARKING PLAN A-12 G2 & G1 PARKING PLAN A-13 LOWER LEVEL 2 & 1 PLAN A-14 GROUND FLOOR PLAN A-15 OND & TYPICAL FLOOR (3-6)PLAN A-16 SEVENTH & EIGHTH FLOOR PLAN A-17 ROOF PLAN A-20 COURT PLAN A-21 CIRCULATION AND LOADING PLAN A-31 22nd AND H STREET PERSPECTIVE VIEW A-32 H STREET ELEVATION A-33 23rd STREET ELEVATION A-34 EYE STREET ELEVATION A-35 22nd STREET ELEVATION A-36 COURT ELEVATIONS A-41 ELEVATION DETAILS - CURTAIN WALL AND SUNSHADES A-42 ELEVATION DETAILS - TERRA COTTA SUNSHADES A-43 ELEVATION DETAILS - TERRA COTTA PANELS A-51 NORTH/SOUTH BUILDING TION A-52 EAST/WEST BUILDING TION A-53 BLOCK TION THROUGH NEIGHBORING BUILDINGS A-54 PARTIAL TION AT EAST ENTRANCE A-55 PARTIAL TION AT SOUTHEAST ENTRANCE A-56 PARTIAL TION AT NORTHEAST ENTRANCE A-57 PARTIAL TION AT H STREET A-58 PARTIAL TION AT HIGH BAY A-59 PARTIAL TION AT RETAIL ENTRANCE () OCULUS 2410 17th STREET NW SUITE 201 WASHINGTON DC 20009 202.588.5454 CIVIL ENGINEER WILES MENSCH CORPORATION 11860 SUNRISE VALLEY DRIVE SUITE 200 RESTON, VA 20191 703.391.7600 STRUCTURAL AND MEP ENGINEERS BALLINGER 833 CHESTNUT STREET SUITE 1400 PHILADELPHIA, PA 19107 215.446.0900 TRAFFIC ENGINEER WELLS + ASSOCIATES 1420 SPRING HILL ROAD SUITE 600 McLEAN, VA 22102 703.917.0739 A-61 MODEL PHOTOGRAPHS A-71 LEED CHECKLIST L-01 ILLUSTRATIVE SITE PLAN L-02 ANNOTATED SITE PLAN - SOUTH L-03 ANNOTATED SITE PLAN - NORTH L-04 PLANTING PLAN - SOUTH L-05 PLANTING PLAN - NORTH L-06 SITE FURNISHINGS L-07 EYE STREET POCKET PARK L-08 PLANTING C-01 EXISTING CONDITIONS PLAN - SOUTH C-02 EXISTING CONDITIONS PLAN - NORTH C-03 SEDIMENTATION AND EROSION CONTROL PLAN - SOUTH C-04 SEDIMENTATION AND EROSION CONTROL PLAN - NORTH C-05 GRADING PLAN - SOUTH C-06 GRADING PLAN - NORTH C-07 UTILITY PLAN - SOUTH C-08 UTILITY PLAN - NORTH C-09 STORM WATER MANAGEMENT PLAN C-10 SEDIMENTATION AND EROSION CONTROL DETAILS THE GEORGE WASHINGTON UNIVERSITY FOGGY BOTTOM CAMPUS SQUARE 55, WASHINGTON, DC OND - STAGE Case No. 06-11/06-12 OND-STAGE COVER SHEET A-00

OND-STAGE PUD CHECKLIST (2406.12) ZONING DATA CIRCULATION () SQUARE 55, LOT 28 TION ITEM SHEET NO. 2406.12(b) DETAILED STATEMENT OF USES LOCATED IN In Written PROJECT Application 2406.12(c) DETAILED SITE PLAN: LOCATION AND EXTERNAL DIMENSIONS OF A-11 A-21 ALL BUILDINGS AND STRUCTURES AREA AND DIMENSIONS LOT AREA = 56,885 S.F. MEASURED BUILDING AREA = 51,197 S.F. PERCENTAGE OF LOT OCCUPANCY = BUILDING AREA/LOT AREA = 51,197 / 56,885 S.F. = 90% GROSS FLOOR AREA TABULATION SQUARE FEET PARKING SPACES PROVIDED: Standard Compact Total Valet Total (9' x 19') (8' x 16') (8 x16 ) G-1 LEVEL 43 27 70 11 81 G-2 LEVEL 55 27 82 11 93 G-3 LEVEL 68 27 95 15 110 G-4 LEVEL 65 15 80 15 95 231* 96 327 52 379 379 TOTAL SPACES PROVIDED INCLUDING VALET SPACES 2406.12(d) 2406.12(e) UTILITIES AND OTHER EASEMENTS C-07 C-08 WALKWAYS AND DRIVEWAYS A-14, A-21 L-01 - L-03 DETAILED LANDSCAPING AND GRADING PLAN: EXISTING TOPOGRAPHY, CONTOURS, NATURAL C-01 - C-02 FEATURES, LANDSCAPING GRAPHIC ILLUSTRATION OF GRADES EXCEEDING 15% IN 5% INCREMENTS N/A NEW CONTOURS, PROPOSED FINISHED GRADES, C-05 C-06 PLANTING, AND LANDSCAPING L-01 L-05 EXISTING TREES TO BE RETAINED L-03 - L-04 C-01 C-02 PROPOSED DRAINAGE, INCLUDING WATER AND C-07 C-10 SEWER LINES, INLETS AND BASINS, CONNECTIONS TO PUBLIC WATER AND SEWER LINES PROPOSED EROSION CONTROL MEASURES C-03, C-04 C-10 ARCHITECTURAL PLANS TIONS, AND ELEVATIONS: TYPICAL FLOOR PLANS AND ELEVATIONS FOR A-11 - A-17 EACH BUILDING A-31 A-36 TIONS FOR EACH BUILDING A-51 - A-59 ELEVATIONS FOR ENTIRE SQUARE A-09 - A-10 LEVEL TOTAL BLDG. (EXCLUSIONS) TOTALGFA OPEN TO SHAFTS PARKING BELOW RAMP 1 51,099 (2,291) 48,808 2 47,150 (4,196) (999) 41,955 3 50,750 (227) (999) 49,524 4 50,750 (1,955) (999) 47,796 5 50,750 (227) (999) 49,524 6 50,750 (1,955) (999) 47,796 7 49,006 (227) (999) 47,780 8 46,656 (1,718) (1,193) 43,745 TOTAL 396,911 (10,505) (7,187) (2,291) 376,928 S.F. PENTHOUSE 9,742 S.F. TOTAL GROSS FLOOR AREA PROVIDED / ALLOWED GFA PROVIDED GFA ALLOWED 376,928 S.F. (SEE CHART ABOVE) 400,244 S.F. (PER FIRST-STAGE PUD) PENTHOUSE FAR ALLOWED = 0.37 FAR, 56,885 X 0.37 = 21,047 S.F. PENTHOUSE FAR PROVIDED = 9,742 S.F. BUILDING HEIGHT BUILDING HEIGHT ALLOWED = 110 FT (PER FIRST-STAGE PUD) BUILDING HEIGHT PROVIDED = 110 FT PERCENTAGE OF COMPACT SPACES ALLOWED - 40% (Section 2115.2) PERCENTAGE OF COMPACT SPACES PROVIDED 96+52/327 = 39.1% *INCLUDES 19 SUSTAINABLE VEHICLES AND 8 ACCESSIBLE SPACES (IBC 2009 Section 1106) 6 ADA STANDARD ACCESSIBLE SPACES 2 ADA VAN ACCESSIBLE SPACES WITH 98" CLEAR HEIGHT 6 ELECTRIC VEHICLE SPACES WITH CHARGING PROVISIONS 13 LEFE VEHICLES (LOW EMMISSIONS, FUEL EFFICIENT VEHICLES) PERCENTAGE OF SUSTAINABLE VEHICLES 19/327 = 5.8% (5% REQUIRED by LEED NC) BICYCLE SPACES PROVIDED (per LEED NC requirement) 80 BICYCLE SPACES PROVIDED OUTSIDE BUILDING 30 BICYCLE SPACES PROVIDED INSIDE BUILDING LOADING BERTHS (2201.1) *SEE A-21 FOR LOADING BERTH DETAILS 1 12'X55' LOADING BERTH PROVIDED 1 12'X45' LOADING BERTH PROVIDED 1 12'X30' LOADING BERTH PROVIDED 1 10'X20' SERVICE/DELIVERY BERTH PROVIDED 2 LOADING PLATFORMS @ 100 SQ.FT. PROVIDED 1 LOADING PLATFORM @ 200 SQ.FT. PROVIDED 2406.12(f) CIRCULATION PLAN: DRIVEWAYS AND WALKWAYS, INCLUDING A-14, A-21 WIDTHS, GRADES, AND CURB CUTS L-01 - L-03 DETAILED PARKING PLAN - NUMBER OF PARKING A-11- A-12 SPACES A-01 DETAILED LOADING PLAN - NUMBER OF LOADING A-01, A-21 BERTHS MEASURING POINT TAKEN AT CENTER OF BUILDING ON H STREET AT TOP OF CURB MEASURING POINT = 60.25 ROOF SLAB ELEVATION = 170.25 COURTS - *SEE A-20 FOR COURT PLANS AND DETAILS CLOSED COURT AREA REQUIRED = 2 x Square of the width OPEN COURT WIDTH REQUIRED 3 inch/foot OF COURT HEIGHT COURTS PROVIDED 2406.12(g) OTHER INFORMATION SITE CONTEXT IMAGES A-06 A-07 PERSPECTIVE RENDERING DAYTIME A-31 PHOTOGRAPHS OF MODEL A-61 2406.12(b) STATEMENT OF ACCORDANCE WITH In Written FIRST-STAGE APPROVAL Application OPEN COURT A (23 RD STREET) OPEN COURT B (H STREET) CLOSED COURT C (INTERIOR BLOCK) CLOSED COURT D (INTERIOR BLOCK) CLOSED COURT E (INTERIOR BLOCK) CLOSED COURT F (INTERIOR BLOCK) OND-STAGE PUD CHECKLIST AND ZONING DATA A-01

DEVELOPMENT SITES () PRIMARY USE CATEGORIES ACADEMIC/ADMINISTRATIVE/MEDICAL * RESIDENTIAL/CAMPUS LIFE/ATHLETIC COMMERCIAL/INVESTMENT OTHER RENOVATION/REDEVELOPMENT OF HISTORIC BUILDINGS SITES TO BE ADDRESSED UNDER SEPARATE ZONING PROCESS CAMPUS PLAN BOUNDARY *Note: Development sites 79A1 and 103A each include one property not currently owned by GW. Upon acquisition of these properties, the University intends to file an amendment to this PUD to include the properties in the develpment sites as depicted in this exhibit. OND-STAGE Foggy Bottom Campus PUD APPROVED FOGGY BOTTOM CAMPUS PLAN AND FIRST-STAGE PUD July 2006 DEVELOPMENT SITES A-02

PROPOSED ZONING L Street () Washington Circle K Street C-4 R-5-E hir ea ve sylv ani aa ve I Street ZONES C-2-A C-2-C R-5-D H Street 20th Street 22nd Street 23rd Street Ne w 21st Street Ha m ps FB/R-3 Pen n C-4 G Street C-4 CR SP-2 DC/CR Vir gin FB/R-3 GOV ia R-5-B SP-2 R-5-D R-5-E Av en GOV W R-5-E F Street SP-2 SP-2 W-2 GOV OND-STAGE SITES TO BE ADDRESSED UNDER SEPARATE ZONING PROCESS ZONE BOUNDARY SITE PLAN A-03 Foggy Bottom Campus Plan: 2006-2025 July 2006

CONNECTICUT AVENUE NW L STREET NW L STREET NW () WASHINGTON CIRCLE K STREET NW K STREET NW ROCK CREEK PARKWAY VIRGINIA AVENUE NW 25th STREET NW NEW HAMPSHIRE AVENUE NW PENNSYLVANIA AVENUE NW 24th STREET NW 23rd STREET NW 22nd STREET NW 21st STREET NW 16th STREET NW 20th STREET NW 19th STREET NW 18th STREET NW 17th STREET NW G STREET NW G STREET NW F STREET NW F STREET NW WHITE HOUSE 66 POTOMAC RIVER KENNEDY CENTER E STREET NW E STREET NW OND-STAGE 0 400 800 1600 * IMAGE OBTAINED FROM GOOGLE EARTH, 2010 GW - - AERIAL PLAN AERIAL PLAN A-04

K STREET NW K STREET NW WASHINGTON CIRCLE () 2200 PENN PENNSYLVANIA AVENUE NW 21st STREET NW 24th STREET NW THE GEORGE WASHINGTON UNIVERSITY HOSPITAL 23rd STREET NW THE AVENUE 22nd STREET NW GW MEDICAL FACULTY ASSOCIATES (MFA) RICE NEW HAMPSHIRE AVENUE NW HIMMELFARB HEALTH SCIENCES LIBRARY ROSS SCHOOL OF MEDICINE JBKO MUNSON ACADEMIC CENTER WEST END MARVIN CENTER FULBRIGHT CAMPUS BOUNDARY OND-STAGE 24th STREET NW 23rd STREET NW MADISON TOMPKINS DUQUES 22nd STREET NW GELMAN LIBRARY KOGAN PLAZA LISNER AUDITORIUM 21st STREET NW SAMSON CORCORAN UNIVERSITY YARD ARCHITECTURAL VICINITY PLAN A-05 0 150 300 600 GW - - VICINITY PLAN

THE GEORGE WASHINGTON UNIVERSITY HOSPITAL GW MEDICAL FACULTY ASSOCIATES (MFA) THE AVENUE FOGGY BOTTOM - GWU BLUE & ORANGE LINES SERVICE/LOADING ENTRANCE J.Q. ADAMS HOUSE RICE () RETAIL ENTRANCE 837 22nd STREET JBKO HIMMELFARB HEALTH SCIENCES LIBRARY MUNSON WEST END ROSS SCHOOL OF MEDICINE ROSS SCIENCE AND SCHOOL OF MEDICINE 22nd STREET NW 23rd STREET NW NORTHEAST ENTRANCE EAST ENTRANCE ACADEMIC CENTER WEST ENTRANCE FULBRIGHT SCHENLEY CRAWFORD SOUTHEAST ENTRANCE PARKING GARAGE ENTRANCE PARKING MADISON GELMAN LIBRARY OND-STAGE KOGAN PLAZA ARCHITECTURAL BLOCK PLAN 0 75 150 300 GW - - BLOCK PLAN A-06

() 1.) Corner of 23 rd and Eye Streets, from Foggy Bottom-GW Station (Metro), looking Southeast toward Square 55 (right) 2.) 23 rd Street looking South toward Lincoln Memorial (left, distant) 3.) 23 rd Street looking North toward Square 55 (left-of-center) 4.) 22 nd Street looking North through GW Campus toward Square 55 (right-of-center, distant) 5.) H Street looking West through GW Campus toward Square 55 (center, distant) 6.) Eye Street looking West through GW Campus toward Square 55 (center, distant) 23RD STREET 22ND STREET 1 T JBKO 8 7 REET 6 ROSS EET (Existing Structures to be Demolished) EET GHT OND-STAGE 2 G L REET 5 CONTEXT PHOTOS 24TH STREET 3 DUQUES 4 21ST STREET A-07 7.) Eye Street looking across the Academic Center (left, site of future development) toward Square 55 (right). 8.) Corner of Eye and 22 nd Streets looking toward Square 55 (right), across the site of future development (left). Key Plan

() 1.) Corner of 23 rd and Eye Streets looking toward JBKO and Munson Residence Halls, with Parking Garage (left, to be demo.) 2.) 23 rd Street looking North toward Buiding K (demo.) and JBKO in background 3.) Corner of 23 rd and H Streets looking Northeast toward Fulbright Residence Hall (center) and Parking Garage (right, demo.) 4.) H Street court between Fulbright Residence Hall (left) and Parking Garage (right, demo.) with current shuttle stop 5.) Corner of 22 nd and H Streets looking West toward Parking Garage (demo.), with Fulbright Residence Hall (distant) 6.) Corner of 22 nd and H Streets looking Northwest toward the Parking Garage (demo.) THE AVENUE 1 8 7 EYE STREET JBKO ROSS 23RD STREET 2 (Existing Structures to be Demolished) 4 MADISON 22ND STREET 3 5 6 ACADEMIC CENTER GELMAN LIBRARY H STREET OND-STAGE SITE PHOTOS 7.) Eye Street looking Southwest toward Parking Garage (demo.), with Munson and JBKO Residence Halls (right) 8.) Service Area behind JBKO Residence Hall (right) with Building K and parking garage behind (mid-ground, demo.) Key Plan A-08