Appendix A. Summary of Key Findings: US Hwy Corridor Study. Retail-Commercial Development Plan Page A-1

Similar documents
Section 1. Executive Summary

I. INTRODUCTION. Project Background and Study Area

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Future Land Use and Development Policies

The transportation system in a community is an

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

A raised and landscaped median will be constructed in South College Avenue between Trilby Road and Skyway Drive.

Hockessin Community Redevelopment Plan

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Executive Summary. The goals of the Plan are to:

ESTABLISH AN EFFICIENT TOWN CENTER

The West Vaughan Employment Area Secondary Plan Policies

Implementation Guide Comprehensive Plan City of Allen

PROJECTS AND THE PUBLIC ART MASTER PLAN

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

Selected Area Study. Vision Plan Draft

ACCESS PLAN. SD 11/SPLITROCK BOULEVARD Brandon, SD. Prepared by South Dakota Department of Transportation City of Brandon

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

AGINCOURT SECONDARY PLAN

Planning Report June 2018 [DRAFT]

PRELIMINARY REPORT. HIGHWAY 18 CORRIDOR NEIGHBORHOOD PLAN VILLAGE OF DOUSMAN November, 2014

Executive Summary. NY 7 / NY 2 Corridor

M E M O R A N D U M July 27, 2018

IH35 Corridor Plan Amendment to the Comprehensive Plan

Planning & Zoning Commission Staff Report

PORT WHITBY COMMUNITY

Access Management: An Overview

Appendix 18F: Tauriko Business Estate Services Strategy Statement and Sequencing Schedule

Brian Madigan, RLA, CPESC Director Land Planning & Design

M-11 (Wilson Avenue) Access Management Plan

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Iowa s Statewide Urban Design Standards Promote Improved Access Management

SECTION 4(f) DE MINIMIS DOCUMENTATION

Services Department F May 28, 2007

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Appendix I. Access Management & Land Use Zoning Strategies Memo

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

Drexel, Barrell & Co.

CHAPTER 7: Transportation, Mobility and Circulation

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

SHEFFIELD PARK Paulding County, GA DRI #588

This page left intentionally blank.

POLICY AMENDMENT AND LAND USE AMENDMENT KILLARNEY/GLENGARRY (WARD 8) NW CORNER OF RICHMOND ROAD AND 33 STREET SW BYLAWS 1P2015 AND 7D2015

IH35 Corridor Plan Amendment to the Comprehensive Plan

6 Growth Management Challenges and Opportunities

LOCATION At the corner of Brawley School Road & Williamson Road in Mooresville, North Carolina

Local Access Management. Brent Sweger, P.E. Division of Planning Kentucky Transportation Cabinet June 2, 2006

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

EXECUTIVE SUMMARY. Introduction

Prepared by: Casey Kempenaar, Senior Planner

FIRE AND RESCUE. Intent

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

Southern Gateway Project and Public Green

Appendix E Preliminary Location Hydraulic Study

FDOT D4 Complete Streets

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

4.1 Build Alternative 1 Construction Phasing

ACCESS MANAGEMENT REPORT U.S S.H. 1 TO S.H. 14 S.H U.S. 287 TO I-25

Johnson County I-69. Corridor Plan DRAFT DRAFT

510 Highways, Streets & Roads Comprehensive Plan Section 510

5.0 Community Design Plan

Drexel, Barrell & Co.

Director, Community Planning, Toronto and East York District

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

1.1.1 Growth Plan for the Greater Golden Horseshoe 2006 Office Consolidation January 2012

PLANNING AND NATURAL RESOURCES COMMITTEE. Public Access Conceptual Design Alternatives for the Red Barn Area of La Honda Creek Open Space Preserve

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

2040 Long Range Transportation Plan

RESOLUTION NO R

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

WURZBACH PARKWAY WURZBACH PARKWAY

KNOXVILLE/KNOX COUNTY METROPOLITAN PLANNING COMMISSION SUBDIVISION REPORT - CONCEPT/USE ON REVIEW

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

4-Town Comprehensive Plan DRAFT 7/30/07

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

Port Lavaca Future Land Use

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

Right-of-Way Acquisitions and Relocations Technical Memorandum

COUNCIL COMMUNICATION

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Section 9 NEIGHBORHOOD DESIGN

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

Plan Policies. Introduction

Transcription:

Retail-Commercial Development Plan 2020 Appendix A Summary of Key Findings: US 24-40 Hwy Corridor Study Introduction The US 24-40 Corridor Study was initiated by state, regional, county and city officials and staff to preserve the transportation investment made in US 24-40. The project was initiated through the cooperation of the cities of Basehor and Tonganoxie, Leavenworth County, KDOT, and the Mid-America Regional Council (MARC). This consortium selected the firm of Bucher, Willis and Ratliff Corporation (BWR), in cooperation with Jane Mobley Associates, Richard Caplan and Associates, and ETC Institute to assist them in the completion of the US 24-40 Corridor Study. For a full copy of the report, contact Tonganoxie City Hall or visit the City s website at www.tongie.org. Study Area The Study Corridor encompassed one mile either side of US 24-40 from Honey Creek Road on the west to K-7 on the east. A larger area of Leavenworth County was considered with respect to its influence on the study corridor. This larger planning area included all of Leavenworth County south of Dempsey Road. Purpose The purpose of the study was to protect and preserve the transportation investment within the corridor by implementing sound corridor land use and transportation planning and management principles. Throughout the 14 month study duration, the public was invited through several different forums to provide meaningful input in developing community values to be embodied in the study. Those values included the desires to maintain a high level of mobility and safety on the highway, to preserve the rural drive experience of US 24-40, and to foster orderly economic growth in southern Leavenworth County. The study defined guidelines for managing traffic, access, land development densities, and design standards and set forth an implementation plan to achieve the study recommendations. Page A-1

Interim Access & Traffic Management Plan Given the current lack of funding to build the permanent improvements, interim improvements should be implemented as needed to address safety issues that arise and to accommodate the growing traffic demands. Typical interim improvements include: the relocation of existing traffic signals, and the addition of new traffic signals (only where legal warrants for signal installation are met); targeted widening of US 24/40 Highway to install a center turn lane or a median; removal of median breaks; and the addition of turn lanes at intersections. The interim (short range) Access and Traffic Management Plan is intended to provide mitigation for existing access and traffic management deficiencies. It is not the intent to deprive existing properties access, but is intended to improve the safety for the motoring public. Interim improvements are enhancements that can be implemented in less than a year s time, and can continue to be implemented until the ultimate plan is realized. The time line for implementation is dependent on local priorities and availability of funding. The appropriate jurisdictions should pursue these opportunities as funding allows, recognizing that implementation of the projects will result in enhancement of safety and mobility in the corridor. The Short-Range Traffic and Access Management Opportunities are summarized in Table 7-4 and presented graphically in Figures 7-3 to 7-7 of the report. Page A-2 City of Tonganoxie, Kansas

Project Description Location Jurisdiction Consolidate Private Driveways Owners may voluntarily cooperate with KDOT and local governments to consol-idate multiple drives on their own property, share drives with adjacent property owners, or relocate drives to other roads to reduce the number of driveways onto US 24/40 Highway. Multiple Locations KDOT / Local Relocate Traffic Signal Remove existing signal that does not meet legal warrants at Tonganoxie High School entrance and relocate to the intersection at US 24/40 Highway / Main Street. Tonganoxie High School Entrance and Main Street KDOT / Tonganoxie Alter On-site Traffic Circulation Alter the on-site school traffic circulation to direct exiting traffic to Main Street where vehicles would make use of the Main Street traffic controlled intersection to access the highway. Tonganoxie High School KDOT / Local New Traffic Signals Install traffic signals at intersections along US 24/40 Highway locations warranted based on existing traffic counts and consistent with Figure 7-2. Laming Road KDOT / Tonganoxie Widening for Center Turn Lane Widen existing highway to install a center turn lane to remove turning vehicles from through lanes for existing full access driveways and street intersections. Acquire adjacent right-of-way through site plan approval process. US 24/40 Hwy from Smiley Road to E 14 th Street KDOT / Tonganoxie Supporting Local and Collector Streets Construct supporting local and collector streets to provide property access. As noted in Figures 7-3, 7-4, 7-6, and 7-7 Tonganoxie/ Basehor Honey Creek Road 14 th Street 21 st Street Main Street Laming Road Acquire Right-of-Way on Intersecting Arterial Streets Acquire 120 of right-of-way for designated intersecting arterial streets through site plan approval process. 206 th Street 198 th Street 182 nd Street Leavenworth Co. / Tonganoxie / Basehor 174 th Street 166 th Street 150 th Street 147 th Street 142 nd Street Economic Development Plan 2020 Page A-3

Figure 7.3 Page A-4 City of Tonganoxie, Kansas

Figure 7.4 Economic Development Plan 2020 Page A-5

Retail-Commercial Development Plan