North Loop Paving. December 18th, Street Reconstruction Project. Forrest Hardy, Transportation Planner Minneapolis Public Works

Similar documents
MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

St. Clair Avenue West Area Transportation Master Plan

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Welcome to the. Open House

METRO Gold Line BRT CBAC Meeting. August 23, 2018

M E M O R A N D U M SITE DATA

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

AGENDA ACTION ITEMS INFORMATION ITEMS

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

The George Washington University Streetscape Concept Plan. May 6 th 2009 Public Presentation for Discussion EHRENKRANTZ ECKSTUT & KUHN ARCHITECTS

Toronto Complete Streets Guidelines

September 28, 2017 Wentworth Avenue (CR 8) Sidewalk Improvements Open House

West Loop. Neighborhood Plan. Prepared by: Neighbors of West Loop, Chicago, IL August 14, 2018

Rezoning Transportation Analysis Petition Number: General Location Identifier:

4.1 Build Alternative 1 Construction Phasing

2017 General Obligation Bond

John Portman Boulevard Corridor

Lambeth Main Street Streetscape Improvements

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

This Review Is Divided Into Two Phases:

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

International Blvd. TOD Plan Public Workshop #1

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

University Park Subdivision Street Assessment Report

Edenfield Avenue Green Street Demonstration Project Neighborhood Meeting

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Pennsy Greenway Trail

WEST LOOP DESIGN GUIDELINES CHECKLIST

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

DESIGN CRITERIA PACKAGE

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Welcome to the LYNX Blue Line Extension Transit Station Area Plans Public Workshop No. 3. Presentation will begin at 6:00 P.M.

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

REQUIRED CHECKLIST FOR Better Streets Plan Section 138.1(c)(2)

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

Fall 2017 Construction Update

Maplewood Avenue Downtown Complete Street Project

I-70/71 Innerbelt Project

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

West Broadway Transit Study Initial Screening of Alternatives Memo

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

COMPLETE GREEN STREET CHECKLIST

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

PLAN ELEMENTS WORKSHOP. April 5, 2016

Corridor Management Committee. September 29, 2017

Rapid Transit Implementation Working Group

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

Welcome to the first Community Workshop for Wesley Heights Greenway Cedar Street to Bruns Avenue

Cleveland Park Streetscape and Drainage Improvement Project 1

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

Railyard Enterprise Project Steering Committee Meeting #4

Mississippi Drive Corridor Revitalization. A DestinationTransportation Project...

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

ATTACHMENT A. SILVERDALE DESIGN STANDARDS Amendments to the Waaga Way Town Center Chapter

2040 Long Range Transportation Plan

2100 PENNSYLVANIA AVENUE, NW Z.C. CASE NO O/06-12O PRE-HEARING SUBMISSION

North Downtown Specific Plan MEMORANDUM

TABLE OF CONTENTS. Building Great Neighbourhoods. Working together to make the most out of your neighbourhood.

ASPEN HILL Minor Master Plan Amendment

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Transportation Committee

Project Overview. Get Involved. Public Information Meeting. Contact Information

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

4/8/2015 Item #10D Page 1

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

ARLINGTON COUNTY, VIRGINIA

North Street Reconstruction & Integrated Stormwater Management System

Spring 2018 Construction Update

BATHURST QUAY NEIGHBOURHOOD PLAN IMPLEMENTATION. Streetscape & Public Realm Improvement Plan - Canada Malting Silo Site and Eireann Quay

Infrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

MAY 2012 CITY OF ST. LOUIS PARK, MINNESOTA SAINT LOUIS PARK BELTLINE AREA FRAMEWORK & DESIGN GUIDELINES

Corridor Beautification Partnership

4 Park Planning and Design

Ashbridges Bay TTC Maintenance and Storage Facility

d Escoto, M. City of Chicago Streetscape and Urban Design Program, Chicago Department of Transportation. (2003). Streetscape Guidelines.

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

Creative Village Design Review Committee

TO: Denver Planning Board FROM: Analiese Hock, Senior City Planner DATE: March 13, 2018 RE:

Executive Summary. NY 7 / NY 2 Corridor

Potential Green Infrastructure Strategies May 6, 2015 Workshop

FDOT D4 Complete Streets

SLIDE TITLE TRANSIT-ORIENTED DEVELOPMENT PLAN RED-PURPLE BYPASS STUDY AREA PUBLIC MEETING #2 RED AND PURPLE MODERNIZATION. RPM TOD Plan Update

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

A larger version of this map is located on the last page of this PDF.

California Environmental Quality Act (CEQA) Environmental Review Process

4 January 11, 2012 Public Hearing APPLICANT:

Transcription:

CITY OF MINNEAPOLIS Street Reconstruction Project December 18th, 2017 Forrest Hardy, Transportation Planner Minneapolis Public Works Forrest.Hardy@MinneapolisMN.Gov (612) 673-5951 Adam Hayow, Project Engineer Minneapolis Public Works Adam.Hayow@MinneapolisMN.Gov (612) 673-2172

Overview Two related City of Minneapolis projects: - Complete reconstruction of segments of,,, 8th Ave N, and 9th Ave N including new street and sidewalks North Loop Pedestrian Improvements - Pedestrian spot treatments at 16 intersection locations, including ADA ramp upgrades, curb extensions, and signal upgrades Project Schedule Project Milestones Introductory Engagement Meetings Preliminary Concept Engagement Meetings Final Concept Engagement Meetings (NL Paving) Today s Meeting: Preliminary Concepts Present final concept design Obtain feedback on final concept Provide a summary of next steps Other Project Engagement: North Loop Neighborhood Association; Warehouse District Business Association; 2020 Partners; Minneapolis Bicycle & Pedestrian Advisory Committees; Minneapolis Advisory Committee on People with Disabilities; City of Minneapolis Ward 3 Council Member Jacob Frey; Minneapolis Heritage Preservation Commission City Council Layout Approval (NL Paving) Final Design/ Engineering (NL Paving) Assessment Public Meeting (NL Paving) City Council Assessment Hearing (NL Paving) July Aug/Sept Dec Jan Spring - Fall Winter 2019 2017 2017 2017 2018 2018 2018/19 Project Phases Preliminary Recommended Detailed design Construction planning & concept design and engineering engagement

Existing conditions Poor stormwater conveyance Deteriorated street condition Wood Pavers Brick Pavers

Existing conditions Narrow sidewalks in poor condition Narrow sidewalks in poor condition Wood Pavers Brick Pavers Wide crossing distances

Existing conditions Bike lane gap on Wood Pavers Brick Pavers

Existing conditions Sidewalk gap at existing loading docks Wood Pavers Brick Pavers

Planning & Policy Guidance Minneapolis Warehouse District Designation Study In addition to improving aging infrastructure, a full reconstruction Prepared by: City of Minneapolis Department of Community Planning & Economic Development Approved by the Minneapolis City Council April 16, 2010 provides an opportunity to design streets in the area to better support existing and North Loop Small Area Plan (2009) 700 block of First Street North, 1921. Source: Minnesota Historical Society Prepared for the Minneapolis Heritage Preservation Commission Minneapolis, MN future users of the corridor. The 2009 Access Minneapolis Transportation Plan, and the 2016 Complete Streets Complete Streets Policy (2016) Project By City of Minneapolis Community Planning & Economic Development (CPED) Planning Division October 28, 2009 Local and Federal Historic District Designations Policy provide guidance for allocating space within the public right of way with Design respect to people walking, biking, taking C i t y w i d e A c t i o n P l a n transit, and driving. The Warehouse District Heritage Street Plan and North Loop Small Area Plan provide additional ADA CITY OF MINNEAPOLIS Warehouse District Heritage Street Plan recommendations for how streets within A C C E S SMINNEAPOLIS Ten-Year Transportation Action Plan Standards the project area could be utilized. Finally, State Aid the project also lies within multiple historically designated areas that each have their own implementation criteria. July 17, 2009 Access Minneapolis (2009) Standards Other Engineering Design Standards & Prepared for City of Minneapolis Community Planning & Economic Development (CPED) September 13, 2011 Warehouse District Heritage Street Plan (2011) Best Practices

Project precedents Sidewalk at loading docks on Brick pavers and planted boulevard along 6th Ave N Wood Pavers Concrete intersection on 6th Ave N Brick Pavers

Project precedents Curb extensions, street trees and delineation of parking lanes in Fulton Randolph-Market District, Chicago, Illinois

Scope Overview - Heritage Street Materials

DOG PARK 918 LOFTS THIRD NORTH APARTMENTS Segment 1 of N. 4: North 3rd St from 10th Ave. N. to 5th Ave. N. Segment 1 of 4: North 3rd St from 10th Ave. N. to 5th Ave. 918 LOFTS DOG PARK LOFTS BASSETTGURLEY CREEK OFFICE CENTER 9th Ave N 8th Ave N 10th Ave N THIRD NORTH APARTMENTS HERSCHELL LOFTS DOG PARK JAGER WAREHOUSE BUILDING BASSETT CREEK OFFICE CENTER BASSETT CREEK OFFICE CENTER Existing Granite Curb Year of Construction: 2019 Contact: Project Information Forrest Hardy forrest.hardy@minneapolismn.gov Year of Construction: 612-673-5951 Webpage: 2019 Contact: Forrest Hardy forrest.hardy@minneapolismn.gov North Loop612-673-5951 Paving Meeting Webpage: #3 - Final Concept Existing Granite Curb Existing Granite Curb MODIST BREWING COMPANY SHERWIN WILLIAMS BLDG Project Information WESTERN CONTAINER/ ARCTIC CAT 6th Ave N PAPER WESTERN CONTAINER/ ARCTIC CAT 6th Ave N WESTERN CONTAINER/ MARTIN FAULK ARCTIC CAT match line MARTIN FAULK PAPER Ave N JAGER WAREHOUSE BUILDING 6th Ave N 7th MARTIN FAULK PAPER 9th Ave N 10th Ave N THIRD NORTH APARTMENTS HERSCHELL LOFTS GURLEY LOFTS match line DOG PARK DOG PARK 918 LOFTS DOG PARK Improvements 8th Ave N Improvements GURLEY LOFTS 8th Ave N, Final Concept - Subject to further engineering revisions 9th Ave N 10th Ave N HERSCHELL LOFTS MODIST BREWING COMPANY SHERWIN BOOKMEN LOFTS SHERWIN WILLIAMS BLDG WILLIAMS BLDG MODIST BREWING COMPANY BOOKMEN LOFTS Project Information BOOKMEN LOFTS Year of Construction: 2019 Contact: Forrest Hardy forrest.hardy@minneapolismn.gov 612-673-5951 Webpage: Preliminary plan subject to further revisions. Street geometry, furnishing zone dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Prepared by: Stantec Updated December 18, 2017 N Preliminary plan subject to further revisions. Street geometry, furnishing zo dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Preliminary plan subject to further revision dimensions, tree locations, and driveway p based on further design and engineering co

CUZZY S GRILL & BAR Segment 4 of 4: 5th Avenue North from south of 4th Street to Washington Avenue MODIST BREWING COMPANY WESTERN CONTAINER/ ARCTIC CAT, Final Concept - Subject to further engineering revisions Improvements A Segment 4 of 4: 5th Avenue North from south of 4th Street to Washington Avenue Existing Abandoned 5th Ave N North Loop Paving Improvements Rail Track MODIST BREWING COMPANY 4th St /Awning Segment 4 of 4: 5th Avenue North from south of 4th Street to Washington Avenue /Awning Improvements WESTERN CONTAINER/ ARCTIC CAT A N DESIGNER S GUILD BUILDING N B B B B CUZZY S GRILL & BAR Existing Abandoned Rail Track Section A B WESTERN CONTAINER/ ARCTIC CAT Existing 5th Ave N Abandoned Rail Track /Awning 4th St N 4th St MODIST BREWING COMPANY WESTERN CONTAINER/ ARCTIC CAT B MODIST BREWING COMPANY A Existing/Awning Abandoned Rail Track /Awning DESIGNER S GUILD BUILDING /Awning A /Awn DESIGNER S GUILD BUILDING DESIGNER S GUILD BUILDING Section B Section A Section A Section A Project Information Section B Year of Construction: 2019 ProjectContact: Information Project Information Year of Forrest Hardy Year of Construction: Construction: forrest.hardy@minneapolismn.gov 612-673-5951 2019 2019 Webpage: Contact: DecContact: 18th, 2017 Forrest Hardy Preliminary plan subject to further revisions. Street geometry, furnishing zone dimensions, tree locations, and driveway placement are subject to change Projectand Website: based on further design engineering considerations Section B Section B Prepared by: Stantec Updated December 18, 2017 Preliminary plan subject to further revisions. Street geometry, furnishing zone dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Prepared by: Stantec Updated December 18, 2017 N N

rovements North Loop Paving Improvements North from 3rd Street to Washington Avenue Segment 3 of 4: 7th Avenue North from 3rd Street to Washington Avenue, Final Concept - Subject to further engineering revisions Improvements SHERWIN WILLIAMS BLDG Existing Abandoned Rail Track A Existing Abandoned Rail Track A B B A A SHERWIN WILLIAMS BLDG N SHERWIN WILLIAMS BLDG 4th St N 4th St N A Segment 3 of 4: 7th Avenue North from 3rd Street to Washington Avenue Existing Abandoned Rail Track A MARTIN FAULK PAPER MARTIN FAULK PAPER Section A Section A B B Do MARTIN FAULK PAPER Section B Section A Section B Project Information Year of Construction: 2019 Contact: Forrest Hardy Project Information forrest.hardy@minneapolismn.govv 612-673-5951 Year of Construction: Webpage: Meeting #3 - Final Concept 2019 Contact: Forrest Hardy Do Preliminary plan subject to further revisions. Street geometry, furnishing zone dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Prepared by: Stantec Updated December 18, 2017

GURLEY LOFTS 8th Ave N, 9th Ave N, Final Concept - Subject to further engineering provements Improvements revisions 9th Ave N Segment 2 of 4: 9th Avenue North and 8th Avenue North from 3rd Street to Washington Avenue e North and 8th Avenue North from 3rd Street to Washington Avenue mprovements GURLEY LOFTS 9th Ave N THIRD NORTH APARTMENTS GURLEY LOFTS Existing Wood Pavers 8th Ave N 9th Ave N THIRD NORTH APARTMENTS DOG PARK THIRD NORTH APARTMENTS THIRD NORTH APARTMENTS 8th Ave N DOG PARK THIRD NORTH APARTMENTS Year of Construction: North Loop Paving DOG 2019 PARK Webpage: Preliminary plan subject to further revisions. Street geometry, furnishing zone dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Existing Wood Pavers Forrest Hardy forrest.hardy@minneapolismn.gov 612-673-5951 Existing Wood Pavers BUNKER S Contact: Project Information BUNKER S Existing Granite Curb Existing 8th Ave N Granite Curb ww.minneapolismn.gov/cip/future/wcmsp-200196 Existing Granite Curb THIRD NORTH APARTMENTS THIRD NORTH APARTMENTS ardy rdy@minneapolismn.gov 5951 9th Ave N BASSETT CREEK OFFICE CENTER GURLEY LOFTS nue North and 8th Avenue North from 3rd Street to Washington Avenue THIRD NORTH APARTMENTS Prepared by: Stantec Updated December 18, 2017 Preliminary plan subject to further revisions. Street geometry, furnishing zone BUNKER S dimensions, tree locations, and driveway placement are subject to change based on further design and engineering considerations Prepared by: Stantec Updated December 18, 2017

Existing condition of wood pavers and brick pavers (8th Ave N) Wood Pavers Brick Pavers

Existing condition of wood pavers and brick pavers (8th Ave N) Wood Pavers Brick Pavers

Existing condition of wood pavers and granite curbs (8th Ave N)

Existing rail track partially exposed along Wood Pavers Brick Pavers

Parking Capacity The diagram below is a general assessment of the on-street parking capacity within and near the project. The surface parking lots and garages are not encompassing of all parking facilities in the area. Several private garages exist that were not available to be assessed. These quantities are an estimate based on satelite and street view imagery. project area select parking lot/garage 10th Ave N 8 8 11 23 21 Unknown 17 26 9th Ave N 8th Ave N Washington Ave N 13 19 9 10 8 126 48 37 32 4 119 120 4th St N 5 12 6th Ave N 89 170 14 14 23 175 50 63 9 13 8 17 28 30 48 16 26 19 27 Unknown 26 94 ## estimated number of parking spaces per block or lot/garage (I-94 viaduct - 5th St N) 5th St N 38

Parking Demand Washington Ave N These diagrams are a summary of observed on-street parking demand in the district. Observation dates and 10th Ave N 9th Ave N 8th Ave N 6th Ave N times are found under each diagram. The highest demand was seen during peak entertainment/retail hours. Offstreet parking was observed but is not represented here. Observed range of maximum parking demand, per block 0-25% 25-50% 50-75% 75-100% Residential Hours 4th St N Observation 1: Saturday 8/26/17 starting at 8:15am Observation 2: Sunday 8/27/17 starting at 10:45pm 5th St N Washington Ave N 10th Ave N 9th Ave N 8th Ave N 6th Ave N Washington Ave N 3rd St 3rd N St N 10th Ave N 9th Ave N 8th Ave N 6th Ave N 4th St 4th N St N Entertainment/Retail Hours 4th St N 4th St N Observation 1: Friday 7/14/17 starting at 5:00pm Observation 2: Tuesday 7/18/17 starting at 6:45pm during Twins vs. Yankees ## 5th St N estimated number of parking spaces per block Commercial Office Hours Observation 1: Tuesday 7/11/17 starting at 3:00pm 5th St N

Artist's concept - at 9th Ave N, looking southeast

Next Steps Public Meetings at Minneapolis Central Library, Doty Board Room 1. Feedback from this meeting will be considered with the final staff recommended layout 2. Staff will bring a final recommended layout to Minneapolis City Council in 1st Quarter 2018 for consideration for approval 3. Historical Preservation Application in 2nd Quarter 2018 4. Final Engineering Design in 2018 Meeting #1 Introduction: Monday, July 24th Meeting #2 Preliminary Concepts: Tuesday, Aug 29th Meeting #3 Final Concept Layout: : Monday December 18th, 2017 North Loop Pedestrian: Expected 1st Quarter 2018 5. Assessment Meeting and Public Hearing expected winter 2018/19 6. Construction scheduled for 2019 Project Contacts Forrest Hardy Project Planner Project Website www.minneapolismn.gov/cip/future/wcmsp-200196 612-673-5951 Forrest.Hardy@minneapolismn.gov Adam Hayow Project Engineer North Loop Pedestrian Improvements www.minneapolismn.gov/cip/future/north-loop-ped-improvements 612-673-2172 Adam.Hayow@minneapolismn.gov