The Van Ness Campus. Weekly Construction Bulletin #259

Similar documents
Chapter 2. Project Description

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

AMEND DMENT H HOSPITAL

Proposed Staging Plan For:

(E) PARKING LOT OPEN TO PUBLIC (E) PARKING LOT OPEN TO PUBLIC (E) BUILDING TO REMAIN PUBLIC (E) BUILDING TO REMAIN (E) BUILDING TO REMAIN

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

SITE PLAN REVIEW APPLICATION

Chapter 22. Alternatives to the Proposed Project

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

ARLINGTON COUNTY, VIRGINIA

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Shell Beach Road Streetscape Frequently asked Questions

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Cleveland Park Streetscape and Drainage Improvement Project 1

PLANNED UNIT DEVELOPMENT APPLICATION

ARLINGTON COUNTY, VIRGINIA

Prince William Street Project (Grant Avenue to Wellington Road)

A. INTRODUCTION B. PROJECT LOCATION

Pine Avenue Improvement Project

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

Request Alternative Compliance (Commercial Parking Lot in Restricted Area) Staff Recommendation Approval. Staff Planner Ashby Moss

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

EXHIBIT A. Chapter 2.7 SPECIAL PLANNED DISTRICTS. Article XVIII 15th Street School Master Planned Development

DESIGN & CONSTRUCTION GUIDELINES

A. INTRODUCTION B. NO ACTION ALTERNATIVE

8 October 14, 2015 Public Hearing

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

BE IT ORDAINED by the Board of Supervisors of Chesterfield County:

(DC1) Direct Development Control Provision DC1 Area 4

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

Errata 1 Landmark Apartments Project Final Environmental Impact Report

City of Kearney Capital Improvement Update October 1, TH STREET AND 17TH AVENUE IMPROVEMENTS

NOVEMBER 2016 AARP IN ST. LOUIS & CITIZENS FOR MODERN TRANSIT PLACEMAKING STRATEGIES FOR ST. LOUIS TRANSIT DRAFT

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

HELLO & WELCOME. Prior/Venables Replacement A NEW PLAN FOR THE FALSE CREEK FLATS PLANNING PROCESS OVERVIEW

Ohlone College Measure G Project Scope Revisions

ADOPTED AT NOVEMBER 15, 2012 PACC MEETING

Fall 2017 Construction Update

JOB CREATION PROJECTS

5.7 Design Criteria for the Private Realm Organization of Private Realm Design Standards and Guidelines Guidelines vs.

WELCOME NEIGHBORS! April 11, 2019

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

County of El Dorado Standard Plans

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT 2632 EAST WASHINGTON BOULEVARD ('ST. LUKE MEDICAL CENTER')

City of La Palma Agenda Item No. 5

NorthPoint, Inc. Community-Based Development Concept

DEVELOPMENT CONTROLS MEDICAL DISTRICT

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

Rezoning Transportation Analysis Petition Number: General Location Identifier: , ,

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Asbury Chapel Subdivision Sketch Plan

Creative Village Design Review Committee

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

PennDOT Public Meeting. S.R. 3044, Section A01 Castle Shannon Boulevard Roadway Improvement Project

PLANNING APPROVAL STAFF REPORT Date: November 17, 2011

GREENING THE BOULEVARD Master Plan Concepts for Venice Boulevard between Lincoln and Sawtelle

APPENDIX F: DETAIL DRAWINGS

Item PZ South Lindbergh Project Overview

Written Statement for Keizer Station Area B Amendment. Master Plan Amendment for Keizer Station Area B GENERAL INFORMATION

City of Fontana Notice of Preparation and Notice of Public Scoping Meeting Fontana North Walmart Project

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Planning Districts INTRODUCTION

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Downtown Redevelopment Project Update

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

Oconomowoc Area School District Facility Construction Update August 25, 2017

Dogpatch/22nd Street Greening

A/E REVIEW CHECKLIST SITE & LANDSCAPE

CRESCENT RESOURCES INC.

Blue Line LRT Extension

WILMINGTON WATERFRONT Approved Project

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

SCTPO Project Summary September 2014

UNIVERSITY OF NORTHERN IOWA

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

DRAFT. 10% Common Open Space

CONCEPT PLAN APPLICATION

MISSION STREETSCAPE PLAN. Neighborhood Commercial Streets handle continuous activity. Neighborhood Commercial STREET ROW: Main Design Treatments

FLORIN ROAD CORRIDOR Site Plan and Design Review Guidelines Checklist

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

MULTIFAMILY RESIDENTIAL DESIGN PRINCIPLES Site Plan and Design Review Principles Checklist

Inner Sunset Streetscape Improvement Project. Operations and Customer Service Committee July 11, 2017

SOUTH UNIVERSITY Street Design Alternatives in Progress

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

BRADENTON RIVERWALK EXPANSION MASTER PLAN

The Brown Road Innovation Zoning District shall be specified for the areas as designated on the Charter Township of Orion Zoning Map.

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

Awarded Small Works Projects

4 January 11, 2012 Public Hearing APPLICANT:

Transcription:

The Van Ness Campus Weekly Construction Bulletin #259 Construction Update Week of September 24, 2018 The Van Ness Campus Weekly Bulletins are intended to help inform members of the community about upcoming construction activities. 1. 2. 3. 4. 5. 6. Reference Weekly Construction Activities Log (attached) Reference Six Week Construction Activities Log (attached) Submit written questions or comments at http://cpmc2020.org/contact-us For additional project information visit our project website at http://cpmc2020.org General Information (415) 762-7447 Emergency Phone Numbers a. For police, fire or ambulance emergencies dial 911 b. Van Ness Campus Construction Hotline (415) 762-7477. Please note this is for urgent construction related concerns at the Van Ness Campus only. For nonemergency communication associated with the Van Ness Campus Construction please contact us via our project website or the General Information phone line.

Weekly Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, September 24, 2018 The purpose of the Weekly Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily X X 5 Post for Muni Bus Line Relocation Post for Muni bus line will move to its final location on Post Street. X Fence Line Removal Fence around the project will be removed Final sidewalk will be accessible to pedestrians X 3 Landscape Improvements Barricade on Van Ness will be moved closer to the hospital to allow for landscape improvements. Foliage will be planted around hospital. Trash receptacles will be placed on the exterior of hospital. X X 1 Deliveries Moving to Hospital s Loading Dock Construction material and hospital equipment will be delivered to loading dock entrance on Franklin Street. Commercial trucking will deliver construction materials to X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to Reference attached Site Logistics Map for general location of Construction Activities. 9/24/18 7a-5p None 9/28/18 9/24/18 7a-5p None 10/12/18 9/24/18 7a-5p None 9/30/18 9/24/18 7a-5p None 10/31/18 9/24/18 None Permanent

Six Week Construction Activities Sutter Health CPMC Van Ness Campus Hospital - Week Starting Monday, September 24, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily X X Post for Muni Bus Line Relocation Post for Muni bus line will move to its final location on Post Street. X Fence Line Removal Fence around the project will be removed Final sidewalk will be accessible to pedestrians X 3 Landscape Improvements Barricade on Van Ness will be moved closer to the hospital to allow for landscape improvements. Foliage will be planted around hospital. Trash receptacles will be placed on the exterior of hospital. X X 1 Deliveries Moving to Hospital s Loading Dock Construction material and hospital equipment will be delivered to loading dock entrance on Franklin Street. Commercial trucking will deliver construction materials to X 1 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to Reference attached Site Logistics Map for general location of Construction Activities. 9/24/18 7a-5p None 9/28/18 9/24/18 7a-5p None 9/12/18 9/24/18 7a-5p None 9/30/18 9/24/18 7a-5p None 10/31/18 9/24/18 None Permanent

Weekly Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, September 24, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily X X 6 Polk Street Lane Closure South bound lane on Polk Street (at Cedar Avenue) will be closed to replacing sidewalk and parking strip. X X 2 Delivery of Construction Materials X X X 4 South Cedar Sitework Cedar Ave delivery lane. Commercial trucking will deliver construction materials to Form Curbs and pour concrete for sidewalk Install streetlight conduit Install irrigation pipes X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to Reference attached Site Logistics Map for general location of Construction Activities. 9/24/18 7a-5p, M-F None 9/29/18 9/24/18 8/6/18 None 10/31/18 9/24/18 7a-5p, M-F None 10/1/18 9/24/18 8/6/18 None 10/1/18 9/24/18 8/6/18 None 10/1/18 9/24/18 8/6/18 None Permanent

Six Week Construction Activities Sutter Health CPMC Van Ness Campus MOB - Week Starting Monday, September 17, 2018 The purpose of the Six Week Log is to identify operations that may generate traffic congestion, noise, dust, vibration, extraordinary light after sunset, utility disruptions, mass Daily X X 6 Polk Street Lane Closure (at Cedar Street Intersections) South bound lane on Polk Street (at Cedar Street) will be closed to replacing sidewalk and parking strip. 9/24/18 7a-5p, M-F None 9/29/18 X X 2 Delivery of Construction Materials X X X 4 South Cedar Sitework Cedar Ave delivery lane. Commercial trucking will deliver construction materials to Form Curbs and pour concrete for sidewalk Install streetlight conduit Install irrigation pipes X X X X 4 Geary Street Sitework X X 4 Sidewalk Closure Demolition and pavement of sidewalk adjacent to the medical office. Lane changes on Geary Street between Polk Street and Geary Street to accommodate right lane closure. Northern pedestrian sidewalk on Geary Street will be closed and rerouted to southern sidewalk for utility work. X 4 Permanent Bus Stop Change West bound 38 bus line will be to its permanent location to 9/17/18 8/6/18 None 10/31/18 9/17/18 7a-5p, M-F None 10/11/18 9/17/18 8/6/18 None 10/11/18 9/17/18 8/6/18 None 10/11/18 9/17/18 8/6/18 None Permanent

HEMLOCK ST. POST STREET Y Loading dock for abatement activities Court Yard Hotel Tower Office Tower Entrance Staging area for interior/soft demolition GEARY BOULEVARD FRANKLIN STREET VAN NESS AVENUE Directions of Demolition CEDAR STREET POLK STREET Loading dock for abatement activities GEARY STREET N LEGEND MOB Area Boundary Fence Construction Access Gate MUNI Electric Lines MYRTLE ST. Hospital Truck Routes MOB Truck Routes SCALE CAMPUS BUILDING VERSION Not to Scale VNC Hospital, MOB 2.4 DATE Sept 08, 2010 NUMBER D1 O'FARREL ST.