MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Similar documents
MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Florence High School / Middle School Page 1 of 3 Florence, WI

PLATTEVILLE MIDDLE SCHOOL

Josefa Ortiz De Dominguez Elementary School

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Richard Henry Lee Elementary School

Mechanical Inspection Plumbing

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Edward Jenner Elementary Academy of the Arts

Agustin Lara Elementary Academy

Washington Irving Elementary School

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

Joseph Brennemann Elementary School

Calmeca Academy of Fine Arts and Dual Language

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Francis M McKay Elementary School

Genevieve Melody Elementary School

Oscar DePriest Elementary School

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

Charles W Earle Elementary School

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

GARCIA GALUSKA DESOUSA Consulting Engineers

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Facilities Master Planning

Appendix B. Facilities Assessment Report

Ashland School District Facility & Capacity Assessment Report 2005

Cook - Wissahickon Elementary School

Sidney Sawyer Elementary School

George B Swift Elementary Specialty School

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

John Palmer Elementary School

DeWitt Clinton Elementary School

DOCUMENT TABLE OF CONTENTS

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

Estimated Repair, Replacement, and Upgrade Costs

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

Briar Crest Elementary

REPAIR ESTIMATE GUIDE

RECAPP Facility Evaluation Report

Alessandro Volta Elementary School

2014 Bond Project Guide

DESIGN STANDARDS SECTION PLUMBING FIXTURES AND EQUIPMENT. 1.3 Wall hung toilet room fixtures. Urinals for handicapped may be stall type.

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

DRAFT. Widen Elementary School Site Summary 74,523 SF. Introduction

Forest Hills Facilities Plan

Nebraska Department of Correctional Services

Canadian Property Inspections

DOMESTIC WATER PACKAGED BOOSTER PUMPS

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

The Ultimate Home Maintenance Schedule

PLAN REVIEW SUBMITTAL GUIDE

Inspecta-Homes 2469 University Avenue West St. Paul MN Ph#: (651)

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

Mechanical System Description

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

DESIGN AND CONSTRUCTION STANDARDS GENERAL DESIGN GUIDELINES

Siemens Building Technology MEP Existing Conditions

New High School Concept

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Appendix E: Photo Documentation

Asurity 1. Property Inspection Report S Gurd Rd., Hastings, MI Inspection prepared for: Beretta Lenos Real Estate Agent: Stan Labinski -

RECAPP Facility Evaluation Report

DESIGN STANDARDS SECTION Toilet rooms and utility rooms to have floor drains at lowest point.

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

SCO # 1 & 2 PUNCLH LIST Project Name: VANCLEAVE UPPER ELEMENTARY CLA#: 13003

El 0. El 0. El El. El El. El 0 TWO FAMILY HOUSING INSPECTINO CHECKLIST

S AGE E NGINEERING A SSOCIATES, LLP

RECAPP Facility Evaluation Report

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

CONNECTICUT. Downloaded

Design Standards Manual

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

Tillamook High School Bond Projects

Unit # 1038 ± 900 SF Width ± 15' Depth ± 60'

Unit # E ± 1,200 SF Width ± 20' Depth ± 60'

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Inspection Report. Prepared for: Tonia Mann. Property Address: 402 Leslie Court McDonough, GA Date: March 07, 2013

PLUMBING REQUIREMENTS

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

Unit HH Gregg. ± 30,000 SF Width ±26' Lakeland Retail Center. Lease Outline Drawing. Unit HH Gregg. Depth ± 145' HVAC Units & Information

AGENDA. 1. Call to Order. 2. Approval of Minutes. 3. Approval of Invoices and Commitments. 4. Review Updated Site Analysis and Permitting

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Oconomowoc Area School District Facility Construction Update August 25, 2017

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

Facilities Management State-Funded and Billable Services

PREPARED FOR: (Name of Client) CONCERNING: (Address of Property) BY: P Home. YOUR HOME CHECK 1305 FM 359, Suite G F

Transcription:

ARCHITECTURE ROLLING HILLS ELEMENTARY SCHOOL Rolling Hills Elementary was built in 1999 and is the newest addition to the Mukwonago Area School District. The building contains approximately 64,900 gross square feet on the first floor, with a partial mechanical mezzanine above of nearly 4,400 gross square feet. The exterior wall is load bearing masonry cavity walls type construction. The roof structure over the flat roof consists of steel columns, beams, joists, and a built up roofing system. The pitched roof over the mechanical mezzanine consists of wood trusses, and standing seam metal roof. 1. SITE Condition of Asphalt Parking 1.1 The asphalt parking lot near the front entrance is in good condition and should be resealed and restriped in the near future. Condition of Asphalt Playgrounds 1.2 Several large cracks have appeared in the asphalt playground, on the east side of the building, and will need to be repaired. Adequate Parking / Observed Traffic Flow 1.3 Parking is adequate. Athletic Field Conditions 1.4 The baseball diamond / grass playground is in good condition. The soccer grass is in very poor condition. Condition of Landscaping 1.5 Landscaping around the perimeter of the building is in good condition. 1.6 Landscaping at the edge of the playground and parking lot is in poor condition, where most of the grass has eroded away. Reseed Lawn. ADA Access 1.7 From parking lot to front door: An ADA accessible route and accessible parking stalls are provided at the front entrance. 1.8 From building to playground: ADA access is provided through several doors throughout the building. 2. BUILDING ROOF Roof Type 2.1 Built-up roof system/standing seam metal roof Lifespan / Age / Condition 2.2 Roof was new in 1999 and is in good condition. 2.3 Leaks have appeared at the connection between the flat roof and the west and east wall of the gym. A repair was made, but water continues to leak down the wall in these areas. Also, the flexible flashing used in the walls of this area is failing and should be repaired. PRA Project No. 06069 Rolling Hills Elementary School Page 1

ARCHITECTURE 3. BUILDING - EXTERIOR Condition of Brick / Tuck Pointing 3.1 Brick work is in good condition. Condition of Windows / Insulated Glass / Operation 3.2 Windows are in good condition. Condition of Trim Work (Metal Coping, Trim Accent Pieces, Etc.) 3.3 Trim work is in good condition. Condition of Exterior Doors (Store Front, Steel Doors, Etc.) 3.4 Exterior doors are in good condition. Condition of Exposed Foundations, Cracks 3.5 No work required. Condition of Drainage System (Gutters, Downspouts, Scuppers) 3.6 Drainage system is in good condition. Caulking 3.7 Caulking is in good condition. 4. BUILDING INTERIOR ADA Access / Entrance 4.1 ADA access is adequate. ADA Bathrooms 4.2 All public bathrooms are ADA accessible and in good condition. Asbestos Abatement 4.3 Report available at School and District offices. Interior Windows / Doors 4.4 Interior windows/doors are in good condition. Elevator 4.5 N/A Stairs 4.6 N/A Flooring / Carpet 4.7 The tile/carpets around the building are in good condition. A few areas of tile flooring are cracked and need to be replaced. The gym epoxy floor shows signs of bubbling and should be repaired. The hallway and classroom floors have huge cracks. Ceilings 4.8 Ceiling tiles are in good condition. General paint condition on walls 4.9 Painted walls around the building are in good condition. Cracks in the library walls have appeared and should be repaired and repainted. Condition of woodwork / casework 4.10 Woodwork/casework is in good condition. PRA Project No. 06069 Rolling Hills Elementary School Page 2

ARCHITECTURE Miscellaneous 4.11 N/A PRA Project No. 06069 Rolling Hills Elementary School Page 3

PLUMBING ROLLING HILLS ELEMENTARY SCHOOL Sanitary Drainage System: Sanitary waste is extended from the building below ground to an on site private wastewater treatment system. Storm Drainage System: Storm water from roof areas is collected at interior roof drains, routed down to below grade and extended to an on site storm water retention basin. Domestic Water System: Domestic water is supplied to the building from an on site well. Water supply piping is routed below ground from the well to the building and in the building to a water meter and well pressure tanks in the South Mechanical Mezzanine. Domestic water is routed throughout the building above the ceiling. A water softener and brine tank is provided to soften the domestic hot water. Domestic hot water is provided by two (2) gas-fired, sealed combustion, tank type water heaters. A tempering valve is installed to limit the hot water supply temperature to the building plumbing fixtures with the exception of the kitchen. A gas-fired, wall-hung booster heater is installed in the kitchen to serve the dishwasher. Plumbing Fixtures: Water Closets: Urinals: Lavatories: Sinks: Mop Basins: Floor outlet, manual flush valve, water closets, vitreous china units. Stall floor outlet, vitreous china urinals, sensor operated flush valve. Wall-hung, vitreous china units with mixing valve faucet and push button operator. Countertop, self-rimming, single and double compartment stainless steel sinks, deck-mounted gooseneck spout, mixing faucet with wrist handles. Floor set, floor outlet, 36 x 24 x 10 fiberglass mop basin with wallmounted faucet with vacuum breaker. PRA Project No. 06069 Rolling Hills Elementary School Page 4

PLUMBING Water Coolers: Wall-hung, combination standard/handicapped height water coolers. General Comments: 1.1 The building s domestic hot water distribution system is the only piping that is softened. The entire building s water distribution system should be softened except for the exterior hose bibbs. New larger water softening equipment should be provided and additional hard water piping extended through the building to all exterior hose bibb locations. Estimated Cost $ 12,000. 1.2 The staff stated that at times they run out of hot water. The existing gas-fired water heaters appear to be in good condition, and to improve upon this problem, a storage tank should be provided. Estimated Cost $ 8,000. 1.3 Replace water heater copper condensate drain pipes with CPVC pipe. Estimated Cost $ 500. PRA Project No. 06069 Rolling Hills Elementary School Page 5

HVAC ROLLING HILLS ELEMENTARY SCHOOL Heating: The building is heated by three (3) gas-fired, forced draft, flexible tube, hot water boilers located in the North Mechanical Mezzanine. Each boiler is provided with a primary circulating pump. Secondary hot water circulating pumps with a hot water piping loop routed around the building, above the ceiling, are connected to radiation, air handling unit heating coils, variable volume air handling units and reheat coils throughout the building. Ventilating: The building is ventilated by three (3) air handling units serving the following areas: Area Served Unit Location Type Gymnasium Gym Mechanical Mezzanine Constant Vol. w/reheat Coils Classroom North North Mechanical Mezzanine Var. Vol. w/vav Reht. Units Classroom South South Mechanical Mezzanine Var. Vol. w/vav Reht. Units Supply ductwork is extended from each air handling unit above the ceiling with variable volume units to sidewall or ceiling outlets. The variable volume units are controlled by room thermostats for individual room temperature control. Economizer relief is provided by a roof-mounted relief hood located above the corridor ceiling and ducted to grilles in the corridor ceiling. Exhaust for toilet rooms, locker/shower rooms, kitchen hood, etc. is provided by roof-mounted exhaust fans. Air Conditioning: The building is air conditioned by a grade-mounted air cooled chiller, a chilled water piping loop with circulating pump is routed above the ceiling and connected to each air handling unit cooling coil. The chilled water system contains a glycol solution to eliminate the need to drain the chiller or cooling coils during the heating system. Temperature Controls: Automatic temperature controls for the HVAC systems in the building are Trane Company Tracer Summit Direct Digital Controls (DDC). PRA Project No. 06069 Rolling Hills Elementary School Page 6

HVAC HVAC Comments: 1.1 Replace boiler system with new high efficiency boilers. Estimated Cost $150,000. 1.2 Provide additional exhaust ventilation for Kiln Room to control heat. Estimated Cost $ 800. PRA Project No. 06069 Rolling Hills Elementary School Page 7

ELECTRICAL ROLLING HILLS ELEMENTARY SCHOOL ELECTRICAL SERVICE AND DISTRIBUTION The main electric service is 2500A, 120/208V 3-phase, 4-wire. The Square D service entrance switchboard is original to the 1999 construction of the building. There is additional space in the distribution section for additional feeders. A majority of the branch-circuit panelboards located throughout the school have space for additional branch circuits that may be required if lighting replacements, boiler replacements, septic/mound system upgrades, and/or water heating upgrades are completed. 1.1 Minor power distribution modifications will be required for water heater replacement. 1.2 Minor power distribution modifications will be required for boiler replacement. 1.3 Minor power distribution modifications will be required for septic/mound upgrades. SURGE SUPPRESSION The main service does have a TVSS unit to provide surge suppression. EMERGENCY GENERATOR AND TRANSFER SWITCH LIGHTING The emergency systems are served by a 100 kw Spectrum Detroit Diesel natural gas generator that is original to the 1999 construction of the building. It is located outside next to the transformer. There are two separate transfer switches; one 80A transfer switch to serve lifesafety loads and one 225A transfer switch to serve non-life safety loads. The majority of the interior lighting at this building is T8 fluorescent with parabolic fixtures. Two-lamp fixtures are spaced 12 on center in the corridors and three-lamp fixtures are spaced 10 on center in classrooms. Both areas appear dark and District Buildings and Grounds staff indicated lighting upgrades as a possible project at this school to correct this. However, this relighting is not strongly recommended unless students and staff are complaining of eye strain. PRA Project No. 06069 Rolling Hills Elementary School Page 7

ELECTRICAL 1.4 Option A: Remove and relocate existing fixtures in classrooms and corridors to 8 on center and add additional fixtures to match existing. $88,500 Option B: Remove existing fixtures in classrooms and corridors and replace one for one with new troffers in lieu of parabolics. $177,000 The exterior lighting is HPS. The exit lights are LED. FIRE ALARM The existing fire alarm system in this building is a Radionics fire alarm control panel with Gentex devices. There is smoke detection in the corridors, storage rooms, and classrooms. Mechanical rooms have heat detection. The horn/strobe coverage appears to be adequate for current Code. CLOCK SYSTEM The existing clock system in this building is a Rauland system installed during the 1999 construction of this building. Buildings and Grounds staff as scheduled the removal of this system and installation of a Primex wireless GPS clock system for 2007. INTERCOM SYSTEM The existing intercom system in this building is a Rauland system installed during the 1999 construction of this building. DATA DISTRIBUTION The data distribution was completed in the late 1990 s as part of the TEACH telecommunication systems program. Cat 5 outlets are provided in each classroom. TELEPHONE DISTRIBUTION The telephone distribution was completed in the late 1990 s as part of the TEACH telecommunication systems program. Cat 5 phone outlets are provided in each classroom. TELEVISION DISTRIBUTION The television distribution was completed in the late 1990 s as part of the TEACH telecommunication systems program. Television distribution outlets are provided in each classroom. PRA Project No. 06069 Rolling Hills Elementary School Page 8

PHOTOGRAPHS ROLLING HILLS ELEMENTARY SCHOOL 1.2 Asphalt paving at playground 1.5 Landscaping at perimeter of building 2.2 Roof 2.3 Brick repair at gym wall 2.3 Brick repair at gym wall 2.3 Flexible membrane flashing failure at gym wall PRA Project No. 06069 Rolling Hills Elementary School Page 9

PHOTOGRAPHS 2.3 Interior leaks from roof above 2.3 Interior leaks from roof above 2.3 Interior leaks from roof above 4.7 Floor tile 4.7 Floor tile 4.7 Gym floor PRA Project No. 06069 Rolling Hills Elementary School Page 10

PHOTOGRAPHS 4.9 Cracks in library walls PRA Project No. 06069 Rolling Hills Elementary School Page 11