I-485/ I-85 Interchange Charlotte, NC December 6, LANE The Lane Construction Corporation, 90 Fieldstone Court Cheshire, CT 06410

Similar documents
Constructing PCCP Under High Traffic Volume

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

I-66 EASTBOUND WIDENING INSIDE THE BELTWAY PARDON OUR DUST MEETING

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Downtown Redevelopment Project Update

Project Status. Construction is underway for Phase 3. Overall Project Area and Schedule. Schedule of Current Construction Phases.

Project Purpose. Project Need

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Construction Engineering & Inspection

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

WELCOME TO OPEN HOUSE TWO November 28, 2018

Fall 2017 Construction Update

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Moving The Metro. A special construction update for the metro Omaha area.

Technical Bullet Series on Clay Brick Pavers

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

I-25 / Rio Bravo Interchange. I-25 / Rio Bravo Interchange. Presenters 11/30/2016 THIRD PUBLIC MEETING DECEMBER 1, 2016 NMDOT CN A300280

JOB CREATION PROJECTS

DESIGN CRITERIA PACKAGE

23 EA , , , , , , , LF , , ,596.

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

FHWA INVEST. And the Harbor Bridge Project

Prince William Street Project (Grant Avenue to Wellington Road)

City of Richmond. Engineering Design Specifications

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Victoria Bridge Municipal Class EA Civic Works Committee

Middlebury RS 0174(8)

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

LOCATION At the corner of Brawley School Road & Williamson Road in Mooresville, North Carolina

AASHTO Board of Directors. Standing Committees (Functional Areas): Finance and Administration. Highway Traffic Safety. Performance.

7.5 Impacts on the Section 4(f) Properties

Chesterfield County Project Update

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

Start of works exhibition

NAPA COUNTY PUBLIC WORKS Standards & Specifications

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

Severn River Sub-Watershed: BMP 09-Retrofit

Edmonton s LRT Setting the Stage for Heading Further South

TRANSPORTATION COMMITTEE

Bexar County Public Works Department Flood Control Program

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

APPENDIX G: TOWN ORDINANCE REVIEW

FOR IMMEDIATE RELEASE DATE: FRIDAY, AUGUST 31, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Massachusetts Water Resources Authority

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Daniel J. Sporik, P.E. Civil Engineer

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Spring 2018 Construction Update

Fairfax County Parkway (Route 286) Widening Project

Welcome to the Sellwood Bridge Project Pre-Construction Open House

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

PROPOSED IMPROVEMENTS

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE

University Park Subdivision Street Assessment Report

II PREVIOUS REPORTS PERTINENT TO THIS MATTER II

Promoting Low Impact Development Sustainable Stormwater Management

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 21, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

Cleveland Innerbelt Bridge / Central Viaduct City Planning Commission November 6, 2009

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

FOR IMMEDIATE RELEASE DATE: FRIDAY, SEPTEMBER 28, Road Commission of Kalamazoo County Weekly Project Updates HAVE YOU SIGNED UP?

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

A Connected Region for Our Future. Tampa Bay Regional Planning Council

4.1 Build Alternative 1 Construction Phasing

PUBLIC MEETING NO. 4 OCTOBER 29, 2013

Spreadsheet Report Page 1. WREDP Infrastructure Wickenburg, AZ SD Estimate Rev

III - design standards

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

2017 Canadian Consulting Engineering Awards

LOCATION AND DESIGN DIVISION

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

HARBOR BRIDGE. Randall C. Grones, PE - SPD. US 181 Harbor Bridge October

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Low Level Road Project. Canadian Consulting Engineers Award 2016

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

Open House Wellesley Station Second Exit Construction Update and Public Art Concept

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

2 ALTERNATIVES AND OPTIONS

Western Belfast Bypass almost finished

Garver Feed Mill Timeline

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

City of Guelph - Wilson Street Parkade / Wilson Street Reconstruction Proposed Project Schedule April 21,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Transcription:

I-485/ I-85 Interchange Charlotte, NC December 6, 2014

North Carolina

I-485/I-85 Interchange Charlotte Charlotte 485 Outer Loop

Partners The North Carolina Department of Transportation STV/Ralph Whitehead Associates The Lane Construction Corporation

1980 s 2003 constructed by Lane/Rea 1980 s-ncdot Original Design

RFP Design-4 Level Stack

High level, long span bridges 2M CY borrow for approach fills High MSE walls Detour I-85 traffic Icing Future widening RFP Design-4 Level Stack Challenges

Turbine Design Proposed as an alternate design Based on a European model Similar designs in FL and UK All left turning traffic - circles counter-clockwise around intersecting roads at relatively high speed Uses simple span, low level bridges, smaller structural members 2 level lower embankments, flatter roadway profiles Future widening easier, less costly

Thorpe, England, UK Tampa FL I-4 and I-75 Similar designs in service

Conceptual Rendering

Awarded September 2010 I-485 (Charlotte Eastern Outer Loop)/ I-85 NCDOT Project #: C202523, TIP Project R-2123CE Company Bid Price Score Adjusted Score The Lane Construction Corp. $92,162,250 94.5 $77,102,938 Engineer s Estimate $124,291,688 TOTAL SAVINGS: $32,129,438 Completion Date December 2014

Major Quantities Earthwork PCCP-Jointed Doweled Asphalt Pavement Drainage Structures Box Culvert Construction Sound wall 1,540,000 CY 196,000 SY 164,000 TN 29,400 LF 19 Bridges (1 Steel) 580 FT 2,040 LF

Cost Savings 2M CY borrow job became a balance job Low level, simple span bridges Minimized traffic control, temporary routes and closures Shared resources

Segment 1 Segment 3 Segment 2 Earthmoving confined within segments/no on-road hauling

Single spans

Simple span girder erection

Short duration night time closures

Awards Roads and Bridges 2012 Top 10 Roads - #1

October 2011

May 2012

January 2013 October 2012 -Looking east from future 485

June 2013

January 2014

May 2014

October 2014

Concrete Paving

Concrete Plant

Concrete Plant

Concrete Pavers GZ 850 with DBI

Concrete Pavers GZ 850 with DBI

Concrete Pavers GZ 850 with DBI

Concrete Pavers GZ 600

Innovation Stringless Paving Next Generation Concrete Surface Slurry Disposal Line Laser Profiler/ProVAL MIT T2 to locate dowel array

Stringless Paving

Traditional Wireline

Stringless Paving Total stations backsight the control points and frontsight paver with x,y,z locations. On-board computer calculates a new frontsight to coincide with the model and instructs the paver to adjust steering and elevation accordingly. Control Pt. (3) Total Stations 3 rd UTS used to check behind paver

Control point Control point Optimal handoff distance between total stations Control point Control point Control point

UTS cluster configuration_check behind paver

Next Generation Concrete Surface

NGCS test section

NGCS-3 step process

Slurry disposal

Hydraulic filtering press

Lined evaporating basin

Liteweight Laser Profiler

Roline line laser

ProVAL ride quality reporting

MIT T2 device

Northbound Southbound I-85 added lanes

Low profile simple span bridges

Be Safe!