WELCOME AREA 2 AREA 1 AREA 3 AREA 4 WHAT HAPPENS AT THE END OF THE PROCESS? AREA 5

Similar documents
Welcome to the Oakridge Centre Open House

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

East Fraser Lands Area 2 Parks Concept Plan. Park Board Committee Meeting Monday, November 20, 2017

Crofton Manor 2803 West 41st Avenue WHAT WE HEARD. Public Consultation: Phase 1

CITY OF VANCOUVER POLICY REPORT DEVELOPMENT AND BUILDING

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Enhanced Planning Process

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Report Date: January 28, 2014 Contact: Matt Shillito Contact No.: RTS No.: VanRIMS No.: Meeting Date: February 4, 2014

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

1. POPLAR LANDING + MUNI EVERS PARK

Mill Woods Town Centre Proposed Rezoning LDA

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

Local Growth Planning in North Central Green Line Communities

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

The Cambie Corridor 2015 Fall workshop series. What we heard WORKSHOP OUTLINE

Cambie Corridor Planning Program Phase One. Standing Committee on Transportation and Traffic January 19, 2010

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

TO: Mayor & Council DATE: April 12, The Planning and Development Department and the Engineering Department recommend that Council:

MAYFIELD WEST SECONDARY PLAN PHASE 2

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

South Davis County COMMUNITY SPOTLIGHT

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Oakridge Redevelopment: New Park Concept Overview and Phase 1 Engagement Results

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Welcome. Thank you for attending our first Early Input Opportunity Meeting. The Purpose of this meeting is to: Introduce you to the project team

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

This Review Is Divided Into Two Phases:

POLICY AMENDMENT AND LAND USE AMENDMENT TUXEDO PARK (WARD 9) CENTRE STREET N AND 26 AVENUE NE BYLAWS 36P2017 AND 234D2017

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

Welcome to the Little Mountain Open House!

MAYFIELD WEST SECONDARY PLAN PHASE 2

Planning Commission Report

Rezoning Frequently Asked Questions

Downtown Streetscape Manual & Built Form Standards

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

Town Center (part of the Comprehensive Plan)

Community Information Meeting

Official Plan Review

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

SECTION ONE: INTRODUCTION. introduction

Queensborough Eastern Neighbourhood Node. Community Open House

Waverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018

Building out the Regional Growth Strategy in Surrey: a Strong Centre & a Connected Transit City

South th E ast Communit ity Centre (SECC)

DOWNTOWN GEORGETOWN PLANNING STUDY

ARLINGTON COUNTY, VIRGINIA

Edward R. Sajecki Commissioner of Planning and Building

LAND USE AMENDMENT CORNERSTONE (WARD 3) 60 STREET NE AND COUNTRY HILLS BOULEVARD NE MAP 26NE BYLAW 22D2017

Hamilton Area Plan Bylaw 9000 Schedule 2.14

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

WHAT IS A POLICY STATEMENT?

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

REZONING GUIDE. Zone Map Amendment (Rezoning) - Application. Rezoning Application Page 1 of 3. Return completed form to

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

1071 King Street West Zoning Amendment Application - Preliminary Report

R E P O R T DEVELOPMENT SERVICES DEPARTMENT

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

edmonton.ca/ribbonofgreen #ribbonofgreen

PLAN ELEMENTS WORKSHOP. April 5, 2016

Chapter 2: Vision, Goals and Strategies

Figure 1- Site Plan Concept

Further input invited as Colchester Growth Strategy nears final phase

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Northwest commuter rail station US 36 BRT. Westminster Station

38 Queen s University Campus Master Plan Part 1

Urban Planning and Land Use

MOUNT PLEASANT COMMUNITY PLAN

2 STATUTORY PUBLIC MEETING AND INFORMATION REPORT FOR PUBLIC MEETING ON AMENDMENT NO. 62 TO THE YORK REGION OFFICIAL PLAN

Minto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW

Draft Cary Community Plan Review Part 3: Shop, Engage, Serve, Special Area Plans, Other Updates. October 27, 2015 Police Department Training Room

MOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN. Wednesday, March 5, 2008 Informal Public Open House

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

WHEREAS, the current Comprehensive Plan was adopted in 2005; and

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

North Fair Oaks Community Plan Summary and Information

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

S C O P E O F W O R K A P R I L

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

Bloor St. W. Rezoning - Preliminary Report

Lynn Waterfront Master Plan

Streets for People, Place-Making and Prosperity. #TOcompletestreets

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Transcription:

Boundary Road WELCOME PREVIOUS OPEN HOUSE BOARD It has been over a decade since the East Fraser Lands Official Development Plan (EFL ODP) was approved in 200. On June 1, 2017, Vancouver City Council endorsed a planning program to review and update the EFL ODP to reflect: Explore options to increase housing diversity in Area 3 Revisions to Area 1 for a standalone community centre New Council policy and standards Changing environmental conditions due to climate change, and Delivery of public benefits WHAT HAPPENS AT THE END OF THE PROCESS? Changes to the EFL ODP and corresponding CD-1 Zoning By law amendments will be presented for Council s consideration at the end of the approximately year long process. If approved, the updated ODP will be used to inform ongoing implementation of EFL and future rezonings. AREA SE Marine Drive AREA 2 Kent Ave North HOW CAN YOU PROVIDE INPUT: 1. Talk to City staff or the project team. 2. Fill out a comment sheet here, or later online at vancouver.ca/eastfraserlands. If you ve filled out a comment sheet today, please drop it off at the sign-in table or mail it back to us (address on the form). 3. Write us at: eastfraserlands@vancouver.ca. Join our email list by signing in at the front table. ** Area 3 illustration based on the current ODP, not proposed concepts.

BACKGROUND PREVIOUS OPEN HOUSE BOARD 2002 200 200 200 2010 201 2017 Sawmill Closes EFL Policy Statement EFL Official Development Plan Area 1 Rezoning Approved Area 2 Rezoning Approved ODP Amendment Affordable Housing Approved Today s Open House * EFL ODP 10-year review endorsed by City Council EFL Illustrative Plan EFL POLICY STATEMENT (200) OFFICIAL DEVELOPMENT PLAN (200) The EFL Policy Statement established a vision for the future community. EFL is envisioned as a complete community with opportunities for its residents to live, work, learn, shop and play. The new community will be socially and environmentally sustainable and will provide housing opportunities for a variety of households, ages and income levels. The EFL ODP refines the vision outlined in the policy statement and establishes a foundation of planning, urban design, development, sustainability principles and strategies to enable the development of EFL as a complete community, The ODP addresses: land use and density housing type and tenure community amenities access and movement building form, layout and height parks and open spaces, and development phasing

PLANNING PROCESS PREVIOUS OPEN HOUSE BOARD The objective of the 10-year review is to update the ODP to reflect new Council Policy and standards, changing environmental conditions due to climate change, and delivery of public benefits. The ODP review will also explore options to increase housing diversity in Area 3 while respecting the overall intent of the plan. The result of the planning program is an updated EFL ODP, which will be presented to Council. If adopted, it will be used to inform ongoing implementation of EFL and future rezoning of Area 3. SUMMER 2017 PHASE 1 Establish a planning program Comprehensive review of ODP, set objectives, initial meetings, scope timelines, complete analysis, establish consultation plan JANUARY 201 PHASE 2 Develop options to address challenges Design concept for waterfront redesign, Area 3 site plan options, refinements to amenity package, and other items identified in phase 1 WE ARE HERE MAY 201 PHASE 3 Refine concept and proposed ODP amendments Preferred waterfront/shoreline design, Area 3 concept plan, updated amenity package, and other items identified in phase 1 SPRING 201 PHASE Finalize draft ODP amendments Finalize ODP amendments and consequential amendments to CD-1 Bylaws and Design Guidelines SUMMER 201 FINAL STEPS Report to Council Council consideration of amendments: referral and Public Hearing Development of the previously approved Area 1 & 2 Parcels will continue while the EFL ODP review is underway. Future rezoning of Area 3 will follow.

ROLES IN THE PROCESS PREVIOUS OPEN HOUSE BOARDS The City of Vancouver will work with the community in and around the East Fraser Lands site, Wesgroup, and other stakeholders to complete an Official Development Plan 10-year review planning program. Each group will have the following roles: COMMUNITY Identify issues, priorities and ideas to inform the ODP review and redesign options. Provide input throughout the process. Participate in public workshops and events. Review and provide feedback on the ODP 10-year review options. EFL COMMITTEE This group of dedicated citizens has worked with the City and Wesgroup from 2002 to 2010 to establish a shared vision for the new community, and since then have acted as stewards for the plan. CITY OF VANCOUVER Coordinate the EFL ODP 10-year review planning program. Provide technical guidance on planning, urban design, engineering, transportation, housing, parks, amenities and social policy issues. Ensure City policies and directions, landowner s objectives, and community priorities, are reflected in the 10-year review. Facilitate discussion and coordinate feedback at open houses and meetings regarding redesign concepts, and new directions. Draft revisions to the EFL ODP including redesign concepts for City Council s consideration. Evaluate all future rezoning applications based on the Council approved updated EFL ODP. WESGROUP Act as proponents for the redevelopment of the site. Identify proponent s priorities and aspirations for the review and redesign Generate and refine redesign concepts (with technical input from the City) balancing objectives of all parties. Work with the City to inform and engage nearby residents in the planning process.

PLANNING CONTEXT MAP PREVIOUS OPEN HOUSE BOARD WAVERLEY ELEMENTARY SCHOOL NANAIMO PARK CORPUS CHRISTI SCHOOL E 9TH AVE DR. GEORGE M. WEIR ELEMENTARY SCHOOL E 5TH AVE KILLARNEY SECONDARY SCHOOL KILLARNEY PARK KILLARNEY COMMUNITY CENTRE E 9TH AVE TYNE ST TYNE ST DR HN MACCORKINDALE ELEMENTARY E 5TH AVE SIR CHARLES KINGSFORD-SMITH ECOLE ANNE HEBERT ELEMENTARY E 5TH AVE CAPTAIN JAMES COOK ELEMENTARY SCHOOL CAPTAIN COOK PARK SPARWOOD PARK CHAMPLAIN HEIGHTS ELEMENTARY SCHOOL BURNABY SIR JAMES DOUGLAS ELEMENTARY SCHOOL CHAMPLAIN HEIGHTS PARK BOBOLINK PARK CHAMPLAIN HEIGHTS COMMUNITY CENTRE DAVID OPPENHEIMER ELEMENTARY SCHOOL ELLIOTT ST FRASERVIEW GOLF COURSE KERR ST EVERETT CROWLEY PARK CHAMPLAIN HEIGHTS ANNEX BOUNDARY RD SE MARINE DR SE MARINE DR EAST KENT AVE S EAST FRASER LANDS SITE RICHMOND PARKS SCHOOLS COMMUNITY CENTRES EAST FRASER LANDS SCHOOL SITE BIKE PATHS

EFL ODP OVERVIEW PREVIOUS OPEN HOUSE BOARD The EFL Official Development Plan (200) supports the following: Site area 51 hectares (12 acres) Townhomes Low- and mid-rise multi-family 719,50 sq. m Housing Types buildings 10-25 storey high rise buildings (7,7,250 sq. ft.) Total Floor area 10.2 hectares (25.2 acres) including Anticipated Population at build-out Approximately 12,500 Parks a continuous foreshore park, plazas, playfields, ecological areas and neighbourhood parks Retail Floor Area 23,350 sq. m (251,335 sq. ft.) focused on a High street with a grocery store Childcare Facilities Four facilities with a total of 25 childcare spaces 10 out-of-school care spaces 2,900 sq. m (2,000 sq. ft.) Office and Flex Uses Floor Area 71,00 sq. m Community Centre 2,790 sq. m (30,000 sq. ft.) similar in size to the Creekside Community Centre Residential Floor Area (7,22,90 sq. ft.) K-7 Elementary School site $ Affordable housing 20% of the units are for affordable housing Schools Secondary School site, if required at time of rezoning. THE EFL ODP IS DIVIDED INTO THREE NEIGHBOURHOODS AREA AREA 2 ** Area 3 illustration based on the current ODP, not proposed concepts.

EFL ODP URBAN DESIGN PRINCIPLES OUS E I V E PR OUS H N OPE D R BOA The EFL ODP includes a set of urban design principles, which establish: the overall vision of a complete, sustainable community, rooted in the site s natural characteristics and complementary to the qualities of the adjacent, existing communities; and an urban design framework to govern more detailed planning and design at the various stages of development. These urban design principles will continue to guide the design of the community. Distinct Neighbourhoods Open space network Views Land use and development intensity Continuous foreshore park High street Neighbourhood greens Hierarchy of movement Rail corridor Public edges for public spaces Marine way frontage Clustered towers High street connectivity Historical patterning Mixed uses Mixture of building types and scales Visual connections

Boundary Road DEVELOPMENT PROGRESS PREVIOUS OPEN HOUSE BOARD SE Marine Drive Kent Ave North AREA MAP Area 3 Constructed Under Construction Design in process ** Area 3 illustration based on the current ODP, not proposed concepts. Upcoming

WHAT S BEING REVIEWED? PREVIOUS OPEN HOUSE BOARD REVIEW AREA areas hatched blue are not changing Planning for East Fraser Lands has been underway for over a decade. The intent of the EFL ODP 10-year review is to adapt and respond to new information and Council policies, rather PARCEL 1 than an extensive revisit of the master plan and previous approvals. AREA AREA 2 Kent Ave North PARCEL 13 PARCEL 1 SE Marine Drive NORTH PARCEL 19 NORTH Boundary Road While the review is underway, Wesgroup Properties is proceeding with development in Area 1 & 2 (shown in blue) in accordance with the previously approved rezonings. Development projects south of the rail corridor will be evaluated on a case-by-case basis to ensure alignment with potential changes to the Community Centre and waterfront plaza. SHORELINE WHAT ELSE SHORELINE SHORELINE WATERFRONT IS BEING REVIEWED? SHORELINE SHORELINE PARKING REGULATIONS BIKE NETWORK + BIKE SHARE LOCATIONS TRANSIT OPTIONS BUILDING HEIGHTS IN WATERFRONT PRECINCT PARCEL 19 CHILDCARE CENTRE The 10-yr review has incorporated multiple opportunities for public review and feedback on proposed changes Area Not Under Change SHORELINE ** Area 3 illustration based on the current ODP, not proposed concepts. to the EFL ODP. It has been over 10-years since the EFL ODP was adopted by Council in 200, and 7-years since the Financial Plan & Strategy was approved. As implementation of the plan progresses, a number of challenges and potential new opportunities have been identified. The following are the key areas of focus for the EFL ODP review: FRASER RIVER SHORELINE PUBLIC BENEFITS The eastern neighbourhood (Area 3) is the last significant area in EFL (approx. 13. ha / 33 ac.) that is not rezoned. Since 200, housing affordability has become a critical issue in Vancouver. Area 3 represents an opportunity to reconsider the area to explore a greater diversity of housing options. Recognizing climate change and sea level rise impacts, the 10- year review will focus on integrating and responding to new flood control levels and changes in regulatory approvals for the Fraser River shoreline. The review will also explore temporary uses on the waterfront plaza to anchor the High Street and to create a highly animated public destination as development progresses. EFL is unique in that the City is responsible for the delivery of public amenities (parks, childcare, community centre, sites for affordable housing) which is different from most development projects in Vancouver. While some progress has been made, a number of challenges have emerged including increasing costs to deliver the amenities, lower development revenues than anticipated and competing priorities within EFL and city-wide. OTHER AMENDMENTS The ODP review includes other amendments identified through the process, and those previously proposed including additional density on Parcel 1 for affordable housing, and inclusion of an Energy Centre on Parcel 19. EVOLVING COUNCIL POLICY On large phased developments such as EFL, it can be challenging to adapt to new and emerging City policy. The 10-year review offers an opportunity to strategically update the plan to reflect new directions such as street adjustments for cycling facilities, redesign of the shoreline to adapt to new flood control levels, response to the Zero Emissions building plan, and the need for greater housing diversity. CENTRAL WATERFRONT Changes to the central waterfront (Area 1 and Area 2) heights and densities are being explored to continue marking the High Street as the central heart of the neighbourhood, re-distribute density and park space to allow for a new Community Centre site, along with an increase in affordable housing in the central part of EFL.

WHAT WE HEARD NEW INFORMATION OPEN HOUSE #2 Two concept plans were presented at the last set of open houses (January 13 & 15, 201). Below are the concepts and a summary of the public feedback we received. TWO CONCEPTS FOR Two concepts were developed by the design team, in consultation with City staff and presented for public feedback. Concept A Concept B Kent Ave Kent Ave High Street High Street Boundary Rd Boundary Rd Fraser River Fraser River Concept A includes a variety of outdoor spaces along the waterfront, an east-west pedestrian paseo with mixed-use buildings connecting the High Street to small retail nodes along the Fraser River. Concept B consolidates park space into a major ecological corridor (Avalon Park) at the centre of the Area 3 neighbourhood, and a narrower riverfront park. Select opportunities for retail nodes are included next to the park. EVALUATION OF CONCEPTUAL PLANS WITH URBAN DESIGN CRITERIA As part of the 200 EFL ODP, a series of urban design principles were created and approved by Council. Respondents were asked to score each concept individually according to how well it met the stated urban design criteria. Results from this question related to each concept can below: Concept A Concept B 2% 3% 2% 1% 39% 3% 3% 3% 23% 27% 27% 3% 27% 31% 21% 29% 22% 2% 23% 19% 22% 2% 31% 29% 27% 20% 27% 27% % % % % % 10% % % % 2% % 11% 7% % 7% 11% 11% 13% % 7% 7% % % 3% 11% 7% 12% % Distinct neighbourhoods Land use and development intensity Mixed uses Mixture of building types and scales Open Space and Parks High street connectivity Hierarchy of movement Distinct neighbourhoods Land use and development intensity Mixed uses Mixture of building types and scales Open Space and Parks High street connectivity Hierarchy of movement 0 = don t know 1 = does not meet principle 2 = almost meets principle 3 = meets principle 0 = don t know 1 = does not meet principle 2 = almost meets principle 3 = meets principle CONCEPT* DEVELOPING A PREFERRED Based on feedback from the public, Urban Design Panel and technical staff review, a new concept has been developed which incorporates the most successful elements of the two concepts: Aspects of concepts A & B that respondents were in support of and that were incorporated into the preferred concept include: Larger Avalon park space and enhanced public connection with the Fraser River Legible street and bicycle network Refined smaller scale urban block structure The paseo, linking High Street through to Avalon park Diverse spaces for social gathering Small-scale commercial/retail opportunities

WHAT WE HEARD (CONT.) NEW INFORMATION OVERALL, WHICH CONCEPT FOR DO YOU PREFER? 37% 1% 7% Concept A Concept B No preference As seen in the chart (above), the majority of respondents selected concept A as being their preferred concept for Area 3. PUBLIC BENEFITS East Fraser Lands is planned to include a robust package of public amenities some of which are already in development including: 25.2 acres of parks and public open space, a 30,000 sq. ft. community centre, four childcare facilities with spaces for 25 children, 10 after school care spaces, two school sites, and sites to accommodate 20% of the units for affordable housing. As part of the first phase of the ODP review, opportunities for additional amenities were identified: Approximately 2 acres of additional park space; Library space; An extra 20 childcare spaces; and Opportunities for additional affordable and rental housing. Attendees of the open houses were asked if the enhanced set of public amenities is the right package for the new and existing community, if there is anything missing, and which were their highest priority. Responses are below: The majority of respondents explained that this is the right package of amenities to serve the new and existing community. Those who didn t agree expressed their desire for improved public transit, access to familyoriented middle-income housing, improved on-street parking, small scale retail, and seniors facilities. The highest priority for delivery of new amenities for respondents are: 1. Community Centre 2. Park Space 3. Library. Childcare 5. Elementary School (note: delivery of the school is a Provincial obligation). Affordable Housing CIVIC CENTRE & WATERFRONT PLAZA An opportunity to provide a standalone civic centre and waterfront plaza is being explored. Attendees were asked what they thought of this idea. The majority of respondents were in favour of the proposed standalone civic centre and waterfront plaza, while some had no preference, and a small number of people preferred the original ODP version.

CREATING A PLAN 1 200 Approved Official Development Plan + Urban Design Principles NEW ION MAT R O INF 2 3 Concept Development + Evaluation Expanding the Scope PARCEL 1 th PARCEL 13 Concept A Kent Ave N or PARCEL 1 Draft Policy and Concept Plan e Drive Marine W ay PARCEL 19 Boundary Road Area 3 AREA AREA 2 SHO We are here SE Marin * NORTH NORTH REL INE SHO REL INE SH EL AREA E ELIN E SHOR MAY 201 ELIN SHOR High street connectivity Hierarchy of movement JULY 2017 + PUBLIC ENGAGEMENT Kent Ave N or th E Why are we taking a closer look at changes to Area 1 and Area 2 waterfront? Concept B Area 3 Urban design and built form: retain the focus on High Street and the central neighbourhood as the area of greatest height and development intensity + ODP + CD-1 BY LAW Civic Centre and waterfront plaza: consolidate park space to provide an expanded waterfront plaza, framed by a new civic centre Housing affordability: opportunity to add new affordable housing to the central neighbourhood + Civic Centre & Waterfront Plaza Open space and parks AREA 2 Area 1 & 2 Mixture of building types and scales Marine W ay AMENDMENTS SUMMER /FALL 201 PUBLIC ENGAGEMENT PUBLIC ENGAGEMENT JANUARY 201 Boundary Road Mixed uses SE Marine Drive ELIN Distinct neighbourhoods Land use and development intensity E IN SHOR + PREFERRED CONCEPT WATERFRONT OR 5 PUBLIC ENGAGEMENT MAY 201 UPDATED MASTER PLAN & ODP AMENDMENTS

Boundary Road EFL TRANSIT PLANNING AND CONCEPTS NEW INFORMATION TRANSIT PLANNING PROCESS Early Mid Mid Early 201 Study and develop transit concepts 201 * We are here Finalize concepts 201 2019 2019 2020 Incorporate into EFL ODP update TransLink Network Management TransLink Public Consultation Start Implementation of Phase 2 Investment Plan The City initiated a transit study and has worked closely with TransLink to develop transit service concepts TransLink will incorporate the findings from the ODP process into transit planning for the Phase 2 Investment Plan The planning and study process thus far has included working sessions with stakeholder groups including the Metro Vancouver Alliance Routespeak and the Fraserview Transit Working Group, as well as a focused transit workshop with EFL residents The study process has developed shorter, medium and longer term transit service concepts, with a focus on the shorter term opportunities. Future opportunities such as a rail connection or a water-based connection will continue to be explored. The preliminary concepts will inform transit supportive requirements for the EFL and will be included in the ODP update. This also includes pedestrian facilities required to facilitate transit access As part of Phase 2 of the 10 Year Vision, TransLink has identified the EFL as an area candidate for service investments. The concepts developed will require further detailed planning and engineering work, community consultation and feasibility testing before determining which service(s) is/are preferred and can be implemented. The City will continue to work closely with TransLink, who will incorporate this work into Phase 2 Investment Plan concepts. Service concepts shown on these presentation boards should be considered as under discussion, and one or more could be implemented in the near term or longer term pending further planning and approval. We want to hear your thoughts on your preferred concept and/or package of preferred concepts, as shown in these boards. INTERNAL ROUTING CONCEPTS AREA SE Marine Drive 100 AREA 2 Kent Ave North Existing Bus Routes 11 Bus Route Loop / Turnaround Concepts Future Pedestrian Connections

CONCEPTS FOR FUTURE CONSIDERATION (NORTH - SOUTH CONNECTIONS) NEW INFORMATION ROUTE 29 EXTENDED ROUTES NEW A & 2 EAST LEGEND Route Concept Current Routing Routing modification Current Adjacent Route City Boundary 29th Ave Station VANCOUVER BURNABY Joyce-Collingwood Station LEGEND Route Concepts Current Routing Routing modification Current Adjacent Route City Boundary 29th Ave Station VANCOUVER BURNABY Joyce-Collingwood Station EXPO LINE EXPO LINE E 1th Ave Kingsway E 1th Ave Kingsway E 9th Ave Current 29 E 5th Ave Elliott Street Tyne Street Boundary Rd E 9th Ave E 5th Ave Elliott Street Tyne Street Boundary Rd Route 2 Section modified Champlain Mall Champlain Mall Route 29 Section modified Muirfield Dr Current 2 Muirfield Dr Current 2 29 extended Marine Dr EFL Current 29 Route A Marine Dr Route 2 East EFL Provides north-south connectivity and connection to Expo Line (estimated 20 to 25 min) Provides north-south connectivity from EFL to Champlain Heights (within 12 min) and Expo Line (within 20 min) Does not connect directly to Champlain Mall Retains most of the existing route, while the extension serves a new market including the EFL WHICH CONCEPT DO YOU PREFER? Retains local service in Champlain Heights, but results in some loss of coverage and direct access to Champlain Mall for some current transit customers Utilizes steeper slopes - can create accessibility and service reliability issues Please place an X dot under your preferred concept on this board. Use a large red dot for your overall preferred concept across all boards. WHY DO YOU PREFER THE CONCEPT? Please place a sticky note with any comments under your preferred concept Service concepts shown on these presentation boards should be considered as under discussion, and not as part of an approved implementation plan. One or several projects could be implemented within the near term, pending funding approval for Phase 2 of the 10-Year Vision, and further detailed planning. For more information on TransLink s Investment Plan and process, please visit: https://tenyearvision.translink.ca/ Service ideas emerging from this current process will be reviewed, with any proceeding action contingent on: Consultation with other communities including Champlain Heights and other communities in Vancouver, Burnaby, and New Westminster Confirmation of operational feasibility (e.g. road tests, bus layover and terminus spaces), additional transportation engineering and design, and review and identification of adequate bus stop locations

Knight St Knight St Kerr St Kerr St CONCEPTS FOR FUTURE CONSIDERATION (WEST - EAST CONNECTIONS) NEW INFORMATION NEW ROUTE C VANCOUVER Cambie St Kingsway Boundary Rd LEGEND Route Concept Current Adjacent Route City Boundary WHICH CONCEPT DO YOU PREFER? Please place an X dot under your preferred concept on this board. Use a large red dot for your overall preferred concept across all boards. EXPO LINE BURNABY 1st Ave Main St 9th Ave 5th Ave 57th Ave CANADA LINE Marine Dr Station Route C Route 100 EFL Marine Dr 22nd St Station WHY DO YOU PREFER THE CONCEPT? Please place a sticky note with any comments under your preferred concept RICHMOND Provides direct connection to the Canada Line (within 20 min) and addresses existing overcrowding issues by complementing Route 100, which would be retained Provides limited new transit coverage to adjacent communities NEW ROUTE D VANCOUVER Cambie St Kingsway Boundary Rd LEGEND Route Concept Current Adjacent Route City Boundary WHICH CONCEPT DO YOU PREFER? Please place an X dot under your preferred concept on this board. Use a large red dot for your overall preferred concept across all boards. EXPO LINE BURNABY 1st Ave Main St 9th Ave 5th Ave 57th Ave CANADA LINE Marine Dr Station Route 100 EFL Marine Dr Route D 22nd St Station WHY DO YOU PREFER THE CONCEPT? Please place a sticky note with any comments under your preferred concept RICHMOND Provides direct connection to the Expo Line (within 20 min) toward the east in anticipation of future travel demand towards eastern part of the Metro Region, while retaining the existing Route 100 Provides limited new transit coverage to adjacent communities Service concepts shown on these presentation boards should be considered as under discussion, and not as part of an approved implementation plan. One or several projects could be implemented within the near term, pending funding approval for Phase 2 of the 10-Year Vision, and further detailed planning. For more information on TransLink s Investment Plan and process, please visit: https://tenyearvision.translink.ca/ Service ideas emerging from this current process will be reviewed, with any proceeding action contingent on: Consultation with other communities including Champlain Heights and other communities in Vancouver, Burnaby, and New Westminster Confirmation of operational feasibility (e.g. road tests, bus layover and terminus spaces), additional transportation engineering and design, and review and identification of adequate bus stop locations

CONCEPTS FOR FUTURE CONSIDERATION (NORTH - EAST CONNECTIONS) NEW INFORMATION These service concepts were developed on the basis of improving connectivity to the EFL, while increasing legibility, directness and reducing duplication between the existing 11 and C routes. ROUTE 11 - A ROUTE 11 - B VANCOUVER E 9th Ave Kingsway Boundary Rd EXPO LINE BURNABY Metrotown Station Imperial St LEGEND Route Concept Current Routing Routing modification Current Adjacent Route City Boundary VANCOUVER E 9th Ave Kingsway Boundary Rd EXPO LINE BURNABY Metrotown Station Imperial St LEGEND Route Concept Current Routing Routing modification Current Adjacent Route City Boundary E 5th Ave Current C Patterson Ave Sussex Ave Current 11 Edmonds Station E 5th Ave Current C Patterson Ave Sussex Ave Current 11 Edmonds Station Marine Dr 11 Section modified Marine Dr 11 Section modified EFL SURREY EFL SURREY 11 modified - A 11 modified - B Simplifies routing between EFL and Metrotown, providing improved travel time (within 15 min) with minimal loss of transit coverage Limited coverage and convenience for EFL residents WHICH CONCEPT DO YOU PREFER? Please place an X dot under your preferred concept on this board. Use a large red dot for your overall preferred concept across all boards. Simplifies routing between EFL and Metrotown, providing improved travel time (within 15 min)and increases convenience for EFL Increases travel time and requires an inconvenient transfer for some existing (and future) customers WHY DO YOU PREFER THE CONCEPT? * Please place a sticky note with any comments under your preferred concept ROUTE C-B ROUTES C-A & METROTOWN ITS VANCOUVER E 9th Ave Kingsway Boundary Rd EXPO LINE BURNABY Metrotown Station Imperial St LEGEND Route Concept Current Routing Routing modification Current Adjacent Route City Boundary VANCOUVER E 9th Ave Kingsway Boundary Rd Metrotown ITS EXPO LINE BURNABY Metrotown Station Imperial St LEGEND Route Concepts Current Routing Routing modification Current Adjacent Route City Boundary E 5th Ave Current C Patterson Ave Sussex Ave Current 11 Edmonds Station E 5th Ave Current C Patterson Ave Sussex Ave Current 11 Edmonds Station C-B Marine Dr C Section modified Marine Dr C Section modified EFL SURREY EFL C-A SURREY Simplifies routing between EFL and Metrotown, and provides direct service (within 12 min) Inconveniences some existing transit customers Providing stops and transit access challenging on Boundary Rd Provides several opportunities for direct access into the EFL, with minimal loss of transit coverage A Metrotown Independent Transit Service (ITS) would provide direct travel (within 10 min) between EFL and Metrotown, but requires private operator May reintroduce service duplication (inefficiencies) The concept(s) presented as Independent Transit Services (ITS), would be privately operated and would need to go through an approval process, for more information please visit: https://www.translink.ca/plans-and-projects/independent- Transit-Services.aspx. Currently, no private party has committed to operating such a service. Service concepts shown on these presentation boards should be considered as under discussion, and not as part of an approved implementation plan. One or several projects could be implemented within the near term, pending funding approval for Phase 2 of the 10-Year Vision, and further detailed planning. For more information on TransLink s Investment Plan and process, please visit: https://tenyearvision.translink.ca/ Service ideas emerging from this current process will be reviewed, with any proceeding action contingent on: Consultation with other communities including Champlain Heights and other communities in Vancouver, Burnaby, and New Westminster Confirmation of operational feasibility (e.g. road tests, bus layover and terminus spaces), additional transportation engineering and design, and review and identification of adequate bus stop locations

PROPOSED ODP AMENDMENTS NEW INFORMATION Resulting from the 10-year review of the East Fraser Lands Official Development Plan (ODP) the following changes are proposed: OVERALL DENSITY Increased floor area is proposed in Areas 1, 2 and 3 as illustrated on the previous boards. Based on the proposed changes, the Land Use section of the ODP would be amended generally as follows: Area 1 - rezoned in 200 3,21,7 37,91,259,0 Area 2 - rezoned in 2010 Area 3 - future rezoning Area - future rezoning Area 5 - future rezoning TOTAL Original ODP (square feet) 1,52,3-1,52,3 2,093,277 Proposed Additional (square feet) 1,01,131 Proposed Total by Area (square feet) 3,13,0 7,0-7,0 192,13-192,13 7,7,2 1,79,07 9,225,327 AREAS PROPOSED AREA SE Marine Drive FOR CHANGE Legend AREA 2 Additional density in areas with approved rezonings Kent Ave North Density shift from community centre site Boundary Road Additional density in areas with future rezonings AFFORDABLE HOUSING Consistent with the EFL ODP requirements for Affordable Housing 20% of the residential units (at least 17% of the residential floor area) is to be provided as Social Housing. Figure 1 of the EFL ODP would be amended as follows: AFFORDABLE HOUSING SITES Legend additional density on previously approved affordable housing sites previously approved affordable housing sites proposed affordable housing sites (to be confirmed through area rezoning) AREA AREA 2 SE Marine Drive Kent Ave North * * * * * * * Boundary Road

PROPOSED AMENDMENTS NEW INFORMATION BUILDING HEIGHTS The EFL ODP includes two diagrams that illustrate building heights in the plan. The diagrams are proposed to be amended as follows: MAXIMUM BUILDING HEIGHTS AREA SE Marine Drive AREA 2 Kent Ave North Boundary Road 2- Storeys 3- Storeys 3-15 Storeys 3-23 Storeys 3-25 Storeys Heights up to 2 Storeys OPTIMUM BUILDING HEIGHTS AREA SE Marine Drive 5 7 7 AREA 2 12 + 12 11 9+2 Kent Ave North 11 15 12+3 25 20+5 +2 7 22 1+ 25 1 19 17 2 1 9+7 19+9 1 22 1+ 1 25 25 23 3 1 21 1 1 12 23 21 19 19 1 Boundary Road

PROPOSED ODP AMENDMENTS NEW INFORMATION CURRENT AMENITY PACKAGE The EFL ODP includes a robust package of public amenities to support the new community, including: 25.2 acres of parks and public open space 30,000 sq.ft. community centre Four childcare facilities with spaces for 25 children 10 after school-care spaces Two school sites Sites to accommodate 20% of the units for affordable housing PRELIMINARY ADDITIONAL AMENITIES PARCEL 1 PARCEL 3 PARCEL 5A UPDATED AMENITY PACKAGE As part of the EFL ODP 10-year Review additional public amenities and some changes to the existing package of amenities are proposed including: 20 spaces of childcare spaces located in the Community Centre Two acres of park space including wider riverfront park Expanded destination waterfront plaza Waterfront site for the community centre 27, sq.ft. of Social Housing (approx. 350 units) Improved connections to Champlain Heights Potential library co-located with the Community Centre, subject to financial viability PARCEL 3 AFFORDABLE HOUSING SITES PARKS SCHOOL SITES CHILD CARE FACILITIES COMMUNITY CENTRE ADDITIONAL AFFORDABLE HOUSING SITES ADDITIONAL PARK & EXPANDED SHORELINE DELIVERY STRATEGY An update to the East Fraser Lands: Public Amenity Financial Plan & Strategy will be completed as part of the upcoming Area 1 rezoning (anticipated in winter 2019). The update will incorporate additional public amenities and identify strategies to improve amenity delivery. WATERFRONT PLAZA POTENTIAL CIVIC CENTRE LOCATION

NEXT STEPS FILL OUT A COMMENT FORM EFL ODP 10-YEAR REVIEW WHAT S NEXT? Throughout the planning process there will be more opportunities to provide your input. Please let us know what you thought about the information presented today. Fill out the comment form available at this open house or online. Your feedback will be used to finalize refinements to the plan, and draft amendments to the EFL ODP. STAY INVOLVED Add your name to our email list or sign in today to be notified when Council considers changes to the EFL ODP and CD-1 bylaw HOW YOU CAN PROVIDE INPUT: 1 2 3 Talk to City staff or the project team. Fill out a comment sheet here, or later online at vancouver.ca/eastfraserlands. If you have filled out a comment sheet today, please drop it off at the sign-in table or mail it back to us (address on the form). Write to us at: eastfraserlands@vancouver.ca Join our email list by signing in at the front table to be notified of the next public event. NEXT STEPS AREA SE Marine Drive Council decision: Following a Council decision on the proposed EFL ODP changes, individual sites could be developed aside from the Area 1 waterfront and Area 3, which would require future rezoning applications AREA 2 2010 Kent Ave North (200) WATERFRONT Boundary Road Area 1 rezoning and Financial Plan update: If Council approves changes to the EFL ODP for the Area 1 waterfront, a rezoning application could be submitted in late 201 or early 2019. Staff would also complete an update to the EFL Financial Plan at the same time. Area 3, and 5 rezoning applications: Both Area and Area 5 are privately owned, and rezoning applications for either of those sites may be submitted independent of the rezoning of Area 1 and Area 3.