SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER

Similar documents
1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

1 P a g e w w w. s m o k e c o n t r o l. c o. nz

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

SECTION ELEVATOR FIRE RATED SMOKE CONTAINMENT SYSTEM

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

1 P age w w w. s m o k e c o n t r o l. c o m. a u PROPRIETARY ITEM: FIBERHSIELD V AUTOMATIC OVERHEAD COILING TYPE FABRIC FIRE CURTAIN

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

SECTION DOMESTIC WATER PUMPS

SECTION AIR DUCT ACCESSORIES

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION COMMERCIAL DOOR OPERATORS OVERHEAD RSX FIRE DOOR OPERATOR

B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work.

Louvers & Dampers April Product Guide Specification SECTION COMBINATION FIRE SMOKE DAMPERS

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

1. Portable fire extinguishers. 2. Fire-protection cabinets for portable fire extinguishers.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

B. After installation, the Owner shall be able to perform hardware configuration changes as desired without the services of the Integrator.

FIRE & LIFE SAFTEY STANDARD

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

SECTION OVERHEAD COILING FIRE DOORS 641 SERIES OVERHEAD COILING COUNTER FIRE DOORS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

WALLCOVERINGS WALLCOVERINGS

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

Operation & Maintenance Manual

SECTION FIRE EXTINGUISHER CABINETS

SECTION OVERHEAD COILING FIRE DOORS FIREKING FIRE DOOR SERIES, MODEL 635

SECTION INTRUSION DETECTION

ARBOR SERIES WOOD WALLCOVERINGS

Architectural 3-Part Specifications

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SECTION INTRUSION DETECTION SYSTEM

SECTION FIRE ALARM SYSTEMS

Construction Standards Page

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

B. Product Schedule: For appliances. Use same designations indicated on Drawings.

SECTION OVERHEAD COILING FIRE DOORS FIREKING FIRE DOOR SERIES, MODEL 634

WINDSOR FOREST HIGH SCHOOL HVAC REPLACEMENT ADDENDUM #2 SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM FEBRUARY 18, 2016

1.3 REFERENCES A. ANSI/NFPA 70 - National Electrical Code. B. ARI Commercial and Industrial Humidifiers.

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING

1.3 REFERENCE STANDARDS

DONALD H. BERG, ARCHITECT

Control Panel. 1.0 GENERAL SCOPE OF WORK Introduction... 2

DIVISION 10 SPECIALTIES

SECTION OVERHEAD COILING FIRE DOORS 640 SERIES OVERHEAD COILING COUNTER FIRE DOORS

SECTION (15767) - UNIT HEATERS

Linear Heat Detection Engineering Specifications

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

UNIFIED FACILITIES GUIDE SPECIFICATIONS

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

Design & Construction Standards, Revised January

Wayne State University WSU Project No Chatsworth Tower Apts. Misc. Bldg. Upgrades DSD Project No

A. This Section includes the following lighting control devices:

SECTION FAN COIL UNITS

A. This Section includes the following lighting control devices:

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

SECTION LIGHTING CONTROL DEVICES

SECTION OVERHEAD COILING FIRE DOORS

Iowa State Fire Marshal

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture.

RESIDENTIAL APPLIANCES DIVISION 11 - EQUIPMENT PN A

A. Section Masonry Assemblies: Anchor placement in masonry.

KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

Bold items are particular to the City of Euless

Product Guide Specification

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

SECTION SPRINKLER SYSTEMS

APPENDIX H (DESIGN SUBMISSION CRITERIA)

SECTION CENTRAL BATTERY INVERTERS. A. This Section includes fast-transfer central battery inverters with the following features:

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

SECTION SECURITY TESTING AND COMMISSIONING

NFPA 80 Overview January 21, 2016

Regulations Governing Fire Protection Systems That will be connected to the Town of Wayland Municipal Fire Alarm System.

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

University of Rochester October 17, 2008 Brooks Landing Business Center

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TOTALPAC2 Integrated Fire Protection System

1. Items known commercially as finish hardware or builders hardware, required for swing, sliding, or folding doors.

Brighton Area Fire Authority

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

SECTION Overhead Coiling Doors

Introduction Consultant shall incorporate the material in the DSS into the project specifications.

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

Transcription:

SECTION 08 3493 AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Smoke detector-activated, vertical closing fire barrier conveyor system closure. 2. Self-closing without auxiliary power. 3. For complex large and small protected openings for roller conveyor. B. Related Requirements: 1. 08 3100 Access Panels. 2. 09 2200 Load Bearing Header Framing 3. 09 9100 Paint: Field painting of specified components. 4. 28 3000 Detection and Alarm: Provision of smoke detectors. 5. Division 26 Sections for 240V and control circuit power including conduit, boxes, conductors, wiring devices, and emergency power. 1.02 REFERENCES A. NFPA Codes and Standards: 1. 80 Standard Fire Door and Other Opening Protectives 2. 110 Standard for Emergency and Standby Power Systems 3. 70- National Electric Code 4. 111 Stored Electrical Energy Emergency & Standby Power Systems 5. 72- National Fire Alarm and Signaling Code B. UL Standards: 1. 268 Smoke Detectors for Fire Alarm Systems. 2. 864 Standard for Control Units and Accessories for Fire Alarm Systems 1.03 SUSTAINABLE DESIGN REQUIREMENTS A. LEED-NC: Comply with Section 01 8100 Sustainable Design Requirements including, without limitation, submittal and documentation requirements. B. Credit/Point Goals Applicable To This Section: In addition to global Project credit/point goals: 1. Materials & Resources - Construction Waste Management 2. Materials & Resources - Recycled Content 3. Materials & Resources - Regional Materials 4. Indoor Environmental Quality - Construction IAQ Management Plan 1.04 SUBMITTALS A. Comply with Section 01 3300 Submittal Procedures: 1. Product Data. 2. Shop Drawings: 01/22/16 08 3493-1

a. Include opening dimensions. b. Show and identify related work performed under other sections of the specifications. 3. Quality Assurance/Control Submittals: a. Certifications. b. Manufacturer s installation instructions and testing procedures. 1.05 CLOSEOUT SUBMITTALS A. Comply with Section 01 7700 Project Closeout: 1. Operation and Maintenance Manual. 2. Manufacturer s Warranty 1.06 QUALITY ASSURANCE A. Certifications: FM Approval with 3 hour fire rating B. Pre-Installation Meeting: 1. Schedule and convene a pre-installation meeting prior to commencement of field operations with representatives of the following in attendance: Owner, Architect, General Contractor, fire barrier system sub-contractor, and electrical sub-contractor. 2. Review substrate conditions, requirements of related work, installation instructions, storage and handling procedures, and protection measures. 3. Document responsibilities of various parties and deviations from specifications and installation instructions. 1.07 DELIVERY, STORAGE, AND HANDLING A. Comply with Section 01 6600 Delivery, Storage, and Handling. B. Comply with manufacturer s instructions. 1.08 WARRANTY A. Provide manufacturer s standard one year warranty. B. Maintenance and Testing: 1. Perform minimum semi-annual maintenance and testing on each smoke containment system as required by the manufacturer s warranty, code agency evaluation reports, and as required by local authority having jurisdiction. 2. Backup Battery: Tested per the Operation and Maintenance Manual. 3. Provide test documentation. PART 2 - PRODUCTS 2.01 MANUFACTURED UNITS A. Stoebich conveyor system closure RGT for roller conveyor B. Manufacturer: 1. Stoebich Fire Protection 01/22/16 08 3493-2

C. Label each fire barrier system with following information: 1. Manufacturer s name. 2. Label of quality control agency. 2.02 PERFORMANCE / DESIGN CRITERIA A. Test Operation and Fire Operation: By gravity, controlled by building fire alarm system signal and test switch. 1. Raise closure after Test and After Fire Alarm: Manual or Power operated motor for opening. 2. Reset After Test and After Fire Alarm: Automatic. No service call needed. No replacement parts needed. B. Maximum Opening Sizes (feet): 1. 12 wide x up to 12 drop. C. Test to 200,000 cycles. 2.03 COMPONENTS A. Closure Assembly: Galvanized steel construction. 1. Rating: E180, 180 minutes fire rating and 90 minutes insulation ( NFPA 80 ). B. Fix Field Assembly: Galvanized steel construction. See manufacturer s literature for the vertical closing conveyor system closure for roller conveyor 1. Rating: E180, 180 minutes fire rating and 90 minutes insulation ( NFPA 80 ). C. Rewind Motor: 1. External Motor. 2. 400-480V AC. D. Control System: 1. Comply with UL864 and FM standard. RZ3 with battery backup. Hold open time 45 minutes ( RZ3 ). H: Finishes: 1. Galvanized steel standard ( Optional ): 1. Stainless steel 2.04 FABRICATION 01/22/16 08 3493-3

A. Installation Configuration: System attached directly to substrate vertical opening. See manufacturer s literature for alternate types of system attachments. B. Fabricate and install mounting brackets, hardware, and fasteners needed to attach fire barrier assembly to building structure. PART 3 - EXECUTION 3.01 EXAMINATION A. Examine substrates upon which work will be installed. 1. Verify related work performed under other sections is complete and in accordance with Shop Drawings. 2. Verify wall surfaces are acceptable for installation of smoke containment system components. B. Coordinate with responsible entity to perform corrective work on unsatisfactory substrates. C. Coordinate electrical interface and connection with Division 26. D. Coordinate interface and connection with fire alarm system. E. Commencement of work by installer is acceptance of substrate. 3.02 INSTALLATION A. Install fire barrier system components in accordance with manufacturer s installation instructions. 3.03 FIELD QUALITY CONTROL A. Field Test: Follow manufacturer s cycle test procedures. 1. Notify Owner s Representative, local Fire Marshal and alarm sub-contractor minimum one week in advance of scheduled testing. 2. Complete maintenance service record. 3.04 DEMONSTRATION A. Demonstrate required testing and maintenance procedures to Owner s Representative. B. System Replacement Notice: Inform Owner s Representative that system requires replacement following exposure to temperatures exceeding 600 degrees F. 01/22/16 08 3493-4

END OF SECTION 01/22/16 08 3493-5