Technical Report Land Use Plan Compatibility

Similar documents
Blue Line LRT Extension

Place and Opportunity: An Equity Assessment of the Twin Cities Region (

West Broadway Transit Study Initial Screening of Alternatives Memo

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Technical Report Visual Quality

DEVELOPMENT FRAMEWORK POST 2030 LAND USE PLAN INTRODUCTION

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Tracking the Blue Line Extension

Right-of-Way Acquisitions and Relocations Technical Memorandum

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Chapter 1: Introduction

Corridor Management Committee. April 14, 2016

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Planning Districts INTRODUCTION

Mississippi Skyway Preliminary Engineering Report

POCKET COMMUNITY PLAN

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Transportation Committee

Grand Rounds History

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

FUTURE LAND USE ELEMENT

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

Implementation Guide Comprehensive Plan City of Allen

WORK SESSION STAFF REPORT Work Session Item No. 2. Michael Grochala, Community Development Director

Section 3: Land Use M C H E N R Y K A N E. Figure 3.1: Potential Future Municipal Boundaries. Future Municipal Boundaries. County Land Use Plans

Issues Requiring Future Study

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Regency Developments. Urban Design Brief. Holyrood DC2 Rezoning

Community Working Group Meeting #3. Agenda

Seneca Meadows. Block 4 Locate office, technology, and medical development adjacent to I Screen views of garage structures from I-270.

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

124 Subarea Visions. Vision Plan. A. Nelessen Associates, INC I Visioning I Planning I Urban Design

To ensure that resources will be available to provide a consistent level of public services to the community.

Staff Report and Recommendation

VISUALIZATION TOOLS FOR COMMUNICATION & DECISION MAKING REAL MINNESOTA EXAMPLES

Corridor Background. Defining the Corridor Study Area. Lake Street. 38th Street. 46th Street

Missing Link Study Grand Rounds Parkway Planning and Design Introduction

CHAPTER 1. Ms. Guajardo s Class - Central Elementary CH 1 1

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Midtown Greenway Land Use and Development Plan Executive Summary

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

LAND USE MEADOWS PLANNING AREA

CHAPTER 3: LAND USE. 3.1 Purpose. 3.2 Influencing Factors

CHAPTER 7: Transportation, Mobility and Circulation

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

EAST SACRAMENTO COMMUNITY PLAN

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

West Ocala Vision & Community Plan City Council Work Session. Presented by West Ocala Community Plan Steering Committee

Corridor Management Committee. September 29, 2017

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

HAZARD MITIGATION GOALS AND OBJECTIVES

Status Report: MD 355 Project

Transportation. Strategies for Action

7.0 SECTION 4(F) EVALUATION

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

June 14, 2017 for the June 20, 2017 Parks and Trails Commission Meeting

Overview of the Plan. The Building Blocks of Centers, Neighborhoods and Network INTERNAL DRAFT

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

St. Louis Park Wooddale LRT Station Site development guidelines

THE 355/270 CORRIDOR:

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

Isabel Neighborhood Plan: Alternatives

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

The transportation system in a community is an

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

BeltLine Corridor Environmental Study

Glenborough at Easton Land Use Master Plan

Planning & Zoning Commission Staff Report

BUILDER LOTS FOR SALE

Comprehensive Plan. Faribault, Minnesota. Hoisington Koegler Group Inc. Claybaugh Preservation Architecture Inc. Howard R. Green Company Bonz/REA

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

DEVELOPMENT FRAMEWORK 2030 LAND USE PLAN INTRODUCTION

Land Use. Hardware Street Vendor Mixed-Use

Elliot Park 2. Neighborhood Master Plan. Historical Perspective

CITY OF ANN ARBOR MASTER PLAN. Land Use Element

City of Royalton Comprehensive Land Use Plan 2005 to Revision February 8, 2011

Subarea 4 Indian Creek. Vision The combination of park networks and transportation amenities make Subarea 4 the greenest hub in the Corridor.

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

1.0 PROJECT PURPOSE AND NEED

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Assembly Amendments to Anchorage 2040 Land Use Plan Adopted on September 26, 2017

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

REGIONAL ACTIVITY CENTER

3.0 PROJECT DESCRIPTION

Description of Preferred Alternative

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Transcription:

Technical Report Land Use Plan Compatibility 1.0 Introduction 1.1 Purpose of Report This Land Use Plan Compatibility Technical Report has been prepared in support of the Bottineau Transitway Project Draft Environmental Impact Statement (Draft EIS). The objective of this report is to evaluate the Project s potential land use impacts within the study area. This includes the following: Description of existing land use conditions Description of future planned land use Evaluation of compatibility of Bottineau Transitway Project with local land use planning policies 2.0 Technical Analysis 2.1 Regulatory Context/Methodology 2.1.1 Legal and Regulatory Context No specific laws or executive orders regulate the consideration of land use impacts as part of preparing NEPA review documents. The National Environmental Policy Act (NEPA, 41 USC 4321) and Minnesota Environmental Policy Act (MEPA 2007 c 116D) form the general basis of consideration for discussing land use issues. Local municipalities have land use controls available to them in the form of comprehensive plans guiding land use and city zoning codes guiding development. 2.1.2 Study Area The study area is defined as the jurisdictions in which the transitway would be located. 2.1.3 Methodology Land use data were obtained from existing and planned land use maps for the cities of Maple Grove, Brooklyn, Crystal, Robbinsdale, Golden Valley, and Minneapolis as published as part of the comprehensive plans for each city. These data were supplemented by recent aerial photography and field inspections of the Bottineau Corridor. Assessment of compatibility with existing and planned land uses was based on the land use inventories and plans in cities adopted comprehensive plans. A list of referenced plans is included in Appendix A. Note that negative impacts, including noise, community cohesion, economic development, and visual quality have a relationship to the land uses within the study area considered by the environmental document. Although these impacts may require mitigation to allow the existing and planned land uses to continue, this technical memorandum focuses on the compatibility of the Bottineau Transitway Project with local and regional land use planning documents. October 2012 1

2.2 Affected Environment Existing and Future Land Use The following section outlines the existing land use conditions within the Bottineau Corridor. Existing land use is described for each alignment. Referenced city land use mapping for all alignments can be found in Appendix B. Alignment A Alignment A begins in southeastern Maple Grove and passes through the southwestern portion of Brooklyn. This alignment has four LRT Stations: Hemlock Lane, Revere Lane, Boone Avenue/Hennepin Tech, and 71st Avenue. The land surrounding the westernmost segment of Alignment A between Hemlock and US 169 is designated as Gravel Mining Area on the City s existing and future land use plan maps. This designation denotes the City of Maple Grove s intent to provide for extraction of this valuable resource followed by reclamation of the 2,000-acre area for suburban development. Extraction has been completed west of Hemlock Lane and this area has been redeveloped for commercial and residential use. Extraction activities have moved eastward and are expected to continue for several decades. As the extraction is completed, the land will be graded and made available for development. The City of Maple Grove 2008 Comprehensive Plan calls for regional mixed use in the area recommending that development occur in a compact, vertically integrated manner with predominantly office and/or corporate uses. The proposed Hemlock Lane LRT Station is located north of a suburban shopping area. The proposed Revere Lane LRT Station is located in a current extraction area adjacent to a planned future roadway. Proposed station location LRT Station area near Hemlock Lane Elm Creek Boulevard October 2012 2

Proposed station location Elm Creek Boulevard Existing aggregate mining activity surrounding the Revere Lane LRT Station site. Continuing east from US 169, Alignment A runs along the south side of Brooklyn Boulevard until it reaches CSAH 81. The existing land uses surrounding the corridor east of US 169 are primarily industrial/business park uses to the south of Brooklyn Boulevard, with Hennepin Technical College and residential uses to the north. The City of Brooklyn plans to transition industrial uses to business park use while the other uses are planned to remain. The Boone Avenue/Hennepin Tech LRT Station would be located in this area. October 2012 3

Hennepin Technical College Proposed station location Hennepin Technical College lies to the north of Brooklyn Boulevard with business park/industrial uses to the south. As the alignment shifts onto the railroad corridor paralleling CSAH 81, the surrounding land uses are primarily commercial/industrial. The Brooklyn 2030 Comprehensive Plan confirms that these land uses are planned to remain with some areas transitioning to mixed use. The Brooklyn 2030 Comprehensive Plan introduces the new future land use designation of Neighborhood Commercial (NC) for the area surrounding the proposed 71st Avenue LRT Station. A zoning designation of NC by Brooklyn is intended to provide for compact, pedestrian-oriented mixed-use areas of limited size as opposed to the auto-oriented commercial uses in the area today. Proposed station location North The 71st Avenue Station area from the west. October 2012 4

Alignment B Alignment B begins in Brooklyn just north of Highway 610 and ends at Alignment C. Stations would be located at 97 th Avenue, 93 rd Avenue, 85 th Avenue, and Brooklyn Boulevard, all along West Broadway Avenue. Land uses at the north end of Alignment B are transitioning from agricultural use/open space to commercial use. The Brooklyn 2030 Land Use Plan designates a portion of this area near the 97th Avenue LRT Station for Signature Mixed Use (including the Target North Campus) with most of the area surrounding the 93rd Avenue LRT Station planned for expansion of business parks. The Signature Mixed Use designation indicates commercial development which shapes a strong image for the City, including high quality and landmark buildings or coordinated group of buildings with significant height and scale. Proposed station location Winnetka Ave North This view of the 97 th Avenue Station area shows existing agricultural land uses. October 2012 5

85 th Ave Proposed station location North This view of the 93rd Avenue LRT Station site from the west shows the business parks that lie to the west of West Broadway Avenue. Between the 93rd and 85th Avenue LRT Stations, land uses are primarily residential with plans to continue such use in the future. At 85th Avenue, land uses include North Hennepin Community College and some limited commercial uses along 85th Avenue, with the predominant land use being residential. Residential uses extend south toward Brooklyn Boulevard. These uses are planned to remain. Hennepin County is planning a new library for the northeast quadrant of the intersection. West Broadway Ave Proposed station location North This view of the 85th Avenue LRT Station area from the west shows the North Hennepin Community College in the southeast corner of the intersection, commercial use in the southwest corner and the surrounding residential use. October 2012 6

Brooklyn Blvd The proposed Brooklyn Boulevard LRT Station lies within a large suburban commercial node characterized by big box (e.g. Target) and other auto-oriented retail uses. The Brooklyn 2030 Comprehensive Plan indicates this commercial center is expected to remain into the future. Proposed station location North Alignment C Suburban commercial uses surround the Brooklyn Boulevard Station site (viewed from the west). Alignment C begins in Brooklyn and largely follows Bottineau Boulevard through Crystal and Robbinsdale. Stations would be located at 63 rd Avenue, Bass Lake Road, and downtown Robbinsdale. Existing land uses surrounding Alignment C in Brooklyn consist of primarily industrial and commercial uses with some residential uses. The majority of these land uses are planned to remain, with some uses transitioning to business park use. At the 63rd Avenue LRT Station area, surrounding existing uses are a mix of commercial, industrial, and high-density residential land uses with an existing Metro Transit and Ride structure on the west side of CSAH 81. Uses are planned to transition to high-density residential, institutional, and mixed use. October 2012 7

Proposed station location North This view of the 63rd Avenue LRT Station site from the west shows the Metro Transit and Ride facility on the west side of CSAH 81 and scattered commercial uses on the east side. South of 63rd Avenue, Alignment C passes into the City of Crystal. The land uses surrounding the corridor in Crystal are predominantly low-density residential to the west and commercial and airport uses to the east. The Bass Lake Road LRT Station is currently surrounded by high-density residential and commercial uses, with some park uses. The Crystal Comprehensive Plan (2011) future land use map indicates these uses are planned to remain. South of Bass Lake Road, the existing uses are primarily commercial and industrial with some park uses. Again, these land use patterns are generally planned to remain in the future. October 2012 8

Proposed station location North The Bass Lake Road LRT Station area (viewed from the west) includes both large-scale commercial and high-density residential uses. From Crystal, Alignment C enters the northwest corner of the City of Robbinsdale at 47 th Avenue approximately four blocks north of Highway 100. The surrounding existing and planned future land uses surrounding the corridor are primarily low-density residential, with some commercial, highdensity residential, and park uses. East of the Robbinsdale (42nd Avenue) LRT Station lies downtown Robbinsdale, a large retail/office area centered on both West Broadway Avenue and CSAH 81. West of the BNSF corridor, residential uses predominate. The City of Robbinsdale Comprehensive Plan indicates increasing density in the downtown area including transition of some parcels to mixed use. October 2012 9

Proposed station location North Alignment D1 The BNSF corridor creates a clear boundary between the commercial uses of downtown Robbinsdale to the east and the residential area to the west Robbinsdale. Alignment D1 begins near 34 th Avenue in Robbinsdale and continues south into the City of Golden Valley crossing the municipal boundary at 26 th Avenue. Sochacki North Vegetation and park uses buffer the BNSF corridor from residential uses in Robbinsdale to the east and Golden Valley to the west. Land uses surrounding Alignment D1 in Golden Valley are primarily low-density residential and park uses, with limited areas of institutional use. The City of Golden Valley Comprehensive Plan 2030 Update indicates these land uses are planned to remain. The existing and planned future land uses October 2012 10

surrounding the Golden Valley Road and Plymouth Avenue LRT Stations are also low-density residential and park uses. Proposed station location Golden Valley Road North The Golden Valley LRT Station would be located below grade in the BNSF corridor at the boundary between park uses to the west and institutional and residential uses to the east. October 2012 11

Proposed station location Theodore Wirth Regional North The Plymouth Avenue LRT Station is also grade separated, but closer to recreational facilities within Theodore Wirth Regional. Alignment D1 continues along the BNSF Railroad corridor southeast through eastern areas of Golden Valley, with Theodore Wirth Regional Regional to the west and low-density residential land uses to the east. Alignment D1 enters Minneapolis north of TH 55 then travels east to Penn Avenue where it joins the Alignment D common section. Currently, the primary land uses are park and lowdensity residential uses with no plans for changes in the future. Along TH 55, existing and future planned land uses are primarily low-density residential uses. Alignment D2 The D2 alignment transitions from the BNSF Railroad Corridor to street running segments through Robbinsdale and the north side of Minneapolis before rejoining the D1 alignment along TH 55 at Penn Avenue. Throughout the entire D2 Alignment, the predominant land uses are residential, including low-, medium-, and high-density residential uses, community-oriented commercial uses and institutional uses. North Memorial Medical Center is located in Robbinsdale at the north end of this alignment. The North Memorial LRT Station would serve this regional medical facility as well as existing and future commercial uses to the north. October 2012 12

Proposed station location North Memorial Medical Center lies within a residential area along CSAH 81. The City of Minneapolis future land use plan indicates the West Broadway corridor as urban neighborhood which includes mixed residential and commercial uses. The Minneapolis Plan for Sustainable Growth and the West Broadway Alive Plan designate West Broadway as a Commercial Corridor and Penn Avenue as a Community Corridor with the surrounding area as Urban Neighborhood. They further designate the intersection of Penn Avenue and West Broadway as a Neighborhood Commercial Node (that extends from 26 th Avenue North to Oliver Avenue) that is appropriate for mixed use commercial/residential. Residential uses at the node can be medium to high density. The proposed Broadway/Penn Station would serve this existing and future commercial corridor. The proposed Plymouth LRT Station is surrounded by institutional and community commercial uses within an otherwise residential neighborhood. The Penn Avenue/Plymouth Avenue intersection is a Neighborhood Commercial Node that is appropriate for mixed use commercial/residential uses. Residential uses at the node can be medium to high density. The Minneapolis Plan designates this area as urban neighborhood as illustrated in the Future Land Use Plan. October 2012 13

Penn Ave Proposed station location North The Broadway/Penn commercial node is surrounded by residential uses. Proposed station location Penn Ave North View of Penn/Plymouth intersection from the west. Community institutional uses are a focus of this neighborhood intersection. October 2012 14

Penn Ave Alignment D Common Section Alignment D is located entirely in Minneapolis, beginning at Penn Avenue and following TH 55 to 6 th Avenue North into downtown Minneapolis. Stations would be located at Van White Boulevard and The Interchange. The land use surrounding the Alignment D common section are primarily low- and medium-density residential between Penn Avenue and I-94. Future land uses in this area are designated as urban neighborhood use, which includes religious, institutional, and open space uses. Existing institutional and religious uses (academic facilities, a community center, library and a church) are adjacent to the corridor near TH 55 between Irving Avenue and Bryant Avenue. The western portions of the new Heritage neighborhood contain a mix of residential land uses including medium-, and highdensity housing. This land use pattern continues to Lyndale Avenue/I-94, where the corridor enters downtown Minneapolis. The Minneapolis Plan for Sustainable Growth indicates that residential land uses will remain in the area surrounding the proposed Penn Avenue Station. The Plan also indicates no planned changes to the existing land uses in the area surrounding the Van White LRT Station. TH 55 Proposed station location TH 55, viewed here from the south at Penn Avenue, lies within a residential neighborhood through this segment. East of I-94, Alignment D enters the downtown area of Minneapolis, characterized by commercial and industrial uses. The alignment terminates at Target Field Station which is currently transitioning from industrial uses to a signature mixed-use development adjacent to the Minnesota Twins ballpark as indicated in The Future Land Use Plan map for the Downtown Sector from The Minneapolis Plan. The terminal station would be located at The Interchange, an intermodal transit station under construction and planned to open in 2014. The North Loop Small Area Plan (2010) guides October 2012 15

redevelopment for the North Loop area and calls for mixed use developments organized to support transit. TH 55 Proposed station location The Van White LRT Station lies within a recently redeveloped neighborhood with a variety of housing densities. October 2012 16

Future site of The Interchange Proposed station location North Alignment D terminates at the Interchange, a multi-modal facility under construction in downtown Minneapolis. 2.3 Comprehensive Plan Compatibility This section evaluates the compatibility of the transitway with land use planning policies. No-Build Alternative The No-Build Alternative would not be compatible with City comprehensive plans, which call for support of transit as described below. Transportation System Management Alternative The Transportation System Management alternative would provide some transit improvements, and would therefore partially fulfill the intent of regional and local comprehensive plans to support and develop transit in the corridor. Build Alternatives An objective of the City of Maple Grove 2008 Comprehensive Plan is that multi-modal transportation be planned for and invested in to slow the growth of congestion. Strategies supporting this objective include promoting the evaluation of light rail and other modes of transit, planning land use patterns to support transit development, continuing to support the integration of land uses enabling shared parking and transit-oriented developments, and planning for the concentration of jobs and housing around transit hubs and daily conveniences. In addition, Maple Grove s comprehensive plan acknowledges that all areas designated as mixed use that have not been developed have the potential for transit-oriented higher-density clustered or mixed-use development, including the Gravel Mining Area. Overall, the Bottineau Transitway would be compatible with Maple Grove land use planning policies. Within Brooklyn, the Bottineau Transitway Project is compatible with local land use planning policies. The Brooklyn 2030 Comprehensive Plan acknowledges that CSAH 81 is currently being October 2012 17

studied by Hennepin County and Metro Transit for use as a transit corridor. The plan states that the City encourages a thorough analysis of the corridor to provide the most cost-effective and efficient mode of transit and to construct it in a timely manner. In addition, Brooklyn s comprehensive plan recognizes that changes are necessary to implement the policies and objectives of the plan, including the consideration of transit overlay districts in areas where the City plans to have transit connections in the future, including Bottineau Boulevard. Additionally, the plan calls for promoting transit-oriented development where possible, and encouraging commercial higher density residential uses along transit routes. The proposed station locations would provide access to employment centers and other major destinations in Brooklyn, which would be compatible with these goals. The Bottineau Transitway Project is consistent with Crystal s local land use planning policies. It is a policy of the City of Crystal, Minnesota Comprehensive Plan Update Through the Year 2030 (2011) to plan and invest in multi-modal transportation choices, based on the full range of costs and benefits, to slow the growth of congestion and serve the region s economic needs. A strategy supporting this policy is to expand the transit system. The Public Transit chapter of Crystal s comprehensive plan supports the development of the Bottineau Transitway Project with LRT as the preferred technology. The Bottineau Transitway Project is compatible with Robbinsdale s local land use planning policies articulated in the City of Robbinsdale Comprehensive Plan. An objective of Robbinsdale s comprehensive plan is to provide an effective choice of transportation modes for the city s residents. The plan states that transit corridors provide the potential for concentrations of residential uses that may accommodate the regional projections for increased population. The plan also states that the City should coordinate all future downtown redevelopment with a transit hub, exclusive busway and light rail transit plans. In addition, the transitway is included on Robbinsdale s Transit Routes map (Figure 4G of the comprehensive plan). The transportation chapter of Robbinsdale s comprehensive plan acknowledges the Bottineau Transitway planning efforts, expressing a preference for LRT. The City of Golden Valley Comprehensive Plan 2030 Update includes the goal of enhancing transit usage. A supporting objective is to support local and regional transit provider plans and programs that benefit residents and visitors in the community. Although Golden Valley s comprehensive plan does not specifically mention the Bottineau Transitway Project, light rail would be compatible with the Plan. The Bottineau Transitway Project is compatible with the City of Minneapolis local land use planning policies. The transportation chapter of The Minneapolis Plan for Sustainable Growth (2009), indicates that enhanced transit services are the means to efficiently meeting the needs of the traveling public. The plan also calls for ongoing investment and development of corridors served by light rail, commuter rail, streetcars, and buses. Additionally, The Minneapolis Plan for Sustainable Growth s future Transitway System map acknowledges potential Bottineau Transitway routes, noting that transitway alignments and station locations are still under review and subject to change. Regional Compatibility Metropolitan Council s Regional 2030 Transportation Policy Plan (2010) acknowledges ongoing study of the Bottineau corridor as a future transit route. Policy 15 of the Transportation Policy Plan addresses transitway development and implementation. The policy states that the Metropolitan Council will strongly pursue, in coordination with CTIB, county regional railroad authorities and transit providers, the cost-effective implementation of a regional network of transitways to provide a traveltime advantage for transit vehicles, improve transit service reliability and increase the convenience and attractiveness of transit service. Strategies supporting Policy 15 refer to land use. Strategy 15c states that Metropolitan Council will consider readiness, priority, and timing along with local commitment to transitway implementation October 2012 18

and land use when making transitway investments. Strategy 15g states that local units of government are expected to develop local comprehensive plans, zoning, and community development strategies that ensure more intensified development along transitways and that this development should be effectively linked to the transitway through compact, walkable environments. The Bottineau Transitway is compatible with local and regional land use planning policies. 2.3.1 Construction Phase Impacts Construction phase impacts are defined as the temporary impacts that occur during project construction only. No-Build Alternative No construction impacts would occur under the No-Build Alternative. Therefore, there are no construction-related land use compatibility issues for this alternative. Transportation System Management Alternative Construction phase impacts would be limited to the area of the transit center and park-and-ride facility at 97th Avenue and West Broadway Avenue. There are no land use planning policy compatibility issues for this alternative. Build Alternatives Construction phase impacts generally include: Traffic detours resulting in traffic increases through residential neighborhoods. Noise, dust, and visual impacts due to construction. Temporary effects to land use due to staging areas. Staging areas have not yet been identified for the Bottineau Transitway. These impacts do not pose compatibility issues with planning policy documents. Negative impacts such as those listed above are addressed under other topic areas (community cohesion, noise, etc.). 2.3.2 Indirect/Secondary Impact Indirect effects related to potential for redevelopment are addressed in the Economic Impacts Technical Memo. 2.4 Avoidance, Minimization, and/or Mitigation Measures As all alignments are compatible with land use planning policy documents, no avoidance, minimization, or mitigation measures are needed. 3.0 Summary All alignments are compatible with land use planning policy documents. Therefore, any selected alternative would be compatible with land use planning policies as well. October 2012 19

APPENDIX A List of Referenced Planning Documents October 2012

Land Use Planning Documents City of Maple Grove 2008 Comprehensive Plan Brooklyn 2030 Comprehensive Plan Crystal Comprehensive Plan City of Robbinsdale Comprehensive Plan City of Golden Valley Comprehensive Plan 2030 Update The Minneapolis Plan for Sustainable Growth Metropolitan Council s Regional 2030 Transportation Policy Plan October 2012

APPENDIX B Existing and future land use maps for Maple Grove, Brooklyn, Crystal, Robbinsdale, Golden Valley, and Minneapolis October 2012

Figure 2.9-25 -

Figure 2.8 lviaj Ie Grove Land Use Plan-PI'O)lOSE~d (Revised 11/24/08) ). D Low-Medium Density Residential 0 M~dium-Density Residential - High-Density Residential c ommercial D Industrial IZ2I Mixed-Use Development D Gravel Mining Special Area Plan D Public and Sem>Public D, Golf Course or Protected Open Space (Public or Private) E:::J Wetland or Floodplain Neighborhood Community Playfield Conservancy Unear Regional Trail.!:' Schools,..See Figures 2:11 & 2.12 and Section 2.4b in Land Use Plan This map is a general, conceptjjal guide to land development It is subject to change -and interpretation by the City Council. Further direction is provided by guidelines in the pl.an text. - 24 -

3-13

Land Use Definitions The following definitions are meant to clarify the intent of the land use designations and provide a general vision of uses allowed in each designation. Actual allowable uses are conveyed through the City s Zoning Ordinance. Low Density - Developments in areas designated as low density may not exceed 3 units per acre Medium Density - Developments in areas designated as medium density must be more than 3 units per acre and may not exceed 9 units per acre High Density - Developments in areas designated as high density must be more than 9 units per acre and may not exceed 25 units per acre 3-17

FIGURE F-1(a) 2000 EXISTING LAND USE (NORTH HALF) # 62ND AVE N Existing Land Use, 2000 60TH AVE N 58TH AVE N REGENT AVE N HAMPSHIRE AVE N WEST BROADWAY AVE 58TH AVE N ORCHARD BASS LAKE RD 56TH AVE N WILSHIRE BLVD BOTTINEAU BLVD VERA CRUZ AVE N 54TH AVE N 2030 Land Use Class LDR MDR HDR NC GC I 51ST AVE N BOTTINEAU BLVD FAIRVIEW AVE N Airport Railway Other Undev (I) Other Undev (LDR) Public-Inst (GC) Public-Inst (HDR Public-Inst (LDR) Public-Inst- Road Rights-of-Way 47TH AVE N 47TH AVE N WELCOM ADAIR AVE N DOUGLAS DR N LOUISIANA AVE N 0 0.1 0.2 0.3 0.4 0.5 Miles 45TH AVE N N CRYSTAL COMPREHENSIVE PLAN PROPOSED FINAL VERSION PAGE 28

FIGURE F-2(a) 2010 EXISTING LAND USE (NORTH HALF) 62ND AVE N Existing Land Use, 2010 60TH AVE N HAMPSHIRE AVE N WEST BROADWAY AVE 58TH AVE N 56TH AVE N WILSHIRE BLVD 54TH AVE N FAIRVIEW AVE N 58TH AVE N REGENT AVE N ORCHARD BASS LAKE RD BOTTINEAU BLVD VERA CRUZ AVE N 2030 Land Use Class LDR MDR HDR NC GC 51ST AVE N BOTTINEAU BLVD 47TH AVE N 47TH AVE N WELCOM ADAIR AVE N DOUGLAS DR N LOUISIANA AVE N 45TH AVE N N I Airport Railway Other Undev (I) Other Undev (LDR) Public-Inst (GC) Public-Inst (HDR Public-Inst (LDR) Public-Inst- Road Rights-of-Way 0 0.1 0.2 0.3 0.4 0.5 Miles CRYSTAL COMPREHENSIVE PLAN PROPOSED FINAL VERSION PAGE 30 #

FIGURE F-3(a) 2030 PLANNED LAND USE (NORTH HALF) 62ND AVE N Planned Land Use, 2030 60TH AVE N HAMPSHIRE AVE N WEST BROADWAY AVE 58TH AVE N 56TH AVE N WILSHIRE BLVD 54TH AVE N FAIRVIEW AVE N 58TH AVE N REGENT AVE N ORCHARD BASS LAKE RD BOTTINEAU BLVD VERA CRUZ AVE N 2030 Land Use Class LDR MDR HDR NC GC 51ST AVE N BOTTINEAU BLVD 47TH AVE N 47TH AVE N WELCOM ADAIR AVE N DOUGLAS DR N LOUISIANA AVE N 45TH AVE N N I Airport Railway Other Undev (I) Other Undev (LDR) Public-Inst (GC) Public-Inst (HDR Public-Inst (LDR) Public-Inst- Road Rights-of-Way Special Area Plan A (See Text) 0 0.1 0.2 0.3 0.4 0.5 Miles CRYSTAL COMPREHENSIVE PLAN PROPOSED FINAL VERSION PAGE 32 #

Figure 2A Existing Land Patterns 2-4

Figure 2B Future Land Use Map 2-10

E Railroad JERSEY AVE Chapter 3: Land Proposed Use Local Trail 3-3 PED Figure 3.1: Existing Pedestrian Land Bridge Use Map 1998 2008 S T A T E H I G H W A Y 1 6 9 CITY OF PLYMOUTH 169 M E N D E L S S O H N A V E N U E 169 1 inch = 1,833 feet Thibault ASSOCIATES Golden Valley May 1999 Medley Hills Hennepin County Radio Lakeview Public Works GOLDEN VALLEY ROAD B E T T Y C R O C K E R Comprehensive Plan 1999-2020 CITY OF NEW HOPE 456 70 B O O N E A V E N U E SOUTH FRONTAGE RD Existing Local Trail Regional Trail Proposed Regional Trail Road Rights-of-Way Municipal Line D R M I L L S B L V D G E N E R A L Urban Planning Development Redevelopment Housing U n i o n P a c i f i c R R Wesley Æÿ 55 394 WISCONSIN AVE D U L U T H S T R E E T 4567 156 Golden Oaks North Hennepin French - Wirth Trail 1 0 T H A V E N U E Brookview Golf Course (Public) Westwood Hills Environmental Education Center W I N N E T K A A V E N U E M E D I C I N E L A K E R O A D W I N N E T K A A V E N U E RHODE ISLAND AVE Pennsylvania Woods O L Y M P I A Library I S L A N D A V E Government Center Post PED Office Brookview R H O D E H A R O L D Western Avenue Marsh PED W E S T E R N S T NEVADA AVE Wildwood Sigurd Olson Elementary School P L Y M O UT H A V E N U E G O L D E N S T A T E B A S S E T T S V A L L E Y R O A D C O U N T R Y C L U B D R I V E A V E N U E C a n a d i a n P a c i f i c Lions A V E N U E 4567 40 L A U R E L A V E N U E LOUISIANA AV S A N D B U R G MARKET ST R R Hampshire Golden Valley Golf Club (Private) H I G H W A Y C R E E K Sandburg Middle School 5 5 R O A D Seeman DOUGLAS DRIVE 4567 102 D O U G L A S D R I V E 102 D U L U T H ST (Cedar Lake-MN Valley) Regional Trail FLORIDA AVE FRONTAGE RD WAYZATA BLVD 4567 66 CROIX Potential South Hennepin Minnesota Center of the Arts G L E N W O O D Valley School Laurel Laurel Avenue Avenue Greenbelt South Cortlawn (King Creek) PED Honeywell Pond CITY OF ST. LOUIS PARK CITY OF CRYSTAL R R P a c i f i c AVE Proposed PED S T R E E T GOLDEN VALLEY ROAD C a n a d i a n Z A N E A V E LINDSAY STREET FRONTAGE RD A V E N U E GOLDEN HILLS DR FRONTAGE RD A V E X E N I A L I L A C D R I V E NORTH LILAC DR Bassett Creek Nature Area Mn/DOT St. Croix Yosemite K I N G I N T E R S T A T E C R E E K Æÿ 100 S T A T E H I G H W A Y 1 0 0 Meadowbrook Elementary School TURNERS CROSSROAD 3 9 4 Gearty Briarwood Nature Area 394 C U L V E R R E G E N T A V E N U E PED Scheid 34TH Briarwood Bird and Wildlife Sanctuary FRONTAGE RD FRONTAGE RD AVENUE Breck School R O A D C a n a d i a n P a c i f i c RR S W E E N E Y Æÿ 100 N O B L E A V E N U E Noble Elementary School G O L D E N Schaper Natchez Stockman V A L L E Y T W I N L A K E G L E N W O O D JUNE AVENUE Rice Lake Nature Area L A K E R O A D U n i o n P a c i f i c RR A V E N U E North Tyrol PED North Hennepin French - Wirth Trail M E A D O W L A N E SOUTH FRONTAGE RD 4567 40 CITY OF GOLDE CITY OF ROBBINSDALE 26TH AVENUE Mary Hills 4567 66 Theodore Wirth Golf Course (Public) Wirth - Memorial way Trail Æÿ 55 W I R T H P A R K W A Y C a n a d i a n Potential Glenview Terrace B A S S E T T S Santa Fe RR C R E E K Trail Theodore Wirth Theodore Wirth Regional Z E N I T H A V E W I R T H L A K E Burlington PLYMOUTH AV P a c i f i c R R Link Northern Bassetts Creek Trail Bassetts Creek Trail X E R X E S A V E N U E CITY OF MINNEAPOLIS GE RE CO IN 1 in Thib ASSO Urba Residential Low Density (0.1 to 5 units per acre) 2714 acres Medium Density (5 to 11.9 units per acre) 201 acres High Density (12 to 20 units per acre) 100 acres Industrial Light Industrial (also includes office) 85 acres Industrial (also includes office) 95 acres I-394 Mixed Use (includes approximately 25 percent 200 acres residential, 5 to 11.9 units per acre) DOUGLAS AVENUE South Tyrol Public & Semi-Public Schools & Religious Facilities 1,375 acres Public Facilities (miscellaneous) 403 acres Semi-Public Facilities (miscellaneous) 305 acres Golden May 19 Commercial & Open Space Railroad 150 acres Office 95 acres Commercial (also includes office) 95 acres Date: May 1999 Source: Golden Valley Comprehensive Plan, 1999-2020 Open Space (public and private ownership) 58 acres Open Water (Based on 2008 aerial photos) 295 acres Wetlands National Wetlands Inventory - not field verified (Minor adjustments made to some wetlands.) 169 acres Existing Local Trail Proposed Local Trail Regional Trail Proposed Regional Trail Pedestrian Bridge Road Rights-of-Way Municipal Line 700 acres City of Golden Valley Comprehensive Plan 2008 2018

Chapter 3: Land Use 3-7 Figure 3.4: Land Use Plan Map 2010 2030 Theodore Wirth Regional (Mpls & Rec Board) Residential Low Density (0.1 to 5 units per acre) Medium Low Density (5 to 11.9 units per acre) Medium High Density (12 to 19.9 units per acre) High Density (20 to 30 units per acre) Commercial Office Retail/Service (also includes office) Industrial Light Industrial (also includes office) Industrial (also includes office) Mixed Use (includes approximately 25 percent residential, 5 to 11.9 units per acre) Open Space (public and private ownership) Schools & Religious Facilities Public Facilities (miscellaneous) Semi-Public Facilities (miscellaneous) Open Water Wetlands (National Wetlands Inventory, Barr Engineering, and HR Green 1999 SWMP - not field verified) Railroad Road Rights-of-Way Private Streets Municipal Line Date: December 4, 2008 Sources: Hennepin County Surveyors Office for Property Lines (2008), DNR, HR Green, Barr Engineering for Wetlands, City of Golden Valley for all other layers City of Golden Valley Comprehensive Plan 2008 2018

Map 1.1: Existing Land Use Citywide Legend Existing Land Use Low-Density Housing (up to 20 DU/acre) Medium-Density Housing (20-50 DU/acre) High-Density Housing (50-120 DU/acre) Very High-Density Housing (>120 DU/acre) Congregate Living Commercial Mixed Use Public/Institutional Cultural/Entertainment Transportation/Communication/Utilities Industrial s/open Space Vacant Centerline Water / Source: City of Minneapolis Created by: Minneapolis Community Planning and Economic Development Department Planning Division Adopted by City Council October 2, 2009 0 2,500 5,000 10,000 15,000 Feet 1-33

Map 1.2: Future Land Use Citywide Legend p h g # * Transit Station Growth Center Major Retail Center Activity Center Neighborhood Commercial Node Industrial Employment District Commercial Corridor Community Corridor Centerline Urban Neighborhood # * Mixed Use Commercial # * Public and Institutional Transitional Industrial Industrial s and Open Space Water p pp # *h gp h g p p p h g p Urban neighborhood contains a range of residential densities, with a limited amount of other uses appropriate in a residential setting. p Text p p For more details on categories, see narrative in land use chapter. h g # * # * * p# / p Source: City of Minneapolis p Created by: Minneapolis Community Planning and Economic Development Department Planning Division Adopted by City Council October 2, 2009 Amended March 22, 2011 Amended August 16, 2011 p # * # * 0 2,500 5,000 10,000 15,000 Feet 1-39

Map 1.1a: Existing Land Use Downtown Sector Legend Existing Land Use Low-Density Housing (up to 20 DU/acre) Medium-Density Housing (20-50 DU/acre) High-Density Housing (50-120 DU/acre) Very High-Density Housing (>120 DU/acre) Congregate Living Commercial Mixed Use Public/Institutional Cultural/Entertainment Transportation/Communication/Utilities Industrial s/open Space Vacant Centerline Water / Source: City of Minneapolis Created by: Minneapolis Community Planning and Economic Development Department Planning Division Adopted by City Council October 2, 2009 0 2,500 5,000 Feet 1-34

Map 1.2a: Future Land Use Downtown Sector #* Legend p Transit Station hg Growth Center #* Major Retail Center Activity Center Neighborhood Commercial Node Industrial Employment District Commercial Corridor Community Corridor Urban Neighborhood Mixed Use Commercial Public and Institutional p Transitional Industrial Industrial s and Open Space p #* p hg p p Water / p hg Urban neighborhood contains a range of residential densities, with a limited amount of other uses appropriate in a residential setting. For more details on categories, see narrative in land use chapter. 0 2,500 5,000 10,000 Feet Source: City of Minneapolis Created by: Minneapolis Community Planning and Economic Development Department Planning Division Adopted by City Council October 2, 2009 Amended March 22, 2011 Amended August 16, 2011 1-40