room data sheet TAMURA HOUSE 396 POWELL STREET, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

Similar documents
room data sheet GASTOWN HOTEL 110 WATER STREET, VANCOUVER, BC 1/11 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet CORDOVA RESIDENCE 1/11 54 EAST CORDOVA STREET, VANCOUVER, BC RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

MOLSON S BANK BUILDING 166 EAST HASTINGS STREET, VANCOUVER, BC

room data sheet MARBLE ARCH HOTEL 518 RICHARDS STREET, VANCOUVER, BC 1/14 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet MARR HOTEL 401 POWELL STREET, VANCOUVER, BC 1/9 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

room data sheet ORANGE HALL 341 GORE AVENUE, VANCOUVER, BC 1/8 RESIDENTIAL ROOM RM DIVISION ELEMENT REQUIREMENT

MAINTENANCE STANDARD LABOR CHARGE ESTIMATE AMOUNTS

Kirkstall Brewery Inventory

EQUIPMENT GUIDE LIST - CHAPTER

FOOD SERVICE May 6, 2016

Use a minimum loading pad 6' curb length of a hard surface to connecting curb and sidewalk.

Where value-oriented meets family-oriented.

1152 Vinetta - Des Peres The Wakefield Model $634,900

Make Ready Estimate. Total Tenant Charges $0

QUALITY FEATURES Trent 24 7 & ascot semi-detached

Modern Exteriors Stylish Kitchens Designer Bathrooms Comtemporary Living Fixtures & Finishes Schedule Inclusions Brochure

Bath Planning Worksheet

Residential Accessibility Checklist - for Unit Types A and B With Connecticut Amendments Type A Units Accessibility Requirements rev.

SPACE TYPE: JUDICIAL CHAMBER

You ll Love Life In A New Pentrex Home!

Closing Checklist. Mstr Hall/Clo. Mstr Bath. Guest Bath 1/2 Bath Kitchen Nook. Guest Hall. Utility Rm Garage Yard. Right Side Left Side Rear

Plan 1. Single Story. zz Single-Story. zz 2 Bedrooms. zz Den. zz 2 Baths. zz 2-Car Garage. zz Optional Bedroom 3. zz 1,518 Square Feet

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

MD-CU 29 4 ANTIMICROBIAL COPPER ALLOYS AND ASSOCIATED FABRICATED PRODUCTS MASTER LABEL AND ASSOCIATED FABRICATED PRODUCTS

AGING IN PLACE CHECKLIST Use this checklist to identify fall hazards and accessibility for the homeowner and family members.

You can choose one or all of the items from the IKEA Installation Service Menu. For further information, contact us at your local store.

Bathroom remodeling Dictionary

You can choose one or all of the items from the Installation Service Menu.

ENVIRONMENTAL HORTICULTURE: AGRISCIENCE AND BIOTECHNOLOGY September 30, 2010

University of Delaware

Deluxe Inclusions. Harrington Homes reserves the right to change designs and inclusions without notice.

You can choose one or all of the items from the IKEA Installation Service Menu. For further information, contact us at your local store.

SCHEDULE C1 SALES ASSOCIATE COPY DINING LIVING / SLEEPING 18'-0" 9'-4" W/D

TERRACE VIEW APARTMENTS

All Waters Edge homes come with the following standard features throughout:

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

FOOD SERVICE May 6, 2016

TERRACE VIEW APARTMENTS

$759, Vinetta, Des Peres You ll Love Life In A New Pentrex Home! ~ Wakefield 1.5 Story Model ~

Universal Design Checklist

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS

Aging-In-Place Remodeling Checklist

Executive Townhome FOR SALE 38 SAN REMO TERRACE. 38 San Remo Terrace Mimico Village


Food Premises - Structural Specifications

KCKHA PRICE LIST 2015

NANO LIVING NANO TERRACE FINISHES SPECIFICATION

Introducing... The Lake Country Series. 18 Wide Single Section Homes. ... our WIDEST single section homes! Canada. Proudly made in

sjvhomes.com Quality Pfister chrome plumbing fixture Refrigerator space plumbed for ice-maker Quality Pfister chrome plumbing fixture

SPACE TYPE: CHILD CARE

Now that you have given your 30 Day Notice to Vacate, what are the next steps?

PATIENT CARE Single Wardrobe, Open Single Wardrobe, Door Double Wardrobe, Open. Double Wardrobe, Doors (shown) 5232 (reversed)

Sudbury Kitchens DESIGN SURVEY

TERRACE VIEW APARTMENTS

The Lake Country Series

Elegant. Affordable.TM YOUR HOME BY THE NUMBERS

1008 Twin Pine - Des Peres Wakefield Model $689,305

TERRACE VIEW APARTMENTS

ATTACHMENT A - ITEM DETAIL

Safe at Home. Suggestions for Homeowner Created in partnership with the Administration on Aging. Assessor: Assessor: Homeowner Name: Address:

Pre-Delivery Orientation (PDO)

* Comfortable Lifestyle * * Affordable Quality *

YOU LL LOVE LIFE IN A NEW PENTREX HOME!

TERRACE VIEW APARTMENTS

CULINARY OPERATIONS September 30, 2010

28', 32' AND 42' SERIES FLOOR PLANS

Proudly made in. Canada. to Canadian Standards. The Columbia Series. 14 Wide Single Section Homes

210 Ironstone Court. Above information is believed to be accurate but is not warranted. Multiple Listing Service Property, Ottawa Real Estate Board

POWDER ROOM. BLACKCOMB PLAN TYPE BE 3 Bedrooms, 2 1 /2 Bathrooms Approx 1,392 sq. ft.

SCHEDULE OF FINISHES AND OUTLINE SPECIFICATIONS

SECTION 7 ~ PATHOLOGY GROSSING STATIONS

THE CROWN SERIES. Coco, Jackson & Myrtle Floorplans REV *With Craftsman Package

TREATMENT ROOM DATA SHEETS

YOU LL LOVE LIFE IN A NEW PENTREX HOME! $845,075

MOVE OUT CLEANING CHECKLIST

Proudly made in. Canada. to Canadian Standards. The Columbia Series. 14 Wide Single Section Homes

Environmental Safety Risk Assessment Inpatient Behavioral Health Settings (Compiled from tools in the public domain)

DESIGNER KITCHEN WITH PREMIUM APPLIANCES 1407 & 1409 Military Trail Features & Finishes 1. Open concept kitchen with NEFF designer cabinetry and Caesa

Opening Soon! Ian Weber & Sam Melendez (239) Gopher Tortoise Trail Lehigh Acres, FL drhorton.com/swfla

HUNTER HOUSING AND SUPPORT DEMONSTRATION PROJECT

Procurement Department ADDENDUM # 1

CENTRAL GREAT PLAINS SERIES

(916)

SPECIFICATIONS ANNEXURE C TYPE B2 HOMES LIST OF

Plan 2y. First Story. Second Story. Two-Story 4 Bedrooms Loft Exercise Room 3 Baths 2-Car Garage Optional: Bedroom 5 & 6 2,611 Sq. Ft.

Plan 1. Preliminary. 2 Bedrooms. Optional Bedroom 3. Optional California Room. 2 Baths. Den. Optional Bonus Room

SPECIFICATIONS ANNEXURE C TYPE A2 HOMES LIST OF

Homes in Cates Bay - Overview

Community Map J ACKSON IEW. JACKSON VIEW Active Adult Community Thomas Drive & Emerald Court Jackson, CA 95642

Coquille Indian Housing Authority Maintenance Report February 2017

I N C L U S I O N S L I S T

Estimate Form for Kitchen Design and Installation

Troy's Home Inspection Services LLC

New Food Service Plan Review Checklist

EXCEL HOMES WENTWORTH in MountainView. MAIN FLOOR 1476 sq. ft. FRONT GARAGE SEMI-ESTATE HOME BUNGALOW. excelhomes.ca

An Owner s Guide to Maintaining a Mobile / Manufactured Home August 2010

Tivoli s Newest Custom Home... The Magnolia Magnolia Street Sarasota, FL


THERE IS NOTHING STANDARD ABOUT OUR FIXTURES AND FINISHES.

Transcription:

RESIDENTIAL ROOM Window Provide an operable window New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good Proximity access control technology door hardware, closer in protective box/grille to prevent fi nger ingress and damage, wall-mounted door stop, door peep-hole fi nished GWB & paint. fi nished GWB & paint. New sheet vinyl w/ cove edges & cap New free-standing stainless steel counter unit with integral single or double compartment basin and combined hot and cold water supplies, overfl ow, stainless steel or tile back-splash, stainless steel counter top with raised edge to impede drips, double stainless steel doors enclosing a double height shelving unit, solid wood frame and legs to ensure storage items are a minimum of 8 above the fl oor line, sheet stainless steel caps at the feet and to come with attachment clips to securely fasten to the wall. The Ikea Varde is an acceptable unit. New stainless steel wall mounted shelf unit consisting of two shelves, min. 4-0 long, with support diagonal brackets for secure wall anchorage, and each shelf to come with raised edges on exposed sides to impede drips. The Ikea EKBY Robert shelf unit is an acceptable unit. 15 PLUMBING Single lever hot/cold faucet with rotatable gooseneck trim Retain existing electric heating and where required, provide new electric heating system. Each residential room to have its own control of the heating system. New surface mounted vandal resistant luminaire controlled by a light switch located at the unit entry door. Provide new duplex receptacles as required by CEC. In addition to code requirements, provide: 2 new dedicated duplex receptacles for fridge and microwave, New ground fault current interrupter duplex receptacle by the vanity sink 1 voice and data line 1 new cable television outlet, locate by general duplex receptacle in room. New combined fi re alarm heat/smoke detector. 1/8 s SRO Renewal Initiative

New pressed metal door, 20 min. FPR in new metal door buck ADMIN/CONTROL DESK New proximity access control technology door hardware Repair and refi nish existing plaster/gwb fi nishes, or provide new fi nished GWB & paint. New sheet vinyl w/ cove edges & cap New millwork computer station with laminate surfaces and convenient and adequate electrical receptacles, integral task lighting and communications outlets. Integral to the workstation millwork should be a higher countertop serving as a sill for vertical or horizontal operating glazed and lockable security window of minimum 1/4 tempered glass and 24 sq.ft. (2.23 sq.m) New ventilation as per ASHRAE 62.1. System may be stand-alone or part of the corridor pressurization system. Retain existing electric heating and where required, provide new electric heating system. Temperature control in room. New surface mounted luminaires controlled by occupancy sensor switch. Each computer/work station will be provided with a new duplex receptacle and new voice and data outlet. Provide new duplex receptacles and voice and data outlets to meet room specifi c equipment needs. One new duplex receptacle will be provided for general use. New ventilation as per ASHRAE 62.1. System may be stand-alone or part of the corridor pressurization ventilation system. Provide electrical baseboard heating system. 2/8 s SRO Renewal Initiative

New sheet vinyl w/ cove edges & cap Millwork: laminate faced millwork and laminate countertops with a double compartment sink and integral splashback. Arrange the kitchen cabinetry for adequate preparation space between the range and sink, accommodation for a full size fridge, dishwasher and a microwave oven shelf, and lockable millwork drawers and doors. 15 PLUMBING Single lever hot/cold faucet Retain existing electric heating and where required, provide new electric heating system. New kitchen exhaust and hood for the domestic range or cooktop. New surface mounted vandal resistant luminaires controlled by occupancy sensor switch. Two new duplex split receptacles will be provided and mounted above the kitchen counter top. Provide new electrical receptacles to meet specifi c kitchen equipment needs. KITCHEN 3/8 s SRO Renewal Initiative

AMENITY New sheet vinyl w/ cove edges & cap New fl ush mount tv on wall brackets New wall counter supported on wall brackets at high stool height New millwork computer desk with two work stations with incorporated privacy barriers, cord holes and pull-out keyboard tray. Millwork to be all laminate outer face and with caulked kick plates at fl oor. Lockable cabinet on legs for games, books and general storage Optimum layout of comfortable seating as space permits for the number of users as specifi ed in appendices and in consultation with the Authority. New ventilation as per ASHRAE 62.1. System may be stand-alone or part of the corridor pressurization system. Retain existing electric heating and where required, provide new electric heating system. Lockable thermostat/ sensor for separate control of HVAC system. New surface mounted vandal resistant luminaires controlled by occupancy sensor switch. Each computer/work station will be provided with a new duplex receptacle and new voice and data outlet. Each TV will be provided with a new duplex receptacle and cable and data television outlet. Two new duplex receptacles will be provided for general use. 4/8 s SRO Renewal Initiative

LAUNDRY Interior Glazing New pressed metal door, 20 min. FRR, in new metal buck or existing wood frame, made good New proximity access control technology door hardware Provide a minimum of 12 sq.ft. (1.12 sq.m) of 1/4 (6 mm) tempered glass oriented to the lunch room or administration offi ce New sheet vinyl w/ cove edges & cap /EQUIPMENT Millwork: Clothes folding table with a laminate countertop 15 PLUMBING Waste standpipe for washers, hot and cold supply to washers and to new laundry sink Retain existing electric heating and where required, provide new electric heating system. Temperature control in room. New dryer exhaust system to connect to new dryers, complete with lint trap. New surface mounted vandal resistant luminaires controlled by occupancy sensor switch. Provide new electrical receptacles to meet specifi c room equipment needs. One new duplex receptacle will be provided for general use. 5/8 s SRO Renewal Initiative

NON-ACCESSIBLE W/C New pressed metal door, 20 min. FRR, in new metal buck or existing wood frame, made good New proximity access control technology door hardware Lower: Abuse resistant GWB to be used from fl oor level up to approximately 4-0 above fi nished fl oor. Small painted wood trim members to be installed at drywall joint approximately 4-0 above fi nished fl oor level to simulate a wainscoting appearance. Upper: Provide new fi nished paperless GWB & paint. Provide new fi nished paperless GWB & paint. New sheet vinyl w/ cove edges & cap Bench, toilet tissue holder, mirror, towel/clothes hooks, soap dispenser and paper towel dispenser, lockable needle disposal bin 15 PLUMBING New shower trim with thermostatic single lever shower mixing valve and tamper-proof shower head. New water closet, lavatory and trim. Retain existing electric heating and where required, provide new electric heating system. Temperature Control in room. New surface mounted vandal resistant luminaires controlled by occupancy sensor switch. Luminaires will be suitable for the environment where they will be installed. 6/8 s SRO Renewal Initiative

CORRIDOR/CIRCULATION As required by code compliance repquirements, new pressed metal door, 20 min. FPR, in new metal bucks Hardware tied to fi re alarm, and panic bar or paddle latch hardware. Lower: Abuse resistant GWB to be used from fl oor level up to approximately 4-0 above fi nished fl oor. Small painted wood trim members to be installed at drywall joint approximately 4-0 above fi nished fl oor level to simulate a wainscoting appearance. Upper: Repair and refi nish existing plaster/gwb fi nishes, OR provide new fi nished GWB & paint. New sheet vinyl w/ cove edges & cap inlaid panels for aesthetics and wayfi nding Repair and refi nish existing plaster/gwb fi nishes, or provide new fi nished GWB & paint where required. 23 HEATING VENTILATING & AIR CONDITIONING New corridor ventilation and pressurization system. Retain existing electric heating and where required, provide new electric heating system. 26 ELECTRICAL New surface mounted vandal resistant luminaires. New duplex receptacles will be provided for general use. Maximum spacing between receptacles will be 25 feet. 7/8 s SRO Renewal Initiative

GARBAGE ROOM Overhead Door New pressed metal door, 20 min. FPR, in new metal buck or existing wood frame, made good, as access from building interior New proximity access control technology door hardware Good quality metal sectional manually operated overhead door, lockable from interior Repair and refi nish existing plaster/gwb fi nishes, or provide new fi nished GWB & paint Repair and refi nish existing plaster/gwb fi nishes, or provide new fi nished GWB & paint Finished, sealed concrete sloped to fl oor drain Metal ramp to roll out bins Exhaust fan, central floor drain and hose bibb New surface mounted luminaire controlled by occupancy sensor switch 8/8 s SRO Renewal Initiative